+ All Categories
Home > Documents > TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to...

TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to...

Date post: 28-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
24
______________________________________________________________________ The Dow Chemical Company Midland, MI 48674 October 29, 2010 Ms. Mary Logan Remediation Project Manager U.S. Environmental Protection Agency, Region 5 77 West Jackson Chicago, IL 60604 Re: Task 1.3 Determination of the Need for Early Response Actions in EU010 and EU011-Revision 1-Settlement Agreement No. V-W-10-C-942 for The Tittabawassee River/Saginaw River & Bay Site Dow Submittal Number 2010-066 Ms. Logan: Attached please find the Task 1.3 Determination of the Need for Early Response Actions in EU010 and EU011-Revision 1. The document is being submitted under AOC CERCLA Docket No. V-W-10-C-942 and Appendix A, Statement of Work Schedule. Please feel free to contact me with any questions or concerns. Sincerely, The Dow Chemical Company Todd Konechne Project Coordinator cc: Al Taylor, MDNRE Diane Russell, U.S. EPA Joseph Haas, U.S. Fish and Wildlife Steve Lucas, Dow Peter Wright, Dow Greg Cochran, Dow
Transcript
Page 1: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

______________________________________________________________________ The Dow Chemical Company Midland, MI 48674 October 29, 2010 Ms. Mary Logan Remediation Project Manager U.S. Environmental Protection Agency, Region 5 77 West Jackson Chicago, IL 60604 Re: Task 1.3 Determination of the Need for Early Response Actions in EU010

and EU011-Revision 1-Settlement Agreement No. V-W-10-C-942 for The Tittabawassee River/Saginaw River & Bay Site

Dow Submittal Number 2010-066 Ms. Logan: Attached please find the Task 1.3 Determination of the Need for Early Response Actions in EU010 and EU011-Revision 1. The document is being submitted under AOC CERCLA Docket No. V-W-10-C-942 and Appendix A, Statement of Work Schedule. Please feel free to contact me with any questions or concerns. Sincerely, The Dow Chemical Company

Todd Konechne Project Coordinator cc: Al Taylor, MDNRE

Diane Russell, U.S. EPA Joseph Haas, U.S. Fish and Wildlife Steve Lucas, Dow Peter Wright, Dow Greg Cochran, Dow

Page 2: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Task 1.3 Determination of the Need for Early Response Actions in EU010 and

EU011The Tittabawassee River/Saginaw River & Bay Site

Prepared by: The Dow Chemical Company

Date: October 29, 2010

Dow Submittal Number 2010.066Revision 1

Page 3: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Contents Page

1  Introduction 1 1.1  Background 1 1.2  Task 1.3 Objectives 1 

2  Summary of Existing Data and Information 2 

3  Summary of Previous and Ongoing Work 3 

4  Task 1.3 Characterization and Assessment Process 4 4.1  Property Owner Notification Process 4 4.2  Characterization and Assessment of EU Properties 4 4.3  Determination for Early Mitigation Measures Prior to Segment-Specific Work, Task 1.4 5 

5  Task 1.3 Characterization and Assessment Results 6 

6  Identified Data Gaps 7 

7  Proposed Treatment for Identified Task 1.4 Areas 8 

8  Proposed Task 1.4 Schedule 9 

List of Tables

Table 1: List of EU 010 and 011 Properties Table 2: Task 1.3 Results Summary Table

List of Figures

Figure 1: Exposure Unit Location Map Figure 2: EU010 Figure 3: EU011

Appendices

Appendix A: Property Inspection Questionnaire

Page 4: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

ACRONYMS AND ABBREVIATIONS

AOC Administrative Order on Consent

EE/CA Engineering Evaluation/Cost Analysis

EPA U.S. Environmental Protection Agency

EU exposure units

FS feasibility study

GPS Geographic Positioning System

IRA Interim Response Activities

DNRE Department of Natural Resources and Environment

RCRA Resource Conservation and Recovery Act

SOW statement of work

Page 5: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

1

1 Introduction 1.1 Background

This Task 1.3 Report characterizes and determines the need for early response actions in exposure units (EUs) EU010 and EU011. This report was prepared in accordance with the requirements contained in Section IX (Work To Be Performed), Paragraph 21.a. of the Administrative Settlement Agreement and Order on Consent (AOC) for The Tittabawassee River/Saginaw River & Bay Site (Site) (Settlement Agreement No. V-W-10-C-942), and Section 1 of the Statement of Work (SOW, Attachment A of AOC), effective January 21, 2010.

