+ All Categories
Home > Business > TEAMGROUP-Consulting Engineering & Management _Global Recruitment

TEAMGROUP-Consulting Engineering & Management _Global Recruitment

Date post: 06-May-2015
Category:
Upload: team-consulting-engineering-and-management
View: 2,436 times
Download: 2 times
Share this document with a friend
Description:
TEAM Group of Companies is a group of lead largest group of companies of this line in Thailand formed by the amalgamation of 13 firms, we are prompt to meet the customer’s demands in various fields. We always embrace team work as a value in a bid to deliver quality services and ensure the optimal satisfaction of our customers. Today, in the context of globalization, the Southeast Asian countries are all striving to encourage self-development in order to keep abreast of rapid global changes. Attracted by favourable investment atmosphere and government’s policy, we have incorporated the business on the creation, design and production of all kinds of media for public relations, alternative energy development and environmental management, and logistics services. Our unrivalled team is formed by a workforce of approximately 1,000 at present.
67
Transcript
  • 1.On the Leading Edge For over 30 years TEAM GROUP has been entrusted30 by both the public and private sectors with a wide range of development projects, both domestic and international. With the high caliber workforce and the enhanced comprehensive services required to respond to new global needs, the Group has maintained its position at the frontline of consulting and related businesses in Thailand and is further committed to creating new service bases in the region and beyond. 1Team1-64.indd 1 4/2/10 7:22:04 PM

2. Message from the Chairman In this ever-changing world, consultancies are required to find prompt and effective solutions to the new and critical challenges which are constantly emerging. Through their expertise, accrued experience and state-of-the-art technology, the staff of TEAM GROUP are able to meet these requirements and in the process develop their specializations. This has led to the Groups becoming the top-ranked Thai consultant in its areas. To give one example of our success, faced with the worlds ongoing energy problems and the need to develop alternative energy, we have played a vital role in many projects involving clean energy and energy conservation and, helping to alleviate the problem of climate change, TEAM GROUP has devised a multitude of innovative outcomes. TEAM GROUP is foremost among consulting service providers which assist the public and private sectors in developing such measures. Our other works include services in environmentally-friendly buildings, planning and development of pollution-free transit systems, environmental management, solid waste and wastewater management, and waste-to-energy. In 2009, TEAM GROUP was entrusted with a number of important projects in both Thailand and neighboring countries. The year thus represented an important phase in TEAM GROUPs growth. In addition to our ability to address new challenges, another key to this success is our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client. Effective and timely solutions within budget are always assured. Decades-long experience and the trust we have obtained build our confidence in directing the organization toward international expansion, especially in the Southeast Asian region. I strongly believe that our highly professional staff will be able to prove the potential of Thai consultants in the international arena and, as they have already done in Thailand, steer TEAM GROUP to the position of leading consultancy in this region.(D Prasert Patramai)(Dr. P t P t i)Chairman of the Board 2Team1-64.indd 2 4/2/10 7:22:06 PM 3. our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client ... ...2552 ( .)3Team1-64.indd 3 4/2/10 7:22:11 PM 4. Contents 06 07 08 A VALUE-BASED ORGANIZATIONI N T E G R AT E DEXPERTISE EXECUTIVES 12 13 A N O T H E R CHALLENGING CREDENTIALSBUILDING ANDINFRASTRUCTURE14 YET SUCCESSFUL YEAR18 TRANSPORTATIONAND LOGISTICS ENVIRONMENT 4 26 Team1-64.indd 4 4/2/10 7:22:15 PM 5. 36WATER RESOURCES44 ENERGY COMMUNICATIONS AND PUBLIC PARTICIPATION 50 56 MANAGEMENT AND TRAINING62 63 64 CORPORATE S O C I A L RESPONSIBILITY CARE FOR THE ENVIRONMENT, SAV E T HE E A R T H STRIVING TO GO BEYOND THE LEADING EDGE. . .5Team1-64.indd 54/2/10 7:22:21 PM 6. Founded in 1978, TEAM GROUP is a conglomerate of Thai-based consulting firms. Our business started with the provisionVision:TO BE THEof services in the fields of water resources development andenvironment. From there, we expanded to provide sustainablesolutions in the areas of transportation and logistics,infrastructure, energy, building, management, andcommunications and public participation. Integrated servicesare viewed as a critical business strategy in our quest toimprove our competitiveness and our ability to respond to THAI LEADER IN customer demand. Embracing the values of service, quality and teamwork, ourprofessional workforce provides clients with time-bound, cost- THE INTEGRATED effective, and innovative multidisciplinary solutions, all focusedon clients needs.CONSULTING A Value-BasedAND RELATED Organization BUSINESSES2521DOMESTICALLY ANDINTERNATIONALLYOperating Performance and WorkforceOperating Revenue Workforce200014001.6 Workforce (person) 1.4 1,150 1,1681.4 1.4 (MB) 1,57212001.3 1.3 1,466 1,461 1,0821,099( )1500 1,3921.2 1.21000914 1,213/ 1 80010000.8 Million bahtRevenue per capita 6000.6 500 4000.4 2000.2 0 00 yr 20052006 20072008 2009 yr 2005 2006200720082009 Revenue Workforce Revenue per capita6Team1-64.indd 64/2/10 7:22:36 PM 7. Integrated Expertise ENERGY ATT Consultants Co., Ltd. (ATT) Energy, oil and gas, power plant, petrochemical-related projects, berth, building, pipeline system and utilities.Through the tight amalgamation of 13affiliates, specialists in a diverse range offields, TEAM GROUP is able to offerintegrated solutions to their clients. TEAM Energy Management Co., Ltd. (TEM) Integrated consulting services in energy conservation, energy auditing and energy efficiency.13Energy & Environmental Management Co., Ltd. (EEM) Alternative energy development and environmental management.INFRASTRUCTURE & ENVIRONMENT TEAM Consulting Engineering and Management Co., Ltd. (TEAM)MANAGEMENT & TRAINING Engineering, environment, and management consultancy services. Management Solutions International Ltd. (MSI) Integrated consultancy services in corporate strategic management, finance and investment, accounting, marketing, project management Geotechnical & Foundation Engineering Co., Ltd. (GFE) and project development. Geotechnical engineering consultancy services. SQ Architects and Planners Co., Ltd. (SQ) Planning and design of building architecture, interior design,Modern Management and Technology Co., Ltd. (MMT) landscape architecture, and design for urban development. Human resource development, optimizing academic and administrative competence.TEAM Logistics and Transport Co., Ltd. (TLT) Transportation planning, traffic management, and traffic impact COMMUNICATIONS & PUBLIC PARTICIPATION management, logistics, and supply chain management. Daoreuk Communications Co., Ltd. (DR) Integrated services in communications and public participation in strategic planning; action planning and implementation, ranging from TEAM Consulting and Management (Cambodia) Co., Ltd. publication and multimedia production to event management and Based in Phnom Penh, capable local professionalscommunity relations. provide regional consulting services. TEAM Consulting and Management (Cambodia) Co., Ltd.TEAM LAO Co., Ltd. A full range of consulting services for the public and private sectors as well as international agencies in Lao PDR and theTCG Printing Co., Ltd. (PRT) Greater Mekong subregion. One-stop service in digital printing as well as design and related TEAM LAO Co., Ltd.services.7Team1-64.indd 7 4/2/10 7:22:37 PM 8. Board of Directors Dr. Prasert Patramai Chairman of the Board . Mr. Peerawat PremchunDirectorDr. Thanasarn Khuayjarernpanishk Director . Mr. Amnat PrommasutraDirectorMr. Wera Sutesopon DirectorMr. Suksavasdi SrisuphonvanijDirector 8Team1-64.indd 84/2/10 7:22:41 PM 9. 