CALIFORNIA DATE R.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20 SIMON N. GRAY CALAVERAS COUNTY APP DATE REVISIONS NO. DESIGNED UNDER THE DIRECTION OF: BAR IS ONE INCH AT FULL SCALE IF NOT ONE INCH ON THIS SHEET SCALE ACCORDINGLY 0 1" OF SHEETS SHEET NUMBER DRAWING NUMBER SCALE TECHITE WATER PIPELINE REPLACEMENT DESIGN: DRAWN: CHECKED: DATE: DATE: DATE: COLEMAN ENGINEERING 1358 BLUE OAKS BLVD ROSEVILLE, CA 95678 (916) 791-1188 SUITE 200 Y T N U O C S A R E V A L A C T C I R T S I D R E T A W SNG WCJ SNG 02-26-19 02-26-19 02-26-19 02-26-19 02-26-19 CALAVERAS COUNTY WATER DISTRICT TECHITE WATER PIPELINE REPLACEMENT IMPROVEMENT PLANS FOR ISSUED FOR BIDS SHEET C11 SHEET C10 SHEET C9 SHEET C8 SHEET C7 SHEET C6 SHEET C5 EBBETTS PASS WATER SYSTEM / BIG TREES SUBDIVISION
Transcript
Page 1: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

CALAVERAS COUNTY WATER DISTRICT

TECHITE WATER PIPELINE REPLACEMENT

IMPROVEMENT PLANS FOR

ISSUED FOR BIDS

SHEET C11

SHEET C10

SHEET C9

SHEET C8

SHEET C7

SHEET C6

SHEET C5

EBBETTS PASS WATER SYSTEM / BIG TREES SUBDIVISION

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
G1
AutoCAD SHX Text
1
AutoCAD SHX Text
17
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
SITE
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
C A L A V E R A S
AutoCAD SHX Text
C O U N T Y
AutoCAD SHX Text
108
AutoCAD SHX Text
49
AutoCAD SHX Text
88
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
120
AutoCAD SHX Text
16
AutoCAD SHX Text
ARNOLD
AutoCAD SHX Text
IONE
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
SAN ANDREAS
AutoCAD SHX Text
PINE GROVE
AutoCAD SHX Text
SONORA
AutoCAD SHX Text
GROVELAND
AutoCAD SHX Text
ANGELS CAMP
AutoCAD SHX Text
88
AutoCAD SHX Text
120
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
PROJECT MAP
AutoCAD SHX Text
SCALE: 1"=400'
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
G1
AutoCAD SHX Text
G2
AutoCAD SHX Text
GENERAL NOTES, LEGEND & ABBREVIATIONS
AutoCAD SHX Text
PLAN & PROFILE STA. 0+20-10+75
AutoCAD SHX Text
C2
AutoCAD SHX Text
CIVIL PLANS
AutoCAD SHX Text
C1
AutoCAD SHX Text
GENERAL PLANS
AutoCAD SHX Text
%%UINDEX OF SHEETS
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C5
AutoCAD SHX Text
C6
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
PRV STATION-DETAILS
AutoCAD SHX Text
C12
AutoCAD SHX Text
PRV STATION-RELOCATION
AutoCAD SHX Text
C13
AutoCAD SHX Text
SECTIONS & DETAILS-1
AutoCAD SHX Text
C14
AutoCAD SHX Text
SECTIONS & DETAILS-2
AutoCAD SHX Text
C15
AutoCAD SHX Text
PLAN & PROFILE STA. 10+75-20+50
AutoCAD SHX Text
PLAN & PROFILE STA. 30+50-40+00
AutoCAD SHX Text
PLAN & PROFILE STA. 40+00-51+00
AutoCAD SHX Text
PLAN & PROFILE STA. 51+00-62+00
AutoCAD SHX Text
PLAN & PROFILE STA. 62+00-69+10
AutoCAD SHX Text
PLAN & PROFILE STA. 20+50-30+50
AutoCAD SHX Text
UNDERGROUND SERVICE ALERT OF NORTHERN CALIFORNIA
AutoCAD SHX Text
1-800-227-2600
AutoCAD SHX Text
BEFORE YOU DIG
AutoCAD SHX Text
AT LEAST TWO DAYS
AutoCAD SHX Text
DIAL TOLL FREE
AutoCAD SHX Text
H I G H W A Y 4
AutoCAD SHX Text
TANK NO. 8
AutoCAD SHX Text
TANKS NO. 4 & 5
AutoCAD SHX Text
BIG TREES SUBDIVISION
AutoCAD SHX Text
OTTAWA DRIVE
AutoCAD SHX Text
C7
AutoCAD SHX Text
C8
AutoCAD SHX Text
C9
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-1
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-2
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-3
AutoCAD SHX Text
C11
AutoCAD SHX Text
C10
AutoCAD SHX Text
CONSTRUCTION SEQUENCING DETAILS
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\G1 - COVER SHEET.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
STA 69+10
AutoCAD SHX Text
STA 29+00
AutoCAD SHX Text
STA 22+45
AutoCAD SHX Text
STA 60+42
AutoCAD SHX Text
STA 52+00
AutoCAD SHX Text
STA 40+18
AutoCAD SHX Text
STA 13+35
AutoCAD SHX Text
STA 8+89
AutoCAD SHX Text
STA 0+20
AutoCAD SHX Text
CONSTRUCTION PHASE BOUNDARY/CONNECTION POINT (TYP)
AutoCAD SHX Text
MIDO WAY
AutoCAD SHX Text
HOKAN CIRCLE
AutoCAD SHX Text
SHOSHONE DRIVE
AutoCAD SHX Text
BLACKFOOT CIRCLE
AutoCAD SHX Text
OTTAWA DRIVE
AutoCAD SHX Text
BIGFOOT CIRCLE
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 2: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

“ ”

“ ”

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
GENERAL NOTES, LEGEND &
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
G2
AutoCAD SHX Text
2
AutoCAD SHX Text
17
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
STORM DRAIN & SIZE
AutoCAD SHX Text
SANITARY SEWER & SIZE
AutoCAD SHX Text
DRAIN INLET
AutoCAD SHX Text
SD
AutoCAD SHX Text
SS
AutoCAD SHX Text
10
AutoCAD SHX Text
x
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
x
AutoCAD SHX Text
10.00
AutoCAD SHX Text
N/A
AutoCAD SHX Text
FL=
AutoCAD SHX Text
FINISH GRADE ELEVATION
AutoCAD SHX Text
SHEET DRAINAGE FLOW
AutoCAD SHX Text
FLOWLINE ELEVATION
AutoCAD SHX Text
SLOPE (CUT or FILL)
AutoCAD SHX Text
NATURAL GROUND ELEVATION
AutoCAD SHX Text
INTERMEDIATE CONTOUR LINE
AutoCAD SHX Text
INDEX CONTOUR LINE
AutoCAD SHX Text
FL=
AutoCAD SHX Text
10.00
AutoCAD SHX Text
FM
AutoCAD SHX Text
FORCE MAIN & SIZE
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
NEW
AutoCAD SHX Text
(N)
AutoCAD SHX Text
E
AutoCAD SHX Text
IE
AutoCAD SHX Text
PVC
AutoCAD SHX Text
RCP
AutoCAD SHX Text
SCH
AutoCAD SHX Text
FL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
MIN
AutoCAD SHX Text
AB
AutoCAD SHX Text
HP
AutoCAD SHX Text
INV
AutoCAD SHX Text
FT
AutoCAD SHX Text
GPM
AutoCAD SHX Text
EL/ELEV
AutoCAD SHX Text
W/
AutoCAD SHX Text
PE
AutoCAD SHX Text
MAX
AutoCAD SHX Text
SD
AutoCAD SHX Text
OD
AutoCAD SHX Text
REINF
AutoCAD SHX Text
NTS
AutoCAD SHX Text
DIA/%%C
AutoCAD SHX Text
PSI
AutoCAD SHX Text
SQ
AutoCAD SHX Text
CLR
AutoCAD SHX Text
EW
AutoCAD SHX Text
OC
AutoCAD SHX Text
MH
AutoCAD SHX Text
CONC
AutoCAD SHX Text
EASTING
AutoCAD SHX Text
INVERT ELEVATION
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
REINFORCED CONCRETE PIPE
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
FLANGED/FLOWLINE
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
AGGREGATE BASE
AutoCAD SHX Text
HORSEPOWER
AutoCAD SHX Text
INVERT
AutoCAD SHX Text
FEET
AutoCAD SHX Text
GALLONS PER MINUTE
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
WITH
AutoCAD SHX Text
PLAIN END
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
OUTSIDE DIAMETER
AutoCAD SHX Text
REINFORCEMENT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
SQUARE
AutoCAD SHX Text
CLEARANCE
AutoCAD SHX Text
EACH WAY
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
NPW
AutoCAD SHX Text
NON-POTABLE WATER
AutoCAD SHX Text
FG
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
SS
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
WSP
AutoCAD SHX Text
WELDED STEEL PIPE
AutoCAD SHX Text
SST
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
SECTION DETAIL LOCATOR
AutoCAD SHX Text
DETAIL LOCATOR
AutoCAD SHX Text
1
AutoCAD SHX Text
M1
AutoCAD SHX Text
A
AutoCAD SHX Text
M1
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
GSP
AutoCAD SHX Text
GALVANIZED STEEL PIPE
AutoCAD SHX Text
GR
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
10.0
AutoCAD SHX Text
PROP GROUND ELEVATION
AutoCAD SHX Text
10.0
AutoCAD SHX Text
N/A
AutoCAD SHX Text
SD
AutoCAD SHX Text
SS
AutoCAD SHX Text
FM
AutoCAD SHX Text
8
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
10
AutoCAD SHX Text
8
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
ARV
AutoCAD SHX Text
AIR RELEASE VALVE
AutoCAD SHX Text
BFD
AutoCAD SHX Text
BACK FLOW DEVICE
AutoCAD SHX Text
BFV
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
FF
AutoCAD SHX Text
FINISH FLOOR
AutoCAD SHX Text
GA
AutoCAD SHX Text
GAUGE
AutoCAD SHX Text
GAL
AutoCAD SHX Text
GALLONS
AutoCAD SHX Text
GV
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
WSE
AutoCAD SHX Text
WATER SURFACE ELEVATION
AutoCAD SHX Text
V
AutoCAD SHX Text
VOLTS
AutoCAD SHX Text
SF
AutoCAD SHX Text
SQUARE FEET
AutoCAD SHX Text
THK
AutoCAD SHX Text
THICK
AutoCAD SHX Text
UNO
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
EA
AutoCAD SHX Text
EACH
AutoCAD SHX Text
IPT
AutoCAD SHX Text
IRON PIPE THREAD
AutoCAD SHX Text
REQ'D
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
