Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6 Distributed Generation Protection Requirements PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 1 of 12 SUMMARY The protection requirements for connecting new Distributed Generation (DG) have been modified to reduce the need for Direct Transfer Trip (DTT) schemes which are costly to employ and difficult to manage. Level of Use: Informational Use AFFECTED DOCUMENT Distribution Interconnection Handbook (DIH) TD-2306B-001, Interconnecting Large 2-20MW Generation Systems TARGET AUDIENCE Employees involved with generation interconnection on electric distribution circuits. DEFINITIONS Certified Inverter – For the purposes of this document it is an inverter that has been “Certified” per UL 1741 or UL 1741A to trip in 2 seconds or less after the formation of an unintended island. DG; Distributed Generation – Electric power producing devices or equipement,not directly connected to the bulk electric system, includes both generators and electric storage devices. Line Section – Defines the zone of protection for the DG in which it is expected to detect and trip for faults and is bounded by a 3 phase fault interrupting device. .A given line section or sections could include multiple zones of protection. Minimum load – The absolute minimum load that is based on a years’ worth of load data. For solar generating facilities with no battery storage daytime load will be used (10 am to 4 pm for fixed panel installations and 8 am to 6 pm for solar generating facilities with tracking systems). WHAT YOU NEED TO KNOW Distribution Evaluation The requirements below are subject to the following: (1) PG&E at its discretion may still require DTT on any DG system, especially for those that may not trip for end of line faults and has significant fault current contributions. (2) Phase and ground protection are required to detect end-of-line faults. This may be waived for smaller certified units that have aggregated fault current contribution less than 10% and expected to trip due to anti-islanding protection after the feeder breaker tripped.
Transcript
Page 1: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 1 of 12

SUMMARY

The protection requirements for connecting new Distributed Generation (DG) have been modified to reduce the need for Direct Transfer Trip (DTT) schemes which are costly to employ and difficult to manage.

Level of Use: Informational Use

AFFECTED DOCUMENT

Distribution Interconnection Handbook (DIH)

TD-2306B-001, Interconnecting Large 2-20MW Generation Systems

TARGET AUDIENCE

Employees involved with generation interconnection on electric distribution circuits.

DEFINITIONS

Certified Inverter – For the purposes of this document it is an inverter that has been “Certified” per UL 1741 or UL 1741A to trip in 2 seconds or less after the formation of an unintended island.

DG; Distributed Generation – Electric power producing devices or equipement,not directly connected to the bulk electric system, includes both generators and electric storage devices.

Line Section – Defines the zone of protection for the DG in which it is expected to detect and trip for faults and is bounded by a 3 phase fault interrupting device. .A given line section or sections could include multiple zones of protection.

Minimum load – The absolute minimum load that is based on a years’ worth of load data. For solar generating facilities with no battery storage daytime load will be used (10 am to 4 pm for fixed panel installations and 8 am to 6 pm for solar generating facilities with tracking systems).

WHAT YOU NEED TO KNOW

Distribution Evaluation

The requirements below are subject to the following:

(1) PG&E at its discretion may still require DTT on any DG system, especially for those that may not trip for end of line faults and has significant fault current contributions.

(2) Phase and ground protection are required to detect end-of-line faults. This may be waived for smaller certified units that have aggregated fault current contribution less than 10% and expected to trip due to anti-islanding protection after the feeder breaker tripped.

Page 2: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 2 of 12

(3) These exemptions do not apply to certified and non-certified Inverters with Stand-Alone capabilities.

(4) Transmission DTT requirements are independent and still apply.

(5) For a line section with all certified inverters, reclose blocking will not be required if the first reclose can be delayed to 10 seconds.

(6) If an existing uncertified DG already has DTT then this uncertified DG would not count towards the 10% limit for the “other machine or uncertified DG is > 10% of project” screen. Other uncertified DG with previously approved protection may still need to be re-studied on a case by case basis.