1 2 3 4 5 6 7 8 9 1011 12 131 Dr. Prasert Patramai 5 Mr. Chawalit Chantararat8 Dr. Sirinimit Wungsoontorn 11 Dr. Pradit Nopmongcol . .. Chairman of the BoardExecutive Director Executive DirectorExecutive Director 2 Mr. Peerawat Premchun -- 12 Mr. Chawan Theungsang- Senior Executive Director 6 Mr. Kittipol Bunnim 9 Mr. Thongchai Montapaneewat -3 Dr. Thanasarn KhuayjarernpanishkExecutive Director Executive Director13 Dr. Samran Chooduangngern.. Senior Executive Director--Deputy Managing Director--(TEAM Cambodia)- EEMTEAM Cambodia4 Mr. Amnat Prommasutra7 Mr. Prasong Wangrattanapranee 10 Mr. Issarin Patramai Senior Executive DirectorExecutive Director Executive Director -- MSI MMT 9Team1-64.indd 9 4/2/10 7:22:43 PM 10. 1 2 3 4 5 6 7 89 10 11 1213 14 151 Mr. Srid Aphaiphuminart5 Ms. Lertluksna Yodavudh 8 Dr. Surasak Taweesilp 12 Mr. Rachapon Silavisesrith. Chairman of the Board (ATT)Managing Director (DR) Executive Director (SQ) ATTDR SQ - Managing Director (TLT) 2 Dr. Werapol Thonguthai 6 Mr. Preecha Vongvitavat TLT 13 Mr. Teeravit Jomsueb.9 Mr. Kaiwut Simtarakaew Managing Director (ATT)Executive Director (DR)Deputy Managing Director (SQ) ATTDR Deputy Managing Director (TLT) SQTLT 3 Mr. Wirat Ongprasert 7 Dr. Aphichat Sramoon14 Mr. Tanin Pongsilamanee .10 Mr. Wijit Silavisesrith Executive Director (ATT)Executive Director (SQ) ATT-Managing Director (SQ)SQManaging Director (GFE) SQ 4 Mr. Arnon Kulruedeerittha GFE15 Ms. Sopapan Chintaganont11 Mr. Wichian Wachirachowpong Executive Director (ATT)Executive Director (SQ) ATT Director (SQ) SQSQ10Team1-64.indd 104/2/10 7:22:53 PM 11. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Mr. Choosak Losagulpong7 Mr. Sathit Malaitham 13 Ms. Vimol OngsakulAssistant Managing DirectorAssistant Managing Director - Transportation and LogisticsDivision Head - Accounting and FinanceConstruction Supervision Consulting 2 Mr. Wattana Limdaengsa-nguan 8 Mr. Phisol Chansri 14 Mr. Srijaroung Bandhaya Assistant Managing Director Assistant Managing Director - Water Resources Department Head - Human Resources Construction Supervision Consulting 3 Ms. Budsaba Isrankura Na Ayudhaya9 Mr. Somkiat Manirudj 15 Ms. Roongtip KoungyuttamongkolAssistant Managing Director - Environmental ScienceAssistant Managing Director - Water Resources Department Head - Business Promotion and Communications 4 Ms. Pramwanee Predapun10 Mr. Grisada Anoosittagool Assistant Managing Director - Environmental Science Assistant Managing Director (TEAM LAO)5 Ms. Yaowapa Chuwong 11 Mr. Cherd-matee PinittanonAssistant Managing Director - Environmental ScienceAssistant Managing Director (TEAM LAO)6 Mr. Charnchai Gowgirdwiboon 12 Ms. Sawanmon Awaiwanont Assistant Managing Director - Transportation and LogisticsAssistant Executive Director (DR) 11Team1-64.indd 114/2/10 7:23:05 PM 12. Another Challengingyet Successful YearDue to our dedication to realizing our vision and values, in 2009 we notonly successfully completed previously established projects, but were also newlyengaged in far-reaching projects initiated by the public and privatesectors, both in Thailand and in neighboring countries.In particular, two affiliates TEAM Consulting and Management(Cambodia) Co., Ltd. and TEAM LAO Co., Ltd. had wider opportunities tobecome involved in local projects, which added to their experience andenhanced their potential to be stepping stones into the wider region.Some of the projects we were entrusted with in 2009 are presented in thisannual report, categorized into the areas of building and infrastructure,transportation and logistics, environment, water resources, energy,management and training, and communications and public participation. 2552 TEAM Consulting andManagement (Cambodia) Co., Ltd. TEAM LAO Co., Ltd..2552 12Team1-64.indd 124/2/10 7:23:16 PM 13. CredentialsOur growth in 2009 is attributable to our clients trust, which has enabled usto expand and diversify our expertise and the range of services we offer;the opportunities our clients have offered us have strengthened our confidence thatwe can successfully meet the challenges of the future. Our great appreciationtherefore goes to: 2552 ...Private Enterprises & International Organizations Government & State EnterprisesCentral Pattana Public Company Limited Office of the National Economic and Social Development Board ()Bangchak Biofuel Company Limited Department of Scientific ServiceThai Oil Public Company LimitedMetropolitan Electricity Authority ()CH. Karnchang Public Company Limited Electricity Generating Authority of Thailand.()Banpu Public Company Limited Metropolitan Waterworks Authority()SEAFCO Public Company LimitedThe Stock Exchange of Thailand()Map Ta Phut Tank Terminal Company LimitedOffice of Transport and Traffic Policy and PlanningWat Traimit Wittayaram Thailand Institute of Scientific and Technological ResearchElectricity Generating Public Company LimitedNational Institute of Metrology (Thailand) ( )Advance Agro Public Company LimitedBangkok Metropolitan Administration()Bangkok Mass Transit System Public Company Limited King Mongkuts University of Technology Thonburi ()Land and Houses Public Company Limited Wastewater Management Authority()Ek-Chai Distribution System Company LimitedThe Liquor Distillery Organization, Excise Department -Integrated Refinery & Petrochemical Complex (IRPC) Thailand Tobacco MonopolyPublic Company Limited( )Ministry of Public Works and Transport, Kingdom of CambodiaAsian Development Bank Airports of Thailand Public Company LimitedJapan Bank for International Cooperation ( ) PTT Public Company Limited. () 13Team1-64.indd 13 4/2/10 7:23:17 PM 14. 14Team1-64.indd 14 4/2/10 7:23:21 PM 15. Buildingand InfrastructureFunction,aesthetics,energy-efficiency andenvironmentally-friendly designare our prime considerations when combiningour expertise in engineering, architecture,landscape architecture, interior design, andmechanical, electrical and communicationsystems. The result is the delivery of fullyintegrated services in building and infrastructuredevelopment.15Team1-64.indd 154/2/10 7:23:24 PM 16. PTT Central Workshop in RayongLaboratory Design .In 2009, we were entrusted with the detailed design of()laboratories by several organizations. Design of theselaboratories focused on enhancing research developmentand promotion as well as achieving greater operationalClient: PTT Public Company Limitedefficiency for our clients. Blending function with a modernAdministered by: ATT Consultants Co., Ltd.and attractive design, these facilities also embraced the:.