WWM
AutoCAD SHX Text
WELDED WIRE MESH
AutoCAD SHX Text
M
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
FLOW ARROW
AutoCAD SHX Text
IRRIG
AutoCAD SHX Text
IRRIGATION
AutoCAD SHX Text
CONT
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
DDCV
AutoCAD SHX Text
DOUBLE DETECTOR CHECK VALVE
AutoCAD SHX Text
FM
AutoCAD SHX Text
FORCE MAIN
AutoCAD SHX Text
WL
AutoCAD SHX Text
WATER LEVEL
AutoCAD SHX Text
PSF
AutoCAD SHX Text
POUNDS PER SQUARE FOOT
AutoCAD SHX Text
LF
AutoCAD SHX Text
LINEAR FEET
AutoCAD SHX Text
DIP
AutoCAD SHX Text
DUCTILE IRON PIPE
AutoCAD SHX Text
AC
AutoCAD SHX Text
ASPHALT CONCRETE
AutoCAD SHX Text
PCC
AutoCAD SHX Text
PORTLAND CEMENT CONCRETE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
WATER MAIN & SIZE
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
1. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE PLANS, NOTES, DETAILS, AND PROVISIONS AS SPECIFIED HEREON AND IN ACCORDANCE WITH THE PROJECT MANUAL AND TECHNICAL SPECIFICATIONS. ALL REQUIREMENTS, STANDARDS, AND SPECIFICATIONS OF ALL AGENCIES HAVING JURISDICTION OVER THE WORK SHALL BE DONE TO THE SATISFACTION OF ALL OF THE INVOLVED AGENCIES. 2. ALL WATER WORK WILL BE DONE UNDER THE INSPECTION OF ALL WATER WORK WILL BE DONE UNDER THE INSPECTION OF CALAVERAS COUNTY WATER DISTRICT (CCWD). 3. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND FACILITIES AFFECTED BY THE WORK AND SHALL CONTACT UNDERGROUND SERVICES ALERT (USA) 48 HOURS PRIOR TO ANY EXCAVATION WORK FOR IDENTIFICATION AND LOCATION OF UNDERGROUND UTILITIES. (PHONE: 1-800-227-2600) 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAND DIGGING THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAND DIGGING AND VERIFYING THE LOCATION AND DEPTH OF ALL EXISTING FACILITIES PRIOR TO ANY EXCAVATION. 5. WHERE DEPTH OF EXCAVATIONS INTO WHICH WORKERS DESCEND WHERE DEPTH OF EXCAVATIONS INTO WHICH WORKERS DESCEND IS 5 FEET OR DEEPER, THE CONTRACTOR IS REQUIRED TO PROVIDE SHEETING, SHORING & BRACING AND OBTAIN AN EXCAVATION PERMIT FROM THE NEAREST CAL/OSHA OFFICE & PROVIDE COPY TO CCWD PRIOR TO CONSTRUCTION. 6. AT AREAS ABOVE 2,500 FEET ELEVATION, ALL CASTING AND AT AREAS ABOVE 2,500 FEET ELEVATION, ALL CASTING AND CONCRETE COLLARS IN THE ROADWAY SHALL BE DEPRESSED 1/4 INCH FOR SNOWPLOWING. 7. CONNECTIONS TO EXISTING WATER FACILITIES SHALL HAVE CONNECTIONS TO EXISTING WATER FACILITIES SHALL HAVE PRIOR APPROVAL BEFORE PROCEEDING AND BE DONE IN ACCORDANCE WITH CCWD TIE-IN PROCEDURES, PLANS, AND SPECIFICATIONS. 8. THE CONTRACTOR SHALL HAVE A COPY OF CCWD APPROVED THE CONTRACTOR SHALL HAVE A COPY OF CCWD APPROVED CONSTRUCTION PLANS AND SPECIFICATIONS ON SITE. SPECIFICATIONS, SPECIFIC NOTES, AND DETAIL DRAWINGS THEREON WHICH SHALL TAKE PRECEDENCE OVER GENERAL DRAWINGS AND PLANS UNLESS OTHERWISE DIRECTED BY THE DISTRICT ENGINEER. ANY DEVIATION FROM APPROVED PLANS DURING CONSTRUCTION WILL REQUIRE PRIOR WRITTEN NOTICE TO CCWD, OTHER APPROPRIATE PUBLIC AGENCIES, AND SHALL REQUIRE APPROVAL BY CCWD. 9. ONLY CCWD PERSONNEL SHALL OPERATE EXISTING FACILITIES. ONLY CCWD PERSONNEL SHALL OPERATE EXISTING FACILITIES. 10. THE HIGHEST REQUIRED FIRE FLOW IS 1,000 GPM AT 20 PSIG THE HIGHEST REQUIRED FIRE FLOW IS 1,000 GPM AT 20 PSIG RESIDUAL. 11. BASED UPON STATIC CONDITIONS AND A HYDRAULIC GRADE BASED UPON STATIC CONDITIONS AND A HYDRAULIC GRADE LINE OF 5,325 FEET. THE MAXIMUM AND MINIMUM PRESSURES ARE CALCULATED TO BE 86 PSI @ STA 8+20 AND 40 PSI @ STA 28+53, RESPECTIVELY. 12. PIPELINES SHALL BE DISINFECTED, TESTED, AND INSTALLED IN PIPELINES SHALL BE DISINFECTED, TESTED, AND INSTALLED IN ACCORDANCE WITH AWWA STANDARDS. 13. SERVICE INSTALLATIONS IN ROADWAYS WITH CUTS OR FILLS SERVICE INSTALLATIONS IN ROADWAYS WITH CUTS OR FILLS GREATER THAN 6 FEET IN HEIGHT AND SLOPES STEEPER THAN 3:1 ARE REFERENCED UNDER CCWD STANDARD DETAIL W07D. 14. LIDS FOR WATER FACILITIES SHALL BE MARKED “WATER”. LIDS FOR WATER FACILITIES SHALL BE MARKED “WATER”. WATER”. . 15. CURBS SHALL BE MARKED WITH A “W” BRAND WHERE WATER CURBS SHALL BE MARKED WITH A “W” BRAND WHERE WATER W” BRAND WHERE WATER BRAND WHERE WATER SERVICES INTERCEPT. 16. CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE AND CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE AND IMPLEMENT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH CASQA GUIDELINES. 17. NO SERVICES SHALL BE INSTALLED IN DRIVEWAYS. NO SERVICES SHALL BE INSTALLED IN DRIVEWAYS. 18. IF EXISTING ALIGNMENT IS DETERMINED IN THE FIELD TO IF EXISTING ALIGNMENT IS DETERMINED IN THE FIELD TO DEVIATE FROM THE ALIGNMENT SHOWN ON THE PLANS, CONTRACTOR SHALL FOLLOW THE EXISTING ALIGNMENT. IF ALIGNMENT DEVIATES FROM THE PERMANENT EASEMENT, CONTRACTOR SHALL NOTIFY THE DISTRICT AND REQUEST DIRECTION PRIOR TO CONSTRUCTION. 19. THRUST BLOCKS REQUIRED ON ALL FITTINGS PER CCWD THRUST BLOCKS REQUIRED ON ALL FITTINGS PER CCWD STANDARD DETAIL W01.
AutoCAD SHX Text
WM
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
SRV
AutoCAD SHX Text
SURGE RELIEF VALVE
AutoCAD SHX Text
BOV
AutoCAD SHX Text
BLOW OFF VALVE
AutoCAD SHX Text
BV
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
CO
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
FH
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
MJ
AutoCAD SHX Text
MECHANICAL JOINT
AutoCAD SHX Text
PRV
AutoCAD SHX Text
PRESSURE REDUCING VALVE
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
TREE
AutoCAD SHX Text
N/A
AutoCAD SHX Text
BORE PIT LOCATION
AutoCAD SHX Text
N/A
AutoCAD SHX Text
1. FOR SOIL BORING LOGS, ESTIMATED DEPTH TO ROCK, GROUNDWATER, AND TRENCHING FOR SOIL BORING LOGS, ESTIMATED DEPTH TO ROCK, GROUNDWATER, AND TRENCHING RECOMMENDATION SEE THE "GEOTECHNICAL INVESTIGATION REPORT" DATED MAY 12, 2014, PREPARED BY CONDOR EARTH TECHNOLOGIES, INC. 21663 BRIAN LANE, SONORA, CA 95370 - PH. (209) 532-0361. 2. THERE IS NO TRACER WIRE BURIED WITH THE EXISTING 14" TECHITE PIPE. THE PIPE AS THERE IS NO TRACER WIRE BURIED WITH THE EXISTING 14" TECHITE PIPE. THE PIPE AS SHOWN ON THE PLANS IS BASED ON POTHOLES AND SPOT LOCATIONS IDENTIFIED AND LOCATED BY CALAVERAS COUNTY WATER DISTRICT, AND MAY NOT REFLECT THE EXACT LOCATION OF THE EXISTING PIPE, ANGLE POINTS AND MISCELLANEOUS APPURTENANCES. 3. THE TOPOGRAPHIC SURVEY OF THE EXISTING PIPE ALIGNMENT WAS PERFORMED ON JUNE 3, THE TOPOGRAPHIC SURVEY OF THE EXISTING PIPE ALIGNMENT WAS PERFORMED ON JUNE 3, 2014 BY LAND AND STRUCTURE, 105 SOUTH STEWART STREET, SONORA, CA 95379 - PH. (209) 532-5173. 4. INDIVIDUAL SERVICE INTERRUPTIONS SHALL BE SCHEDULED DURING TIMES CONVENIENT FOR INDIVIDUAL SERVICE INTERRUPTIONS SHALL BE SCHEDULED DURING TIMES CONVENIENT FOR THE CUSTOMER. THE CUSTOMER SHALL BE NOTIFIED 7 DAYS PRIOR TO THE SCHEDULED SHUT DOWN BY MAIL AND FLYER OR DOOR TAGS. AN INDIVIDUAL SERVICE SHUTDOWN SHALL NOT BE LONGER THAN 8 HOURS IN DURATION. A NETWORK PIPELINE CONNECTION SHUTDOWN SHALL NOT BE LONGER THAN 8 HOURS IN DURATION.
AutoCAD SHX Text
PROJECT NOTES:
AutoCAD SHX Text
FPVC
AutoCAD SHX Text
FUSIBLE POLYVINYL CHLORIDE
AutoCAD SHX Text
AIR RELEASE VALVE
AutoCAD SHX Text
BLOW-OFF VALVE
AutoCAD SHX Text
ROW
AutoCAD SHX Text
RIGHT-OF-WAY
AutoCAD SHX Text
WATER SERVICE/METER
AutoCAD SHX Text
ELEVATIONS NOTED ARE RELATIVE TO ASSUMED ELEVATION OF 5,006 FT AT THE NORTHERN CORNER OF THE TANK 4 & 5 UTILITY BANK CONCRETE PAD. CONTRACTOR TO MAINTAIN VERTICAL CONTROL AND ACCURATELY RECORD ELEVATIONS OF ALL FITTINGS ON AS-BUILT DRAWINGS.
AutoCAD SHX Text
SURVEY CONTROL:
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\G2 - GENERAL NOTES.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
(E)
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NORTHING
AutoCAD SHX Text
N
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
TEMPORARY
AutoCAD SHX Text
ACP
AutoCAD SHX Text
ASBESTOS CONCRETE PIPE
AutoCAD SHX Text
DWY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
PVMT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
DBL
AutoCAD SHX Text
DOUBLE
AutoCAD SHX Text
ESMT
AutoCAD SHX Text
EASEMENT
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
HIGH-DENSITY POLYETHYLENE
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 3: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

