Team 16 - NATHAN DE HAAN BRENNAN STEENHOEK JUSTIN THALMAYER TIM BOSCH All Terrain Wheeling Assistance
Transcript
Page 1: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Team 16 -NATHAN DE HAAN

BRENNAN STEENHOEK

JUSTIN THALMAYER

TIM BOSCH

All

Terrain

Wheeling

Assistance

Page 2: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

The Team

NATHAN DE HAAN

JUSTIN

THALMAYER

BRENNAN

STEENHOEK

TIM

BOSCH

1 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 3: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Outline

1) Introduction

2) Design Criteria

3) Building

2 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 4: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Introduction

Image Source: http://archive.jsonline.com/images.ashx?file=mjs-causcol11p3_-mjs_-news_-mjd.jpg&resize=

Image Source: http://i.dailymail.co.uk/i/pix/2014/10/02/1412214732150_wps_23_INDEPENDENCE_CA_SEPTEMBER.jpg

3 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 5: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Our Mission:

To increase manual wheelchair users’ ability to function independently in difficult terrains and environments.

4 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 6: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Design Criteria

▶ Higher torque

▶ Hands not in contact with wheels

Source: http://www.uww.edu/Images/mmr/galleries/wheelchair%20tourney%202012/wheelchair-tourney-16.jpg

5 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 7: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Comparisons

▶ Cost

▶ Indoor use

▶ Flexibility

▶ Backwards movement

▶ Turning

Source: https://www.gogrit.us/shop

6 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 8: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Design Decisions

▶ Removable and somewhat universal

▶ Retains movement flexibility

▶ Prototype feasibility

Source:

http://www.sunrisemedical.com/getattachment/e8320c01-753f-4db6-ad9e-683663596b50/GP.aspx

Source:

http://lghttp.30059.nexcesscdn.net/80C479/magento/m

edia/catalog/product/cache/1/image/330x330/140720ac20424209c6bb28e1b7731856/a/e/aero-x-2.jpg

7 of 14

Page 9: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Design Decision

8 of 14

Force: 65 lbf Force: 150 lbf

Force: 50 lbf

ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 10: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Design Decisions

9 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 11: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Design Decisions

▶ Removal of Second Gear and pawl▶ Development of braking system

10 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 12: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Assembly

11 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 13: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

12 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 14: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

13 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 15: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Conclusions

▶ The value of our education▶ The value of hands-on experience▶ Impact of our design

14 of 14ConclusionBuildingDesign DecisionsDesign CriteriaIntroOutlineTeam

Page 16: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Questions?

Page 17: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Appendix A: Budget

Page 18: Team 16 - ATWAengr.calvinblogs.org/17-18/srdesign16/wp-content/uploads/2017/10/CEAC.pdfOutline 1) Introduction 2) Design Criteria 3) Building Team Outline Intro Design Criteria Design

Appendix B: Stopping Distance