REroute I-70 Corridor HIGHWAYS TO BOULEVARDS: Creating Value In Cities By Design UNIVERSITY OF COLORADO DENVER Jordan Block, Samantha Danforth, AnaClaudia Magalhaes, Brandon Mcnellis, Jason Newsome, & Jian Tang
Transcript
Page 1: TEAM 2 - Re-Route I-70 Corridor

REroute I-70 CorridorHIGHWAYS TO BOULEVARDS: Creating Value In Cities By Design

UNIVERSITY OF COLORADO DENVER Jordan Block, Samantha Danforth, AnaClaudia Magalhaes, Brandon Mcnellis, Jason Newsome, & Jian Tang

Page 2: TEAM 2 - Re-Route I-70 Corridor

REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESthe reroute

DowntownDenver

Boulder

Denver International Airport

MARYLAND

UTAH

Page 3: TEAM 2 - Re-Route I-70 Corridor

why is it important?CONTEXT MAP

Page 4: TEAM 2 - Re-Route I-70 Corridor

why is it important?REGIONAL GROWTH - I-70 EAST DRAFT ENVIRONMENTAL IMPACT STATEMENT

DEVELOPMENTPOPULATION JOBS

New development in Downtown Denver, DIA, Stapleton, and the Gateway Area is expected to increase population by 75% and increase employment by 71% in the region. These values represent build-out conditions projected for 2030.

Page 5: TEAM 2 - Re-Route I-70 Corridor

feasibility

Page 6: TEAM 2 - Re-Route I-70 Corridor

BASELINE ADT - CDOT 2011 ADT

65

135

90

105175

130

125

225

200

160 70

��������� ���������������������������������������� ��������������������������������������congestion, road delays, and safety problems.

*numbers in thousands

Page 7: TEAM 2 - Re-Route I-70 Corridor

110

170

125

125250

175

175

275

250

215 100

2011 ADT VS. 2030 ADT PROJECTIONS - CDOT

ADT on I-70 is projected to increase by 20-35% between now and 2030; ADT on I-270 and I-76 is projected to increase by 40-80%.

135

90

105

175

130

125

225

200

160 70

65

*numbers in thousands

2030 ADT

Page 8: TEAM 2 - Re-Route I-70 Corridor

175

175

100

275

250

215

NUMBER 1: REROUTE I-70

9% ������������� � redistributed from the new boulevard to the new I-70 alignment, a 14-20% increase over current I-76 and I-270 ADT.

*numbers in thousands

9% OF TRAFFIC = THROUGH TRAFFIC91% OF TRAFFIC = LOCAL TRAFFICdrcog’s, may 2000

155115170

125

9%

140125

250

125110

redistributing ADT

REDI

STRI

BUTI

ON

Page 9: TEAM 2 - Re-Route I-70 Corridor

NUMBER 2: RE-STITCHING THE NETWORK

*numbers in thousands

ADT along the new boulevard will decrease 30-40%�������������������������������absorbed by an enhanced street network.

8575 155115

30-40%

9%

175

175

100

275

250

215

250

140125

redistributing ADT

REDI

STRI

BUTI

ON

Page 10: TEAM 2 - Re-Route I-70 Corridor

NUMBER 3: IMPROVED OPTIONS

*numbers in thousands

7065 8575

11%

9%

175

175

100

275

250

215

250

140125

30-40%

ADT along the new boulevard will decrease 11%�������������������������������absorbed by enhancing access to transit and other mobility options.

redistributing ADT

REDI

STRI

BUTI

ON

Page 11: TEAM 2 - Re-Route I-70 Corridor

SUMMARY

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%ADT ALONG NEW I-70 ALIGNMENT ONLY INCREASED BY 13-20%

11%

9%

30-40%

redistributing ADT

REDI

STRI

BUTI

ON

Page 12: TEAM 2 - Re-Route I-70 Corridor

SUMMARY

10%

40-50%

10%

30-40%

Through Traffic10%

90%Local Traffic

VSCurrent ADT Composition ADT Distribution ThroughImproved Infrastructure

Current I-70 Denver Blvd

REALIGMENT

STRENGTHEDNETWORK

IMPROVEDOPTIONS

redistributing ADT

Page 13: TEAM 2 - Re-Route I-70 Corridor

objectives

Page 14: TEAM 2 - Re-Route I-70 Corridor

what is our vision?APPROACH

Page 15: TEAM 2 - Re-Route I-70 Corridor

what is our vision?GOALS

Page 16: TEAM 2 - Re-Route I-70 Corridor

what is our vision?STRATEGIES

Page 17: TEAM 2 - Re-Route I-70 Corridor

DESIGN SOLUTIONS CHECKLIST objectives

PREREQUISITES � Designing a city for people

� Enhance region

� Working with existing plans

MOBILITY � ������

� Network

� Connections

� Access

� Choice

ECONOMY � Development

� Access

ENVIRONMENT � Nature

� Health and Safety

PLACE � Experience

� Foster neighborhood identity

� Connect communities

Page 18: TEAM 2 - Re-Route I-70 Corridor

big moves

Page 19: TEAM 2 - Re-Route I-70 Corridor

REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver Bllvddd

= Rerouted I-70

Page 20: TEAM 2 - Re-Route I-70 Corridor

DESIRED CONNECTIONSbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver BBllllvvl ddd

