Task 2.3 Operations Report. Pedro Henrique Rausch Bello Leader of Task 2.3 Instituto de Física - UFRJ Second Latin American EELA Workshop Itacuruçá, 24.06.2006. Task 2.3 Status – WS1. Pilot Testbed Operational (7 sites) Started implementation of User Support System UFRJ Roc Site - PowerPoint PPT Presentation
29
IST-2006- 026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America Task 2.3 Operations Report Pedro Henrique Rausch Bello Leader of Task 2.3 Instituto de Física - UFRJ Second Latin American EELA Workshop Itacuruçá, 24.06.2006
Transcript
Page 1: Task 2.3 Operations Report

IST-2006-026409 www.eu-eela.org

E-infrastructure shared between Europe and Latin America

Task 2.3 Operations Report

Pedro Henrique Rausch Bello

Leader of Task 2.3

Instituto de Física - UFRJ

Second Latin American EELA Workshop

Itacuruçá, 24.06.2006

Page 2: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 2IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Task 2.3 Status – WS1

• Pilot Testbed Operational (7 sites)

• Started implementation of User Support System

• UFRJ Roc Site

• Running LCG 2.7

• Monitoring tools setup

Page 3: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 3IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

EU-LAC Meeting

• April 28 – 29, right after WS1

• EELA set up a demonstration in RedCLARA’s stand

• Demonstrations were conducted for several people

Page 4: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 4IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Pilot Testbed Status during WS1

• Plus: INFN Catania: CE + SE + WNs

Page 5: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 5IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Pilot Testbed Present Status (1)

• Plus: INFN Catania: CE + SE + WNs

• UNAM – testing phase done – Being integrated to the production service

• REUNA – User Interface

Page 6: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 6IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Pilot Testbed Present Status (2)

• From the last slide we see the integration of new sites is very slow

• WHY?

• CEDERJ has peculiar characteristics • CSIC is undergoing a major facility relocation.

Integration is expected to begin in two weeks• UDEC has issues with the OS needed by the

middleware• UNAM was slow to begin the integration process (two

months between first contact and actual start of work)

Page 7: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 7IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Resource Centre Integration

Site Middleware Version Date of integration Person in charge Contact OnlineUFRJ LCG 2.7 10-01-2006 Pedro Rausch YESUFF LCG 2.7 15-01-2006 Vinod Rebello YES

CIEMAT LCG 2.7 05-01-2006 Fernando Blanco

UPV LCG 2.7 12-04-2006 Ignacio BlanquerCSIC       Daniel Cano  ULA gLite 3.0 12-04-2006 Vanessa Hamar YESUNAM LCG 2.7 21-06-2006 Luciano Diaz YESUDEC       Claudio Baeza  REUNA gLite (UI) 3.0 22-05-2006 Juan Carlos Martinez YESINFN LCG 2.7 05-01-2006 Grid-Prod@CT YESCEDERJ       Maurício Gouvêa  UNLP          

SENAHMI

UTFSM

CUBAENERGIA

LIP

CERNUC          

Page 8: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 8IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

RC Integration Process (1)

• The Procedure for integration of a new RC is simple:

1. The Site manager contacts the Task 2.3 Leader (Pedro Rausch – [email protected]) announcing the desire to integrate his resources:

2. The following information MUST be sent:• Description of Hardware Resources• Network Address (not individual hosts!!)• If the site is willing to run jobs from VOs other than EELA (such

as HEP and BIOMED)

3. T2.3 Leader sends a proposed installation plan – in the case of new sites, or an acceptance notice for inclusion in the case of already running sites

Page 9: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 9IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

RC Integration Process (2)

4. After installation, the site undergoes a testing phase, which lasts for up to two weeks

5. After test validation the site is considered part of the Pilot Testbed

Page 10: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 10

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

User Support System

• Fully operational – http://support.eu-eela.org/

• Enlisted support personnel is urged to check it regularly

Page 11: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 11

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Middleware Upgrade Plan

• All EELA dedicated RCs are expected to upgrade to gLite 3.0 in the following months

• First, UFRJ and CIEMAT will maintain both infrastructures for as long as necessary

• Running sites will receive notification when the Testbed is ready for site migration