1 Certified Inverter:

1.1 < 40 kW, then

• DTT and ground fault protection are not required

1.2 ≥ 40 kW and < 1000 kW, and

1. Line section aggregated DG ≤ 50% of minimum load then

• DTT and ground fault protection are not required

2. Line section aggregated DG > 50% of minimum load, and

a. Aggregate machine ≤ 40% or uncertified DG is < 10% of the aggregate DG (all types) on line section, then

• DTT and ground fault protection are not required

b. Aggregate machine > 40% or uncertified DG is > 10% of the aggregate DG (all types) on line section requires:

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

1.3 ≥ 1000 kW, and

Line section aggregated DG ≤ 50% of minimum load, then

• Requires PG&E SCADA equipped recloser or interrupter

1. Line section aggregated DG > 50% of minimum load, and

a. Aggregate machine ≤ 40% or uncertified DG is < 10% of the aggregate DG (all types) on line section, and

Page 3: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 3 of 12

(1) Short circuit contribution ratio ≤ 10%, then

• PG&E SCADA equipped recloser or interrupter

(2) Short circuit contribution ratio > 10%, then requires:

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

b. Aggregate machine > 40% or uncertified DG is > 10% of the aggregate DG (all types) on line section requires:

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

2 Uncertified Inverter:

Requires:

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

• Customer side interrupter or recloser

• Redundant sets of PG&E approved protective relays

3 Machine – Induction or Synchronous:

3.1 < 40 kW, then DTT and ground fault protection are not required

3.2 ≥ 40 kW and < 400 kW, and

1. Line section aggregated DG ≤ 50% of minimum load, and

a. Short circuit contribution ratio ≤ 10%, then requires:

• Redundant sets of PG&E approved protective relays

b. Short circuit contribution ratio > 10%, then requires:

• Ground Fault Protection and Reclose Blocking

• Redundant sets of PG&E approved protective relays

2. Line section aggregated DG > 50% of minimum load, then requires:

Page 4: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 4 of 12

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

• Redundant sets of PG&E approved protective relays

3.3 ≥ 400 kW, and

1. Line section aggregated DG ≤ 50% of minimum load, then requires:

• Ground Fault Protection and Reclose Blocking

• Redundant sets of PG&E approved protective relays

2. Line section aggregated DG > 50% of minimum load, then requires:

• Ground Fault Protection and Reclose Blocking

• PG&E SCADA equipped recloser or interrupter

• Redundant sets of PG&E approved protective relays

Note: When distribution upgrades such as reclose blocking are required additional time is needed before the DG facility is allowed to parallel with the PG&E system.

Flow chart – 1 is appended in reference to the requirements in sections 1-3 above.

Transmission and Substation Evaluation

For distributed generation,( i.e. generation connected to non-dedicated distribution circuits), the protection requirements for substation and transmission installations are as follows:

The requirements below are subject to the following:

(1) PG&E at its discretion may still require DTT on any DG system, especially for those that may not trip for end of line faults and has significant fault current contribution.

(2) If an existing uncertified DG already has DTT this uncertified DG would not count towards the 40% limit for machines or the 10% limit of “Other uncertified DG”. This includes existing hardwire CB tripping. Other uncertified DG with previously approved protection may still need to be restudied on a case per case basis.

(3) The machine generation shall be fixed P/Q type (fixed power factor).

(4) Excess generation on an ungrounded system could lead to temporary phase to ground overvoltages during transmission SLG faults, an evaluation will be needed to determine if overvoltage mitigation is required.

Page 5: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 5 of 12

(5) These exemptions do not apply to certified and non-certified Inverters with Stand-Alone capabilities.

4 Certified Inverter Substation and Transmission Line Section Review:

4.1 Substation Transformer

1. Transformer aggregated DG ≤ 50% of minimum load then

• DTT and transformer tripping is not required. End of review.

2. Transformer section aggregated DG > 50% of minimum load

If the substation transformer is ungrounded then

a. Evaluation will be required which may include grounding the transformer or installation of an overvoltage tripping scheme to prevent overvoltage of Transmission equipment on the affected line section.

