+ All Categories
Home > Documents > Task XIX: Micro Demand Response and Energy Savings · Outline of Presentation • Overview of...

Task XIX: Micro Demand Response and Energy Savings · Outline of Presentation • Overview of...

Date post: 10-Jul-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
31
Task XIX: Micro Demand Response and Energy Savings Final Management Report Presented by Linda Hull
Transcript

Task XIX: Micro Demand Response andEnergy Savings

Final Management ReportPresented by Linda Hull

Outline of Presentation• Overview of project

– Objectives and work programme• Task Status Report

– Objectives / Progress for last 6 months– Finance

• Final Management Report– Work Performed– Outputs– Achievements

• Matters for the ExCo– Approval of Final Management Report

Overview of Task XIX

OperatingAgent

Finland Greece UKIndia SpainFrance Nether-lands

VTT Ademe

Task XIX Project Participants

PPC BEE NL Agency REE EA Technology

EA Technology

Task XIX – Summary of objectives

• Demand response and energy saving services in the residential and small and medium enterprise sectors– End-use monitoring and feedback– Time of use pricing– Remote / automatic demand control

• Identifying the business case for demand aggregators / energy saving service providers

Work Plan• Subtask 1: Demand response and energy saving products• Subtask 2: End use demand changes• Subtask 3: Demand response & energy saving delivery

mechanisms• Subtask 4: SME customer costs and benefits• Subtask 5: Residential customer costs and benefits• Subtask 6: Business case estimation

Task Status Report

Objectives / Progress over last 6 months

• Finalise the scenarios to be used. • Obtain the necessary data and information from the Task

Experts on the country specific case studies.• Refine Excel models and produce worked examples.• Write the second report - The Business Case for Micro

Demand Response and Energy Saving.

ALL COMPLETED END MAY 2010

FinanceSubtask Description

(Euros) (Euros)1 Demand response and energy saving products 45,875 40,1412 End user demand changes 54,895 48,0333 Delivery mechanisms 39,025 34,1474 SME costs/benefits 41,640 36,4355 Residential costs/benefits 41,640 36,4356 Business case estimation 42,825 37,472

Project management, ExCo liaison & reporting 48,795 42,696Travel and subsisdence 23,150 20,256

337,845 295,614

Original Budget Revised B

Revised Budget (Euros)

Expenditure to end August 2010 £197,753

Final Management Report

• Work performed• Reports

– Report 1– Report 2– Dissemination of results

• Recommendations

OverviewLessons learnt and conclusions

Work Performed – overview

Jan-

09

Feb-

09

Mar

-09

Apr-

09

May

-09

Jun-

09

Jul-0

9

Aug-

09

Sep-

09

Oct

-09

Nov

-09

Dec

-09

Jan-

10

Feb-

10

Mar

-10

Apr-

10

May

-10

Experts Meetings 15th & 16th January 11th & 12th May 8th & 9th October 8th & 9th FebruaryChester, UK Nice, France Barcelona, Spain Chester, UK

Subtask 1Questionnaire

Market information

Subtask 2Questionnaire

End use consumption

Subtask 3

Report 1Draft 1 Draft 2 Final

Subtasks 4 to 6

Report 2Draft 1 Final

Report 1:Micro Demand Response and Energy Saving Products:

Definition of Requirements & Options for Effective Delivery

Micro Demand Response and Energy Saving Products: Definition of Requirements & Options for Effective Delivery

• Impact of market structure– Opportunities (drivers) for demand response and energy savings– The way participants interact with one another (barriers)

• Opportunities for demand response and energy savings– Types of loads – suitability for different products/services– Difficult to assess due to lack of data – particularly for SMEs

• Products and services– Advantages / disadvantages considered

• Review of pilots and case studies– Results wide ranging

• Technical architecture requirements– The minimum requirements

Residential energy end uses

0% 20% 40% 60% 80% 100%

Finland

France

Greece

Netherlands

Spain

UKHeatingHot WaterA/CLightingCold AppliancesWet AppliancesConsumer ElectronicsICTCookingSaunasCar HeatingFansOther

0%

10%

20%

30%

40%

50%

60%

Finland France Greece Netherlands Spain UK

% o

f Res

iden

tial C

onsu

mpt

ion

interruptibleschedulablehybridconvenience

Products

  Demand Side Management

Indirect

Load level(amount of energy consumed)

Load Shape (pattern of energy consumption)

Sustained

(long term)

Demand response

TOU tariffs

?

