9
( DoT Report dated 24th June 2010) Intra Circle Aircel 234 17 7.26 101 43.16 Airtel 309 68 22.01 114 36.89 BSNL 367 47 12.81 68 18.53 178 30 16.85 76 42.70 HITL 20 0 0.00 9 45.00 Idea 258 32 12.40 123 47.67 Loop 143 8 5.59 16 11.19 MTNL 38 0 0.00 0 0.00 MTS 183 8 4.37 77 42.08 Reliance 488 57 11.68 185 37.91 Stel 51 5 9.80 19 37.25  TTSL 472 97 20.55 196 41.53 Uninor 151 45 29.80 39 25.83 Videocon 129 0 0.00 10 7.75 Vodafone 260 19 7.31 186 71.54 Vodafone 260 19 7.31 186 71.54  Total 3541 452 12.76 1405 39.68 Name of Service Providers  Total No of Service Providers with whom intra circle testing is to be carried by the Service Provider  Total No of Service Providers with whom intra circle testing is completed by the Service Provider Testin Completed in %  Total No of Service Providers with whom intra circle testing is in progress by the Service Provider Testing in Progress % Etisalat
Transcript
Page 1: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 1/13

( DoT Report dated 24th June 2010)

Intra Circle

Aircel 234 17 7.26 101 43.16

Airtel 309 68 22.01 114 36.89

BSNL 367 47 12.81 68 18.53

178 30 16.85 76 42.70

HITL 20 0 0.00 9 45.00

Idea 258 32 12.40 123 47.67

Loop 143 8 5.59 16 11.19

MTNL 38 0 0.00 0 0.00

MTS 183 8 4.37 77 42.08

Reliance 488 57 11.68 185 37.91

Stel 51 5 9.80 19 37.25

 TTSL 472 97 20.55 196 41.53

Uninor 151 45 29.80 39 25.83

Videocon 129 0 0.00 10 7.75

Vodafone 260 19 7.31 186 71.54

Vodafone 260 19 7.31 186 71.54

 Total 3541 452 12.76 1405 39.68

Name of Service

Providers

 Total No of ServiceProviders withwhom intracircle testingis to becarried bythe Service

Provider

 Total No of ServiceProviderswith whomintra circletesting iscompletedby theServiceProvider

TestinCompleted in

%

 Total No of ServiceProviders withwhom intracircle testingis in progressby theServiceProvider Testing in

Progress %

Etisalat

Page 2: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 2/13

Inter Circle

116 49.57 4702 0 0.00 272

127 41.10 5602 65 1.16 411

252 68.66 6428 1 0.02 5

72 40.45 3545 44 1.24 197

11 55.00 560 0 0.00 31

143 55.43 6987 5 0.07 69

119 83.22 2566 0 0.00 0

38 100.00 268 0 0.00 0

98 53.55 3364 0 0.00 33

246 50.41 8632 10 0.12 4

27 52.94 1120 0 0.00 2

179 37.92 8947 95 1.06 294

52 34.44 3348 36 1.08 41

119 92.25 2519 0 0.00 0

55 21.15 5720 0 0.00 0

55 21.15 5720 0 0.00 0

1709 48.26 70028 256 0.37 1359

Total No of ServiceProviderswith whomintra circletesting isnot startedby theServiceProvider

Testing Yet

to Start%

 Total No of ServiceProviders withwhom intercircle testingis to becarried bythe Service

Provider

 Total No of ServiceProviders withwhom intercircle testing iscompleted bythe ServiceProvider % Testing in

Complleted

 Total No of ServiceProviders withwhomintercircletesting is inprogress bythe ServiceProvider

Page 3: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 3/13

5.78 4430 94.22

7.34 5126 91.50

0.08 6422 99.91

5.56 3304 93.20

5.54 529 94.46

0.99 6913 98.94

0.00 2566 100.00

0.00 268 100.00

0.98 3331 99.02

0.05 8618 99.84

0.18 1118 99.82

3.29 8558 95.65

1.22 3271 97.70

0.00 2519 100.00

0.00 5720 100.00 Voice Only

0.00 5720 100.00 Voice+SMS

1.94 68413 97.69

% Testing in

Progress

Total No of ServiceProviderswith whominter circletesting isnot startedby theServiceProvider % Testing