If the substation transformer is grounded

b. Aggregate machine ≤ 40% or uncertified DG to total generation ratio is < 10% of the transformer aggregate DG (all types), then

• DTT and transformer tripping are not required continue to substation review.

c. Aggregate machine > 40% or uncertified DG to total generation ratio is > 10% of the transformer aggregate DG (all types), the following is required:

• Transformer protection tripping of feeder breakers is required. Tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme would also be required for a single transformer station. Continue to substation review.

4.2 Substation Review

1. Total Substation aggregated DG ≤ 50% of minimum load, then

• DTT and transformer tripping are not required. End of review.

2. Total Substation aggregated DG > 50% of minimum load, and

a. Aggregate machine ≤ 40% or uncertified DG to total generation ratio is < 10% of the substation aggregate DG (all types), then

• DTT and transformer tripping are not required continue to transmission line review.

Page 6: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 6 of 12

b. Aggregate machine > 40% or uncertified DG to total generation ratio is > 10% of the substation aggregate DG (all types), the following is required:

• Station tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme is required. Continue to transmission line review.

4.3 Transmission Line Section Review

1. Total line section aggregated DG ≤ 50% of minimum load, then

• DTT from transmission terminals to feeder breakers is not required. End of review.

2. Total Substation aggregated DG > 50% of minimum load, and

a. Aggregate machine ≤ 40% or uncertified DG to total generation ratio is < 10% of the line section aggregate DG (all types), then

• DTT from transmission terminals to feeder breakers is not required. End if review.

b. Aggregate machine > 40% or uncertified DG to total generation ratio is > 10% of the line section aggregate DG (all types), then the following is required:

• DTT from transmission terminals to feeder breakers is required.

• Reclose blocking at the transmission terminals is required if not installed.

A second flow chart is appended in reference to the requirements in section 4 above.

5 Machine Based Generation Substation and Transmission Line Section Review:

The requirements below are subject to the following:

(1) PG&E at its discretion may still require DTT on any DG system, especially for those that may not trip for end of line faults and has significant fault current contribution.

(2) If an existing uncertified DG already has DTT this uncertified DG would not count towards the 40% limit for machines or the 10% limit of “Other uncertified DG”. This includes existing hardwire CB tripping. Other uncertified DG with previously approved protection may still need to be restudied on a case per case basis. The machine generation shall be fixed P/Q type (fixed power factor).

(3) Excess generation on an ungrounded system could lead to temporary phase to gnd overvoltages during transmission SLG faults, an evaluation will be needed to determine the if overvoltage mitigation is required.

Page 7: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 7 of 12

(4) Phase and ground fault detection for transmission EOL faults is required via 59N, 51N, 51C, 51V or 21 elements. Small generators may not be able to detect all transmission EOL faults, therefore as long as aggregate gen is < 50% of minimum load, EOL fault detection for all transmission faults is not required. For generation with total SCCR > 0.1 EOL fault detection is required for all transmission faults.

5.1 Substation Transformer

1. Transformer aggregated DG ≤ 50% of minimum load then

a. DTT and transformer tripping is not required. End of review.

2. Transformer section aggregated DG > 50% of minimum load.

If the substation transformer is ungrounded then

a. Evaluation will be required which may include grounding the transformer or installation of an overvoltage tripping scheme to prevent overvoltage of Transmission equipment on the affected line section.

If the substation transformer is grounded

b. Aggregate machine generation to total generation ratio is < 40% or aggregate uncertified DG to total generation ratio is ≤ 10%, then

(1) Transformer Aggregate machine generation ≤ 50% of minimum load then

• DTT and transformer tripping are not required continue to substation review.

(2) Transformer Aggregate machine generation > 50% of minimum load then

• DTT and transformer tripping are required continue to substation review.

c. Aggregate machine generation to total generation ratio is > 40% or aggregate uncertified DG to total generation ratio is > 10%, the following is required:

(1) Transformer protection tripping of feeder breakers is required. Tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme would also be required for a single transformer station. Continue to substation review.

Page 8: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 8 of 12

5.2 Substation Review

1. Total Substation aggregated DG ≤ 50% of station minimum load, then

a. DTT and transformer tripping are not required. End of review.

