TDC2/TCC2 WG status report in EATM. S. Evrard on behalf of the TDC2/TCC2 WG 18.06.2013 WP breakdown TDC2/TCC2 Visit on June 4 th Next issues ENTM agenda. Work package breakdown. Visit on June 4th: TCSC dose rate measurement by means of Telerob. TCSC contact : 11 mSv /h. - PowerPoint PPT Presentation
Popular Tags:
8
TDC2/TCC2 WG status report in EATM S. Evrard on behalf of the TDC2/TCC2 WG 18.06.2013 1.WP breakdown 2.TDC2/TCC2 Visit on June 4 th 3.Next issues 4.ENTM agenda
Transcript
Page 1: TDC2/TCC2  WG status report in EATM

TDC2/TCC2 WGstatus report in EATM

S. Evrard on behalf of the TDC2/TCC2 WG18.06.2013

1. WP breakdown2. TDC2/TCC2 Visit on June 4th

3. Next issues4. ENTM agenda

Page 2: TDC2/TCC2  WG status report in EATM

Work package breakdownActivity WPA WDP DIMR Collective dose

(mSv)Transport 15/01 OK

Vacuum 22/01 OK

Targets and collimators 29/01 OK

XTAX tables 05/02 OK OK 10.5

Cooling and Ventilation 06/02 OK

Civil Engineering 15/02

Magnets 26/02 OK

LV electricity 19/03 OK

Cabling 19/03

RP issues 02/04 OK

Beam instrumentation 09/04 OK

Survey

Page 3: TDC2/TCC2  WG status report in EATM

Visit on June 4th: TCSC dose rate measurement by means of Telerob

TCSC contact : 11 mSv/h

Page 4: TDC2/TCC2  WG status report in EATM

T4 measurement from RP – 4th June 2013

418th June 2013M. Calviani / E. Nowak - TCC2TDC2 WG meeting

Ratio D/U ~ 1.8

Page 5: TDC2/TCC2  WG status report in EATM

New CE issue: the mezzanine floor is not water tight

Page 6: TDC2/TCC2  WG status report in EATM

Cabling work: tough working conditions

Page 7: TDC2/TCC2  WG status report in EATM

Next actions, topics, issues• Laser scan of TA801 (Thursday 20/06) BE-ABP + DGS-RP• Survey Work package EN-MEF + BE-ABP• New dose rate measurement (Friday 21/06, TBC) EN-HE + DGS-RP• Tech. Spec. for:

– Underground IT network EN-MEF + IT-CS– Chilled pipe removal (asbestos ?) EN-CV– Dismantling works EN-MEF + DGS-RP

• TCSC and Target boxes and monitor storage in B.954 GS-IS• PVC insulation analysis TE-EPC + EN-MME• Mezzanine floor water tighness issue GS-SE + EN-CV• Risk analysis (cranes BA80, B954) EN-HE• Shielded containers for target boxes and monitors EN-STI + EN-MEF + DGS-RP• ENTM on July 2nd all WG members

Page 8: TDC2/TCC2  WG status report in EATM

ENTM agenda July 2nd

• Rationales for TDC2 Consolidation (S. Evrard)• Planned Activities (E. Harrouch)• ALARA Optimisation (S. Evrard)• Transport Issues (J-L Grenard)• Waste management (E. Harrouch)• Risk analysis (E. Harrouch)