()concept of green building to ensure wise use of energy and: resources. We also introduced Building InformationModeling, or BIM technology, to support the design process.Owing to our success in the detailed technical design ofthe Southeast Asian laboratory for the diagnosis of avianinfluenza in 2005, we set our goal of becoming the nationsleading consultancy in laboratory design and construction.Bioprocess Research and Innovation Facility Client: King Mongkuts University of Technology Thonburi (KMUTT) : Seven-storey building equipped with comprehensive TEAM GROUP was entrusted with the design andinterior and exterior utilities on a par with internationalconstruction supervision of a new large centralized, fully-standards.equipped workshop for the maintenance of machinery 7and equipment for the five PTT gas extraction plants inMap Ta Phut Industrial Estate, Rayong. The 3,150 m2 building comprises office and storageareas, maintenance equipment, including 20-ton, 5-tonand 3-ton overhead cranes, and internal roads.5 . 3,150205 3 Building Information Modeling (BIM)16Team1-64.indd 164/2/10 7:23:26 PM 17. Administered by: SQ Architects and Planners Co., Ltd. 2552: 2548 (Building Information Modeling - BIM) Model Center for the Production of Biomass Synthetic Fuel Client: The Thailand Institute of Scientific and Technological Research : Model center, serving as an information storehouse and host for research anddevelopment in the field of biomass fuel development.Chemical Metrology Laboratory The Test Center for Exports Client: National Institute of Metrology (Thailand) Client: Department of Science Service:: An automation system-based referenceEnvironmentally-friendly laboratory for chemical laboratory and specialization center fortesting and experimentation. Thailand. Using solar-cell electricity to reduce power drawn from distribution lines.Building Automation System SQ Architects and Planners Co., Ltd. is one of two companies inThailand that currently introduce the Building Information Modeling (BIM)(BIM)*to their work* BIM BIM is the process of generating and managing building data duringits life cycle. Typically it uses three-dimensional, real-time, dynamicbuilding modeling software to increase productivity in building design andconstruction. The model represents the whole building components,construction procedure, as well as properties and quantity of materials,thus enhancing the accuracy of cost estimation, building structure design aswell as construction management and facility management planning.*From Construction and Property magazine. Issue 18 November-December 2009.*Construction and Property18 -255217Team1-64.indd 17 4/2/10 7:23:28 PM 18. 18Team1-64.indd 18 4/2/10 7:23:29 PM 19. Transportationand LogisticsTo promote sustainable transport for the people of theBangkok region, TEAM GROUP has provided assistancein all stages of the development of Bangkoksmass transit system. This has ranged from masterplanning to design and construction supervision.We have also been entrusted with traffic managementprojects and have improved traffic flow in business areasand around construction sites in Bangkok.The construction supervision of roads and highways inThailand also paved our way to roadwork projectsin neighboring countries. 19Team1-64.indd 19 4/2/10 7:23:32 PM 20. Revision of the Mass Transit Master Plan in the BangkokMetropolitan Region (M-MAP) (M-MAP)Client: Office of Transport and Traffic Policy and Planning :Administered by::TEAM Consulting Engineering and Management Co., Ltd.TEAM Logistics and Transport Co., Ltd.Daoreuk Communications Co., Ltd.20Team1-64.indd 20 4/2/10 7:23:33 PM 21. Integrated Mass Transit M-MAPMaster PlanThe Mass Transit Master Plan in the Bangkok 20 ( 2553-Metropolitan Region (M-MAP) requires a comprehensive2572)study covering all aspects of the rail transit system, its 84environmental impacts and public participation in thecapitals mass transit network. The study will lead to theformulation of a 20-year mass transit system action plan(2010-2029) for Bangkok and its environs. Featuring a radialand circumferential pattern, the network is initially dividedinto 12 inter-connecting lines. In the interests of the public,the master plan specifies the creation of an integrated masstransport network with the use of a common ticket and farerate structure. The plan will also act as a master plan for allagencies concerned. TEAM GROUP assisted with feasibility studiesinvestigating alternative routes, new feeder routes,prioritization of alternative routes, financial andimplementation planning, and environmental impactassessment. 21Team1-64.indd 21 4/2/10 7:25:22 PM 22. Bangkok Mass Transit System: Green Line Extension (Saphan Mai-Lam Lukka)- 4Client: Office of Transport and Traffic Policy and PlanningAdministered by:TEAM Consulting Engineering and Management Co., Ltd.Geotechnical and Foundation Engineering Co., Ltd.Daoreuk Communications Co., Ltd.:4 : TEAM GROUP acted as the consultant in master planning,generating detailed designs for the project. We also supervisedthe construction of the BTS Green Line Extension, consisting of -the Dark Green Line (Mo Chit-Lam Lukka Khlong 4) and theLight Green Line (Bearing-Samut Prakan).2 - Following the successful operation planning, feasibility13.5studies, environmental impact assessment, detailed design,preparation of tender documents and management of publicparticipation activities for the first phase at Mo Chit-SaphanMai, we were further entrusted with management of the secondphase. This covered the 13.5-kilometer long line from SaphanMai to Lam Lukka. The project also features a new design for thefrontage road running in parallel with the track structure andconnecting Phahon Yothin Road with Lam Lukka Road.22Team1-64.indd 22 4/2/10 7:25:23 PM 23. The Capital Market Center ProjectClients: The Stock Exchange of Thailand (SET) Architects 49 LimitedAdministered by: TEAM Logistics and Transport Co., Ltd. :49 :The Stock Exchange of Thailand is developing the first center for innovative financial products and integrated investment in Thailand. Located on an area of 2.384 hectares on Ratchadaphisek Paramics Road, the project features the SET office building and a 1.546- hectare space open to interested parties to implement a land M i c r o development program. The opening of the center was anticipated to worsen traffic in the area, which, in turn, would certainly hinder Simulation S-Paramics is the latest version of the success of the project. the widely applicable Paramics microUsing S-Paramics software, TEAM GROUP generated trafficsimulation traffic flow modeling system, simulation models to predict a wide variety of traffic conditions and software for the analysis and design of proposed mitigation measures to facilitate traffic flow in the vicinity urban and highway networks. It is the most of the site.versatile and comprehensive road traffic flow analysis system for all sizes of road network, available to traffic planners and modelers throughout the world. It presents14.9-its output as a performance index and a real-time visual display for traffic management and road network design. 