= Desired Connections

= Existing Streets

Page 21: TEAM 2 - Re-Route I-70 Corridor

RAIL CONSOLIDATIONbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Needing Consolidation

= Existing Rail

Page 22: TEAM 2 - Re-Route I-70 Corridor

RAIL CONSOLIDATIONbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Consolidated Rail

= Existing Rail

Page 23: TEAM 2 - Re-Route I-70 Corridor

RELOCATE NATIONAL WESTERN STOCKSHOWbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvvver Bllvddd

= Proposed Site

= Existing Stock Show

Page 24: TEAM 2 - Re-Route I-70 Corridor

DEVELOPABLE LANDbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvver Blvdddddd

= ROW AREA

Page 25: TEAM 2 - Re-Route I-70 Corridor

POTENTIAL DEVELOPMENTbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDD nvvver Blllvdddd

= Potential Development

Page 26: TEAM 2 - Re-Route I-70 Corridor

NEW AREAS OF CHANGEbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeD nvvver Blllvddddd

= Areas of Change

= Potential Development

Page 27: TEAM 2 - Re-Route I-70 Corridor

CHARACTER AREASbig moves

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

York

St

Brigh

ton

Blvd

Vasq

uez B

lvd

Was

hing

ton

St

Peco

s St

Broa

dwaySpeer Pkwy

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd

Denver Blvd

38th Ave

= East

= West

= Central

= Nodes

Page 28: TEAM 2 - Re-Route I-70 Corridor

design

Page 29: TEAM 2 - Re-Route I-70 Corridor

PROPOSEDsite plan

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDeDeDeenvnvnvnvvvererererr B B B BBBlvlvlvlvvvdddddd

Page 30: TEAM 2 - Re-Route I-70 Corridor

PROPOSED��������������

Page 31: TEAM 2 - Re-Route I-70 Corridor

EXISTING����������������

= Existing Blocks

Page 32: TEAM 2 - Re-Route I-70 Corridor

PROPOSED����������������

= Proposed Blocks= Existing Blocks

Page 33: TEAM 2 - Re-Route I-70 Corridor

EXISTINGland use

= Mixed Use Commercial = Industrial Mixed Use

= Residential = Parks and Opens Space

= Commercial = Industrial

= Mixed Use = Civic/Entertainment

Page 34: TEAM 2 - Re-Route I-70 Corridor

PROPOSEDland use

= Mixed Use Commercial = Industrial Mixed Use

= Residential = Parks and Opens Space

= Commercial = Industrial

= Mixed Use = Civic/Entertainment

Page 35: TEAM 2 - Re-Route I-70 Corridor

EXISTING��������������������

= Existing Buildings

Page 36: TEAM 2 - Re-Route I-70 Corridor

PROPOSED��������������������

= Proposed Buildings= Existing Buildings

Page 37: TEAM 2 - Re-Route I-70 Corridor

STREET HIERARCHYperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Secondary Streets

= Interstate

= Primary Streets

Page 38: TEAM 2 - Re-Route I-70 Corridor

TRANSIT CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Relocated Rail Stations

= Rail Transit

= Rail Station

Page 39: TEAM 2 - Re-Route I-70 Corridor

EXISTING BIKE CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Existing Bike Routes

Page 40: TEAM 2 - Re-Route I-70 Corridor

PROPOSED BIKE CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Proposed Bike Routes

Page 41: TEAM 2 - Re-Route I-70 Corridor

EXISTING GREEN CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Green Nodes

= Green Connections

Page 42: TEAM 2 - Re-Route I-70 Corridor

PROPOSED GREEN CONNECTIONSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Green Nodes

= Green Connections

Page 43: TEAM 2 - Re-Route I-70 Corridor

CONNECTIONS MADEperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= Connections Made

= Existing Connections

Page 44: TEAM 2 - Re-Route I-70 Corridor

COMMUNITY ENHANCEMENTSperformance

Wad

swor

th B

lvd

Sher

idan

Blv

d

Fede

ral B

lvd

Que

bec

Blvd

Col

orad

o Bl

vd

Dow

ning

St

Brigh

ton

Blvd

Was

hing

ton

St

Peco

s St

Broa

dway

48th Ave

56th Ave

64th Ave

Interstate 70

MLK Blvd

Smith Rd38th Ave

DeDeDenvnvnvererer B B Blvlvlvddd

= New Development

= Restitched Fabric

Page 45: TEAM 2 - Re-Route I-70 Corridor

experience

Page 46: TEAM 2 - Re-Route I-70 Corridor

EAST AREAaerial perspective

Page 47: TEAM 2 - Re-Route I-70 Corridor

EAST AREAaerial perspective

Page 48: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND MONACO STREETindustry incubator