The draft Task 1.1 Technical Memorandum was submitted to the U.S. Environmental Protection Agency (EPA) and the Michigan Department of Natural Resources and Environment (DNRE) (collectively, the Agencies) on March 22, 2010 to meet the requirement of Section 1.1 of the SOW. The AOC/SOW required that the Task 1.1 memorandum propose whether an identified area would be sequenced to start in Task 1.2, 1.3, or 1.4. Task 1.2 addresses areas where additional data are needed to complete the Task 1 evaluation. Task 1.3 addresses areas that require assessment to complete the Task 1 evaluation (including review of data collected under Task 1.2) to determine whether areas under consideration warrant an early response. Finally, Task 1.4 evaluates potential alternative response actions for those EUs and/or properties targeted (either in Task 1.1 or 1.3) for possible early action. All EU10 and EU11 areas specified in the Task 1.1 Technical Memorandum were sequenced into one or more of the three subtasks.

On May 3, Dow received comments from the Agencies on the Task 1.1 Technical Memorandum and partial approval to proceed with Task 1.3 activities in EU010 and EU011. All EU010 and EU011 parcels assessed during Task 1.3 are listed in Table 1. Locations of EU010 and EU011 are presented in Figures 1-3.

1.2 Task 1.3 Objectives As set forth in the SOW, the objective of Task 1.3 is to complete the characterization and assessment of Task 1 areas and to identify the potential need for early mitigation measures under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010 and EU011, and property parcels within those EUs. The AOC stipulates that the Task 1.3 Report be submitted to the Agencies within 60 days after approval of the Task 1.1 Technical Memorandum, and this report fulfills that requirement.

Page 6: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

2

2 Summary of Existing Data and Information Data and information used in the Task 1.3 assessment and characterization of EU010 and EU011 were obtained from the following sources.

• Final GeoMorph Site Characterization Report, Tittabawassee River and Floodplain Soils, Midland, Michigan. Ann Arbor Technical Services, Inc. June 15, 2009

• Electronic data from EPA sampling events at EU properties in 2008

• P1/P2 Action Database for EU010 and EU011

• The EU010 and EU011 boundaries and the property boundaries for parcels within EU010 and EU011 that were included in the Task 1.1 Technical Memorandum

The specific properties and early response activities previously conducted in EU010 and EU011 are discussed in Section 3.

Page 7: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

3

3 Summary of Previous and Ongoing Work Dow and the Agencies have been performing early response actions to address residential properties located within the 8-year Tittabawassee River floodplain. Interim Response Activities (IRAs) were conducted for the Tittabawassee River floodplain under the regulatory authority of the terms of Dow’s Hazardous Waste Operating License (License) as issued under the authority of Michigan’s Part 111. The 8-year floodplain is defined by the March 2004 flood. Priority areas were identified where floodwater surrounded or approached residential properties during the March 2004 flood event.

Residential properties along the Tittabawassee were subdivided into Priority 1 (P1) and Priority 2 (P2), based on the proximity of March 2004 flood waters to residential structures, to sequence the implementation of mitigation measures under the State-approved IRA Work Plan, dated January 20, 2005. Dow attempted to contact all P1 and P2 property owners to offer an on-site visit by Dow representatives to evaluate mitigation options. Mitigation activities included the installation of exposure control barriers for exposed soil areas actively used by an owner, movement/replacement of gardens and flower beds to reduce flooding frequency, and house cleaning.

Under the approved IRA, 13 P1/P2 property owners in EU010 and EU011 accepted mitigation activities. Following subsequent flood events, owners of P1 and P2 properties have continued to be offered mitigation support, by request of the owners, including replacement or repair of previously installed mitigation measures that have been damaged or removed by the flood event.