2. Total Substation aggregated DG > 50% of station minimum load, and

a. Aggregate machine generation to total generation ratio is < 40% or uncertified DG to total generation ratio is ≤ 10% of the substation aggregate DG, then

(1) Station Aggregate machine generation ≤ 50% of minimum load then.

• Station tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme is not required.

(2) Station Aggregate machine generation >50% of minimum load then

• Station tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme is required. Continue to transmission line review.

b. Aggregate machine generation to total generation ratio is > 40% or uncertified DG to total generation ratio is > 10% of the substation aggregate DG, the following is required:

(1) Station tripping via the HV Bus Differential or Total Overcurrent (TOC) scheme is required. Continue to transmission line review.

5.3 Transmission Line Section Review

1. Total line section aggregated DG ≤ 50% of minimum line section load, then

a. DTT from transmission terminals to feeder breakers is not required. End of review.

2. Total Substation aggregated DG > 50% of minimum line section load, and

a. Aggregate machine generation to total generation ratio is < 40% or uncertified DG to total generation ratio is ≤ 10% of the line section aggregate DG, then

(1) Line Section Aggregate machine generation ≤ 50% of minimum load then.

• DTT from transmission terminals to feeder breakers is not required.

Page 9: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 9 of 12

(2) Line Section Aggregate machine generation >50% of minimum load then

• DTT from transmission terminals to feeder breakers is t required.

b. Aggregate machine generation to total generation ratio is > 40% or uncertified DG to total generation ratio is > 10% of the line section aggregate DG, then the following is required:

(1) DTT from transmission terminals to feeder breakers is required.

(2) Reclose blocking at the transmission terminals is required if not installed

A third flow chart is appended in reference to the requirements in section 5 above.

DOCUMENT APPROVER

Roozbeh (Rudy) Movafagh, Manager, Distribution Standards & Strategy

DOCUMENT CONTACT

Brandon Tran, Supervisor, Electric Generation Interconnection, 415.973.2712 [email protected]

Chase Sun, Principal Engineer, DG, Distribution Planning & Reliability

Phuoc Tran, Distribution Generation Engineering Supervisor, Electric Operations

Mike Jensen, Supervising Protection Engineer, System Protection

Dan Jantz, Engineering Standards Technical Specialist, Expert, Distribution Standards

INCLUSION PLAN

This bulletin will reside on the DIH webpage without an inclusion plan at this time.

Page 10: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 10 of 12

Page 11: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 11 of 12

Page 12: TD-2306B-002 Distributed Generation Protection Requirements

Utility Bulletin: TD-2306B-002 Publication Date: 11/15/2017 Rev: 6

Distributed Generation Protection Requirements

PG&E Public ©2017 Pacific Gas and Electric Company. All rights reserved. Page 12 of 12

Sta

rt M

achi

ne G

ener

atio

n R

evie

wN

ote-

4

Agg

rega

te

Gen

erat

ion

> 5

0%

Tran

sfor

mer

Min

24

hr A

ggre

gate

Lo

ad

No

Yes

Agg

rega

te M

achi

ne

Gen

to T

otal

Gen

R

atio

>40

% o

r A

ggre

gate

Unc

ertif

ied

DG

(ie

Win

d) to

Tot

al

Gen

Rat

io >

10 %

N

ote-

2

Box

BY

es

No

Bac

kfee

d in

to

Tran

smis

sion

Lin

e S

ectio

n >

50%

Min

24

hr L

ine

Sec

tion

Agg

rega

te L

oad

Agg

rega

te M

achi

ne

Gen

to T

otal

Gen

R

atio

>40

% o

r A

ggre

gate

Unc

ertif

ied

DG

( ie

Win

d ) to

Tot

al

Gen

Rat

io >

10 %

N

ote -

2B

ox D

Box

AN

o D

TT o

r XFM

R tr

ippi

ng is

re

quire

d. P

roce

ed to

nex

t ev

alua

tion

poin

t if r

equi

red.

Box

BX

FMR

pro

tect

ion

tripp

ing

of

feed

er b

reak

ers

is re

quire

d.S

tatio

n tri

ppin

g vi

a th

e H

V

Bus

Diff

eren

tial o

r TO

C

sche

me

may

als

o be

re

quire

d.

