25
TECH TOC Conference 9 10 April 2019 Artificial Intelligence, Automation & Digitalization Gerhard Fischer, Siemens AG, Germany siemens.com/cranes Unrestricted © Siemens AG 2019
Transcript
Page 1: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

TECH TOC Conference

9 – 10 April 2019

Artificial Intelligence, Automation & DigitalizationGerhard Fischer, Siemens AG, Germany

siemens.com/cranesUnrestricted © Siemens AG 2019

Page 2: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 2 TOC Asia Singapore 2019Information Classification: General

Agenda

Page 3: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 3 TOC Asia Singapore 2019Information Classification: General

Automated Terminal

Requirements to Suppliers

• Increased and defined

safety level

• Increased productivity

Safety

Zero Harm

• Verify performance

• Virtual testing

• Training M&R

Simulation

Risk mitigation

Faster go live

• Predictive maintenance

• Reduction of down times

• Operation optimization

Digital Service

Higher Availability

Integration &

Standardization

Risk & OPEX

reduction

• Hardware minimization e.g.

sensors

• Interface clarity

• Faster go live

Artificial

Intelligence

Performance

• New automation

applications

• Higher performance

• Faster development cycles

1

Page 4: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 4 TOC Asia Singapore 2019Information Classification: General

Automated Terminals

Artificial Intelligence

• Increased and defined

safety level

• Increased productivity

Safety

Zero Harm

• Early verification of

performance

• Virtual testing

• Training M&R

Simulation

Risk mitigation

Faster go live

• Predictive Maintenance

• Reduction of down times

• Operation optimization

Digital Service

Higher Availability

Integration &

Standardization

Risk & OPEX

reduction

• Hardware minimization e.g.

sensors

• Interface clarity

• Faster go live

Artificial

Intelligence

Performance

• New automation

applications

• Higher performance

• Faster development cycles

1

Page 5: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 5 TOC Asia Singapore 2019Information Classification: General

Automated Terminals

Simocrane Modules

2

Page 6: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 6 TOC Asia Singapore 2019Information Classification: General

Example

Complexity Targets for Truck Positioning System

Empty 42'

45'

20' Front

20' rear

2 x20' (tight)

40'

2 x20' (extend)

20' Pos 1(Front)

20' Front 20' Rear

20' Pos 3(Rear) 40' Pos 5(Middle)

40'

45'

45' Pos 5(Middle)

Empty 45'

20' Middle

Offloading order tier 1CAS Job order

Possible trailer

configuration

underneath the

ARMG

38

37

36

35

34

33

32

Ca

se

Nr.

39

31 Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not validConfiguration valid

Configuration valid

Configuration validConfiguration valid

Configuration valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not validConfiguration not valid

Configuration not valid Configuration not valid

Configuration not valid

Configuration not valid

Configuration not valid

Configuration not valid

Configuration not valid

Configuration not valid

Configuration valid

Configuration valid

Configuration not valid

Configuration not valid

Configuration not valid

40'

20' Pos 2 (Front)

20' Front 20' Rear

20' Pos 4(Rear) 40' Pos 6(Middle)

45'

45' Pos 6(Middle)

Offloading order DST 40'/45' Trailer Tier 2CAS Job order

40'/45' Empty

40'

2 x20' + 1 x 20' front

2 x 20' + 1 x 20' rear

2 x40'

4 x20'

1 x20' middle

2 x20'

45'

2x45'

Possible trailer

configuration

underneath the

ARMG

48

47

46

45

44

43

42

40

49

41

Ca

se N

r.

Configuration valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration valid

Configuration valid

Configuration valid

Configuration validConfiguration valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid

Configuration not valid Configuration not valid

Configuration not valid Configuration not valid Configuration not valid Configuration not valid

2

Page 7: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 7 TOC Asia Singapore 2019Information Classification: General

Truck Positioning System

Siemens 3D Sensor

3D Sensor unit

Siemens servo motor

Laser

connector

2D Laser

scanner2nd Encoder

Absolute

EncoderSwivel platform

Fine adjustment

2

Page 8: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 8 TOC Asia Singapore 2019Information Classification: General

E.g. Road truck auto landing

via detection of twistlocks/pins

- Laser scanner dot cloud

- Data collection

- Object classification

- Parameter derivation

See also Charles R. Qi et. al.

„PointNet: Deep learning on point

sets for 3D classification and

segmentation“

Truck Positioning System

Pattern Recognition

2

Page 9: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 9 TOC Asia Singapore 2019Information Classification: General

Truck Positioning System

Detection rates Conventional vs Machine Learning

0

0.2

0.4

0.6

0.8

1.0

Solution maturity

D0 initial detection rate

DS = 0.7..0.8

DS saturated detection rate

D0

Conventional algorithm

(programmed use cases)

Machine learning

(AI)

DS = ca. 1

Road truck (RT)

detection rate

2

Page 10: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 10 TOC Asia Singapore 2019Information Classification: General

Automated Terminals Requirements

Faster Go Live through Simulation

• Increased and defined

safety level

• Increased productivity

Safety

Zero Harm

• Early verification of

performance

• Virtual testing

• Training M&R

Simulation

Risk mitigation

Faster go live

• Predictive Maintenance

• Reduction of down times

• Operation optimization

Digital Service

Higher Availability

Integration &

Standardization

Risk & OPEX

reduction

• Hardware minimization e.g.

sensors

• Interface clarity

• Faster go live

Artificial

Intelligence

Performance

• New automation

applications

• Higher performance

• Faster development cycles

3

Page 11: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 11 TOC Asia Singapore 2019Information Classification: General