• REUNA (UI) and ULA are already running gLite 3.0

Page 12: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 12

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

LHCb Integration Status

• LHCb is able to run production jobs both at CIEMAT and UFRJ

• Additional sites can be added without effort

Page 13: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 13

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

ALICE Integration Status

• ALICE integration depends on the installation of VO-BOXes

• Currently INFN-CATANIA is able to run production jobs

• EELA-UNAM is in the process of installing a VO-BOX

Page 14: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 14

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Security (1)

• WP2 management is setting up the Security Body

• Task 2.3 Leader has been nominated Security Officer Pro-Tempore

• We are currently searching for the definitive subject

Page 15: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 15

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Security (2)

• Site level security is a difficult subject

• Trying to define a minimum denominator

• We have to profit from the size of the pilot Testbed, and the well known relationship between sites

• Some sort of automation is in the works

Page 16: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 16

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Monitoring (1)

• Currently running tools:– GridICE– GSTAT– Real Time Monitor

• Waiting deployment:– Site Functional Tests

Page 17: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 17

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Monitoring (2)

• WP2 needs to set up a distributed monitoring team in order to alleviate some sites and provide a larger time coverage – Grid Operator on Duty

• Will begin searching for candidates soon

Page 18: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 18

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

EELA Middleware – Description

• Consists of all additions to standard middleware + EELA specific applications

• Provides a well defined release schedule, facilitating RC planning

• Assures that software installed is installed on sites in a homogeneous manner

Page 19: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 19

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

EELA Middleware – Planning

• Quarterly releases– M7, M10, M13, M16, M19, M22, “M25”

• Software candidate for inclusion must be presented to the WP2 and WP3 Managers, and to Task 2.3 Leader on the first month of the previous trimester;

• Will be installed immediately on a Pre-production site

• After testing, will be included on the next middleware release

Page 20: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 20

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

EELA Pre-Production Testbed

• A pre-production service will be deployed on selected sites

• This service will be used for the testing of applications candidate for inclusion on EELA’s middleware releases

Page 21: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 21

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Operations Meeting

• Task 2.3 needs to set up an operations meeting with ALL personnel responsible for the running of EELA Resource Centres

• SKYPE will be used as communication media

• Small individual meetings every other week

• Group meetings as needs dictate

Page 22: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 22

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Mailing Lists

• Resource Centre personnel must subscribe to:

• allmembers;

• wp2;

• task2.3;

• grid-prod; Do’t forget this one!!!!

Page 23: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 23

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Task 2.3 Action Review (1)

• Task 2.3 Actively participated in the preparation of the EELA Grid Acceptable Use Policy (EELA GAUP)

• Input and writing of relevant sections of Deliverable 2.1.1 (Project Execution Plan) – Everyone involved in WP2 MUST read this document!!

Soon available at: http://documents.eu-eela.org/

• Input for Deliverable 2.4.1 (Network Requirements Report)

• Installation of User Interface in REUNA

Page 24: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 24

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Task 2.3 Action Review (2)

• Upgrade to gLite 3.0 in ULA – Lots of work!!

(Thanks to Vanessa for her patience and hard work)

• Installation of UNAM Resource Centre

(Going into production)

• First Interactions with CEDERJ, CSIC and UNLP

• Security and Monitoring procedures definition

• Planning of day-to-day operational procedures (in progress)

Page 25: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 25

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Open Issues in Task 2.3

• Low engagement from partners (with exceptions)

• Resource Centre integration is very slow:– No previous knowledge– Depends on a handful of people– More engagement would alleviate things

Page 26: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 26

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Partner Resource Commitment

• As stated by Roberto Barbera and Diego Carvalho, we are still a long way from the promised Testbed commitment

• A stronger engagement is needed in order to achieve what’s promised in the Technical Annex

Page 27: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 27

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Work plan until WS3

• Integration of resource centres will continue

• Security– Deployment of Security Staff– Definition of security procedures

• Monitoring– Definition of monitoring team– Deployment of Site Functional Tests

• First release of EELA middleware

Page 28: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 28

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Work plan from WS3 to M13

• Integration of resource centres will continue

• Security– Deployment of security procedures

• Monitoring– Refinement of monitoring procedures

• EELA middleware releases

• Preparation of deliverables D2.3.1 and D2.3.3

Page 29: Task 2.3 Operations Report

Itacuruçá, 2nd LA EELA Workshop, 24.06.2006 29

IST-2006-026409

E-infrastructure shared between Europe and Latin America

www.eu-eela.org

Thanks

• All Resource Centre personnel– Fernando Blanco (CIEMAT) – Vanessa Hamar (ULA)– Everybody at INFN-Catania