Page 49: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND MONACO STREETindustry incubator

Page 50: TEAM 2 - Re-Route I-70 Corridor

WEST AREAaerial perspective

Page 51: TEAM 2 - Re-Route I-70 Corridor

WEST AREAaerial perspective

Page 52: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND FEDERAL AVENUEmixed use

Page 53: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND FEDERAL AVENUEmixed use

Page 54: TEAM 2 - Re-Route I-70 Corridor

CENTRAL AREAaerial perspective

Page 55: TEAM 2 - Re-Route I-70 Corridor

CENTRAL AREAaerial perspective

1

2

3

(44th and Fox)

Page 56: TEAM 2 - Re-Route I-70 Corridor

44TH AVENUE AND FOX STREETtransit oriented development 1

Page 57: TEAM 2 - Re-Route I-70 Corridor

44TH AVENUE AND FOX STREETtransit oriented development 1

Page 58: TEAM 2 - Re-Route I-70 Corridor

GLOBEVILLEre-stitching communities 2

Page 59: TEAM 2 - Re-Route I-70 Corridor

GLOBEVILLEre-stitching communities 2

Page 60: TEAM 2 - Re-Route I-70 Corridor

riverfront redevelopmentBEFORE

3

Page 61: TEAM 2 - Re-Route I-70 Corridor

SOUTH PLATTE RIVER GREENWAY

3riverfront redevelopment

Page 62: TEAM 2 - Re-Route I-70 Corridor

CENTRAL AREAaerial perspective

1

2 3

3(Denver Blvd and Josephine)

Page 63: TEAM 2 - Re-Route I-70 Corridor

CENTRALtransit plaza 1

Page 64: TEAM 2 - Re-Route I-70 Corridor

CENTRALtransit plaza 1

Page 65: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND BRIGHTON BOULEVARD

2gateway to central area

Page 66: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND BRIGHTON BOULEVARD

2gateway to central area

Page 67: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3

Page 68: TEAM 2 - Re-Route I-70 Corridor

DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3

Page 69: TEAM 2 - Re-Route I-70 Corridor

ELYRIA SWANSEAre-stitching communities 4

Page 70: TEAM 2 - Re-Route I-70 Corridor

ELYRIA SWANSEAre-stitching communities 4

Page 71: TEAM 2 - Re-Route I-70 Corridor

evaluation

Page 72: TEAM 2 - Re-Route I-70 Corridor

MAINTENANCE COST SAVINGSevaluation

Denver Boulevard annual maintenance costs:$284,909 +Increased capacity on new I-70:$207,077

Interstate 70 annual maintenance costs:

vs.

Total $491,986

Total $843,166

58%

Page 73: TEAM 2 - Re-Route I-70 Corridor

DEVELOPMENTvalue added

Total buildable land = 51,050,223 sq ft (1,172 acres) New Development = 36,810,313 sq ft (845 acres) ������= 14,239,910 sq ft (327 acres) Park Land = 4,197,322 sq ft (96 acres)

Floor Space = 200,431,703 sq ft 63% Residential 22% Commercial 5% Industrial 1% Civic

Page 74: TEAM 2 - Re-Route I-70 Corridor

DESIGN SOLUTIONS CHECKLIST evaluation

PREREQUISITES � Designing a city for people

� Enhance region

� Working with existing plans

MOBILITY � ������

� Network

� Connections

� Access

� Choice

ECONOMY � Development

� Access

ENVIRONMENT � Nature

� Health and Safety

PLACE � Experience

� Foster neighborhood identity

� Connect communities

Page 75: TEAM 2 - Re-Route I-70 Corridor

CITY FOR PEOPLE ENHANCE REGION EXISTING PLANSprerequisites

250

175

175

100

275

250

215

125

70

140

65 175

125

125

110

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%

DEVELOPMENTPOPULATION JOBS

Page 76: TEAM 2 - Re-Route I-70 Corridor

TRAFFIC NETWORK CONNECTIONS ACCESS CHOICEmobility

250

175

175

100

275

250

215

125

70

140

65 175

125

125

110

ADT ON NEW BOULEVARD IS REDUCED BY 50-60%

Page 77: TEAM 2 - Re-Route I-70 Corridor

ENVIRONMENT HEALTH DEVELOPMENT ACCESSeconomy nature

Page 78: TEAM 2 - Re-Route I-70 Corridor

EXPERIENCE IDENTITY CONNECTIONSplace

Page 79: TEAM 2 - Re-Route I-70 Corridor

questions?


Recommended