””

” ” ””

” ” ””

” ” ”

” ”” ”

””

””

””

”” ”

” ”

”” ”

”” ”

” ”

””

”” ” ”

”” ” ” ”

” ”

””

””

” ””

””

” ”

” ”

” ””

”” ”

”” ” ”

” ””

” ””

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
46
AutoCAD SHX Text
47
AutoCAD SHX Text
48
AutoCAD SHX Text
49
AutoCAD SHX Text
50
AutoCAD SHX Text
51
AutoCAD SHX Text
52
AutoCAD SHX Text
53
AutoCAD SHX Text
54
AutoCAD SHX Text
55
AutoCAD SHX Text
56
AutoCAD SHX Text
57
AutoCAD SHX Text
58
AutoCAD SHX Text
59
AutoCAD SHX Text
60
AutoCAD SHX Text
61
AutoCAD SHX Text
62
AutoCAD SHX Text
63
AutoCAD SHX Text
64
AutoCAD SHX Text
65
AutoCAD SHX Text
66
AutoCAD SHX Text
67
AutoCAD SHX Text
68
AutoCAD SHX Text
69
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
8"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
PHASE 1A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH OF FIRE STATION NO.2 DRIVEWAY TO STA 60+40 INTERSECTION OF MEKO DRIVE AND MIDO WAY (+/- 885 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICE LATERALS. 2. SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2, AND 14” VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V110 AT HOKAN CIRCLE TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIRECTED BY CCWD STAFF. AT STA 60+42±, CUT INTO THE EXISTING TECHITE LINE AND INSTALL CONNECTION DETAIL 4 / C15 INCLUDING CONNECTION TO EXISTING 6” WATER MAIN WATER MAIN ON MIDO WAY AND PROVIDING STUB OUT WITH NEW 6” GATE VALVE FOR CONNECTING BYPASS. GATE VALVE FOR CONNECTING BYPASS. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION. OPEN NEW 10” GATE VALVES, GATE VALVES, PLACE THRUST BLOCKS AND THEN PUT EXISTING TECHITE LINE BACK INTO SERVICE BY OPENING EXISTING VALVES V100, V115 AND V110. 3. SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2 AND NEW 10” VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. AND 14” DIA. WATER MAINS. DIA. WATER MAINS. AS SHOWN IN DETAIL 5/C15, NEAR STA 69+00± CUT INTO EXISTING 8” WATER MAIN AND WATER MAIN AND INSTALL 8”X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (CLOSED) WITH STUB OUT FOR TEMPORARY BYPASS PIPING. SWAB INSIDE ALL FITTINGS WITH 1% CHLORINE SOLUTION. PLACE CONCRETE THRUST BLOCKING AND RETURN EXISTING 8” AND 14” DIA. WATER MAINS TO AND 14” DIA. WATER MAINS TO DIA. WATER MAINS TO SERVICE. 4. UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END BYPASS PIPING, COMPLETE REMAINING END CONNECTIONS USING NEW 6” GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 AND 5/C15. SWAB INSIDE OF ALL FITTINGS AND REMAINING PIPING SEGMENTS WITH 1% CHLORINE SOLUTION. PLACE THE 6” TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL KEEPING THE EXISTING 14” TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE METER BOXES AND TRANSFER 1” WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY TEMPORARY BYPASS. ONCE ALL SERVICES ARE TRANSFERRED, REMOVE THE 14” TECHITE LINE FROM TECHITE LINE FROM SERVICE BY ISOLATING THE LINE WITH THE NEW 10” GATE VALVES AT OPPOSITE ENDS. GATE VALVES AT OPPOSITE ENDS. 5. DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DIA. TECHITE PIPELINE FROM APPROXIMATELY STA 69+00 TO STA 60+50 AND COMPLETE CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. INSTALL THE 10” GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WITH NEW 10” WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT X 14” REDUCER AT REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REMAINING 10” GATE VALVE AND ON OPPOSITE END GATE VALVE AND ON OPPOSITE END BY INSTALLING/COMPLETING THE SPOOL BETWEEN 8”X10” WYE AND 8” GATE VALVE. UPON X10” WYE AND 8” GATE VALVE. UPON WYE AND 8” GATE VALVE. UPON GATE VALVE. UPON RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C15), ALL THRUST BLOCKS SHALL REMAIN UNDISTURBED WITH SUFFICIENT EARTH AND SOIL SURROUNDING AND BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT BLOW-OUT FROM THRUST LOADS. 6. WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE TEMPORARY BYPASS PIPING BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM THE 6” WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 1B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO APPROXIMATELY STA 52+00 (+/- 825 LF). THE 6” BYPASS PIPELINE SHALL BE ANCHORED BYPASS PIPELINE SHALL BE ANCHORED AND SECURED TO LIMIT MOVEMENT, AND ALL ROAD AND DRIVEWAY CROSSINGS INSTALLED BELOW LEVEL OF THE PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICES. 2. SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE NEW 10” VALVE V106A AT MIDO VALVE V106A AT MIDO WAY AND EXISTING 14” VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVES V120 AND V125 AT SHOSHONE DRIVE TO ISOLATE THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE LINE AND INSTALL CONNECTION DETAIL 5/C14. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION TO DISINFECT. PLACE THRUST BLOCKING WITH NEW 10” GATE GATE VALVES OPEN AND 6” VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. TECHITE PIPELINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. AT STA 52+00± CONNECT SOUTH END OF 6” TEMPORARY BYPASS PIPING WHERE SHOWN IN TEMPORARY BYPASS PIPING WHERE SHOWN IN DETAIL 5/C14. AT STA 60+42, RECONNECT 6” TEMPORARY BYPASS PIPING AT MIDO WAY TEMPORARY BYPASS PIPING AT MIDO WAY WHERE SHOWN ON DETAIL 4/C15. DISINFECT CLOSURE FITTINGS AND ASSOCIATED PIPE SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. CONNECT NEW WATER SERVICES TO THE 6” TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TECHITE LINE OPERATIONAL. 4. ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS SUPPLIED VIA THE 6” TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TECHITE PIPELINE CAN BE TAKEN OUT OF SERVICE, DEMOLISHED AND REMOVED MAKING WAY FOR CONSTRUCTION OF THE NEW 10” WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN PIPELINE AS SHOWN IN DETAIL 2/C15, INSTALL GATE VALVE PER DETAIL 3/C15 TO ISOLATE THE EXISTING 6” WATER WATER MAIN ON HOKAN CIRCLE. 5. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH WATER MAIN, CONNECT THE NORTH END BY REMOVING THE 10” X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REDUCER AT MIDO WAY AND THEN CONNECTING TO THE 10” GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE CORRESPONDING 10”X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR GATE VALVE. FOR DISINFECTING ALL CLOSURE FITTINGS AND SPOOLS SWAB INSIDE WITH A 1% CHLORINE SOLUTION. WHEN RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C14), ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. 6. WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN TEMPORARY BYPASS PIPING ARE STILL BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER WATER MAIN AND METER BOX.
AutoCAD SHX Text
PHASE 1A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH OF FIRE STATION NO.2 DRIVEWAY TO STA 60+40 INTERSECTION OF MEKO DRIVE AND MIDO WAY (+/- 885 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICE LATERALS. 2. SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2, AND 14” VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V110 AT HOKAN CIRCLE TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIRECTED BY CCWD STAFF. AT STA 60+42±, CUT INTO THE EXISTING TECHITE LINE AND INSTALL CONNECTION DETAIL 4 / C15 INCLUDING CONNECTION TO EXISTING 6” WATER MAIN WATER MAIN ON MIDO WAY AND PROVIDING STUB OUT WITH NEW 6” GATE VALVE FOR CONNECTING BYPASS. GATE VALVE FOR CONNECTING BYPASS. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION. OPEN NEW 10” GATE VALVES, GATE VALVES, PLACE THRUST BLOCKS AND THEN PUT EXISTING TECHITE LINE BACK INTO SERVICE BY OPENING EXISTING VALVES V100, V115 AND V110. 3. SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2 AND NEW 10” VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. AND 14” DIA. WATER MAINS. DIA. WATER MAINS. AS SHOWN IN DETAIL 5/C15, NEAR STA 69+00± CUT INTO EXISTING 8” WATER MAIN AND WATER MAIN AND INSTALL 8”X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (CLOSED) WITH STUB OUT FOR TEMPORARY BYPASS PIPING. SWAB INSIDE ALL FITTINGS WITH 1% CHLORINE SOLUTION. PLACE CONCRETE THRUST BLOCKING AND RETURN EXISTING 8” AND 14” DIA. WATER MAINS TO AND 14” DIA. WATER MAINS TO DIA. WATER MAINS TO SERVICE. 4. UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END BYPASS PIPING, COMPLETE REMAINING END CONNECTIONS USING NEW 6” GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 AND 5/C15. SWAB INSIDE OF ALL FITTINGS AND REMAINING PIPING SEGMENTS WITH 1% CHLORINE SOLUTION. PLACE THE 6” TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL KEEPING THE EXISTING 14” TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE METER BOXES AND TRANSFER 1” WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY TEMPORARY BYPASS. ONCE ALL SERVICES ARE TRANSFERRED, REMOVE THE 14” TECHITE LINE FROM TECHITE LINE FROM SERVICE BY ISOLATING THE LINE WITH THE NEW 10” GATE VALVES AT OPPOSITE ENDS. GATE VALVES AT OPPOSITE ENDS. 5. DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DIA. TECHITE PIPELINE FROM APPROXIMATELY STA 69+00 TO STA 60+50 AND COMPLETE CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. INSTALL THE 10” GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WITH NEW 10” WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT X 14” REDUCER AT REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REMAINING 10” GATE VALVE AND ON OPPOSITE END GATE VALVE AND ON OPPOSITE END BY INSTALLING/COMPLETING THE SPOOL BETWEEN 8”X10” WYE AND 8” GATE VALVE. UPON X10” WYE AND 8” GATE VALVE. UPON WYE AND 8” GATE VALVE. UPON GATE VALVE. UPON RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C15), ALL THRUST BLOCKS SHALL REMAIN UNDISTURBED WITH SUFFICIENT EARTH AND SOIL SURROUNDING AND BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT BLOW-OUT FROM THRUST LOADS. 6. WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE TEMPORARY BYPASS PIPING BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM THE 6” WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 1B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO APPROXIMATELY STA 52+00 (+/- 825 LF). THE 6” BYPASS PIPELINE SHALL BE ANCHORED BYPASS PIPELINE SHALL BE ANCHORED AND SECURED TO LIMIT MOVEMENT, AND ALL ROAD AND DRIVEWAY CROSSINGS INSTALLED BELOW LEVEL OF THE PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICES. 2. SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE NEW 10” VALVE V106A AT MIDO VALVE V106A AT MIDO WAY AND EXISTING 14” VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVES V120 AND V125 AT SHOSHONE DRIVE TO ISOLATE THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE LINE AND INSTALL CONNECTION DETAIL 5/C14. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION TO DISINFECT. PLACE THRUST BLOCKING WITH NEW 10” GATE GATE VALVES OPEN AND 6” VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. TECHITE PIPELINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. AT STA 52+00± CONNECT SOUTH END OF 6” TEMPORARY BYPASS PIPING WHERE SHOWN IN TEMPORARY BYPASS PIPING WHERE SHOWN IN DETAIL 5/C14. AT STA 60+42, RECONNECT 6” TEMPORARY BYPASS PIPING AT MIDO WAY TEMPORARY BYPASS PIPING AT MIDO WAY WHERE SHOWN ON DETAIL 4/C15. DISINFECT CLOSURE FITTINGS AND ASSOCIATED PIPE SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. CONNECT NEW WATER SERVICES TO THE 6” TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TECHITE LINE OPERATIONAL. 4. ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS SUPPLIED VIA THE 6” TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TECHITE PIPELINE CAN BE TAKEN OUT OF SERVICE, DEMOLISHED AND REMOVED MAKING WAY FOR CONSTRUCTION OF THE NEW 10” WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN PIPELINE AS SHOWN IN DETAIL 2/C15, INSTALL GATE VALVE PER DETAIL 3/C15 TO ISOLATE THE EXISTING 6” WATER WATER MAIN ON HOKAN CIRCLE. 5. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH WATER MAIN, CONNECT THE NORTH END BY REMOVING THE 10” X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REDUCER AT MIDO WAY AND THEN CONNECTING TO THE 10” GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE CORRESPONDING 10”X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR GATE VALVE. FOR DISINFECTING ALL CLOSURE FITTINGS AND SPOOLS SWAB INSIDE WITH A 1% CHLORINE SOLUTION. WHEN RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C14), ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. 6. WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN TEMPORARY BYPASS PIPING ARE STILL BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER WATER MAIN AND METER BOX.