5.24 9.66 S-Paramics S-Paramics 323Team1-64.indd 23 4/2/10 7:25:24 PM 24. Traffic simulation of Sri Nagarindra-Sukhumvit 103 Intersection-103Underpass at the Sri Nagarindra-Sukhumvit 103 Intersection 103Clients: Bangkok Metropolitan Administration (BMA) SEAFCO Public Company LimitedAdministered by: TEAM Logistics and Transport Co., Ltd.: ():TEAM GROUP was assigned to devise a traffic management plan to ensure minimal impact from the-103 construction of the underpass. () The Sri Nagarindra-Sukhumvit 103 (Udom Suk) intersection on Sri Nagarindra Road is one of the most congested areas in Bangkok. The BMA therefore proposed the construction of an underpass to allow drivers to continue without the need to wait for the traffic lights to turn green. The underpass, 18 meters wide and 1,018 meters.4 long, is on Sri Nagarindra Road and features four18 1,018 lanes. During construction, partial closure of Sri Nagarindra Road is anticipated to increase traffic50 congestion by 50%. 24Team1-64.indd 24 4/2/10 7:25:25 PM 25. National Road No. 67 (Anlong Veng-Siem Reap), Cambodia67 ( ) Client: Ministry of Public Works and Transport, Kingdom of Cambodia Administered by: TEAM Consulting Engineering and Management Co., Ltd.:: TEAM GROUP assisted the client in civil workconstruction, overall management and monitoring of theproject. We also provided Cambodian personnel with trainingin all aspects of the work. The National Road Number 67 construction, initiated byCambodias Ministry of Public Works and Transport, is the first 67project to provide a link between Thailand and Cambodia.The road, 131 kilometers in length, not only facilitates travelbetween the two countries but also provides access to131Cambodias renowned tourist attractions, such as AngkorWat, Angkor Thom, Banteay Srei and the last stronghold of theKhmer Rouge in Anlong Veng. It also helps to promote cross-border trading. The road was completed and officially opened to trafficon 4 July 2009. 67 4 2552 25Team1-64.indd 25 4/2/10 7:25:25 PM 26. 26Team1-64.indd 26 4/2/10 7:25:26 PM 27. Environment With over 30 years of experience in this field, TEAM GROUPoffers the clients a one-stop service, including initialenvironmental examination (IEE), environmental impactassessment (EIA), environmental management planning (EMP)and resettlement action plan (RAP). Meeting new socialrequirements, we are also among those service providerspioneering social and health impact assessments (SIA and HIA).We also provide environmental engineering expertisein support of waterworks and wastewatermanagement. This extends from master planning anddesign to construction supervision and implementation. 3027Team1-64.indd 274/2/10 7:25:29 PM 28. Environmental Monitoring for the Natural Gas Pipeline Project( )Client: PTT Public Company LimitedAdministered by: TEAM Consulting Engineering and Management Co., Ltd.:.():We put to use our full breadth of knowledge and experience in monitoring the environmental impact mitigation measures and conducting an environmental quality examination for the18 extension of natural gas pipeline to the Government Complex on Chaeng Watthana Road and the National Energy Center throughout the 18-month construction. The extension covered the areas in Bangkok and Pathum Thani Province.We also monitored the security, health and. environmental specifications, as defined by PTT.The main line starts from the existing pipeline system around Rangsit railway station, runs along the railway and merges with the Suvarnabhumi- Phaya Thai NGV pipeline at Phaya Thai railway- station. There are secondary lines to the Bang Kadi Industrial Park, the Government Complex, the National Energy Center and the Royal Chitralada41.85 Projects. These combine to form a total length of 41.85 kilometers.The project will have the added benefit of encouraging more extensive use of natural gas in transportation, industry and businesses. This is in response to the governments policy to promote the use of alternative energy.28Team1-64.indd 28 4/2/10 7:25:32 PM 29. HIA is an effective wayto promote wellbeing,health and equity.HIA for the MTT Jetty and Tank Farm ProjectClient: Map Ta Phut Tank Terminal Co., Ltd. (MTT) Administered by: TEAM Consulting Engineering and Management Co., Ltd.::TEAM GROUP conducted a health impact assessment in accordance with national laws with the intention of anticipating the health impacts of the project, devising health impact mitigation measures and proposing health impact monitoring guidelines to verify the efficacy of the measures. Located in Map Ta Phut Industrial Estate in Rayong Province, Map Ta Phut Tank Terminal Co., Ltd. currently owns two jetties and 25 storage tanks for raw materials and products, and plans to construct two more jetties and seven more storage tanks to provide support for petrochemical-related industries, thus enhancing this industrys import and export potential.2252 7 29Team1-64.indd 29 4/2/10 7:25:34 PM 30. EIA for the Chana Power Plant Project2,485.58 (824 ) (340Client: Electricity Generating Authority of Thailand (EGAT))Administered by:TEAM Consulting Engineering and Management Co., Ltd. 1(725) :( .) : 2559 .2 The current installed capacity for electricity generation in Southern Thailand amounts to 2,485.58 MW. Major generators include the private Khanom thermal power plant in Nakhon Si42 Thammarat (824 MW), the Krabi thermal power plant in Krabi (340 MW) and the first unit of Chana combined cycle power plant in Songkhla (725 MW). To ensure sufficient electricity supply for 2557 economic and industrial development and to strengthen national energy stability, EGAT planned the construction of a second unit at 860 Chana power plant in 2011 as a substitute for the Khanom power plant, which is due to close in 2016. Construction will take1 approximately 42 months. The new power plant, with an installed capacity of about 860 MW, is slated to operate in July 2014. Having assessed the environmental impacts resulting from the construction and operation of the first unit, TEAM GROUP was 2 entrusted with conducting social, environmental and health impact assessments for the second unit and, following this, the formulation of2 mitigation measures to ensure public acceptance of the second unit matched that of the first unit.130Team1-64.indd 304/2/10 7:25:34 PM 31. EMP, RAP and Raw Water System Design for Hongsa Coal-Fired Power Plant, Lao PDR. Client: Banpu Public Company LimitedThe Hongsa Power Plant Project Administered by: TEAM Consulting Engineering and Management Co., Ltd. consists of a large open-pit lignite mine with reserves of 361 million tons, a: () coal-fired power plant with three 626:MW-generating units, and 67 kilometers of 500 kV double-circuit transmission line running from the power plant to the Thai-Lao border. The raw water system consists of a rock-filled clay-cored dam 235 meters in length and 51 meters in height, a spillway, 5,500 meters of 1,000-1,200 mm diameter pipe, and a pump station equipped with four pump engines. 