Page 8: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

4

4 Task 1.3 Characterization and Assessment Process Property assessments for EU010 and EU011 were conducted starting June 16 2010. The assessments focused on the portions of each property located within the 8-year flood boundary for these properties. The furan/dioxin levels outside of the 8-year boundary average between 10 ppt to 31 ppt within EU010 and EU011. Additionally, areas outside the 8-year flood boundary that where identified as potentially having soils relocated from within the floodplain were included in the land use assessments.

4.1 Property Owner Notification EU010 and EU011 residents were notified of the Task 1.3 land use assessment activities prior to the start of the Task 1.3 field work. Initial notifications were sent by EPA in a letter dated June 3, 2010. This letter explained the rationale for EU identification and also explained the objectives of associated Task 1 activities. A Dow representative then telephoned each EU010 and EU011 resident to schedule the Task 1.3 property land use assessment visit. A certified letter was sent to each resident who did not respond to this initial contact. Residents who did not respond to the certified letter were visited in person at their EU property. As of August 2, 2010, land use assessments have been conducted at 29 of the 44 EU010 and EU011 properties. Nine properties refused Task 1.3 activities, and no response was received from 6 properties. Table 1 documents the attempts to contact each resident to conduct a property land use assessment and the responses received from each residential property owner. Dow will submit a separate report documenting the best efforts that were used to attempt completion of Task 1 work and land use assessments of all properties within these EUs.

4.2 Characterization and Assessment of EU Properties The characterization and assessment of EU properties involved property visits and interviews with property owners or residents to document existing land use activities and to evaluate property conditions in the floodplain. Each property visit was completed within a single day. Each property was visited by two technicians to characterize and assess the property.

The characterization and assessments included:

• Documenting an interview with the property owners or renters focusing on existing land use activities

• Review of previous interviews and site visit information

• Property inspection

• Documentation of land use features, exposed soil, and other potential exposure locations on a site map

• Geographic Positioning System (GPS) survey of land use features and exposed soil areas locations

• Photographs of the property, land use features, and exposed soil areas

• Evaluation of previous P1/P2 Actions

Page 9: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

5

The completed property use questionnaire, maps developed based upon information collected during the site inspection, and property photos are maintained in Dow’s file. The files will be retained in accordance with section XV of the Settlement Agreement (Retention of Records) and the Agencies will have access to the supporting information in accordance with Paragraph 51 of the Settlement Agreement (Data Availability). An example of the questionnaire utilized during the property inspections in provide in Appendix A.

Land use features and potential exposure locations typically included trails, lawns with exposed soil areas, fire pits, play areas, and gardens. Determination for Early Mitigation Measures Prior to Segment-Specific Work, Task 1.4

The identification of properties for early mitigation measures prior to segment-specific work building upon and incorporates certain aspects of the previously established P1/P2 IRA criteria, which identified the potential need for interim response activities on properties flooded by the March 2004 flood event that represents a 8-year flood event. This was based on the presumption that those properties contain furan/dioxin levels above the IRA action level unless otherwise established by sampling. Section II and Exhibit A of the SOW specify that the P1/P2 IRAs will transition to the Settlement Agreement. Therefore, determinations under Task 1 are intended to be consistent with those previous response actions and build upon the approach. The 2010 Task 1.3 characterization and assessment process, which established detailed property-specific information including current land use activities and the presence of exposed soils builds upon presumptive P1/P2 IRA approach, to establish the criteria used to identify EU010 and EU011 properties for sequencing into Task 1.4. In summary, the criteria for including properties or portions of properties, for potential early action under Task 1.4 are: the presence of exposed soil; and areas actively used by the residents of the property; and generally within the 8-year floodplain. In addition, properties that meet the Task 1 trigger criteria but have previously received adequate IRA exposure control mitigation measures are also sequenced into Task 1.4 for potential periodic maintenance. The Task 1.3 characterization and assessments provided a thorough approach to contacting and scheduling property visits and documenting existing land use and conditions within EU010 and EU011. This detailed assessment which builds on aspects of the previously-developed P1/P2 approach, provides a robust process for evaluating the properties against the criteria specified above, identifying areas for consideration under Task 1.4 for the Tittabawassee River EUs.

