+ All Categories
Home > Documents > TC Ford Plant, S aint Paul , MN

TC Ford Plant, S aint Paul , MN

Date post: 25-Feb-2016
Category:
Upload: irma
View: 41 times
Download: 3 times
Share this document with a friend
Description:
TC Ford Plant, S aint Paul , MN. Opened in 1924 Longest continuously running Ford plant In 2006 Ford declared: TCAP closure by 2009 Positive Ranger sales extended closing date Ford officially close s plant on Dec 22, 2011 Phases of demolition - Fall of 2012 - PowerPoint PPT Presentation
Popular Tags:
28
Transcript
Page 1: TC  Ford  Plant,  S aint  Paul , MN
Page 2: TC  Ford  Plant,  S aint  Paul , MN

TC Ford Plant, Saint Paul, MN• Opened in 1924• Longest continuously running Ford plant• In 2006 Ford declared: TCAP closure by 2009• Positive Ranger sales extended closing date• Ford officially closes plant on Dec 22, 2011• Phases of demolition - Fall of 2012• Redevelopment that is now "an opportunity of a

lifetime" Everyone in Saint Paul, the TC region and the country is involved for the jobs and the planet.

Page 3: TC  Ford  Plant,  S aint  Paul , MN

Vision of ARISE An Alliance of Labor, Community, Environmental, and Youth Organizations working together for sustainable development benefiting Saint Paul, the region and all new cities

• Re-Invigorate the Ford Site with high-value jobs

• Mixed-Use Redevelopment with Three Core Values• De-carbonize• Equalize• Re-Invigorate

ARISE values are well aligned with Saint Paul’s Sustainability Report and the Port Authority Reindustrialization Study

Page 4: TC  Ford  Plant,  S aint  Paul , MN

Similar Projects

Dockside Green: Victoria, BC SoMo: Sonoma, CA

• 15 acres of Victoria’s Inner Harbour

• Converted manufacturing site

• Residential, office, retail, & commercial

• Mixed income (Not as much as ARISE plan would be)

• Trying for LEED Platinum

• 200 acres site converted to mixed use, solar-powered, zero waste community with clean tech production at it’s core

• Leed Platinum• High performance and

replicable

Page 5: TC  Ford  Plant,  S aint  Paul , MN

Similar Projects

WĀV: Ventura, California Place• Working Artists Ventura

(WĀV)• First Sustainable Artist

Community • Mixed incomelive/work

community• Provides mixed land use

for art and community• LEED Certified

• Nonprofit which focuses on building sustainable, affordable communities that blend arts with Green Manufacturing Partners

• Projects Philadelphia, AZ, and WĀV

• Main office in Minneapolis• Potential partner

Page 6: TC  Ford  Plant,  S aint  Paul , MN

ARISE Moving Forward• Our vision has grown to include:

• High-value Jobs• Increased Tax Base• Efficient Transit

• ARISE encourages collaboration as the redevelopment process continues and asks supporters of the ARISE plan to be engaged and active in the planning process.

• Localized Economy• On-site Clean Energy• Open Space & Urban

Agriculture

Page 7: TC  Ford  Plant,  S aint  Paul , MN

High Value Jobs• Family Sustaining• Increases Diversity• Values the

Whole PersonAVERAGE

SCENERIO 1-5ARISE

Median Wage/Year $38,074 $41,908

Number of Jobs 5,569 8,964

Aggregate Earnings/Year

$85,252,400 $131,309,876*

*Higher Density Jobs Higher Wages=More Community Jobs

• High Job Multiplier• De-carbonizes:

Product/Process• Permanent

University of Minnesota, ARCH 851 students

Page 8: TC  Ford  Plant,  S aint  Paul , MN

Study for Saint Paul Port Authority – May 2012

• Land Use and Urban Development• Loss of valuable industrial land in cities• Creative re-use of sites and buildings• Progressive American urban development

• Local Resource Production• Clean tech production needed for valuable products• Producing goods locally• Decrease in transit

Page 9: TC  Ford  Plant,  S aint  Paul , MN

Study for Saint Paul Port Authority – May 2012

• Job Creation• Industrial jobs have higher job creation rates• Opportunities for sustainable, high-value jobs for

employees of varying backgrounds• Economic Growth

• Improved fiscal health in Saint Paul: good balance of residential growth and job creation

• Expand production for food processing, medical devices, and clean energy technologies, like solar modules

Page 10: TC  Ford  Plant,  S aint  Paul , MN

Study for Saint Paul Port Authority – May 2012

Page 11: TC  Ford  Plant,  S aint  Paul , MN

Ford Site Sustainable Redevelopment Report

Aligned with ARISE

SOCIAL ENVIRONMENTAL ECONOMIC

"live-work-shop-recreate" energy conservation

renewable energywaste reduction

central location easy transport of goods and

people

collaborationstakeholders involved in

planning process locally/regionally sourced

materialslong term investments in

infrastructure

VALUESCOMMUNITY

DIVERSITY

multi-modal travelpublic transit, biking, walking

adds a significant tax base

Page 12: TC  Ford  Plant,  S aint  Paul , MN

Ford Site Sustainable Redevelopment Report

“the redeveloped Ford Site will balanceeconomic, social and environmental

sustainability in a way that conserves and improves the qualities and

characteristics of the Highland Park neighborhood and Mississippi River Valley corridor in which it sits, while advancing

the City’s economicwealth and community goals, resulting in a

forward-thinking 21st century development.”