361Located in Hongsa, Xayabouri Province, Lao PDR, this project is alarge-scale Thai-Lao venture, for which Banpu PLC., Ratchaburi Electricity 626 3Generating Holding PCL. and the Lao Government are joint shareholders.500It is the first thermal power plant and the largest ongoing power project in-Lao PDR. With a generating capacity of 1,653 MW, the plant will enhance67considerably Lao energy generating potential and stability.TEAM GROUP designed the raw water system supplying the plant andsince 2007 has served continuously as project consultant forimplementation of the environmental management plan and resettlement235 51action plan, in accordance with the Lao Water Resource and Environmental 1,000-1,200Authoritys technical guidelines on resettlement and compensation. This5,500ensures that environmental impacts during construction and operation will4be effectively mitigated and that the 367 affected families in 5 villages willbe appropriately relocated to resettlement sites...( ) ( ). . . 1,653.3675255031Team1-64.indd 314/2/10 7:25:36 PM 32. EIA for Coal-Fired Power Plant in Stueng Hav, Sihanoukville, Cambodia Client: Cambodian Energy LimitedAdministered by:TEAM Consulting Engineering and Management Co., Ltd.100TEAM Consulting and Management (Cambodia) Co., Ltd.: Cambodian Energy Limited: TEAM Consulting and Management (Cambodia) Co., Ltd. TEAM GROUP conducted an environmental impact assessment and set up a monitoring program to minimize the environmental impacts from the power plant in Stueng Hav, Sihanoukville.Located in southern Cambodia, the province of Sihanoukville is a renowned seaside resort while its Stueng Hav District hosts a free trade and industrial zone along with a large, modern deep- sea port. The Cambodian government thus decided on a power plant development scheme to facilitate growth in tourism and industry in the province./This coal-fired power plant boasts a capacity of 100 MW. The coal will be transported from overseas via Panamax- and/or 3,000 DWT Handymax-sized sea vessels to the projects 3,000 DWT coal jetty.32Team1-64.indd 324/2/10 7:25:37 PM 33. Master Plan for Wastewater Management in River Basins Client: Wastewater Management Authority (WMA) Administered by: TEAM Consulting Engineering and Management Co., Ltd.: : TEAM GROUP was appointed the consultant forthe master plan development of the wastewater4management in four major river basins aroundThailand, namely Mae Sa river basin in the North,Chao Phraya river basin in the Central part, Huai SamMo river basin in the Northeast and Songkhla lakebasin in the South. Quality of water resources in thesebasins has been declined due to the communityexpansion and human activities. The master plan will serve as a framework for thedevelopment of a community wastewatermanagement master plan and investment. It will alsoprovide a database for wastewater management in4 Mike 11the communities of these four basins. By using Mike 11software program, the study will provide cause-effectanalysis and solutions to the wastewater managementin each basin to tackle the current water resourceproblems and prevent the reoccurrence. Mike 11 is a software program used in the simulation of water flow. The Mike 11 software models water flow characteristics and levels as well as the flow of sediments in waterways and flooded areas. This assists in the analysis of water quality and in flood prevention.33Team1-64.indd 334/2/10 7:25:39 PM 34. Metropolitan Water Productivity Enhancement Client: Metropolitan Waterworks Authority (MWA)Administered by: TEAM Consulting Engineering and Management Co., Ltd.:(.):To meet the ever-increasing demand for water Station 3, Bang Khen Water Treatment Plant, a large supply and water services in Bangkok, Nonthaburiwater plant with a water production capacity of 3.6 and Samut Prakan, the MWA decided to expand its million cu.m./day supplying most areas of Bangkok. productivity and transmission tunnel network. The installation will enhance the MWAs waterTEAM GROUP has been involved in theproductivity and distribution and help it to meet development of Maha Sawat Water Treatment Plant increasing demand. in Nonthaburi since 1995 and was entrusted, in 2009, In the eastern area of Bangkok, we designed and with the design of phase 4 and its accompanying supervised the construction of a 3,200 mm-diameter transmission conduit. transmission tunnel from the Highway No. 351A scheme to increase its productivity was dividedIntersection, running beneath Kanchanaphisek (East into eight phases, each of which was planned to portion) Road, to merge with the existing tunnel increase daily production capacity by 400,000 cu.m. around Thap Chang Intersection. Water will be Upon its completion of phase 4, the plant will be abledistributed through this 13-km long tunnel to those to produce 1.6 million cu.m./day of water for communities which currently rely on groundwater, a Bangkoks Thon Buri side and for Nonthaburi. When all cause of land subsidence. The tunnel will also increase eight phases are finished in 2017, the total production water supply for the Lat Krabang and Bang Phli capacity will amount to 3.2 million cu.m./day.pumping stations and so help to accommodate growthTEAM GROUP also supervised the installation of in industrial zones in the vicinity of Suvarnabhumi 300 cu.m./minute pump engines at the PumpingAirport. Maha Sawat Water TreatmentPlant34Team1-64.indd 34 4/2/10 11:23:33 PM 35. .300 / 33.6. 2538 25524 3,200351 8( )400,000 4 131.6 25603.2. Nawamin-Thap ChangTransmission Tunnel- A pump engine at Bang Khen Water Treatment Plant 35Team1-64.indd 35 4/2/10 7:25:41 PM 36. 3636Team1-64.indd 36 4/2/10 7:25:42 PM 37. Water Resources Drawing on our 30 years of accumulated knowledge and experience in water resource development, hydroelectric power projects , and drainage and flood control projects , TEAM GROUP today is not only a trusted consultant for the public and private sectors in Thailand, but also for those in neighboring countries. 30 37Team1-64.indd 37 4/3/10 7:33:24 PM 38. Drainage Tunnel from Saen Saep and Lat Phrao Canalsto the Chao Phraya RiverClient: IN Joint Venture Co., Ltd.Administered by:TEAM Consulting Engineering and Management Co., Ltd.::38Team1-64.indd 384/2/10 7:25:47 PM 39. TEAM GROUP provided quality control servicesfor the construction of the drainage tunnel fromSaen Saep and Lat Phrao canals to the Chao PhrayaRiver, by means of which the BMA plans to lessen theongoing problem of annual flooding in the easternBangkok area. 150 This drainage tunnel can rapidly discharge a largevolume of flood water and so alleviate flood problemsin the 150 km2 area of Bang Kapi, Wang Thonglang,Huai Khwang, Din Daeng, Phaya Thai, Saphan Sung,5Lat Phrao, Bueng Kum, Khan Na Yao, Lat Krabang and9 71Min Buri. 5.11 With a total length of 5.11 kilometers, this5-meter diameter drainage tunnel is at present the60longest in Thailand. Starting from the Rama IX swampand running along Saen Saep Canal, Soi Sukhumvit71, Sukhumvit Road and Phra Khanong Canal, water 27is rapidly drained into the Chao Phraya River by the60 cu.m./second pumping facility installed at the endof the tunnel, which, to avoid impacts on an MRTsubway tunnel and on the foundations of surroundingbuildings, is at a depth of 27 meters. 