 Yet to start

Page 4: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 4/13

NETWORK CALL TESTING (IOT)

INTRA CIRCLE INTER CIRCLE

CIRCLE Remarks CIRCLE Remarks CIRCLE

Kolkata 11 9 2 Kolkata 249 249 Kolkata

WB 11 10 1 WB 249 249 WB

Orissa 12 11 1 Orissa 248 248 Orissa

Assam 7 7 Assam 253 253 Assam

North East 7 7 North East 253 253 North East

UPE 12 9 3 UPE 248 248 UPE

Bihar 12 12 Bihar 248 248 Bihar

Mumbai 13 10 3 Mumbai 247 247 Mumbai

Maharashtra 12 8 4 Maharashtra 248 248 Maharashtra

0 Gujarat 12 8 4 Gujarat 248 248 Gujarat

MP 10 9 1 MP 250 250 MP

2 Rajasthan 9 7 2 Rajasthan 251 251 Rajasthan

Delhi 10 4 4 2 Delhi 250 250 Delhi4 Haryana 14 10 4 Haryana 246 246 Haryana

Punjab 10 10 0 Punjab 250 250 Punjab

UPW 15 9 6 UPW 245 245 UPW

J&K   6 5 1  J&K  254 254  J&K 

HP 10 6 4 HP 250 250 HP

9 Chennai 15 11 4 Chennai 245 245 Chennai

ROTN 13 9 4 ROTN 247 247 ROTN

Kerala 14 11 3 Kerala 246 246 Kerala

2 Karnataka 12 10 2 Karnataka 248 248 Karnataka

AP 13 5 4 4 4 AP 247 247 AP

TOTAL 260 19 186 55 0 TOTAL 5720 0 0 5720 0 TOTAL

% completion 7% 72% 21% 0% % completion 0% 0% 100% 0% % completion

NO OFOPRS

FORTESTING

TESTINGCOMPLETED-

Voice+SMS

TESTINGCOMPLETED-

Voice Only

TESTING

WIP

POI/OPTR

NOT READY 

 YET TOSTART

TESTING

NO OFOPRS FOR

TESTING

TESTINGCOMPLETED-

Voice+SMS

TESTINGCOMPLETED-

Voice Only

TESTING

WIP

POI/OPTR

NOT READY 

 YET TOSTART

TESTING

N

F

Page 5: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 5/13

Vodafone GSM IOT INTRA- CIRCLE Status with Other Operators

Activities UPE UPW AP KAR TN CHN KER GUJ BHR KOL ORI ROWB MUM ROMH ASM NE MP RAJ

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R

   E   P   A   I   D

Airtel GSMMO

MT

Vodafone GSMMO

MT

Reliance GSMMO

MT

Reliance CDMAMO

MT

MO

MT

TTSL GSMMO

MT

TTSL CDMAMO

MT

Aircel GSMMO

MT

BSNL GSMMO

MT

BSNL CDMAMO

MT

MTS CDMAMO

MT

Etisalat GSMMO

MT

Loop GSMMO

MT

Videocon GSMMO

MT

STEL GSMMO

MT

MTNL GSMMO

MT

MTNL CDMAMO

MT

HITL CDMAMO

MT

Uninor GSMMO

MT

LEGEND: Voice & SMS Complete

Voice complete & SMS not complete (to include SMS not started)