Page 10: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

6

5 Task 1.3 Characterization and Assessment Results The Task 1.3 characterization and assessment results for EU010 and EU011 are summarized in Table 2. The areas within EU010 and EU011 that are proposed for early action under Task 1.4 also are listed in Table 2. Proposed mitigation methods for the areas identified in Table 2 are discussed in Section 7 of this report, and will be evaluated in an EE/CA or FS following Agency approval of this report and the Agencies’ determination of the need for mitigation measures in the EU010 and EU011 parcels.

Several properties within EU010 and EU011 were not recommended for sequencing into Task 1.4 because the criteria presented in Section 4.3 are not currently met. For these properties, Dow, working with the Agencies, will develop an approach to periodically assess whether conditions have changed at those properties that may warrant additional Task 1.4 evaluations. It is anticipated that this periodic assessment may include: Dow and/or the Agencies inquiring about changes to property conditions and use; contact with new owners if property is sold; and/or contact initiated by the property owners.

Page 11: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

7

6 Identified Data Gaps No data gaps were identified during the Task 1.3 characterization and assessment activities at EU010 and EU011.

Page 12: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

8

7 Proposed Treatment for Identified Task 1.4 Areas The AOC states that the Task 1.3 report shall, at a minimum, identify potential mitigation measures focusing on exposure control for areas where mitigation measures are determined to be necessary in advance of the Segment-Specific Response Proposal. Potential mitigation measures are summarized below:

Exposure Control Barriers

Dow anticipates that most Task 1.4 mitigation measures can be accomplished through the installation of exposure control barriers. An exposure control barrier provides immediate protection to the resident from potential exposure to soil contaminants, should they be present at the property (as discussed above, the P1/P2 process presumed the potential for soil with elevated dioxin/furan concentrations based on the extent of the March 2004 flood). Exposure control barriers can be designed to suit a range of conditions. One example of an exposure control barrier successfully used in the Tittabawassee River floodplain is the addition of a gravel layer added to floodplain trails in EU002.

Movement of Land Use Feature

There may be a situation where a particular land use feature, such as a garden or playground equipment, may be appropriately moved out of the floodplain to reduce or eliminate potential exposure to floods.

Maintenance of Exposure Control Measures

Maintenance of exposure control activities will be initiated by Dow, but may also include self-reporting on the part of the property owners.

All Task 1.4 mitigation measures will be selected, designed, and installed in cooperation with each resident.

Page 13: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

9

8 Proposed Task 1.4 Schedule Following the completion of the Task 1.3 property use assessments a total of 16 properties from EU10 and EU11 are being sequenced into Task 1.4. The AOC stipulates that a Task 1.4 EE/CA or feasibility study (FS) Report be submitted to the Agencies for those areas sequenced into Task 1.4 within 120 days of receiving Agency approval of this Task 1.3 assessment report. It should be noted, that this schedule does not represent the schedule for those Task 1.4 areas identified in the Task 1.1 Tech Memorandum partially approved on May 3.

Page 14: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

List of Tables Table 1: List of EU 010 and 011 Properties Table 2: Task 1.3 Results Summary Table

Page 15: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Table 1Summary of Best Efforts

EU10 and EU11

Telephone Call Certified Letter Home Visit

EU10 Properties10-01 6/18/2010 6/24/2010

10-02 6/18/20106/28/10 7/9/2010 7/15/2010 7/20/2010

10-03 6/18/2010 6/24/201010-04 6/18/2010 Not Yet Completed

10-05 6/18/20106/21/10 6/30/2010

10-06 6/18/20106/28/10 6/30/2010

10-07 7/9/2010 7/15/20107/21/2010 Not Yet Completed

10-08 6/18/20106/28/10 7/6/2010

10-09 7/7/2010 7/9/2010 7/15/20107/21/2010 Not Yet Completed

10-10 6/18/20106/28/10 Not Yet Completed

10-11 6/18/20106/28/10 7/8/2010

10-12 6/18/2010 7/9/2010 7/15/2010 Not Yet Completed

10-13 7/9/2010 7/15/20107/21/2010 Not Yet Completed

10-14 7/15/20107/21/2010 Not Yet Completed

10-15 7/9/2010 7/15/20107/21/2010 Not Yet Completed

10-16 7/12/2010 7/9/2010 7/15/2010

EU11 Properties11-01 6/18/2010 7/9/2010 7/15/2010 Not Yet Completed11-02 6/18/2010 6/24/2010