39Team1-64.indd 39 4/2/10 7:25:49 PM 40. Nam Ngum 2 Hydroelectric Power Project 2 .Client: CH. Karnchang Public Company LimitedAdministered by: TEAM Consulting Engineering and Management Co., Ltd. ATT Consultants Co., Ltd.: .( ):40Team1-64.indd 40 4/2/10 7:25:51 PM 41. Nam Ngum 2 Hydroelectric Power Project is located 90 kilometersnorth of Vientiane Province. The powerhouse will come on stream by2011 and will generate an annual average of 2,218 GWh of electricity for Nam Ngum 2export to Thailand, thus boosting the economy of Lao PDR. Given the size of the dam and accompanying tunnels as well as its Hydroelectriccapacity, Nam Ngum 2 is a huge project which has challenged our Power Projectengineering competency. In addition to generating detailed design andsupervising the construction, in 2009 TEAM GROUP also implemented theenvironmental management and resettlement action plans for the 2relocation of about 6,100 ethnic minorities from 17 villages.The project includes a concrete- faced rock-filled dam 182 meters2 .high and 485 meters long, a reservoir90 with a capacity of 6,774 million cu.m., 11.7 meters wide diversion tunnels and 2554 2,218a powerhouse with 615 MW installed.capacity.22 182485 6,7742552 6,10011.7 17 615 41Team1-64.indd 414/2/10 7:25:54 PM 42. Xayabouri Hydroelectric Power Project .Client: CH. Karnchang Public Company LimitedAdministered by: TEAM Consulting Engineering and Management Co., Ltd.Geotechnical & Foundation Engineering Co., Ltd.ATT Consultants Co., Ltd.: . ():42Team1-64.indd 42 4/2/10 11:29:41 PM 43. Xayabouri Hydroelectric Power Project is part ofthe Mekong cascade development plan, whichcomprises nine run-of-the-river hydroelectric powerprojects. When operates, in 2015, the powerhouse willhave the installed capacity of up to 1,260 MW orapproximately twice that of the Nam Ngum 2 dam.Most of the electricity produced will be sold to theElectricity Generating Authority of Thailand, thussecuring the electricity provision in Thailand andfostering Lao PDRs economic growth. Located in Xayabouri Province, the project isdesignated with the fish passage facility designed fordifferent breeds of fish, the first of its type inSoutheast Asia. Having previously provided the projectsfeasibility study and environmental and social impactassessments, TEAM GROUP was assigned in 2009 toconduct civil work design, estimate the cost, set up anoperation plan and prepare tender documents for theproject.925581,260 2 2. . 43Team1-64.indd 43 4/2/10 7:25:57 PM 44. 4444Team1-64.indd 44 4/2/10 7:26:03 PM 45. Energy TEAM GROUP is not only committed to service excellence in the development ofelectricity systems and the oil industry, but also strives to bring clean, reliable and affordable energy technologies to the marketplace. With our decades of engineering experience, we are able to offer a full range of renewable energy technologies. 45Team1-64.indd 45 4/2/10 7:26:06 PM 46. Chit Lom Electricity Terminal Station andTransmission Line TunnelClient: Metropolitan Electricity Authority (MEA)Administered by: ATT Consultants Co., Ltd. : (.) :TEAM GROUP was entrusted with the design and decided to construct a large new terminal station and construction supervision of the Chit Lom electricityunderground conduit. terminal station, along with a transmission tunnel The new station is housed in a reinforced connecting Bang Kapi and Chit Lom stations. Thisconcrete 10-storey structure with a total functional project was initiated to enhance the electricityarea of 8,500 m2, designed for the installation of three distribution efficiency of MEA in order to meet the 230/69 kV 300 MVA transformers (two are currently increasing demand for electricity in Bangkoksinstalled), SCADA system, oil tanks for the oil-filled business areas. cables, and other control systems.The Chit Lom station was first constructed in 1980The 7-kilometer long, 2.60-meter diameter tunnel to transmit electricity from Bang Kapi station to the was built at a depth of 30 meters beneath Saen Saep areas of Ratchaprasong, Phloen Chit, Sukhumvit, Silom Canal, deeper than the BMAs drainage tunnel and and Pathumwan. However, oil leakage from thethe MRTs subway structure. Installed inside will be underground and time-worn oil-filled transmission three circuits of oil-filled 230 kV transmission lines lines caused frequent short circuits, affecting the (two are currently installed). security of the distribution system. The MEA thus46Team1-64.indd 46 4/2/10 7:26:08 PM 47. FIRST ANDFOREMOST Thailands first electricity stationequipped with large transformersinside a tall building. Protectiveis emphasized, resulting in safety toofficials being in charge.The 230/69 kV, 300 MVA transformeris the largest of its kind in Thailand.The first MEA high-voltagetransmission tunnel project led by aThai-based construction supervisionand management consultant. 2523 .230/69 kV 320 MVA10 8,500 .230/69 kV 300 MVA 3(2 )SCADA 2.60730 . 230 3 (2 ) 47Team1-64.indd 47 4/2/10 7:26:09 PM 48. Tank Farm Terminal in Phetchaburi ProvinceClient: Bangchak Petroleum Public Company Limited Administered by: ATT Consultants Co., Ltd.: ():To increase its exports, Bangchak ( ) Petroleum PCL planned to purchase an EIA- certified seaside tank farm owned by Pan Asia Storage & Terminal Co., Ltd., located in Phetchaburi.TEAM GROUP conducted the technical due diligence of this oil terminal and estimated the costs to repair the facility, to assist the client in making a decision on future investment.( )The tank farm consists of 16 storage tanks 16 with a combined capacity of 500 million liters, 50016 a 16-truck loading bay, a 30,000-ton sea30,000 / berth, three 16 inch-diameter submarine oil 16 6.5 3 pipelines, and other utilities and associated infrastructure.48Team1-64.indd 48 4/3/10 7:36:06 PM 49. Client: Bangchak Biofuel Company LimitedAdministered by: TEAM ConsultingEngineering and Management Co., Ltd.:: Biodiesel Plant in Phra Nakhon Si Ayutthaya Through our services in construction supervision and project management, we anticipate to support the production of inexpensive and environmentally- friendly fuel for domestic consumption.Bangchak Petroleum PCL and Universal Adsorbents & Chemicals Company Limited ( ) established the Bangchak Biofuel Company Limited as a subsidiary primarily responsible for the construction of a palm oil biodiesel (B100) plant next to its tank (B100) farm in Bang Pa In District, Phra Nakhon Si Ayutthaya .. Province. It is planned that the plant will produce 300,000 liters of biodiesel daily. This is in response to 300,000 the governments policy of promoting the use of biodiesel as a means of reducing imports of diesel, securing national energy supplies, and encouraging the use of energy from domestic agricultural produce, which will in turn help to alleviate air pollution and to improve the quality of life of the people.49Team1-64.indd 49 4/2/10 7:26:12 PM 50. 