+ All Categories
Home > Documents > Team No.63

Team No.63

Date post: 22-Mar-2016
Category:
Upload: arup-cause
View: 218 times
Download: 0 times
Share this document with a friend
Description:
Team No.63
Popular Tags:
2
WU ZHI QIAO BRIDGE DESIGN COMPETITION LAYOUT PLAN MX/001 1 : 50 IN A3 Dragon Bridge Flexible alignment The alignment of the bridge can be modified by changing the angle between each connecting triangle.
Transcript

Concept and Inspiration

Connection details

WU ZHI QIAO BRIDGE DESIGN COMPETITION

LAYOUT PLAN

MX/001

1 : 50 IN A3

Flexible Alignment

Construction sequence

Dragon Bridge

Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.

TypicalSection

Elevation

Concept and Inspiration

Connection details

WU ZHI QIAO BRIDGE DESIGN COMPETITION

LAYOUT PLAN

MX/001

1 : 50 IN A3

Flexible Alignment

Construction sequence

Dragon Bridge

Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.

TypicalSection

Elevation


Recommended