11-03 6/18/20106/28/10 7/8/2010

11-04 7/9/2010 7/20/201011-05 6/18/2010 7/13/2010

11-06 6/18/20106/28/10 7/9/2010 7/15/2010 7/20/2010

11-07 6/18/20106/28/10 6/29/2010

11-08 6/18/2010 6/23/201011-09 6/18/2010 6/23/201011-10 6/18/2010 6/29/201011-11 6/18/2010 6/29/2010

11-12 6/18/20106/28/10 Not Yet Completed

11-13 6/18/2010 Not Yet Completed11-14 7/21/2010 7/9/2010 7/14/2010 Not Yet Completed11-15 7/21/2010 7/9/2010 7/14/2010 Not Yet Completed11-16 7/16/210 7/9/2010 7/14/2010 Not Yet Completed

Best Efforts ActivitiesTask 1

Property #Home Visit

Completion Date

Page 16: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Table 1Summary of Best Efforts

EU10 and EU11

Telephone Call Certified Letter Home Visit

Best Efforts ActivitiesTask 1

Property #Home Visit

Completion Date

11-17 6/18/20106/28/10 7/9/2010 7/15/2010 7/20/210

11-18 6/18/20106/28/10 7/13/2010

11-19 6/18/20106/28/10 7/13/2010

11-20 6/18/2010 Not Yet Completed

11-216/18/2010

6/28/107/6/10

7/15/2010

11-22 7/9/2010 7/14/2010 7/28/2010

11-236/18/2010

6/28/107/6/10

7/9/2010 7/15/2010 7/20/210

11-24 6/18/20106/28/10 7/21/2010

11-25 6/18/2010 6/24/2010

11-26 6/18/20106/28/10 7/8/2010

11-276/18/2010

6/28/107/6/10

7/15/2010

11-28 1

6/18/20106/28/107/6/10

7/15/2010

1Property was split from 11-21 based upon information obtained during the property assessment

Page 17: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Table 2Summary of Task 1.3 Assessment Activities

EU010 and EU011

Property Use within Floodplain

Exposed Soil Area

Previous Mitigation Measure

Adequate based upon Current

Use

Meets the P1/P2

Presumptive Criteria

EU010 Properties10-01 Yes Yes NA Yes Yes10-02 Yes Yes NA Yes Yes10-03 Yes No Yes Yes Yes2

10-04 Assessment Not Yet Completed10-05 Yes Yes NA Yes Yes10-06 Yes No NA Yes No10-07 Assessment Not Yet Completed10-08 Yes No Yes Yes No10-09 Assessment Not Yet Completed10-10 Assessment Not Yet Completed10-11 No No NA Yes No10-12 Assessment Not Yet Completed10-13 Assessment Not Yet Completed10-14 Assessment Not Yet Completed10-15 Assessment Not Yet Completed10-16 No No NA No No

EU011 Properties11-01 Assessment Not Yet Completed11-02 No No NA Yes No11-03 Yes Yes NA Yes Yes11-04 Yes Yes NA Yes Yes11-05 Yes Yes NA Yes Yes11-06 Yes Yes NA Yes Yes11-07 Yes Yes No Yes Yes11-08 Yes No NA Yes No11-09 Yes Yes Yes Yes Yes11-10 Yes Yes NA Yes Yes11-11 Yes Yes NA Yes Yes11-12 Assessment Not Yet Completed11-13 Assessment Not Yet Completed11-14 Assessment Not Yet Completed11-15 Assessment Not Yet Completed11-16 Assessment Not Yet Completed11-17 Yes Yes NA Yes Yes11-18 No Yes NA Yes No11-19 No Yes NA Yes No11-20 Assessment Not Yet Completed11-21 Yes Yes NA Yes Yes11-22 Yes Yes NA Yes Yes11-23 Yes Yes NA Yes Yes11-24 Yes Yes NA Yes Yes11-25 Yes Yes NA Yes Yes11-26 Yes Yes NA Yes Yes11-27 Yes Yes NA Yes Yes

11-28 1 Yes Yes NA Yes Yes2

1Property was split from 11-21 based upon information obtained during the property assessment 2 Property with areas outside the 8-year flood boundary that where identified as potentially having soils relocated from within the floodplain.NA-Not applicable based upon non-participation in IRA activities or only the completion of interior

IRA activities

Property # Sequence to Task 1.4

Task 1.3 Assessment Criteria Evaluation

Page 18: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

List of Figures Figure 1: Exposure Unit Location Map

Figure 2 : EU010 Figure 3 : EU011

Page 19: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

!.