5050Team1-64.indd 50 4/2/10 7:26:13 PM 51. Message from the Chairman In this ever-changing world, consultancies are required to find prompt and effective solutions to the new and critical challenges which are constantly emerging. Through their expertise, accrued experience and state-of-the-art technology, the staff of TEAM GROUP are able to meet these requirements and in the process develop their specializations. This has led to the Groups becoming the top-ranked Thai consultant in its areas. To give one example of our success, faced with the worlds ongoing energy problems and the need to develop alternative energy, we have played a vital role in many projects involving clean energy and energy conservation and, helping to alleviate the problem of climate change, TEAM GROUP has devised a multitude of innovative outcomes. TEAM GROUP is foremost among consulting service providers which assist the public and private sectors in developing such measures. Our other works include services in environmentally-friendly buildings, planning and development of pollution-free transit systems, environmental management, solid waste and wastewater management, and waste-to-energy. In 2009, TEAM GROUP was entrusted with a number of important projects in both Thailand and neighboring countries. The year thus represented an important phase in TEAM GROUPs growth. In addition to our ability to address new challenges, another key to this success is our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client. Effective and timely solutions within budget are always assured. Decades-long experience and the trust we have obtained build our confidence in directing the organization toward international expansion, especially in the Southeast Asian region. I strongly believe that our highly professional staff will be able to prove the potential of Thai consultants in the international arena and, as they have already done in Thailand, steer TEAM GROUP to the position of leading consultancy in this region.(D Prasert Patramai)(Dr. P t P t i)Chairman of the Board 2Team1-64.indd 2 4/2/10 7:22:06 PM 52. Managementand Trainingproject andOffering consulting services inorganization management , corporatestrategic management, financial management,investment, marketing and human resourcedevelopment, we assist our clients in projectimplementation and organizational andpersonnel capacity building to enhancetheir competitiveness. 51Team1-64.indd 51 4/2/10 7:26:16 PM 53. Economic Value Management (EVM) Clients: The Airports of Thailand Public Company Limited (AOT) Central Pattana Public Company Limited (CPN)Administered by: Management Solutions International Ltd.: ( )( ):We assisted with the implementation of the EVM We also developed the EVM system for the CPN, system for AOT, a corporatized state enterprise with one of Thailands leading retail property developers, an internationally-oriented operation, so that it couldand raised the EVM awareness throughout the operate in response to the governments policies while organization to ensure its most effective operation. generating benefits for both the state and itsIn 2009, the implementation of EVM system at shareholders. Engineering considerations were also both organizations continued to the implementation applied when devising the corporate strategy tophase. When the system is completely linked with develop airport utilities efficiently. their corporate management, they will be able to settheir investment plan and activities to generate value-added and fair benefits for all stakeholders. 52Team1-64.indd 52 4/2/10 7:26:18 PM 54. Today, most international organizationshave adopted the EVM system as theirorganization management guidelines. Thesystem focuses on value creation throughthe organizations operating, investmentand financing activities. Economic Profit(EP) is used as a key performance metric.One of the most useful strategicmanagement tools, and one which isfrequently used in successful EVMimplementation, is the Balanced Scorecard(BSC). In general, the implementation ofEVM and BSC is divided into three phasesas follows. Phase 1: Organization and personnelpreparation Phase 2: Personnel training anddevelopment of EVM center Phase 3: Linking EVM with corporatemanagement systemEVM (Economic Value Management: EVM) ( ) (Economic Profit: EP)Balanced Scorecard (BSC)EVM()EVMBSC 3 12552EVM EVM2EVM3 EVM 53Team1-64.indd 534/3/10 7:42:06 PM 55. Project Management of the New Tobacco Factory at RojanaIndustrial Park, Phra Nakhon Si Ayutthaya Client: Thailand Tobacco Monopoly (TTM) Administered by: Management Solutions International Ltd. : :TEAM GROUP has recently been assigned as an official consultant by Thailand Tobacco Monopoly (TTM) to manage the construction of its new headquarters and tobacco2553 production facilities following our successful completion of the project site selection, feasibility study as well as its detailed design. Construction will commence in mid 2010 and operations are scheduled to start in 2013. With our integrated expertise in construction and management, we will continue . to provide consultancy services in project management.TTM decided that it needed to move its existing headquarters and production facilities to a new location in Rojana Industrial Park, Phra Nakhon Si Ayutthaya. This is to improve its manufacturing processes, modernize its organization and optimize value to all stakeholders. The relocation requires expertise in diverse disciplines, not only in construction and machinery, but also in computer program design as information technology will be applied to corporate management to enhance operational efficiency and to eliminate redundant procedures. 2556The new plant will produce approximately 32 billion 32,000 cigarettes per year.54Team1-64.indd 54 4/2/10 7:26:20 PM 56. Feasibility Study of the New Alcohol Production FacilityClient: A leading alcohol manufacturer in ThailandAdministered by: Management Solutions International Ltd. : :TEAM GROUP was invited to conduct the feasibility study of a new alcohol production facility for the nations leading alcohol manufacturer. The new facility is planned to serve the rapidly-growing demand, which cannot be sufficiently served by its existing production facility.The feasibility study is regarded as a crucial step prior to construction to ensure maximum operating efficiency and profitability of the investment. We provided our client a wide range of the consultation, covering location selection, market study, feedstock study, preliminary technical design for effective alcohol production process, plant layout design and financial return analysis. Embracing ecological awareness, the new facility is encouraged with environmentally-friendly technologies, namely zero-discharge technology and Clean Development Mechanism (CDM).CDMIn addition, to fulfill the clients requirements, we supported the client in business process improvement, financing structure consulting and requesting approval of the project from its main stakeholders prior to proceeding with investment. 55Team1-64.indd 554/2/10 7:26:22 PM 57. 56Team1-64.indd 56 4/2/10 7:26:23 PM 58. Communicationsand Public ParticipationOur communications expertise is based on a solid foundation of aesthetic values, precise content and theproper use of language in printed publications, multimedia productions and event organizing. By means of this, we have assisted our clients in communicating efficiently to target groups and in promoting positive images of their organizations and projects, enabling them towin public participation and acceptance. 