Box

DD

TT fr

om tr

ansm

issi

on

term

inal

s to

feed

er b

reak

ers

is re

quire

d . R

eclo

se

bloc

king

at t

he tr

ansm

issi

on

term

inal

s is

requ

ired

if no

t in

stal

led.

Not

e -2

If an

exi

stin

g M

achi

ne/

Unc

ertif

ied

DG

alre

ady

has

DTT

this

unc

ertif

ied

DG

w

ould

not

cou

nt to

war

ds th

e ra

tio li

mit

of “O

ther

U

ncer

tifie

d D

G” .

Thi

s in

clud

es e

xist

ing

hard

wire

C

B tr

ippi

ng. O

ther

un

certi

fied

DG

with

pr

evio

usly

app

rove

d pr

otec

tion

may

stil

l nee

d to

be

rest

udie

d on

a c

ase

per

case

bas

is.

•Th

e m

achi

ne

gene

ratio

n sh

all b

e fix

ed P

/Q ty

pe (f

ixed

po

wer

fact

or).

Sub

stat

ion

Tran

sfor

mer

H

V W

ye G

ND

Not

e-3

Box

CN

o

Yes

Not

e-3

Exc

ess

gene

ratio

n on

an

ungr

ound

ed s

yste

m c

ould

le

ad to

tem

pora

ry p

hase

to

gnd

over

volta

ge' s

dur

ing

trans

mis

sion

SLG

faul

ts.

Miti

gatio

n m

ay b

e re

quire

d

Yes

No

Yes

Not

e-4

Pha

se a

nd g

roun

d fa

ult d

etec

tion

for

trans

mis

sion

EO

L fa

ults

is re

quire

d vi

a 59

N, 5

1N, 5

1C, 5

1V o

r 21

elem

ents

. S

mal

l gen

erat

ors

may

no

t be

able

to d

etec

t all

trans

mis

sion

EO

L fa

ults

, the

refo

re

as lo

ng a

s ag

greg

ate

gen

is <

50 %

of

min

imum

load

, EO

L fa

ult

dete

ctio

n fo

r all

trans

mis

sion

faul

ts

is n

ot re

quire

d. F

or g

ener

atio

n w

ith

tota

l SC

CR

> 0

.1 E

OL

faul

t de

tect

ion

is re

quire

d fo

r all

trans

mis

sion

faul

ts

Box

CE

valu

atio

n w

ill b

e re

quire

d w

hich

may

incl

ude

grou

ndin

g th

e tra

nsfo

rmer

or

inst

alla

tion

of a

n ov

ervo

ltage

tri

ppin

g sc

hem

e to

pre

vent

ov

ervo

ltage

of T

rans

mis

sion

eq

uipm

ent o

n th

e af

fect

ed

line

sect

ion.

Tran

smis

sion

R

evie

w

Box

A

Box

A

To S

ubst

atio

n R

evie

w

Sub

stat

ion

Rev

iew

Agg

rega

te

Gen

erat

ion

> 5

0%

Sta

tion

Min

24h

r A

ggre

gate

Loa

d

No

Yes

Agg

rega

te M

achi

ne

Gen

to T

otal

Gen

R

atio

>40

% o

r A

ggre

gate

Unc

ertif

ied

DG

(ie

Win

d) to

Tot

al

Gen

Rat

io >

10 %

N

ote-

2B

ox B

Yes

No

Box

A

To T

rans

mis

sion

R

evie

w

No

Box

A

Box

A

Mac

hine

Bas

ed G

ener

atio

n D

TT R

equi

rem

ents

for >

40k

W

Tran

smis

sion

Bac

kfee

dA

ggre

gate

Syn

ch

Gen

erat

ion

> 5

0%

Tran

sfor

mer

Min

24

hr L

oad

No

Yes

Agg

rega

te M

achi

ne

Gen

erat

ion

> 5

0%

Min

24h

r Loa

d

YesNo

Agg

rega

te M

achi

ne

Gen

erat

ion

> 5

0%

Min

24h

r Loa

d

Box

AN

o

Yes


Recommended