!.

EU010EU011

Midland

Saginaw

Bay City

Shields

Freeland

Zilwaukee

AuburnEssexville

Lake Huron (Saginaw Bay)

BAY

SAGINAW

MIDLAND

Figure 1Exposure UnitLocation Map!. EU Locations

CountiesDow Midland Plant

Page 20: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

#* #*#* #* #*

#* #* #* #* #*#* #* #* #*#* #*#* #*#* #* #* #* #*

#* #* #* #* #* #*#* #* #*#*#* #* #* #* #* #*#*#* #* #* #*

#*#* #* #*

#* #*

#*#*

#*

#*

#*#*#*#* #*#* #* #*#* #*#* #*

#* #*#* #* #* #*#*

#*#* #* #* #*

#*#* #*#* #* #* #* #*

#* #* #* #*#* #* #*

#* #* #* #*

#* #* #*

#*#* #*

#* #* #*

#* #* #*

#* #* #*#*

#* #*

#* #* #*

#*

#*

#*

#* #* #*

#* #* #*

#* #* #* #*#*

#*#*

#*

#*

#*

#*

#*#*

#*#*#*

#* #*#* #* #*#*

#* #* #*

#* #*#* #*

#* #*#*

#*

9P2-N-17

13P2-N-01

10P2-N-13

10P2-N-14

10P2-N-10

10P2-N-01

9P2-A-10

10P2-A-08

9P2-A-16

9P2-N-15

9P2-N-13

10P2-A-11

10P2-N-12

9P2-N-14

9P2-N-18

9P2-N-12

9P2-A-11

10P2-N-09

10P2-N-0710P2-N-0610P2-A-0510P2-N-0410P2-A-0310P2-N-02

13P2-N-05

13P2-N-03

13P2-N-02

10P2-N-16 10P2-N-15

Polygon1227

15

10

31

50

240

48

1272

1001

120

15

2150

3151

31

1407

42

763

442

1407(Proxy)

325

2042(Proxy)

18

660(Proxy)

914(Proxy)

4400

914(Proxy)

2042

44

2600(Proxy)

763

150

2500

3267

2042(Proxy)

914

365

3151

425

914(Proxy)

1800

1407(Proxy)

365

914(Proxy)

750

2300

440(Proxy)

922

442

240(Proxy)

2042(Proxy)

914

788

91011800

914(Proxy)

914(Proxy)

115

2600(Proxy)

660

375

2150(Proxy)

2500

1407(Proxy)

2500(Proxy)

2042(Proxy)

730

914(Proxy)

914(Proxy)

440(Proxy)

914(Proxy)

810

1400

420

2500(Proxy)

10(Proxy)

440(Proxy)

750(Proxy)

914(Proxy)

914(Proxy)

River

Midland

Tittabawassee

Thom

as

Gar

field

Appl

e

Woo

dshi

re

Thom

as

DDEE

EU010

EU009

EU013

CCDD

Tittabawassee RiverSample LocationsTEQ Surface (ppt)

<90

90 - 1000

1000 - 5000

5000 - 10000

>10000

EPA Sample LocationsTEQ (ppt)