AutoCAD SHX Text
PHASE 1A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 69+00 (75'± SOUTH OF FIRE STATION NO.2 DRIVEWAY TO STA 60+40 INTERSECTION OF MEKO DRIVE AND MIDO WAY (+/- 885 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICE LATERALS. 2. SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.1: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2, AND 14” VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V115 AND 6” VALVE V110 AT HOKAN CIRCLE TO ISOLATE VALVE V110 AT HOKAN CIRCLE TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO AND 14” DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIA. WATER MAINS. CLOSE EXISTING VALVE AT TANK NO.8, IF SO DIRECTED BY CCWD STAFF. AT STA 60+42±, CUT INTO THE EXISTING TECHITE LINE AND INSTALL CONNECTION DETAIL 4 / C15 INCLUDING CONNECTION TO EXISTING 6” WATER MAIN WATER MAIN ON MIDO WAY AND PROVIDING STUB OUT WITH NEW 6” GATE VALVE FOR CONNECTING BYPASS. GATE VALVE FOR CONNECTING BYPASS. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION. OPEN NEW 10” GATE VALVES, GATE VALVES, PLACE THRUST BLOCKS AND THEN PUT EXISTING TECHITE LINE BACK INTO SERVICE BY OPENING EXISTING VALVES V100, V115 AND V110. 3. SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.2: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE EXISTING 8” VALVE V100 AT FIRE VALVE V100 AT FIRE STATION NO.2 AND NEW 10” VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. VALVE V105 TO ISOLATE EXISTING 8” AND 14” DIA. WATER MAINS. AND 14” DIA. WATER MAINS. DIA. WATER MAINS. AS SHOWN IN DETAIL 5/C15, NEAR STA 69+00± CUT INTO EXISTING 8” WATER MAIN AND WATER MAIN AND INSTALL 8”X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT X6” WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT WYE INCLUDING NEW 8” VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (OPEN) AND 6” VALVE (CLOSED) WITH STUB OUT VALVE (CLOSED) WITH STUB OUT FOR TEMPORARY BYPASS PIPING. SWAB INSIDE ALL FITTINGS WITH 1% CHLORINE SOLUTION. PLACE CONCRETE THRUST BLOCKING AND RETURN EXISTING 8” AND 14” DIA. WATER MAINS TO AND 14” DIA. WATER MAINS TO DIA. WATER MAINS TO SERVICE. 4. UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END UPON PASSING BACTERIOLOGICAL TESTS FOR 6” BYPASS PIPING, COMPLETE REMAINING END BYPASS PIPING, COMPLETE REMAINING END CONNECTIONS USING NEW 6” GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 GATE VALVES AND STUB OUTS CONSTRUCTED IN DETAILS 4/C15 AND 5/C15. SWAB INSIDE OF ALL FITTINGS AND REMAINING PIPING SEGMENTS WITH 1% CHLORINE SOLUTION. PLACE THE 6” TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL TEMPORARY BYPASS PIPING INTO SERVICE, WHILE STILL KEEPING THE EXISTING 14” TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE TECHITE LINE IN SERVICE. FINISH NEW WATER SERVICES AT THE METER BOXES AND TRANSFER 1” WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY WATER SERVICES ONE-BY-ONE OVER TO THE 6” TEMPORARY TEMPORARY BYPASS. ONCE ALL SERVICES ARE TRANSFERRED, REMOVE THE 14” TECHITE LINE FROM TECHITE LINE FROM SERVICE BY ISOLATING THE LINE WITH THE NEW 10” GATE VALVES AT OPPOSITE ENDS. GATE VALVES AT OPPOSITE ENDS. 5. DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DEMOLISH AND REMOVE THE EXISTING 14” DIA. TECHITE PIPELINE FROM APPROXIMATELY STA DIA. TECHITE PIPELINE FROM APPROXIMATELY STA 69+00 TO STA 60+50 AND COMPLETE CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. INSTALL THE 10” GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG GATE VALVE AND 8”X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG X10” WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WYE, AND CAP SHOWN IN DETAIL 5/C15 ALONG WITH NEW 10” WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE WATER MAIN CONSTRUCTION. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT WATER MAIN, FINISH END CONNECTIONS BY REMOVING THE 10” X 14” REDUCER AT X 14” REDUCER AT REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REMAINING 10” GATE VALVE AND ON OPPOSITE END GATE VALVE AND ON OPPOSITE END BY INSTALLING/COMPLETING THE SPOOL BETWEEN 8”X10” WYE AND 8” GATE VALVE. UPON X10” WYE AND 8” GATE VALVE. UPON WYE AND 8” GATE VALVE. UPON GATE VALVE. UPON RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C15), ALL THRUST BLOCKS SHALL REMAIN UNDISTURBED WITH SUFFICIENT EARTH AND SOIL SURROUNDING AND BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT BLOW-OUT FROM THRUST LOADS. 6. WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WITH BOTH THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE WATER MAIN AND 6” TEMPORARY BYPASS PIPING BOTH IN SERVICE TEMPORARY BYPASS PIPING BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM THE 6” WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 1B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO DIA. TEMPORARY BYPASS PIPELINE FROM STA 60+42 (MIDO WAY) TO APPROXIMATELY STA 52+00 (+/- 825 LF). THE 6” BYPASS PIPELINE SHALL BE ANCHORED BYPASS PIPELINE SHALL BE ANCHORED AND SECURED TO LIMIT MOVEMENT, AND ALL ROAD AND DRIVEWAY CROSSINGS INSTALLED BELOW LEVEL OF THE PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR LATERALS ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, DISINFECT AND TEST THE BYPASS PIPING ALONG WITH THE NEW WATER SERVICES. 2. SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SHUTDOWN NO.3: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS OR LESS. CLOSE NEW 10” VALVE V106A AT MIDO VALVE V106A AT MIDO WAY AND EXISTING 14” VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVE V130 AND 6” VALVES V120 AND V125 AT SHOSHONE DRIVE TO VALVES V120 AND V125 AT SHOSHONE DRIVE TO ISOLATE THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE PIPELINE. AT STA 52+00±, CUT INTO THE EXISTING 14” TECHITE LINE AND INSTALL CONNECTION DETAIL 5/C14. SWAB INSIDE OF ALL FITTINGS WITH 1% CHLORINE SOLUTION TO DISINFECT. PLACE THRUST BLOCKING WITH NEW 10” GATE GATE VALVES OPEN AND 6” VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. VALVE CLOSED, THEN RETURN 14” TECHITE PIPELINE TO SERVICE. TECHITE PIPELINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT ENDS OF 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. AT STA 52+00± CONNECT SOUTH END OF 6” TEMPORARY BYPASS PIPING WHERE SHOWN IN TEMPORARY BYPASS PIPING WHERE SHOWN IN DETAIL 5/C14. AT STA 60+42, RECONNECT 6” TEMPORARY BYPASS PIPING AT MIDO WAY TEMPORARY BYPASS PIPING AT MIDO WAY WHERE SHOWN ON DETAIL 4/C15. DISINFECT CLOSURE FITTINGS AND ASSOCIATED PIPE SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. CONNECT NEW WATER SERVICES TO THE 6” TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TEMPORARY BYPASS LINE, WHILE KEEPING THE 14” TECHITE LINE OPERATIONAL. TECHITE LINE OPERATIONAL. 4. ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS ONCE ALL CUSTOMERS HAVE BEEN TRANSFERRED TO NEW WATER SERVICES LATERALS SUPPLIED VIA THE 6” TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TEMPORARY BYPASS PIPING, THEN THE EXISTING 14” TECHITE PIPELINE TECHITE PIPELINE CAN BE TAKEN OUT OF SERVICE, DEMOLISHED AND REMOVED MAKING WAY FOR CONSTRUCTION OF THE NEW 10” WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN WATER MAIN. PRIOR TO CONSTRUCTION OF THE 10” PIPELINE AS SHOWN IN PIPELINE AS SHOWN IN DETAIL 2/C15, INSTALL GATE VALVE PER DETAIL 3/C15 TO ISOLATE THE EXISTING 6” WATER WATER MAIN ON HOKAN CIRCLE. 5. AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH AFTER FLUSHING, DISINFECTING AND TESTING THE NEW 10” WATER MAIN, CONNECT THE NORTH WATER MAIN, CONNECT THE NORTH END BY REMOVING THE 10” X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE X 14” REDUCER AT MIDO WAY AND THEN CONNECTING TO THE REDUCER AT MIDO WAY AND THEN CONNECTING TO THE 10” GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE GATE VALVE. CONNECT THE SOUTH END AT STA 52+00± BY AGAIN REMOVING THE CORRESPONDING 10”X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR X14” REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR REDUCER AND CONNECTING TO THE 10” GATE VALVE. FOR GATE VALVE. FOR DISINFECTING ALL CLOSURE FITTINGS AND SPOOLS SWAB INSIDE WITH A 1% CHLORINE SOLUTION. WHEN RE-ENTERING TIE-IN POINTS (DETAILS 4/C15 AND 5/C14), ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. 6. WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WHILE THE NEW 10” WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN WATER MAIN AND 6” TEMPORARY BYPASS PIPING ARE STILL BOTH IN TEMPORARY BYPASS PIPING ARE STILL BOTH IN SERVICE AND OPERATIONAL, ONE-BY-ONE DISCONNECT THE NEW 1” WATER SERVICES FROM WATER SERVICES FROM THE 6” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” TEMPORARY BYPASS PIPING AND RE-CONNECT THESE SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER WATER MAIN AND METER BOX.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-1
AutoCAD SHX Text
C1
AutoCAD SHX Text
3
AutoCAD SHX Text
17
AutoCAD SHX Text
1"=80'
AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 4
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
FIRE STATION
AutoCAD SHX Text
NO. 2
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
YARD
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
HOKAN
AutoCAD SHX Text
MIDO WAY
AutoCAD SHX Text
PHASE 1A
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
(SEE NOTES, SHEET C2)
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
FH 1117
AutoCAD SHX Text
FH 1115
AutoCAD SHX Text
FH 1113
AutoCAD SHX Text
FH 1114
AutoCAD SHX Text
NOTES: 1. CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN ACCORDANCE WITH THE SPECIFICATIONS. 2. SANITIZE AND TEST PER THE SPECIFICATIONS. SANITIZE AND TEST PER THE SPECIFICATIONS. 3. THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE PLAN AND PROFILE DRAWINGS FOR MORE DETAIL.
AutoCAD SHX Text
V105
AutoCAD SHX Text
V106A
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C1 -CONSTRUCTION SEQUENCING-1.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
PHASE 2A
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
PHASE 1B
AutoCAD SHX Text
PHASE 1A BYPASS
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
PHASE 1B BYPASS
AutoCAD SHX Text
PHASE 2A BYPASS
AutoCAD SHX Text
V100
AutoCAD SHX Text
V110
AutoCAD SHX Text
V115
AutoCAD SHX Text
V1114A
AutoCAD SHX Text
V1114B
AutoCAD SHX Text
MATCH LINE STA=46+10
AutoCAD SHX Text
SEE DRAWING C2
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 2/C15
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 4/C15
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C15
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 4: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