Virtual Model Virtual Commissioning

Mechanical & Sensor Simulation

Always available

Faster prototyping

Lower investment

Faster adaption to changes

Pre Commissioning Tool

Virtual Test Environment

Verification of

Design

Functionality

KPIs

Training platform

Simulation Horizontal Transport

▪ Identify bottlenecks

▪ Avoid over engineering

▪ Match contractual KPIs

Block Management System

▪ Peak smoothening

▪ Faster load & unload

▪ Energy saving

Virtual Logistics

Simulation & Emulation3

Page 12: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 12 TOC Asia Singapore 2019Information Classification: General

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Overall System

configuration

Page 13: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 13 TOC Asia Singapore 2019Information Classification: General

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Test interface

TOS to BMS

1

Page 14: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 14 TOC Asia Singapore 2019Information Classification: General

UNITY

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

3D modelling in

Unity environment

Of crane using

crane builder‘s

CAD step file

2

Page 15: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 15 TOC Asia Singapore 2019Information Classification: General

SIMIT

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Simatic SIMIT

environment

of crane

automation system

3

Page 16: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 16 TOC Asia Singapore 2019Information Classification: General

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Interaction BMS

with crane

automation system

4

Page 17: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 17 TOC Asia Singapore 2019Information Classification: General

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Interaction BMS

with crane

automation system

and remote

operating station

5

Page 18: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 18 TOC Asia Singapore 2019Information Classification: General

Step-wise Deployment Simulation/Emulation

3

TOS

Block Management SystemBMS

ASC/ARMG/ARMG Advanced Automation AA

Load Collision Prevention LCPS

Final Landing System FLS

Crane Management System CMS

Remote OperationCameras RCOS

Optical CharacterRecognition OCR

Basic Crane Control CC- Drive system- Positioning H/T/G- Micromotion- Crane anti-collision- Anemometer- Load measurement

SIMIT

UNITY

Visualization of

crane motion in

UNITY

Remote Operation System RCOS

Interaction TOS ,

BMS, crane

automation system

and remote

operating station

6

Page 19: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 19 TOC Asia Singapore 2019Information Classification: General

Transparency from the start

Early detection of problems

Early optimization of system

Easier design verification

Shorter project “go live”

Virtual Reality

InstallationConstruction Pre-COM COM SAT Design

Virtual SAT

Virtual Installation

Virtual Pre-Commissioning

Virtual Commissioning

Design Construction Installation Pre-COM COM SAT Operation

Operation

Shortened „Go Live“3

Page 20: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 20 TOC Asia Singapore 2019Information Classification: General

Automated Terminals Requirements

Digitalization

• Increased and defined

safety level

• Increased productivity

Safety

Zero Harm

• Early verification of

performance

• Virtual testing

• Training M&R

Simulation

Risk mitigation

Faster go live

• Predictive Maintenance

• Reduction of down times

• Operation optimization

Digital Service

Higher Availability

Integration &

Standardization

Risk & OPEX

reduction

• Hardware minimization e.g.

sensors

• Interface clarity

• Faster go live

Artificial

Intelligence

Performance

• New automation

applications

• Higher performance

• Faster development cycles

4

Page 21: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 21 TOC Asia Singapore 2019Information Classification: General

Simocrane CMS

Information Management

Alarm Logging Performance DataReplay

Functionality

Condition

Monitoring

Alarm message

system

Relevant

performance data

generation for further

KPI calculation;

Record all

performed

operations

Fast recording

- analog signals

- binary signals

Diagnosis

- fault diagnosis

- root cause analysis

Operational

excellence key

figures

Replay

- all data

- chronological order

Detect time-critical

switching states

4

Page 22: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 22 TOC Asia Singapore 2019Information Classification: General

Crane Condition Monitoring

Digital Crane „Finger Print“‘

CMS

RCMS

- Monitoring of crane components in time / frequency domain

- Large amount of data over time (1 hour = 1 mil. measuring points)

- Digital “’fingerprint”’ of the crane

4

Page 23: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 23 TOC Asia Singapore 2019Information Classification: General

SIMOCRANE CMS

Predictive Maintenance

Distribution of information

RCMS Clients

Data processing

Container

Terminal

WebClients

KPI

Ms. Excel

Reports

SIMOCRANE RCMS

Cloud for Industry

MindSphereCMS

CMS

CMS

CMS

CMS

KPI monitoring

Data Storage

Process Historian

RCMS V4.4

Microsoft

SQLMicrosoft

SQL

Structured Data

4

Predictive maintenance

KPI dashboard

Edge processing

(TM NPU)

Page 24: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 24 TOC Asia Singapore 2019Information Classification: General

Data/image preprocessing by TM NPU module

and transfered to the neural network

3

Static, trained

neural network

Crane camera images1

2

Results of the inference are sent

from TM NPU to the PLC

Function blocks in

the PLC evaluate

the results4

Simatic AI Application

Basic Processing Module TM NPU

PLC sends sensor data to module1

Designed & trained in open

source machine learning

frameworks:

Tensorflow

Caffe

Other possible inputs:

Audio,

Vibrations,

Signals, …

4

Page 25: TECH TOC Conference 9 10 April 2019 Artificial ... · Operational excellence key figures Replay - all data-chronological order Detect time-critical switching states 4. ... Page 24

Unrestricted © Siemens AG 2019

09.04.2019Page 25 TOC Asia Singapore 2019Information Classification: General

Thank you for your attention!

Gerhard Fischer

Head of Sales Harbour Cranes

Phone: +49 9131 98 4849

Mobile: +49 173 381 3850

E-Mail: [email protected]

siemens.com/answers


Recommended