#* <90

#* 90 - 1000

#* 1000 - 5000

#* 5000 - 10000

#* >10000

SAC

EU Boundary

Parcels

8 Year Flood Zone

100 Year Flood Zone

Reach

Roads ³1 inch = 200 feet

10

Title: Task 1 Figures - Revised 6/18/ 2010

DRAFT

Page 21: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

#* #*#* #* #*

#* #* #* #* #*#* #* #* #*#* #*#* #* #* #* #* #* #*

#* #* #* #* #* #*#* #* #*#*#* #* #* #* #* #*#*#* #* #* #*

#*#* #* #*

#* #*

#*#*

#*

#*

#*#*#*#* #*

#* #* #*#* #*#* #*

#* #*#* #* #* #*#*

#*#* #* #* #*

#*#* #*#* #* #* #* #*

#* #* #* #*#* #* #*

#* #* #* #*

#* #* #*

#*#* #*

#* #* #*

#* #* #*

#* #* #*#*

#* #*

#* #* #*

#*#*

#*

#* #* #*

#* #* #*

#* #* #* #*#*

#*#*

#*

#*

#*

#*

#*#*

#*#*#*

#* #*#* #* #*#*

#* #* #*

#* #*#* #*

#* #*#*

#*

13P2-N-02

11P2-N-21

11P2-N-27

11P2-N-14

11P2-A-07

11P2-N-20

11P2-A-06

11P2-N-13

11P2-N-01

11P2-A-09

11P2-A-22

11P2N-1911P2-N-10

11P2-A-2511P2-N-24

11P2-N-26

11P2-N-18

11P2-N-23

11P2-A-17

11P2-N-02

11P2-A-0511P2-N-03

11P2-N-04

11P1-N-12

11P1-A-0811P1-N-15

11P1-A-16

11P1-N-11

13P2-N-04

11P2-N-28

31

50

50

3470

155

5022

310

565

300

1417

31

1451

10186

343

480

788

5050

1480

650

1300

1059

660(Proxy)

1001

1000

600

2150

763

2435

790

290

432

2150

290

2500

2500(Proxy)

220

590

284

750

2435(Proxy)

1001

1001

2850

1600

528

240

835

2500(Proxy)

1807

1300(Proxy)

490

4300

240

2500(Proxy)

1300(Proxy)

660(Proxy)

660(Proxy)

River

Midland

Hornbeam

Gro

ve

Rica

White Beech

Apple Mountain

LeckieAp

plesh

ire

EEFF

FFGG

EU011

EU013

Tittabawassee RiverSample LocationsTEQ Surface (ppt)

<90

90 - 1000

1000 - 5000

5000 - 10000

>10000

EPA Sample LocationsTEQ (ppt)

#* <90

#* 90 - 1000

#* 1000 - 5000

#* 5000 - 10000

#* >10000

SAC

EU Boundary

Parcels

8 Year Flood Zone

100 Year Flood Zone

Reach

Roads ³1 inch = 200 feet

11

Title: Task 1 Figures - Revised 6/18/ 2010

DRAFT

Page 22: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Appendices Appendix A: Land Use Questionnaire

Page 23: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Property Use Assessment   

Parcel Number:    Date of Survey:   

Owner Name:    Field Staff:   

Address:    City, State, Zip:   

Resident/Contact:    Owner Phone #:   

Relation to owner:    Contact Phone #: 

 

 

Section 1 Who lives at the residence:  1.  How many people live at this residence? Age?   

  

2.  How long have you and your family lived at this residence?    

Section 2:  General information about the floodplain  1.  Has the floodplain always been the way it is now or have you made changes to it 

since you lived here? (example: changes to the land elevation, tree clearing)      2.  Are you aware of any soil ever being relocated from the floodplain to other areas 

of your property?  If so, can you tell us where on your property?     

   

Page 24: TASK 1.3 DETERMINATION OF THE NEED FOR EARLY RESPONSE ... · under Task 1.4, prior to segment-specific work. This Task 1.3 report focuses on the Agency approved EUs, namely EU010

Section 3:  Property Use in the floodplain  This section is related to the type of activities you do and your family members do in the floodplain and frequency.   1.   Do you have walking paths in the floodplain? When you walk into the floodplain, 

do you typically use walking paths? How often do you use it and how often do you not use the walking path? 

   2.   Complete Table.  

OUTDOOR AREA  Yes/No  Frequency/Additional Information Yard Work (mowing, raking, etc.) 

Children’s play 

Flower gardening 

Vegetable gardening  

Wood Cutting 

Hunting 

Fishing 

Lawn sports/hobbies 

Fire Pit 

Picnic Table 

Other 

 3.  Do you ever go into the floodplain in the winter months?  How frequently?    4.  Are there any other activities you and your family members do on the 

floodplain? 


Recommended