””

”” ”

”” ”

”” ” ”

”” ”

””

” ”

””

””

” ””

”” ”

” ”” ”

”” ”

” ” ”

”” ”

” ”

””

”” ”

”” ”

” ”

” ”

” ”

” ”” ”

” ” ”

” ”” ”

””

”” ”

”” ”

” ”

””

” ”

” ”” ”

” ” ”

” ”” ”

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
35
AutoCAD SHX Text
36
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
39
AutoCAD SHX Text
40
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
46
AutoCAD SHX Text
47
AutoCAD SHX Text
48
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
PHASE 2A 1. INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 LF). ANCHOR AND SECURE 6” BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. ALSO, AT MEKO AND SHOSHONE DRIVE INTERSECTION, 6” TEMPORARY BYPASS PIPING TEMPORARY BYPASS PIPING SHALL INCLUDE A CROSS WITH TEMPORARY BRANCH LINES (+/- 160 LF) EXTENDING TO EACH SIDE OF SHOSHONE DRIVE OUTSIDE THE MEKO DRIVE INTERSECTION. 2. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 3. SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. KEEP EXISTING 14” TECHITE LINE OPERATIONAL BY ISOLATING IT TECHITE LINE OPERATIONAL BY ISOLATING IT USING EXISTING 6” VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. ON SHOSHONE DRIVE NORTH AND SOUTH OF MEKO DRIVE, INSTALL TWO INSTANCES OF DETAIL 1/C15 FOR THE EVENTUAL PURPOSE OF CONNECT 6” TEMPORARY BYPASS PIPING. IN DETAIL TEMPORARY BYPASS PIPING. IN DETAIL 1/C15, INITIALLY OPEN 6” GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES FOR BYPASS, PLACE THRUST BLOCKS AND THEN RETURN TO NORMAL SERVICE. DISINFECT BY SWABBING ALL FITTINGS, SPOOLS AND VALVES WITH 1% CHLORINE SOLUTION. 4. SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUT DOWN TECHITE LINE USING RECENTLY INSTALLED 10” GATE GATE VALVE AT STA 52+00 AND ISOLATE IN OPPOSITE SIDE USING EXISTING 14” GATE VALVE (VXXX) GATE VALVE (VXXX) NEAR STA 35+00. ON MEKO DRIVE AT STA 40+18±, CUT INTO 14” DIA. TECHITE PIPELINE AND DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. 5. UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS BETWEEN 6” TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT STA 52+00 AND 40+18 AND CONNECT 6” TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF SHOSHONE ACCORDING TO DETAIL 1/C15. DURING INSTALLATION, DISINFECT ALL FITTINGS AND SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. 6. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT ENDS AND CLOSING ISOLATION GATE VALVES AT ENDS AND CLOSING ISOLATION VALVES AT SHOSHONE DRIVE. DEMOLISH AND REMOVE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN, INSTALL NEW 10” X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND SHOSHONE DRIVE INTERSECTION AND REPLACE EXISTING 6” DIA. WATER MAIN AND EXTEND NEW 6” DIA. WATER MAIN AND EXTEND NEW 6” WATER MAIN EAST AND WEST ON SHOSHONE DRIVE (AS NOTED ON DETAILS 1/C15). 7. AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH WATER MAIN AT EACH END (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND CONNECTING X14” REDUCERS AND CONNECTING REDUCERS AND CONNECTING TO 10” GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AS NOTED ON DETAIL 1/C15. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING NEW 10” WATER MAIN INTO WATER MAIN INTO SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW TEMPORARY BYPASS TO NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- 1,120 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER TEMPORARY BYPASS PIPING AND NEW 1” WATER WATER SERVICE LATERALS. 2. SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. ISOLATE 14” TECHITE LINE USING VALVE NEW 10” VALVE NEAR TECHITE LINE USING VALVE NEW 10” VALVE NEAR VALVE NEAR STA 40+18 AND ON OPPOSITE SIDE USING VALVE V135 ON MEKO DRIVE NEAR STA 23+70. AT STA 29+00±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 40+18 AND 29+00 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- 645 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. 2. SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT TECHITE PIPELINE BY CLOSING 10” VALVE AT VALVE AT STA 29+00 AND BY CLOSING VALVES AT TANK 4 & 5 SITE. ON MEKO DRIVE AT STA 22+45±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 29+00 AND 22+45 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 29+00 AND 22+45) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX.
AutoCAD SHX Text
PHASE 2A 1. INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 LF). ANCHOR AND SECURE 6” BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. ALSO, AT MEKO AND SHOSHONE DRIVE INTERSECTION, 6” TEMPORARY BYPASS PIPING TEMPORARY BYPASS PIPING SHALL INCLUDE A CROSS WITH TEMPORARY BRANCH LINES (+/- 160 LF) EXTENDING TO EACH SIDE OF SHOSHONE DRIVE OUTSIDE THE MEKO DRIVE INTERSECTION. 2. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 3. SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. KEEP EXISTING 14” TECHITE LINE OPERATIONAL BY ISOLATING IT TECHITE LINE OPERATIONAL BY ISOLATING IT USING EXISTING 6” VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. ON SHOSHONE DRIVE NORTH AND SOUTH OF MEKO DRIVE, INSTALL TWO INSTANCES OF DETAIL 1/C15 FOR THE EVENTUAL PURPOSE OF CONNECT 6” TEMPORARY BYPASS PIPING. IN DETAIL TEMPORARY BYPASS PIPING. IN DETAIL 1/C15, INITIALLY OPEN 6” GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES FOR BYPASS, PLACE THRUST BLOCKS AND THEN RETURN TO NORMAL SERVICE. DISINFECT BY SWABBING ALL FITTINGS, SPOOLS AND VALVES WITH 1% CHLORINE SOLUTION. 4. SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUT DOWN TECHITE LINE USING RECENTLY INSTALLED 10” GATE GATE VALVE AT STA 52+00 AND ISOLATE IN OPPOSITE SIDE USING EXISTING 14” GATE VALVE (VXXX) GATE VALVE (VXXX) NEAR STA 35+00. ON MEKO DRIVE AT STA 40+18±, CUT INTO 14” DIA. TECHITE PIPELINE AND DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. 5. UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS BETWEEN 6” TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT STA 52+00 AND 40+18 AND CONNECT 6” TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF SHOSHONE ACCORDING TO DETAIL 1/C15. DURING INSTALLATION, DISINFECT ALL FITTINGS AND SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. 6. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT ENDS AND CLOSING ISOLATION GATE VALVES AT ENDS AND CLOSING ISOLATION VALVES AT SHOSHONE DRIVE. DEMOLISH AND REMOVE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN, INSTALL NEW 10” X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND SHOSHONE DRIVE INTERSECTION AND REPLACE EXISTING 6” DIA. WATER MAIN AND EXTEND NEW 6” DIA. WATER MAIN AND EXTEND NEW 6” WATER MAIN EAST AND WEST ON SHOSHONE DRIVE (AS NOTED ON DETAILS 1/C15). 7. AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH WATER MAIN AT EACH END (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND CONNECTING X14” REDUCERS AND CONNECTING REDUCERS AND CONNECTING TO 10” GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AS NOTED ON DETAIL 1/C15. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING NEW 10” WATER MAIN INTO WATER MAIN INTO SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW TEMPORARY BYPASS TO NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- 1,120 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER TEMPORARY BYPASS PIPING AND NEW 1” WATER WATER SERVICE LATERALS. 2. SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. ISOLATE 14” TECHITE LINE USING VALVE NEW 10” VALVE NEAR TECHITE LINE USING VALVE NEW 10” VALVE NEAR VALVE NEAR STA 40+18 AND ON OPPOSITE SIDE USING VALVE V135 ON MEKO DRIVE NEAR STA 23+70. AT STA 29+00±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 40+18 AND 29+00 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- 645 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. 2. SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT TECHITE PIPELINE BY CLOSING 10” VALVE AT VALVE AT STA 29+00 AND BY CLOSING VALVES AT TANK 4 & 5 SITE. ON MEKO DRIVE AT STA 22+45±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 29+00 AND 22+45 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 29+00 AND 22+45) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX.
AutoCAD SHX Text
PHASE 2A 1. INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 LF). ANCHOR AND SECURE 6” BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. ALSO, AT MEKO AND SHOSHONE DRIVE INTERSECTION, 6” TEMPORARY BYPASS PIPING TEMPORARY BYPASS PIPING SHALL INCLUDE A CROSS WITH TEMPORARY BRANCH LINES (+/- 160 LF) EXTENDING TO EACH SIDE OF SHOSHONE DRIVE OUTSIDE THE MEKO DRIVE INTERSECTION. 2. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 3. SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. KEEP EXISTING 14” TECHITE LINE OPERATIONAL BY ISOLATING IT TECHITE LINE OPERATIONAL BY ISOLATING IT USING EXISTING 6” VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. ON SHOSHONE DRIVE NORTH AND SOUTH OF MEKO DRIVE, INSTALL TWO INSTANCES OF DETAIL 1/C15 FOR THE EVENTUAL PURPOSE OF CONNECT 6” TEMPORARY BYPASS PIPING. IN DETAIL TEMPORARY BYPASS PIPING. IN DETAIL 1/C15, INITIALLY OPEN 6” GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES FOR BYPASS, PLACE THRUST BLOCKS AND THEN RETURN TO NORMAL SERVICE. DISINFECT BY SWABBING ALL FITTINGS, SPOOLS AND VALVES WITH 1% CHLORINE SOLUTION. 4. SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUT DOWN TECHITE LINE USING RECENTLY INSTALLED 10” GATE GATE VALVE AT STA 52+00 AND ISOLATE IN OPPOSITE SIDE USING EXISTING 14” GATE VALVE (VXXX) GATE VALVE (VXXX) NEAR STA 35+00. ON MEKO DRIVE AT STA 40+18±, CUT INTO 14” DIA. TECHITE PIPELINE AND DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. 5. UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS BETWEEN 6” TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT STA 52+00 AND 40+18 AND CONNECT 6” TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF SHOSHONE ACCORDING TO DETAIL 1/C15. DURING INSTALLATION, DISINFECT ALL FITTINGS AND SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. 6. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT ENDS AND CLOSING ISOLATION GATE VALVES AT ENDS AND CLOSING ISOLATION VALVES AT SHOSHONE DRIVE. DEMOLISH AND REMOVE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN, INSTALL NEW 10” X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND SHOSHONE DRIVE INTERSECTION AND REPLACE EXISTING 6” DIA. WATER MAIN AND EXTEND NEW 6” DIA. WATER MAIN AND EXTEND NEW 6” WATER MAIN EAST AND WEST ON SHOSHONE DRIVE (AS NOTED ON DETAILS 1/C15). 7. AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH WATER MAIN AT EACH END (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND CONNECTING X14” REDUCERS AND CONNECTING REDUCERS AND CONNECTING TO 10” GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AS NOTED ON DETAIL 1/C15. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING NEW 10” WATER MAIN INTO WATER MAIN INTO SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW TEMPORARY BYPASS TO NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- 1,120 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER TEMPORARY BYPASS PIPING AND NEW 1” WATER WATER SERVICE LATERALS. 2. SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. ISOLATE 14” TECHITE LINE USING VALVE NEW 10” VALVE NEAR TECHITE LINE USING VALVE NEW 10” VALVE NEAR VALVE NEAR STA 40+18 AND ON OPPOSITE SIDE USING VALVE V135 ON MEKO DRIVE NEAR STA 23+70. AT STA 29+00±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 40+18 AND 29+00 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- 645 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. 2. SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT TECHITE PIPELINE BY CLOSING 10” VALVE AT VALVE AT STA 29+00 AND BY CLOSING VALVES AT TANK 4 & 5 SITE. ON MEKO DRIVE AT STA 22+45±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 29+00 AND 22+45 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 29+00 AND 22+45) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX.
AutoCAD SHX Text
PHASE 2A 1. INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 INSTALL 6” DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 DIA. TEMPORARY BYPASS FROM APPROXIMATELY STA 52+00 TO 40+18 (+/- 1,180 LF). ANCHOR AND SECURE 6” BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPING TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. ALSO, AT MEKO AND SHOSHONE DRIVE INTERSECTION, 6” TEMPORARY BYPASS PIPING TEMPORARY BYPASS PIPING SHALL INCLUDE A CROSS WITH TEMPORARY BRANCH LINES (+/- 160 LF) EXTENDING TO EACH SIDE OF SHOSHONE DRIVE OUTSIDE THE MEKO DRIVE INTERSECTION. 2. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TRENCHING WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 3. SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE SHUTDOWN NO.4: FOR EACH SHUTDOWN, COMPLETE WORK AND RETURN CUSTOMERS TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. KEEP EXISTING 14” TECHITE LINE OPERATIONAL BY ISOLATING IT TECHITE LINE OPERATIONAL BY ISOLATING IT USING EXISTING 6” VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. VALVES ON 6” X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. X 14” CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. CROSS AT MEKO AND SHOSHONE DRIVE INTERSECTION. ON SHOSHONE DRIVE NORTH AND SOUTH OF MEKO DRIVE, INSTALL TWO INSTANCES OF DETAIL 1/C15 FOR THE EVENTUAL PURPOSE OF CONNECT 6” TEMPORARY BYPASS PIPING. IN DETAIL TEMPORARY BYPASS PIPING. IN DETAIL 1/C15, INITIALLY OPEN 6” GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES ALONG SHOSHONE DRIVE AND CLOSE 6” GATE VALVES FOR GATE VALVES FOR BYPASS, PLACE THRUST BLOCKS AND THEN RETURN TO NORMAL SERVICE. DISINFECT BY SWABBING ALL FITTINGS, SPOOLS AND VALVES WITH 1% CHLORINE SOLUTION. 4. SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.5: THIS SHUTDOWN TO BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUT DOWN TECHITE LINE USING RECENTLY INSTALLED 10” GATE GATE VALVE AT STA 52+00 AND ISOLATE IN OPPOSITE SIDE USING EXISTING 14” GATE VALVE (VXXX) GATE VALVE (VXXX) NEAR STA 35+00. ON MEKO DRIVE AT STA 40+18±, CUT INTO 14” DIA. TECHITE PIPELINE AND DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. 5. UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS UPON PASSING BACTERIOLOGICAL TESTS, COMPLETE CLOSURE OF ALL TIE-IN CONNECTIONS BETWEEN 6” TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT TEMPORARY BYPASS PIPING AND EXISTING SYSTEM AS SHOWN IN DETAIL 5/C14 AT STA 52+00 AND 40+18 AND CONNECT 6” TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF TEMPORARY BYPASS BRANCH LINES TO EACH SIDE OF SHOSHONE ACCORDING TO DETAIL 1/C15. DURING INSTALLATION, DISINFECT ALL FITTINGS AND SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. 6. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT ENDS AND CLOSING ISOLATION GATE VALVES AT ENDS AND CLOSING ISOLATION VALVES AT SHOSHONE DRIVE. DEMOLISH AND REMOVE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN. ALONG WITH CONSTRUCTION OF THE NEW 10” WATER MAIN, INSTALL NEW 10” X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND X 6” CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND CROSS ACCORDING TO DETAIL 6/C14 AT MEKO AND SHOSHONE DRIVE INTERSECTION AND REPLACE EXISTING 6” DIA. WATER MAIN AND EXTEND NEW 6” DIA. WATER MAIN AND EXTEND NEW 6” WATER MAIN EAST AND WEST ON SHOSHONE DRIVE (AS NOTED ON DETAILS 1/C15). 7. AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH AFTER DISINFECTING AND TESTING, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT EACH WATER MAIN AT EACH END (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND CONNECTING X14” REDUCERS AND CONNECTING REDUCERS AND CONNECTING TO 10” GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AND FOR 6” WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON WATER MAIN BY CONNECTING TO 6” GATE VALVES AS NOTED ON GATE VALVES AS NOTED ON DETAIL 1/C15. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING NEW 10” WATER MAIN INTO WATER MAIN INTO SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW WATER SERVICES FROM 6” TEMPORARY BYPASS TO NEW TEMPORARY BYPASS TO NEW 10” WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 40+18 TO 29+00 (+/- 1,120 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” BYPASS PIPING VIA CORP STOPS AND SERVICE BYPASS PIPING VIA CORP STOPS AND SERVICE SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER TEMPORARY BYPASS PIPING AND NEW 1” WATER WATER SERVICE LATERALS. 2. SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.6: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. ISOLATE 14” TECHITE LINE USING VALVE NEW 10” VALVE NEAR TECHITE LINE USING VALVE NEW 10” VALVE NEAR VALVE NEAR STA 40+18 AND ON OPPOSITE SIDE USING VALVE V135 ON MEKO DRIVE NEAR STA 23+70. AT STA 29+00±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14 AT STA 29+00. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 40+18 AND 29+00 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 52+00 AND 40+18) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 2C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 29+00 TO 22+45 (+/- 645 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE WATER SERVICE LATERALS TO EACH SIDE OF MEKO DRIVE AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. 2. SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.7: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT TECHITE PIPELINE BY CLOSING 10” VALVE AT VALVE AT STA 29+00 AND BY CLOSING VALVES AT TANK 4 & 5 SITE. ON MEKO DRIVE AT STA 22+45±, CUT INTO 14” DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. KEEP 10” GATE VALVES OPEN, GATE VALVES OPEN, PLACE THRUST BLOCKS AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 29+00 AND 22+45 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 29+00 AND 22+45) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-2
AutoCAD SHX Text
C2
AutoCAD SHX Text
4
AutoCAD SHX Text
17
AutoCAD SHX Text
1"=80'
AutoCAD SHX Text
N
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
PHASE 2A
AutoCAD SHX Text
PHASE 2B
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
SHOSHONE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
FH 1112
AutoCAD SHX Text
FH 1111
AutoCAD SHX Text
FH 1110
AutoCAD SHX Text
NOTES: 1. CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN ACCORDANCE WITH THE SPECIFICATIONS. 2. SANITIZE AND TEST PER THE SPECIFICATIONS. SANITIZE AND TEST PER THE SPECIFICATIONS. 3. THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE PLAN AND PROFILE DRAWINGS FOR MORE DETAIL.
AutoCAD SHX Text
V125
AutoCAD SHX Text
V120
AutoCAD SHX Text
V113A
AutoCAD SHX Text
V112
AutoCAD SHX Text
V135
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C2 -CONSTRUCTION SEQUENCING-2.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
PHASE 2C
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
PHASE 2C BYPASS
AutoCAD SHX Text
PHASE 2A BYPASS
AutoCAD SHX Text
PHASE 2B BYPASS
AutoCAD SHX Text
V130
AutoCAD SHX Text
V1112B
AutoCAD SHX Text
V1112A
AutoCAD SHX Text
VXXX
AutoCAD SHX Text
V1110B
AutoCAD SHX Text
V1110A
AutoCAD SHX Text
V113B
AutoCAD SHX Text
MATCH LINE STA=22+00
AutoCAD SHX Text
SEE DRAWING C3
AutoCAD SHX Text
MATCH LINE STA=46+10
AutoCAD SHX Text
SEE DRAWING C1
AutoCAD SHX Text
FH 1109
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 6/C14
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 5: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