Page 13: TC  Ford  Plant,  S aint  Paul , MN

Choices of High Efficiency Housing• Full Range of Housing Choices

• Single family units• Medium density apartments/condos• Hi-Rise garden apartments/condos

• Benefits of Higher Density Housing• Supports Street Car/Rapid Bus Options• Increases tax base• Improves Energy Efficiency• Increases open space

• Envision 20% affordable on-site housing University of Minnesota, ARCH 851 students

Page 14: TC  Ford  Plant,  S aint  Paul , MN

Transit Opportunities• Reduce auto-dependency on-site

• Expand bus and rail options

• Support walk and bike-ability

• Reduce commute time

• Potential for 2.4 million lb reduction of carbon annually

University of Minnesota, ARCH 851 students

Page 15: TC  Ford  Plant,  S aint  Paul , MN

On-Site Clean Energy

• Hydropower• Active Solar• Passive Solar

Estimate 253 million kWh of electricity consumed annually

Estimate 140.5 – 255.5 million or more kWh of electricity produced annually

• Anaerobic Digestion• Ground-source

Heating

University of Minnesota, ARCH 851 students

Page 16: TC  Ford  Plant,  S aint  Paul , MN

Community Open Space

Active recreation space:• Baseball fields, Greenways

Hidden Falls Stream restoration• Natural stream thru the center of the new community

Abundant Planned Open Space • 69 Acres (51% of site) of open space

University of Minnesota, ARCH 851 students

Page 17: TC  Ford  Plant,  S aint  Paul , MN

Re-Connecting to the RiverHidden Falls Stream Restored (How it may look)

The key ARISE aesthetic and storm water feature

Bike/Walkways connect to the River, Highland and inside a new Bike/Walk neighborhood.

Courtesy: Perkins+Will Dockside Green

Page 18: TC  Ford  Plant,  S aint  Paul , MN

Localized Agriculture• Community Gardens for residents

and surrounding neighborhood.

• On-Site Crops for On/Off Site Co-ops and Sustainable Restaurants

• On-Site Production for Processing• Raspberry preserves, Pesto, Salsa, etc• Jobs to sustain the community

Page 19: TC  Ford  Plant,  S aint  Paul , MN

Old Paint Line: Anticipated VOC’s, Lead (Heavy Metals), PCB’s

Rail Yard: Anticipated – Coal Tars, Hydrocarbons (diesel fuels, possible chemical spillage from tank)

Hot Spots - Gas Fill, Wheel Paint Spray Booth , Frame Spray Booth, etcAnticipated VOC’s, Lead (Heavy Metals) PCB’s

Existing Concrete Slab / Capped Contaminated Landfill: VOC’s, Lead (Heavy Metals) and Paint Sludge (Capped 1990’s). No Evidence of Leaking (Considered Permanent).

Existing Factory Concrete Slab

ARISE Lower Cost / Faster Reuse Plan

Bluff Line: No indications of Seepage + the Landfill on the river is stable.

Page 20: TC  Ford  Plant,  S aint  Paul , MN

ARISE Concept

Page 21: TC  Ford  Plant,  S aint  Paul , MN

ARISE Concept

Page 22: TC  Ford  Plant,  S aint  Paul , MN

ARISE Concept

Page 23: TC  Ford  Plant,  S aint  Paul , MN

ARISEDe-carbonize • Equalize • Re-invigorate

University of Minnesota, ARCH 851 students

Page 24: TC  Ford  Plant,  S aint  Paul , MN

Equalize • Provides diverse community access to:

• Economic Opportunity• Open Space

• Distributed effect of development throughout the region

De-carbonize• Low GHG Emission Practices guide every plan

element • Contributing to reduction of environmental effects

• Community Experience• Clean tech production

Page 25: TC  Ford  Plant,  S aint  Paul , MN

Re-Invigorate Saint Paul/Region• Fuel Increased Tax Base

• Expand Local Economy

• Foster Job Market

• Stimulate Higher Levels of Education

• Reinforce Community Culture and Identity

Page 26: TC  Ford  Plant,  S aint  Paul , MN

Ford Site Redevelopment TimelineKey Dates and Processes to Impact for ARISE 

2012 2013

Task Jan-Mar April-June July-Sept Oct-Dec Jan-Mar April-June July-Sept Oct-Dec

Preliminary Phase II Environmental Assessment   

           Follow up Environmental Assessment

    

        

Environmental Remediation   

           Fiscal Analysis                

Sustainability Planning                

Green Manufacturing Study                

Open Space Work Group                

Equipment Removal              

Structural Demolition and Site Restoration                

Alternative Urban Areawide Review (AUAR)                

Master Developer Sought by Ford                

City and Community Set Zoning & Redevelopment Framework                

Zoning Amendments to Planning Commission & City Council

               

Page 27: TC  Ford  Plant,  S aint  Paul , MN
Page 28: TC  Ford  Plant,  S aint  Paul , MN

ARISE Site Plan

University of Minnesota, ARCH 8561 student Work

Clean Tech | Clean Manufacturing

Housing and Retail


Recommended