Voice & SMS testing both in progress

Not started; self ready; issues with other operator

 IDEA/Spice GSM

Page 6: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 6/13

Self not ready for testing

Other Operator not launched

Page 7: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 7/13

HAR PUN JK HP

   P   O   S   T

   P   A   I   D

   P   R   E   P

   A   I   D

   P   O   S   T

   P   A   I   D

   P   R   E   P

   A   I   D

   P   O   S   T

   P   A   I   D

   P   R   E   P

   A   I   D

   P   O   S   T

   P   A   I   D

Remarks

Page 8: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 8/13

Page 9: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 9/13

Vodafone GSM IOT INTER-CIRCLE Status with Other Operators

Activities UPE UPW AP KAR TN CHN KER GUJ BHR KOL ORI ROWB MUM ROMH ASM NE MP RAJ

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

Airtel GSMMO

MT

Vodafone GSMMO

MT

Reliance GSMMO

MT

Reliance CDMAMO

MT

MO

MT

TTSL GSMMO

MT

TTSL CDMAMO

MT

Aircel GSMMO

MT

BSNL GSMMO

MT

BSNL CDMAMO

MT

MTS CDMAMO

MT

Etisalat GSM MOMT

Loop GSMMO

MT

Videocon GSMMO

MT

STEL GSMMO

MT

MTNL GSMMO

MT

MTNL CDMAMO

MT

HITL CDMAMO

MT

Uninor GSMMO

MT

LEGEND:

Voice & SMS Complete

Voice complete & SMS not complete (to include SMS not started)

Voice & SMS testing both in progress

Not started; self ready issues with other operator

Self not ready for testing

Other Operator not launched

 IDEA/Spice GSM

Page 10: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 10/13

N JK HP

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

Remarks

Page 11: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 11/13

Vodafone GSM IOT ROAMING STATUS WITH OTHER OPERATORS

Activities UPE UPW AP KAR TN CHN KER GUJ BHR KOL ORI ROWB MUM ROMH ASM NE

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

Airtel GSMMO

MT

Vodafone GSMMO

MT

Reliance GSMMO

MT

Reliance CDMAMO

MT

MO

MT

TTSL GSMMO

MT

TTSL CDMAMO

MT

Aircel GSMMO

MT

BSNL GSMMO

MT

BSNL CDMAMO

MT

MTS CDMAMO

MT

Etisalat GSMMO

MT

Loop GSMMO

MT

Videocon GSMMO

MT

STEL GSMMO

MT

MTNL GSMMO

MT

MTNL CDMAMO

MT

HITL CDMAMO

MT

Uninor GSMMO

MT

LEGEND:

Voice & SMS Complete

Voice complete & SMS not complete (to include SMS not started)

Voice & SMS testing both in progress

Not started; self ready issues with other operator

Self not ready for testing

Other Operator not launched

 IDEA/Spice GSM

Page 12: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 12/13

HAR PUN JK HP

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

   P   R   E   P   A   I   D

   P   O   S   T   P   A   I   D

Remarks

Page 13: TEC Testing Sheets - Tracker 100716

8/8/2019 TEC Testing Sheets - Tracker 100716

http://slidepdf.com/reader/full/tec-testing-sheets-tracker-100716 13/13

* To be filled by TERM Cells where ILD gatewyas are located

LSA Remarks

AP Vodafone 13 7 6 YAssam Vodafone 8 6 2 YBi ar Vo a one 13 10 3 YC ennai Vo a one 5 5 YDe i Vo a one 10 1 9 YGujarat Vodafone 12 8 4 YHaryana Vodafone 14 14 YHP Vo a one 11 11 Y JK Vo a one 7 1 6 YKarnataka Vodafone 13 13 YKerala Vodafone 14 3 11 YKo ata Vo a one 12 12 YMa aras tra Vo a one 13 8 5 YMP Vodafone 11 11 YMumbai Vodafone 13 13 YNorth East (NE) Vodafone 8 6 2 YOrissa Vo a one 13 9 4 YPunjab Vodafone 11 8 3 YRajasthan Vodafone 9 9 Y Tamilnadu Vodafone 13 13 YUP East Vodafone 13 13 Y

UP West Vodafone 15 3 12 YWB / RoB Vodafone 12 12 Y

Kera a VSNL 13 6 3 4

Name of ILDService Providers

(B)

Total No of Service Providerswith whom testingis to be carried by

the ServiceProvider inColumn B

Total No of Service Providerswith whom testing

is completed bythe ServiceProvider inColumn B

Total No of Service Providerswith whom testingis in progress by

the ServiceProvider inColumn B

Total No of Service Providerswith whom testingis not started theService Provider

in Column B

Whether all callsare made from

foreign end (Y/N),if yes detailthereof (G)

If answer in G column is No, pls provide ILD gateway wise details of callsoriginated locally

Name of theGateway

Name/location of MSC used

Number and ID of trunk group

Date of opening of trunk group

 

on 03.06.2010


Recommended