””

”” ”

”” ”

” ””

””

””

” ” ””

””

” ” ”

” ”” ”

””

”” ”

”” ”

”” ”

””

” ”

” ”” ”

””

” ” ”

” ”” ”

””

” ””

””

”” ”

””

””

” ” ”

” ”

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
PHASE 3A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- 920 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA TECHITE PIPELINE BY CLOSING 10” VALVE AT STA VALVE AT STA 22+45 AND BY CLOSING VALVES AT TANK 4 & 5 SITE AND ALSO CLOSING 6” GATE VALVES V140 GATE VALVES V140 AND V145 ON BLACKFOOT CIRCLE. ON BLACKFOOT CIRCLE AT STA 13+35±, CUT INTO 14” DIA. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS KEEPING NEW 10” GATE VALVES GATE VALVES OPEN, AND THEN RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 22+45 AND 13+35 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 22+45 AND 13+35) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY AND INITIALLY CONNECT TO THE 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING VALVES AT THE TECHITE PIPELINE BY CLOSING VALVES AT THE TANK 4 & 5 SITE, BY CLOSING THE 10” VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE GATE VALVE V140 AND V145 ON BIG FOOT CIRCLE. ON MEWUK LANE AT STA 8+89±, CUT INTO 14” DIA. TECHITE DIA. TECHITE PIPELINE AND INSTALL DETAIL 2/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS AND OPEN NEW 10” GATE VALVES, AND GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 13+35 AND 8+89 AS SHOWN IN DETAILS 5/C14 AND 2/C14, RESPECTIVELY. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. AFTER FINISHING CONSTRUCTION, FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 13+35 AND 8+89) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL UPON BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE OR OTHER ACCEPTABLE METHODS AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. 2. SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS MAXIMUM. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION VALVE AT STA 8+89 AT INTERSECTION OF OTTAWA WAY AND MEWUK LANE AND BY CLOSING VALVES AT TANKS 4 & 5 SITE. CUT INTO 14” DIA. TECHITE PIPELINE AT STA 0+20± AND INSTALL DETAIL 1/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS, OPEN NEW 10” GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 8+89± PER DETAIL 5/C14 AND 0+20± PER DETAILS 1/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. AFTER PLACE THE 6” BYPASS BYPASS PIPELINE INTO SERVICE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE GATE VALVES AT EACH END. NEXT DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER DISINFECTING AND PASSING BACTERIOLOGICAL, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT WATER MAIN AT EACH END (STA 8+89± AND 0+20±) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO THE 10” X14” REDUCERS AND ATTACHING TO THE 10” REDUCERS AND ATTACHING TO THE 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING 10” WATER MAIN INTO SERVICE, REMOVE THE 6” WATER MAIN INTO SERVICE, REMOVE THE 6” TEMPORARY BYPASS PIPELINE.
AutoCAD SHX Text
PHASE 3A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- 920 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA TECHITE PIPELINE BY CLOSING 10” VALVE AT STA VALVE AT STA 22+45 AND BY CLOSING VALVES AT TANK 4 & 5 SITE AND ALSO CLOSING 6” GATE VALVES V140 GATE VALVES V140 AND V145 ON BLACKFOOT CIRCLE. ON BLACKFOOT CIRCLE AT STA 13+35±, CUT INTO 14” DIA. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS KEEPING NEW 10” GATE VALVES GATE VALVES OPEN, AND THEN RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 22+45 AND 13+35 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 22+45 AND 13+35) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY AND INITIALLY CONNECT TO THE 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING VALVES AT THE TECHITE PIPELINE BY CLOSING VALVES AT THE TANK 4 & 5 SITE, BY CLOSING THE 10” VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE GATE VALVE V140 AND V145 ON BIG FOOT CIRCLE. ON MEWUK LANE AT STA 8+89±, CUT INTO 14” DIA. TECHITE DIA. TECHITE PIPELINE AND INSTALL DETAIL 2/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS AND OPEN NEW 10” GATE VALVES, AND GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 13+35 AND 8+89 AS SHOWN IN DETAILS 5/C14 AND 2/C14, RESPECTIVELY. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. AFTER FINISHING CONSTRUCTION, FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 13+35 AND 8+89) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL UPON BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE OR OTHER ACCEPTABLE METHODS AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. 2. SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS MAXIMUM. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION VALVE AT STA 8+89 AT INTERSECTION OF OTTAWA WAY AND MEWUK LANE AND BY CLOSING VALVES AT TANKS 4 & 5 SITE. CUT INTO 14” DIA. TECHITE PIPELINE AT STA 0+20± AND INSTALL DETAIL 1/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS, OPEN NEW 10” GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 8+89± PER DETAIL 5/C14 AND 0+20± PER DETAILS 1/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. AFTER PLACE THE 6” BYPASS BYPASS PIPELINE INTO SERVICE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE GATE VALVES AT EACH END. NEXT DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER DISINFECTING AND PASSING BACTERIOLOGICAL, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT WATER MAIN AT EACH END (STA 8+89± AND 0+20±) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO THE 10” X14” REDUCERS AND ATTACHING TO THE 10” REDUCERS AND ATTACHING TO THE 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING 10” WATER MAIN INTO SERVICE, REMOVE THE 6” WATER MAIN INTO SERVICE, REMOVE THE 6” TEMPORARY BYPASS PIPELINE.
AutoCAD SHX Text
PHASE 3A 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 22+45 TO 13+35 (+/- 920 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD AND INITIALLY CONNECT TO 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE LATERALS BY WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS PIPING VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.8: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA TECHITE PIPELINE BY CLOSING 10” VALVE AT STA VALVE AT STA 22+45 AND BY CLOSING VALVES AT TANK 4 & 5 SITE AND ALSO CLOSING 6” GATE VALVES V140 GATE VALVES V140 AND V145 ON BLACKFOOT CIRCLE. ON BLACKFOOT CIRCLE AT STA 13+35±, CUT INTO 14” DIA. DIA. TECHITE PIPELINE AND INSTALL DETAIL 5/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS KEEPING NEW 10” GATE VALVES GATE VALVES OPEN, AND THEN RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 22+45 AND 13+35 AS SHOWN IN DETAIL 5/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 4/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AFTER FINISHING WATER MAIN AFTER FINISHING CONSTRUCTION AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 22+45 AND 13+35) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. ALL CLOSURE FITTINGS AND SPOOLS TO BE DISINFECTED BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3B 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 13+35 TO 8+89 (+/- 445 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. INSTALL NEW 1” WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY WATER SERVICE LATERALS TO EACH SIDE OF THE ROAD RIGHT OF WAY AND INITIALLY CONNECT TO THE 6” TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE TEMPORARY BYPASS PIPELINE. INSTALL NEW 1” WATER SERVICE WATER SERVICE LATERALS BY TRENCHING ACROSS FULL WIDTH OF ROAD FOR PROPERTIES ON OPPOSITE SIDE OF ROAD FROM THE 6” TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON TEMPORARY BYPASS LINE AND BY COILING EXCESS TUBING FOR SERVICES ON THE SAME SIDE OF ROAD AS THE BYPASS LINE. STUB OUT ONE END OF TUBING AT EXISTING METER BOXES AND CONNECT OPPOSITE END TO THE 6” TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. TEMPORARY BYPASS VIA CORP STOPS AND SADDLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. TEMPORARY BYPASS PIPING AND NEW 1” WATER SERVICE LATERALS. WATER SERVICE LATERALS. 2. SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE SHUTDOWN NO.9: THIS SHUTDOWN MUST BE COMPLETED AND CUSTOMERS RETURNED TO SERVICE WITHIN A MAXIMUM OF 8-HOURS. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING VALVES AT THE TECHITE PIPELINE BY CLOSING VALVES AT THE TANK 4 & 5 SITE, BY CLOSING THE 10” VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE VALVE AT STA 13+35 AND ALSO CLOSING 6” GATE VALVE GATE VALVE V140 AND V145 ON BIG FOOT CIRCLE. ON MEWUK LANE AT STA 8+89±, CUT INTO 14” DIA. TECHITE DIA. TECHITE PIPELINE AND INSTALL DETAIL 2/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS AND OPEN NEW 10” GATE VALVES, AND GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 13+35 AND 8+89 AS SHOWN IN DETAILS 5/C14 AND 2/C14, RESPECTIVELY. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. WHILE KEEPING THE EXISTING 14” TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TECHITE PIPELINE OPERATIONAL, PLACE THE 6” TEMPORARY BYPASS PIPELINE INTO TEMPORARY BYPASS PIPELINE INTO SERVICE AND THEN ONE-BY-ONE TRANSFER WATER SERVICES TO THE BYPASS. ONCE ALL SERVICES ARE TRANSFERRED TO THE 6” BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF BYPASS PIPELINE, TAKE THE EXISTING 14” TECHITE LINE OUT OF TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” GATE VALVES AT EACH END, AND DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE CONSTRUCT THE NEW 10” WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE WATER MAIN INCLUDING DETAIL 3/C14 AT INTERSECTION OF MEKO DRIVE AND BLACKFOOT CIRCLE. AFTER FINISHING CONSTRUCTION, FLUSH, DISINFECT AND TEST THE NEW 10” WATER MAIN AND THEN MAKE FINAL CONNECTIONS AT ENDS (APPROXIMATELY STA 13+35 AND 8+89) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN X14” REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN REDUCERS AND ATTACHING TO 10” GATE VALVES. WHEN RE-ENTERING TIE-IN GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. WHILE KEEPING 6” TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, TEMPORARY BYPASS OPERATIONAL AND 10” WATER MAIN NOW IN SERVICE, WATER MAIN NOW IN SERVICE, ONE-BY-ONE TRANSFER NEW 1” WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER SERVICES TO THE NEW 10” WATER MAIN. ONCE ALL WATER WATER MAIN. ONCE ALL WATER SERVICES ARE TRANSFERRED, REMOVE THE 6” BYPASS PIPELINE. EACH SERVICE LATERAL UPON BYPASS PIPELINE. EACH SERVICE LATERAL UPON COMPLETION SHALL BE ONE CONTINUOUS PIECE OF TUBING WITHOUT SPLICES CUT TO LENGTH TO FIT BETWEEN NEW 10” WATER MAIN AND METER BOX. WATER MAIN AND METER BOX. PHASE 3C 1. INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 INSTALL 6” DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 DIA. TEMPORARY BYPASS PIPELINE FROM APPROXIMATELY STA 8+89 TO 0+20 (+/- 869 LF). ANCHOR AND SECURE THE 6” BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND BYPASS PIPELINE TO LIMIT MOVEMENT, AND INSTALL ALL ROAD AND DRIVEWAY CROSSINGS BELOW LEVEL OF PAVEMENT SURFACE OR OTHER ACCEPTABLE METHODS AS TO NOT OBSTRUCT TRAFFIC AND VEHICLES. FLUSH, TEST AND DISINFECT 6” TEMPORARY BYPASS PIPING. TEMPORARY BYPASS PIPING. 2. SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS SHUTDOWN NO.10: COMPLETE SHUTDOWN AND RETURN CUSTOMERS TO SERVICE WITHIN 8-HOURS MAXIMUM. SHUTDOWN 14” TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION TECHITE PIPELINE BY CLOSING 10” VALVE AT STA 8+89 AT INTERSECTION VALVE AT STA 8+89 AT INTERSECTION OF OTTAWA WAY AND MEWUK LANE AND BY CLOSING VALVES AT TANKS 4 & 5 SITE. CUT INTO 14” DIA. TECHITE PIPELINE AT STA 0+20± AND INSTALL DETAIL 1/C14. DISINFECT ALL FITTINGS, SPOOLS AND VALVES BY SWABBING WITH 1% CHLORINE SOLUTION. PLACE THRUST BLOCKS, OPEN NEW 10” GATE VALVES, AND RETURN 14” TECHITE LINE TO SERVICE. TECHITE LINE TO SERVICE. 3. UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM UPON PASSING BACTERIOLOGICAL TESTS, CONNECT 6” TEMPORARY BYPASS PIPING TO EXISTING SYSTEM TEMPORARY BYPASS PIPING TO EXISTING SYSTEM AT STA 8+89± PER DETAIL 5/C14 AND 0+20± PER DETAILS 1/C14. DISINFECT ALL FITTINGS AND CLOSURE SPOOLS BY SWABBING WITH A 1% CHLORINE SOLUTION. AFTER PLACE THE 6” BYPASS BYPASS PIPELINE INTO SERVICE, TAKE THE EXISTING 14” TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE TECHITE LINE OUT OF SERVICE BY CLOSING 10” GATE GATE VALVES AT EACH END. NEXT DEMOLISH AND REMOVE THE EXISTING 14” TECHITE LINE IN ADVANCE OF TECHITE LINE IN ADVANCE OF CONSTRUCTION OF THE NEW 10” DIA. WATER MAIN. DIA. WATER MAIN. 4. CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER CONSTRUCT NEW 10” WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER WATER MAIN BETWEEN OTTAWA WAY AND TANK 4 & 5 SITE. AFTER DISINFECTING AND PASSING BACTERIOLOGICAL, MAKE FINAL CONNECTIONS TO NEW 10” WATER MAIN AT WATER MAIN AT EACH END (STA 8+89± AND 0+20±) BY REMOVING 10”X14” REDUCERS AND ATTACHING TO THE 10” X14” REDUCERS AND ATTACHING TO THE 10” REDUCERS AND ATTACHING TO THE 10” GATE VALVES. WHEN RE-ENTERING TIE-IN POINTS, ALL THRUST BLOCKS MUST REMAIN UNDISTURBED WITH SUFFICIENT EARTH BEHIND THE THRUST BLOCKS FOR BEARING AREA AND CAPACITY TO PREVENT SOIL BLOW-OUT FROM THRUST LOADS. DISINFECT ALL CLOSURE FITTINGS AND SPOOLS BY SWABBING WITH 1% CHLORINE SOLUTION. AFTER PLACING 10” WATER MAIN INTO SERVICE, REMOVE THE 6” WATER MAIN INTO SERVICE, REMOVE THE 6” TEMPORARY BYPASS PIPELINE.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
CONSTRUCTION SEQUENCING-3
AutoCAD SHX Text
C3
AutoCAD SHX Text
5
AutoCAD SHX Text
17
AutoCAD SHX Text
1"=80'
AutoCAD SHX Text
N
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
MEWUK LANE
AutoCAD SHX Text
BLACKFOOT CIRCLE
AutoCAD SHX Text
TANKS 4 & 5
AutoCAD SHX Text
OTTAWA DRIVE
AutoCAD SHX Text
BIGFOOT
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
PHASE 3A
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
PHASE 3C
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
FH 1019
AutoCAD SHX Text
FH 1020
AutoCAD SHX Text
NOTES: 1. CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN CONSTRUCTION SEQUENCE SHALL BE EXECUTED IN ACCORDANCE WITH THE SPECIFICATIONS. 2. SANITIZE AND TEST PER THE SPECIFICATIONS. SANITIZE AND TEST PER THE SPECIFICATIONS. 3. THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE THESE SEQUENCING PLANS ARE SCHEMATIC FOR CLARITY, SEE PLAN AND PROFILE DRAWINGS FOR MORE DETAIL.
AutoCAD SHX Text
V140
AutoCAD SHX Text
V114
AutoCAD SHX Text
V145
AutoCAD SHX Text
V116
AutoCAD SHX Text
V117A
AutoCAD SHX Text
V150
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C3 -CONSTRUCTION SEQUENCING-3.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
PHASE 3B
AutoCAD SHX Text
(SEE NOTES THIS SHEET)
AutoCAD SHX Text
PHASE 3C BYPASS
AutoCAD SHX Text
PHASE 3A BYPASS
AutoCAD SHX Text
PHASE 3B BYPASS
AutoCAD SHX Text
V444B
AutoCAD SHX Text
V1142B
AutoCAD SHX Text
V1142A
AutoCAD SHX Text
V117B
AutoCAD SHX Text
FH 1142
AutoCAD SHX Text
MATCH LINE STA=22+00
AutoCAD SHX Text
SEE DRAWING C2
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 1/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 2/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 3/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 5/C14
AutoCAD SHX Text
CONNECTION DETAIL, SEE DETAIL 4/C14
AutoCAD SHX Text
V444A
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 6: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