Improved building

standards

Incentive Based

Process / behaviour

change

Improved appliance efficiency

Other Block tariff

Reward scheme

Incentive based

Critical P eak

Pricing

DynamicTOU

pricing

Semidynamic

TOU

Direct load

controlDirect

End Use Monitoring and Feedback

Load limiting

Energy Saving

PRODUCTS

MECHANISMS

TOU tariffs

Static TOU pricing

Processbehaviourchange

Flexible (short term

Technical Architecture

• Controller• Consumer Interface• Response Monitor (Meter)• Internal Communication• Communications Gateway• External Communication

Communications Gateway

Consumer Interface

kWh

£/$/€

CO2

Response Monitor

kWh

kW

Controller 1

Controller 2

Controller 3

End Use Demand 2

Generator / Energy

Storage 1

End Use Demand 1

Response Monitor

kWh

kW

Internal CommunicationExternal Communication

Minimum Functionality ExampleDR – Dynamic Time-of-Use TariffsController Consumer Interface Internal Communications

*Trigger Mode: Manual [Automatic]

*Demand Modification: On/Off [& Modulated]

*Location: General Purpose Outlet (GPO) [Central Home

Energy Management System]

*Information: Tariff Price & Historical consumption

*Notification: Meter Display [VDU+Moblile/Pager] & Bills

*Notification Frequency: Half-houly/Hourly & Billing Cycle (monthly,

quarterly, annually)*Input: None [Consumer Preference

Input]

None[*Signal Flow: Duplex (Two-

way)][*Medium: Wireless]

Response Monitor (Meter) Communications Gateway External Communications

*Type: Interval Meter*Data Transfer: Manual

Read Locally [Read Remotely]

*Tariff: Tariffs can be applied retrospectively with

time stamping

*Signal Flow: Simplex (One-way) [Duplex (Two-way)]

*Situation: Customer Interface (Meter Display/VDU) [Controller (Central

Home Energy Management System)]

*Signal Flow: Simplex (One-way) to Consumer [Duplex (Two-

way)]*Connection: [To/]From

Aggregator, ESCO or Supplier

Report 1: Conclusions

• Impact of market structure is significant– Different drivers / opportunities for new products– Different barriers

• Lack of data on energy end use consumption– Time of day data – Small and medium enterprises

• No ‘one size fits all solutions’– Products– Energy end uses

Report 2:Evaluating The Business Case for

Micro Demand Response and Energy Saving

Evaluating The Business Case forMicro Demand Response and Energy Saving

• Step-by-step methodology• Five country specific case studies

– Finland: Dynamic control of residential storage heater loads– France: Dynamic control of residential storage heater loads– Greece: Subsidy for ‘green a/c’ equipment– India: Replacement of incandescent lamps with CFLs– UK: Direct load control of commercial air-conditioning loads

Step-by-step approach

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 5. Future Add-ins

“win-win-win”

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 4. Future Add-ins

The problem?• National Grid (TSO) increasing need for Balancing Services

Reserve 2010/2011 Forecast 2025/26 Volume 3 TWh per annum 8 TWh per annum Cost £311m per annum £690m per annum

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 4. Future Add-ins

Target Processes?• Cooling and ventilation loads significant

– ~10% to 20% of electricity used in services/commercial sector

• Three scenario’s considered– Single split a/c unit (power consumption 2kW / cooling o/p 6kW)– Scenario 1: daytime / summer operation– Scenario 2: daytime / year round operation– Scenario 3: 24 hours per day / year round operation

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 4. Future Add-ins

Control, Monitoring, Communication Technology• Control: automatic on/off control of compressor• Meter: existing advanced metering (AMR)• Comms Gateway: dedicated gateway needed• Internal Comms: one way wireless (or wired)• External Comms: one way PSTN, GSM or internet

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 4. Future Add-ins

Primary Business Case• Aggregator:

– Expenditure: Purchase of controllers– Income: Provision of balances services to TSO

• Consumer:– Energy savings advice (sufficient?)

• TSO:– Avoided shortfall of reserve and equivalent price to conventional sources

UK: Direct Load Control ofCommercial A/C (1 x 2kW)

-800

-600

-400

-200

0

200

400

600

800

0 20 40 60 80 100 120

Annual Benefit (€/customer/year)

NP

V to

agg

rega

tor (

€/cu

stom

er)

€50 Upfront,€5/year ongoing

€100 Upfront,€10/year ongoing

€200 Upfront,€20/year ongoing

€300 Upfront,€30/year ongoing

Control, Monitoring & Communication Technology costs(per customer)

24 hrs x 375 days a/c utilisation 20% £103.20/year

8 hrs x 80 days utilisation 10% £12.50/year

1. Define the Problem

2. Target Processes

3. Technology

4. Primary Business Case 4. Future Add-ins

Future Add-Ins (Secondary Business Case)• Provision of frequency response• Additional technology costs

– Real-time control

Report 2: Conclusions

• Step-by-step approach provides a useful way of assessing business case

• Difficult to obtain robust data– Technology costs– Amount of demand available for specific products/services– Value of demand response

• Roll of smart metering needs to be considered– None of the case studies utilised smart meter functionality (when available)

Dissemination of Results

• Reports 1 & 2 confidential to participants until March 2011– After March 2011: Available from public area of IEA DSM web-site

• In country dissemination led by Experts– National focus meetings– Summary reports – National reports

Overall Recommendations

• Impact of market structure important– Market mapping could help interaction between participants– Role of regulation needs to be understood

• Difficult to assess level of demand response / energy savings– Need for improved energy end use information

• Technology costs– Need for on-going support of innovation in control and monitoring technology

• Smart meter– Third-party access

Questions / comments

Approval of Final Management

Matters for Executive Committee


Recommended