57Team1-64.indd 57 4/2/10 7:26:26 PM 59. Exhibitionndin Honor of His Majesty the King on His 82 Birthday Anniversary, 5 December 20098252552Client: Bangkok Metropolitan Administration (BMA)Administered by: Daoreuk Communications Co., Ltd.::To join the nation in honoring His Majesty the King, TEAM GROUP assisted with the promotion of his work and benevolence through an exhibition titled All Blessed by the 82 52552 Grace of His Majesty. The exhibition was part of the greatest celebration for His Majesty the Kings birthday. 3 72552 The celebration was held from 3 to 7 December 2009 on Ratchadamnoen Avenue, covering the area from Phan Fa Lilat Intersection to Phan Phiphop Lila Intersection. Located at Maha Jessada Bodin Pavilion Court, the All Blessed by the Grace of His Majesty exhibition presented His Majestys royal biography and described his great kindness to the Thai people. The event comprised exhibition boards, multimedia presentations, light and sound performances, books of good wishes to His Majesty open for public signing, and souvenir postcards. Large projectors installed in a shape of 4-sided prism illustrated royal life throughout the event.58Team1-64.indd 584/2/10 7:26:28 PM 60. Opening Ceremony for the Extension of the Silom Route of theElevated Train6 2Client: Traffic and Transport Department, BangkokMetropolitan AdministrationAdministered by: Daoreuk Communications Co., Ltd. : : Through our public relations strategic planning15 2552 and implementation, we assisted the client in 23 2552 publicizing both the unofficial launch of the historic elevated train line from Taksin Bridge to Wongwian Yai on 15 May 2009 and the official opening6 ceremony, presided over by Her Royal Highness2 Princess Maha Chakri Sirindhorn, on 23 August 2009 at Wongwian Yai Station.Shortening commuting time, this extension of the Silom Route facilitates travel between Bangkok and Thon Buri. Above all, it marks the first elevated train route across the Chao Phraya River. From 15 May to 31 August 2009, the public were able to use the new 15 31 extension free of charge. 2552 59Team1-64.indd 594/2/10 7:26:30 PM 61. Integrated Public Relations for the Phra Maha Mondop Projectat Wat Traimit Wittayaram We provided public relations consulting services,including public participation and media relations aswell as website development for this project from itsinception in 2007 until its completion at the officialClient: The Board of Committee, the Project opening on 24 December 2009. We were also entrustedon the Construction of Phra Maha Mondop towith the creation and publication of Phra Maha Mondop,Enshrine Phra Buddha Maha Suwanpatimakorn,The Exquisite Shelter for Phra Buddha MahaWat Traimit WittayaramSuwanpatimakorn: A Testimony to the Everlasting Faith,Administered by: Daoreuk Communications Co., Ltd. a commemorative book celebrating the project, publishedin three languages: Thai, English and Chinese.: The construction of Phra Maha Mondop at WatTraimit Wittayaram was initiated through the tripartitecooperation of the Government, Wat Traimit Wittayaram,:and the business community in BangkoksSamphanthawong District, and formed part of thecelebrations for His Majesty the Kings 80th birthday in2007. The structure enshrines Phra Buddha MahaSuwanpatimakorn (the Gold Buddha Image), which wasrecorded in The Guinness Book of Records 1991 (37thEdition) as the worlds largest Buddha statue to be cast ingold.60Team1-64.indd 60 4/3/10 9:55:26 PM 62. Phra Maha Mondop, The Exquisite 2550Shelter for Phra Buddha Maha Suwanpatimakorn: A Testimony to the24 2552Everlasting Faith won a Commendable Book Award in the General Category (for books published in 2009) in the 2010 Outstanding Book Awards contest held by the Office of the Basic Education Commission, Ministry of Education.3 2553 (2552) 80 52550()The Guinness Book of Records 199161Team1-64.indd 614/3/10 7:40:37 PM 63. Corporate Social Responsibility2552 Aware of our status as a member of thesociety, TEAM GROUP and the TEAM GROUPFoundation have consistently conducted activitiesfor the public interest. In 2009, we presentedscholarships and school supplies to the studentsat many schools in Nakhon Sawan and Nakhon 34Nayok provinces. Also, we launched the pilot2553project on alternative energy production at WatCSRWang Yai Chim School in Nakhon Nayok, making itthe prototypical school for bio-energy (CSR) .development. In addition, we presented donationsto The Home for the Blind with Multi-Handicappedin Soi Ram Inthra 34, Bangkok. CSR On the coming of the year 2010, we had thebook entitled CSR Insight for Constructive 3,000Development published for free distribution toschools. The book is a compilation of articlesabout the corporate social responsibility (CSR)written by Dr. Asavin Chintakananda, corporateadvisor and expert in business management,economics, investment and stock exchange. Thepublication was aimed to enhance the publicsunderstanding about the CSR activities and raisetheir social responsibility awareness.62Team1-64.indd 624/2/10 7:26:40 PM 64. CareSave the Earthfor the Environment, TEAM GROUP focuses not only on operational excellence, but also on sustainability. Always recognizing responsible environmental stewardship as part of our core mission, we, in cooperation with the Asian Development Bank, the Board of Trade of Thailand, and The Federation of Thai Industries, organized the Going GREEN: Towards Sustainable Development Seminar on 27 November 2009 at the Four Seasons Hotel in Bangkok. The seminar was aimed at encouraging understanding among public entities, private organizations, and the general public of Going Green activities. In pursuing these ends, the seminar helped create strong but sustainable economic growth and encourage environmentally- friendly business practices along with the creation of green entrepreneurs, who will set environmental standards in order that sustainable development goals can be reached.Going GREEN 27 2552 63Team1-64.indd 63 4/2/10 7:26:44 PM 65. Striving to Go Beyondthe Leading EdgeOver 30 years of experience as partners with public and private clients in domesticand cross-border projects, doubled with our commitment to continuously develop ourhuman resources, organization and services, has positioned TEAM GROUP at theforefront of consulting and related businesses. Mature andwell recognized, our goal is to actively expand in private andinternational markets.Unlike working with the public sector, which involves lengthy and complexbureaucratic procedures, private clients can place their trust in our rapid andon-time service delivery, a key-stone of our corporate philosophy.With respect to regional markets, our accrued experience andexpertise in the fields of infrastructure development, environmental management,and energy, coupled with our history of working with international organizations such asthe Asian Development Bank and the Japan International Cooperation Agency, will be ofgreat benefit to present and future projects and partners. Partnerships in projects abroadwill enrich the expertise and skill levels of Thai consultants, as well as broadening theirworking perspectives, and also lead to know-how and technology transfer. This willenable our organization and its stakeholders to grow ona sustainable basis. 3064Team1-64.indd 64 4/2/10 7:26:47 PM


Recommended