······

···

··

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
CONSTRUCTION SEQUENCING
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
C4
AutoCAD SHX Text
6
AutoCAD SHX Text
17
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
%%USTATUS AFTER SECOND STEP
AutoCAD SHX Text
%%USTATUS AFTER FINAL STEP
AutoCAD SHX Text
(E) 14" TECHITE LINE
AutoCAD SHX Text
%%UBY STEP IN EACH PHASE
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C4 - CONSTRUCTION DETAILS.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
%%USTATUS AFTER INITIAL STEP
AutoCAD SHX Text
6" DIA TEMPORARY BYPASS PIPELINE INSTALLED BUT NOT CONNECTED. INSTALL 10" TEES OR CROSSES. ADD (N) 10" GATE VALVES AT ALL NEW TEES OR CROSSES. ADD (N) GATE VALVES AT ALL BYPASS CONNECTIONS. FOR 14" TECHITE CONNECTIONS INSTALL TEMP 10" X 14" REDUCERS. ADD CONCRETE THRUST BLOCKS.
AutoCAD SHX Text
(E) 14" TECHITE LINE
AutoCAD SHX Text
10" DIP
AutoCAD SHX Text
10" DIP
AutoCAD SHX Text
EXISTING SERVICES, TYP
AutoCAD SHX Text
PLACE 14" FCA, TYP
AutoCAD SHX Text
PLACE 10" X 14" REDUCER, TYP (TEMPORARY)
AutoCAD SHX Text
(N) 10" GV, TYP (PERMANENT)
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
6" GV (N)
AutoCAD SHX Text
BYPASS AND FUTURE FH CONNECTION
AutoCAD SHX Text
TEMPORARY 6" DIA BYPASS LINE
AutoCAD SHX Text
TEMPORARY SERVICES, TYP
AutoCAD SHX Text
INSTALL, DISINFECT AND PLACE TEMPORARY BYPASS INTO SERVICE
AutoCAD SHX Text
REMOVE 10" X 14" TEMPORARY REDUCER, CONNECT BYPASS TO 10" GV
AutoCAD SHX Text
REMOVE 14" TECHITE AND INSTALL NEW 10" DIP ONCE BYPASS IS ACTIVE
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
CAP BYPASS UNDERGROUND, INSTALL HYDRANT, OR EXTEND LINE, AS SHOWN ON PROJECT PLAN SHEETS
AutoCAD SHX Text
REMOVE TEMPORARY BYPASS AND TEMPORARY SERVICES
AutoCAD SHX Text
TEST, DISINFECT AND PLACE NEW 10" DIP INTO SERVICE
AutoCAD SHX Text
SERVICES MOVED TO NEW 10" LINE
AutoCAD SHX Text
TEMP 6" DIA BYPASS LINE IS INSTALLED AND IN USE. (E) 14" TECHITE MAIN AND ASSOCIATED VALVES/APPURTENANCES ARE REMOVED. DO NOT DISTURB SOIL WITHIN 5-FEET OF THRUST BLOCKS.
AutoCAD SHX Text
TEMP 6" DIA BYPASS IS DISCONNECTED AND REMOVED. (N) 10" DIP LINE INSTALLED AND IN SERVICE WITH (E) 14" TECHITE LINE.
AutoCAD SHX Text
%%UTYPICAL CONSTRUCTION SEQUENCING DETAILS
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 7: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
+00.00 BEGIN (E) 14"WM & GV
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
4+00
AutoCAD SHX Text
5+00
AutoCAD SHX Text
6+00
AutoCAD SHX Text
7+00
AutoCAD SHX Text
8+00
AutoCAD SHX Text
9+00
AutoCAD SHX Text
10+00
AutoCAD SHX Text
4980
AutoCAD SHX Text
4890
AutoCAD SHX Text
4990
AutoCAD SHX Text
4900
AutoCAD SHX Text
5000
AutoCAD SHX Text
4910
AutoCAD SHX Text
+75.00 MATCH LINE
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
APPROX. TOP OF PIPE ELEV=5002±CONTRACTOR TO POTHOLE (E) WATER MAIN TO VERIFY HORIZONTAL AND VERTICAL LOCATION
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
+75%%p FITTING
AutoCAD SHX Text
+89%%p BYPASS AND FIRE HYDRANT
AutoCAD SHX Text
12" MIN CLEAR
AutoCAD SHX Text
EXISTING 6" WATER LINE
AutoCAD SHX Text
+99%%p 6"W XING
AutoCAD SHX Text
+65%%p (E) 18" CMP XING
AutoCAD SHX Text
+26%%p (E) WATER XING
AutoCAD SHX Text
6"W
AutoCAD SHX Text
18"SD
AutoCAD SHX Text
+20.00 BEGIN PROP WATER MAIN CONST
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
PLACE SLURRY UNDER
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
4900
AutoCAD SHX Text
4900
AutoCAD SHX Text
4910
AutoCAD SHX Text
4920
AutoCAD SHX Text
4930
AutoCAD SHX Text
4940
AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
4970
AutoCAD SHX Text
4980
AutoCAD SHX Text
4990
AutoCAD SHX Text
5000
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 0+20 - 10+75
AutoCAD SHX Text
C5
AutoCAD SHX Text
7
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
BIGFOOT
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
MATCH LINE STA=10+75
AutoCAD SHX Text
SEE SHEET C6
AutoCAD SHX Text
N
AutoCAD SHX Text
OTTAWA
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MEWUK
AutoCAD SHX Text
LANE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
24" STUMP
AutoCAD SHX Text
30" FIR
AutoCAD SHX Text
18" CEDAR
AutoCAD SHX Text
DOUBLE PINE
AutoCAD SHX Text
TREE STUMP/ADDRESS POST
AutoCAD SHX Text
(E) PROPANE TANK
AutoCAD SHX Text
14" CEDAR
AutoCAD SHX Text
(E) PROPANE TANK
AutoCAD SHX Text
(E) WATER TANK NO. 4
AutoCAD SHX Text
(E) WATER TANK NO. 5
AutoCAD SHX Text
30" FIR
AutoCAD SHX Text
30" FIR
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) DBL YELLOW STRIPE
AutoCAD SHX Text
(E) SHED
AutoCAD SHX Text
CEDAR CLUSTER
AutoCAD SHX Text
40" PINE
AutoCAD SHX Text
(E) 10' EASEMENT
AutoCAD SHX Text
(E) 20' ESMT
AutoCAD SHX Text
8" FIR
AutoCAD SHX Text
16" CEDAR
AutoCAD SHX Text
20" PINE
AutoCAD SHX Text
BORE PIT-B9
AutoCAD SHX Text
BORE PIT-B20
AutoCAD SHX Text
(E) BLDG
AutoCAD SHX Text
(E) LOT LINE (TYP.)
AutoCAD SHX Text
24" FIR
AutoCAD SHX Text
20" CEDAR
AutoCAD SHX Text
8" CEDAR
AutoCAD SHX Text
28" PINE (DEAD)
AutoCAD SHX Text
20" PINE
AutoCAD SHX Text
8" CEDAR
AutoCAD SHX Text
34" STUMP
AutoCAD SHX Text
18" CEDAR
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
30" CEDAR
AutoCAD SHX Text
38" STUMP
AutoCAD SHX Text
24" STUMP
AutoCAD SHX Text
16" CEDAR
AutoCAD SHX Text
16" FIR
AutoCAD SHX Text
34" STUMP
AutoCAD SHX Text
38" STUMP
AutoCAD SHX Text
W/GUY
AutoCAD SHX Text
(E) EDGE OF PVMT
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 1/C14
AutoCAD SHX Text
(E) STOP SIGN
AutoCAD SHX Text
50'
AutoCAD SHX Text
5 0'
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
4945
AutoCAD SHX Text
4955
AutoCAD SHX Text
4965
AutoCAD SHX Text
4920
AutoCAD SHX Text
4930
AutoCAD SHX Text
4940
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
50'
AutoCAD SHX Text
FH 1142
AutoCAD SHX Text
FH 1013
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 2/C14
AutoCAD SHX Text
CONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
2
AutoCAD SHX Text
2 (E) ISOLATION VALVES ON 14" TECHITE LINE
AutoCAD SHX Text
(E) CONC. DWY (TYP.)
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
PIPE ALIGNMENT BETWEEN STA 0+20 AND 8+30 IS INTENDED TO FOLLOW THE EXISTING ALIGNMENT. PROVIDE SLOPE PROTECTION/ TRENCH STABILIZATION PER DISTRICT STANDARDS.
AutoCAD SHX Text
(E) ROW
AutoCAD SHX Text
(E) ROW
AutoCAD SHX Text
(E) 15' ESMT
AutoCAD SHX Text
30' TEMPORARY CONSTRUCTION EASEMENT
AutoCAD SHX Text
15'
AutoCAD SHX Text
5
AutoCAD SHX Text
ALIGNMENT PASSES BELOW GUY WIRE. COORDINATE WITH OWNER TO HOLD THE POLE WHILE GUY WIRE IS REMOVED AND REPLACED. CONTRACTOR IS RESPONSIBLE FOR ALL THE WORK ASSOCIATED WITH POLE AND GUY WIRE.
AutoCAD SHX Text
5
AutoCAD SHX Text
30' TEMPORARY CONSTRUCTION EASEMENT
AutoCAD SHX Text
6
AutoCAD SHX Text
12" MINIMUM CLEAR. MAINTAIN SEPARATION PER DISTRICT STANDARD G04.
AutoCAD SHX Text
6
AutoCAD SHX Text
ASSUMED SURVEY CONTROL POINT, SEE SURVEY CONTROL NOTE ON SHEET G2
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C5 - PLAN-1.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 8: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
4910
AutoCAD SHX Text
4910
AutoCAD SHX Text
4920
AutoCAD SHX Text
4930
AutoCAD SHX Text
4940
AutoCAD SHX Text
4950
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
+75.00 MATCH LINE
AutoCAD SHX Text
11+00
AutoCAD SHX Text
12+00
AutoCAD SHX Text
13+00
AutoCAD SHX Text
14+00
AutoCAD SHX Text
15+00
AutoCAD SHX Text
16+00
AutoCAD SHX Text
17+00
AutoCAD SHX Text
18+00
AutoCAD SHX Text
19+00
AutoCAD SHX Text
20+00
AutoCAD SHX Text
4900
AutoCAD SHX Text
4925
AutoCAD SHX Text
4910
AutoCAD SHX Text
4935
AutoCAD SHX Text
4920
AutoCAD SHX Text
4945
AutoCAD SHX Text
+50.00 MATCH LINE
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
+30%%P 10"x10"x6" TEE
AutoCAD SHX Text
+94%%p 10"x10"x6" TEE
AutoCAD SHX Text
18"SD
AutoCAD SHX Text
18"SD
AutoCAD SHX Text
+91%%p (E) 18" CMP XING
AutoCAD SHX Text
+56%%p (E) 18" CMP XING
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
+35%%p CONNECTION PER DETAIL 5/C14
AutoCAD SHX Text
PLACE SLURRY UNDER
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
PLACE SLURRY UNDER
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 10+75 - 20+50
AutoCAD SHX Text
C6
AutoCAD SHX Text
8
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
36" FIR
AutoCAD SHX Text
4925
AutoCAD SHX Text
4900
AutoCAD SHX Text
4935
AutoCAD SHX Text
4910
AutoCAD SHX Text
4945
AutoCAD SHX Text
MATCH LINE STA=10+75
AutoCAD SHX Text
SEE SHEET C7
AutoCAD SHX Text
MATCH LINE STA=20+50
AutoCAD SHX Text
SEE SHEET C7
AutoCAD SHX Text
N
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
8" CEDAR
AutoCAD SHX Text
8" CEDAR
AutoCAD SHX Text
16" PINE
AutoCAD SHX Text
10" CEDAR
AutoCAD SHX Text
6" CEDAR
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
(E) UTILITY POLE W/GUY
AutoCAD SHX Text
(E) 18" CMP
AutoCAD SHX Text
12" CEDARS
AutoCAD SHX Text
DOUBLE CEDAR
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
CEDAR CLUSTER
AutoCAD SHX Text
(E) UTILITY POLE W/GUY
AutoCAD SHX Text
30" OAK
AutoCAD SHX Text
24" OAK
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
8" FIR
AutoCAD SHX Text
CEDAR CLUSTER
AutoCAD SHX Text
BORE PIT-B8
AutoCAD SHX Text
BORE PIT-18
AutoCAD SHX Text
28" PINE
AutoCAD SHX Text
(E) 18" CMP
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) DBL YELLOW STRIPE
AutoCAD SHX Text
(E) UTILITY POLE W/GUY
AutoCAD SHX Text
16" CEDARS
AutoCAD SHX Text
6" CEDAR
AutoCAD SHX Text
8" CEDAR
AutoCAD SHX Text
BORE PIT-B19
AutoCAD SHX Text
(E) UTILITY POLE W/GUY
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) STREET SIGN
AutoCAD SHX Text
(E) EDGE OF PVMT
AutoCAD SHX Text
(E) ROCK
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
BLACKFOOT
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
MEWUK LANE
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
FH 1019
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 3/C14
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 4/C14
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
FH 1020
AutoCAD SHX Text
(E) METER IS ON SEPARATE PARALLEL LINE
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
60'
AutoCAD SHX Text
80'
AutoCAD SHX Text
4
AutoCAD SHX Text
12" MINIMUM CLEAR. MAINTAIN SEPARATION PER DISTRICT STANDARD G04.
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C6 - PLAN-2.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
CONNECTION FOR FUTURE FH
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 9: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
4970
AutoCAD SHX Text
4980
AutoCAD SHX Text
4990
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
+50.00 MATCH LINE
AutoCAD SHX Text
21+00
AutoCAD SHX Text
22+00
AutoCAD SHX Text
23+00
AutoCAD SHX Text
24+00
AutoCAD SHX Text
25+00
AutoCAD SHX Text
26+00
AutoCAD SHX Text
27+00
AutoCAD SHX Text
28+00
AutoCAD SHX Text
29+00
AutoCAD SHX Text
30+00
AutoCAD SHX Text
4945
AutoCAD SHX Text
4975
AutoCAD SHX Text
4955
AutoCAD SHX Text
4985
AutoCAD SHX Text
4965
AutoCAD SHX Text
4995
AutoCAD SHX Text
+50.00 MATCH LINE
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
+00%%p BYPASS CONNECTION & FIRE HYDRANT
AutoCAD SHX Text
+33%%p AIR RELIEF VALVE
AutoCAD SHX Text
+45%%p BYPASS CONNECTION & FIRE HYDRANT
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
4990
AutoCAD SHX Text
5000
AutoCAD SHX Text
5000
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 20+50 - 30+50
AutoCAD SHX Text
C7
AutoCAD SHX Text
9
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text
4975
AutoCAD SHX Text
4945
AutoCAD SHX Text
4985
AutoCAD SHX Text
4955
AutoCAD SHX Text
4995
AutoCAD SHX Text
MATCH LINE STA=20+50
AutoCAD SHX Text
SEE SHEET C8
AutoCAD SHX Text
MATCH LINE STA=30+50
AutoCAD SHX Text
SEE SHEET C8
AutoCAD SHX Text
N
AutoCAD SHX Text
MATCH LINE STA=25+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
MATCH LINE STA=25+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
N
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
(E) ROCK
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) UTILITY POLE W/GUY
AutoCAD SHX Text
(E) TRASH ENCLOSURE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) TRASH ENCLOSURE
AutoCAD SHX Text
BORE PIT-B16
AutoCAD SHX Text
(E) ROCK WALL
AutoCAD SHX Text
(E) CONCRETE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) ROCK WALL
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
BORE PIT-B21
AutoCAD SHX Text
BORE PIT-B17
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) R/R TIE WALL
AutoCAD SHX Text
(E) STAIRS
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
FH 1110
AutoCAD SHX Text
FH 1109
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 5/C14
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
2
AutoCAD SHX Text
(E) 14" ISOLATION VALVE
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
90'
AutoCAD SHX Text
65'
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
50'
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
PLACE 1" ARV PER DISTRICT STANDARD W05
AutoCAD SHX Text
(E) DBL YELLOW STRIPE
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C7 - PLAN-3.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 5/C14
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 10: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

4

9

9

6

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
4980
AutoCAD SHX Text
4980
AutoCAD SHX Text
4980
AutoCAD SHX Text
4980
AutoCAD SHX Text
4990
AutoCAD SHX Text
4990
AutoCAD SHX Text
4990
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
35
AutoCAD SHX Text
36
AutoCAD SHX Text
+50.00 MATCH LINE
AutoCAD SHX Text
31+00
AutoCAD SHX Text
32+00
AutoCAD SHX Text
33+00
AutoCAD SHX Text
34+00
AutoCAD SHX Text
35+00
AutoCAD SHX Text
36+00
AutoCAD SHX Text
37+00
AutoCAD SHX Text
38+00
AutoCAD SHX Text
39+00
AutoCAD SHX Text
40+00
AutoCAD SHX Text
4970
AutoCAD SHX Text
4970
AutoCAD SHX Text
4980
AutoCAD SHX Text
4980
AutoCAD SHX Text
4990
AutoCAD SHX Text
4990
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
+83%%p FIRE HYDRANT
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
4990
AutoCAD SHX Text
5000
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
39
AutoCAD SHX Text
40
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 30+50 - 40+00
AutoCAD SHX Text
C8
AutoCAD SHX Text
10
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B7
AutoCAD SHX Text
MATCH LINE STA=36+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
MATCH LINE STA=40+00
AutoCAD SHX Text
SEE SHEET C9
AutoCAD SHX Text
N
AutoCAD SHX Text
MATCH LINE STA=36+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
MATCH LINE STA=30+50
AutoCAD SHX Text
SEE SHEET C7
AutoCAD SHX Text
N
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
14" CEDAR
AutoCAD SHX Text
16" PINE
AutoCAD SHX Text
18" PINE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B15
AutoCAD SHX Text
BORE PIT-B14
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
(E) DBL YELLOW STRIPE
AutoCAD SHX Text
(E) EDGE OF PVMT
AutoCAD SHX Text
S U B D I V I S I O N
AutoCAD SHX Text
FH 1111
AutoCAD SHX Text
B I G T R E E S
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
(E) ISOLATION VALVE
AutoCAD SHX Text
1
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
90'
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
50'
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C8 - PLAN-4.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
AutoCAD SHX Text
(N) FIRE HYDRANT-CCWD STANDARD DETAILS W04 AND W04A
Page 11: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

4

9

9

4

4

9

9

8

4998

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
5000
AutoCAD SHX Text
5000
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
40
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
46
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
40+00
AutoCAD SHX Text
41+00
AutoCAD SHX Text
42+00
AutoCAD SHX Text
43+00
AutoCAD SHX Text
44+00
AutoCAD SHX Text
45+00
AutoCAD SHX Text
46+00
AutoCAD SHX Text
47+00
AutoCAD SHX Text
48+00
AutoCAD SHX Text
49+00
AutoCAD SHX Text
50+00
AutoCAD SHX Text
51+00
AutoCAD SHX Text
4975
AutoCAD SHX Text
4965
AutoCAD SHX Text
4985
AutoCAD SHX Text
4975
AutoCAD SHX Text
4995
AutoCAD SHX Text
4985
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
+18%%p BYPASS CONNECTION & FIRE HYDRANT
AutoCAD SHX Text
+94%%p 10"x6" CROSS
AutoCAD SHX Text
+62%%p FIRE HYDRANT
AutoCAD SHX Text
+50%%P AIR RELIEF VALVE
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
4970
AutoCAD SHX Text
4980
AutoCAD SHX Text
4990
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
46
AutoCAD SHX Text
47
AutoCAD SHX Text
48
AutoCAD SHX Text
49
AutoCAD SHX Text
50
AutoCAD SHX Text
51
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 40+00 - 51+00
AutoCAD SHX Text
C9
AutoCAD SHX Text
11
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
SHOSHONE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
BORE PIT-B6
AutoCAD SHX Text
4965
AutoCAD SHX Text
4975
AutoCAD SHX Text
4975
AutoCAD SHX Text
4995
AutoCAD SHX Text
MATCH LINE STA=40+00
AutoCAD SHX Text
SEE SHEET C8
AutoCAD SHX Text
MATCH LINE STA=51+00
AutoCAD SHX Text
SEE SHEET C10
AutoCAD SHX Text
MATCH LINE STA=46+00
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
MATCH LINE STA=46+00
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B12
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B11
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
(E) DBL YELLOW STRIPE
AutoCAD SHX Text
(E) EDGE OF PVMT
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B6
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
FH 1113
AutoCAD SHX Text
FH 1112
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
PLACE 1" ARV PER DISTRICT STANDARD W05
AutoCAD SHX Text
(E) RIGHT OF WAY
AutoCAD SHX Text
50'
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C9 - PLAN-5.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
CONNECTION DETAIL SEE DETAIL 5/C14
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
AutoCAD SHX Text
(N) FIRE HYDRANT-CCWD STANDARD DETAILS W04 AND W04A
AutoCAD SHX Text
REMOVE (E) 14" VALVE AND (E) 6" VALVES
AutoCAD SHX Text
CONNECTION DETAIL SEE DETAIL 6/C14
AutoCAD SHX Text
CONNECTION DETAIL SEE DETAIL 1/C15
AutoCAD SHX Text
REPLACE 6" WATER MAIN
AutoCAD SHX Text
CONNECTION DETAIL SEE DETAIL 1/C15
Page 12: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
4940
AutoCAD SHX Text
4940
AutoCAD SHX Text
4950
AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
54
AutoCAD SHX Text
55
AutoCAD SHX Text
56
AutoCAD SHX Text
57
AutoCAD SHX Text
58
AutoCAD SHX Text
59
AutoCAD SHX Text
60
AutoCAD SHX Text
61
AutoCAD SHX Text
62
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
51
AutoCAD SHX Text
52
AutoCAD SHX Text
53
AutoCAD SHX Text
54
AutoCAD SHX Text
55
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
51+00
AutoCAD SHX Text
52+00
AutoCAD SHX Text
53+00
AutoCAD SHX Text
54+00
AutoCAD SHX Text
55+00
AutoCAD SHX Text
56+00
AutoCAD SHX Text
57+00
AutoCAD SHX Text
58+00
AutoCAD SHX Text
59+00
AutoCAD SHX Text
60+00
AutoCAD SHX Text
61+00
AutoCAD SHX Text
62+00
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
+88%%p 10"x6" TEE
AutoCAD SHX Text
+42%%p 10"x6" TEE
AutoCAD SHX Text
+15%%p BOV
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
+00%%p 10"X10"X6" TEE & FH
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 51+00 - 62+00
AutoCAD SHX Text
C10
AutoCAD SHX Text
12
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
6" FIR
AutoCAD SHX Text
4940
AutoCAD SHX Text
4945
AutoCAD SHX Text
4950
AutoCAD SHX Text
4955
AutoCAD SHX Text
4960
AutoCAD SHX Text
MATCH LINE STA=54+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
N
AutoCAD SHX Text
HOKAN
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
MIDO
AutoCAD SHX Text
WAY
AutoCAD SHX Text
MATCH LINE STA=51+00
AutoCAD SHX Text
SEE SHEET C9
AutoCAD SHX Text
MATCH LINE STA=62+00
AutoCAD SHX Text
SEE SHEET C11
AutoCAD SHX Text
MATCH LINE STA=54+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
N
AutoCAD SHX Text
DOUBLE CEDAR
AutoCAD SHX Text
(E) CMP (PLUGGED)
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) CMP (PLUGGED)
AutoCAD SHX Text
(E) CMP (DAMAGED)
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
24" PINE
AutoCAD SHX Text
28" PINE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
BORE PIT-B10
AutoCAD SHX Text
BORE PIT-B5
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
BORE PIT-B4
AutoCAD SHX Text
CEDAR CLUSTER
AutoCAD SHX Text
30" CEDAR
AutoCAD SHX Text
14" CEDAR
AutoCAD SHX Text
16" CEDAR
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
12" PINE
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) YELLOW DBL LINE
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
REPLACE (E) SAMPLE STATION
AutoCAD SHX Text
SEE DISTRICT DET WO9
AutoCAD SHX Text
(E) PRV (TO BE REMOVED)
AutoCAD SHX Text
(E) WARNING SIGN
AutoCAD SHX Text
(E) UTILITY POLES
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
FH 1115
AutoCAD SHX Text
FH 1114
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 2/C15
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 4/C15
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE DISTRICT STANDARDS.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
(E) ISOLATION VALVE
AutoCAD SHX Text
(E) ISOLATION VALVE
AutoCAD SHX Text
BLOW-OFF VALVE SEE DISTRICT DET W06A
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
SEE DETAIL 3/C15 CONNECTION DETAIL FOR BYPASS PIPE
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C10 - PLAN-6.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
INSTALL NEW PRV W/BYPASS SEE RELOCATION DETAIL 1/C13
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 5/C14
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
AutoCAD SHX Text
(E) FH TO BE REMOVED
AutoCAD SHX Text
INSTALL FH AFTER REMOVING BYPASS
Page 13: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
4940
AutoCAD SHX Text
4940
AutoCAD SHX Text
4940
AutoCAD SHX Text
4940
AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
STOP
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
67
AutoCAD SHX Text
68
AutoCAD SHX Text
69
AutoCAD SHX Text
8"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
4960
AutoCAD SHX Text
4970
AutoCAD SHX Text
10"W
AutoCAD SHX Text
14"W
AutoCAD SHX Text
62
AutoCAD SHX Text
63
AutoCAD SHX Text
64
AutoCAD SHX Text
65
AutoCAD SHX Text
66
AutoCAD SHX Text
62+00
AutoCAD SHX Text
63+00
AutoCAD SHX Text
64+00
AutoCAD SHX Text
65+00
AutoCAD SHX Text
66+00
AutoCAD SHX Text
67+00
AutoCAD SHX Text
68+00
AutoCAD SHX Text
69+00
AutoCAD SHX Text
70+00
AutoCAD SHX Text
71+00
AutoCAD SHX Text
72+00
AutoCAD SHX Text
73+00
AutoCAD SHX Text
4940
AutoCAD SHX Text
4940
AutoCAD SHX Text
4950
AutoCAD SHX Text
4950
AutoCAD SHX Text
4960
AutoCAD SHX Text
4960
AutoCAD SHX Text
+00.00 MATCH LINE
AutoCAD SHX Text
EXISTING GRADE @ WATER MAIN
AutoCAD SHX Text
36" MINIMUM COVER OVER PROPOSED WATER MAIN
AutoCAD SHX Text
HIGHWAY 4
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
71+05±
AutoCAD SHX Text
+00%%p 10"x8" TEE
AutoCAD SHX Text
+70%%p AIR RELIEF VALVE
AutoCAD SHX Text
18"SD
AutoCAD SHX Text
+10%%p END WATER MAIN
AutoCAD SHX Text
10" DUCTILE IRON PIPE
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PLAN & PROFILE
AutoCAD SHX Text
STA. 62+00 - 69+10
AutoCAD SHX Text
C11
AutoCAD SHX Text
13
AutoCAD SHX Text
17
AutoCAD SHX Text
HORZ. 1"=40'
AutoCAD SHX Text
VERT. 1"=4'
AutoCAD SHX Text
MATCH LINE STA=66+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
MATCH LINE STA=66+50
AutoCAD SHX Text
SEE THIS SHEET
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 4
AutoCAD SHX Text
MATCH LINE STA=62+00
AutoCAD SHX Text
SEE SHEET C11
AutoCAD SHX Text
MEKO DRIVE
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
FIRE STATION
AutoCAD SHX Text
NO. 2
AutoCAD SHX Text
MAINTENANCE
AutoCAD SHX Text
YARD
AutoCAD SHX Text
48" OAK
AutoCAD SHX Text
(E) YELLOW DBL LINE
AutoCAD SHX Text
PINE/CEDAR
AutoCAD SHX Text
60" CEDAR
AutoCAD SHX Text
26" FIR
AutoCAD SHX Text
60" CEDAR
AutoCAD SHX Text
28" OAK
AutoCAD SHX Text
16" PINE
AutoCAD SHX Text
BORE PIT-B3
AutoCAD SHX Text
(E) 12" CMP
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
(E) UTILITY POLES
AutoCAD SHX Text
(E) UTILITY POLE
AutoCAD SHX Text
30" CEDAR
AutoCAD SHX Text
(E) STOP SIGN
AutoCAD SHX Text
DOUBLE FIR
AutoCAD SHX Text
(E) 18" CMP
AutoCAD SHX Text
BORE PIT-B2
AutoCAD SHX Text
BORE PIT-B1
AutoCAD SHX Text
(E) FOG LINE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
B I G T R E E S S U B D I V I S I O N
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
FH 1117
AutoCAD SHX Text
TO FIRE STATION
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
SEE DETAIL 5/C15
AutoCAD SHX Text
%%uCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING RESIDENTIAL SERVICES, REPLACE ALL LATERALS, BOXES, VALVES, AND METERS. SEE CCWD STANDARD DETAILS W07, W07C & WO7D.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING FIRE HYDRANT - REPLACE LATERAL, VALVE, AND HYDRANT. SEE CCWD STANDARD DETAIL WO4.
AutoCAD SHX Text
3
AutoCAD SHX Text
PLACE WATER METER TO AVOID UTILITY CONFLICT.
AutoCAD SHX Text
(E) PG&E UTILITY
AutoCAD SHX Text
PLACE 1" ARV PER DISTRICT STANDARD W05
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C11 - PLAN-7.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
V100
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 14: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

A

A

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PRV STATION - DETAILS
AutoCAD SHX Text
C12
AutoCAD SHX Text
14
AutoCAD SHX Text
17
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C12 - WATER PIPE DETAILS.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
TO DRAIN
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
1'-6"
AutoCAD SHX Text
DRAIN TO DISCHARGE BOX
AutoCAD SHX Text
1'-6"
AutoCAD SHX Text
3'-0"
AutoCAD SHX Text
20
AutoCAD SHX Text
8
AutoCAD SHX Text
14
AutoCAD SHX Text
17
AutoCAD SHX Text
17
AutoCAD SHX Text
6" DIP WATER MAIN
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
1
AutoCAD SHX Text
MECHANICAL RESTRAINT GLAND
AutoCAD SHX Text
2
AutoCAD SHX Text
6" X 6" X 3" DUCTILE IRON TEE, MJ X MJ X MJ
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
6" D.I.P. SPOOL, FLANGE X PLAIN END
AutoCAD SHX Text
SADDLE, CORP STOP, PRESSURE GAGE ASSEMBLY (SEE DETAIL THIS SHEET)
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
10
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
SLOPE FLOOR
AutoCAD SHX Text
TO DRAIN
AutoCAD SHX Text
22
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
GRAVITY DRAIN
AutoCAD SHX Text
SUMP OR GRAVITY
AutoCAD SHX Text
DRAIN TO DAYLIGHT
AutoCAD SHX Text
7
AutoCAD SHX Text
4"
AutoCAD SHX Text
MIN TYP
AutoCAD SHX Text
24
AutoCAD SHX Text
23
AutoCAD SHX Text
20
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
20
AutoCAD SHX Text
14
AutoCAD SHX Text
19
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
21
AutoCAD SHX Text
4
AutoCAD SHX Text
TO DISCHARGE BOX
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
13
AutoCAD SHX Text
16
AutoCAD SHX Text
4
AutoCAD SHX Text
7
AutoCAD SHX Text
1
AutoCAD SHX Text
18
AutoCAD SHX Text
3
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
2
AutoCAD SHX Text
13
AutoCAD SHX Text
2
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
3" ROMAC DJ400 DISMANTLING JOINT
AutoCAD SHX Text
3" D.I.P. SPOOL, PLAIN ENDS
AutoCAD SHX Text
3" D.I.P. SPOOL, FLANGE X PLAIN ENDS
AutoCAD SHX Text
6" ROMAC DJ400 DISMANTLING JOINT
AutoCAD SHX Text
3" 90-DEGREE BEND, MJ X MJ
AutoCAD SHX Text
3" X 3" X 2" DUCTILE IRON TEE
AutoCAD SHX Text
6" PRESSURE REDUCING VALVE, FL x FL, SEE SPECIFICATIONS
AutoCAD SHX Text
2" PRESSURE RELIEF VALVE, SEE SPECIFICATIONS
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
3" REDUCED PORT PRESSURE REDUCING VALVE, FL X FL, SEE SPECIFICATIONS
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
3/4" CORP. STOP BALL VALVE (AWWA C800, NSF 61 & 372, 300 PSI)
AutoCAD SHX Text
SERVICE SADDLE (MUELLER DR2A, NYLON DUCTILE IRON, DOUBLE STRAP)
AutoCAD SHX Text
3/4" 45-DEGREE BRASS COUPLING, LEAD FREE
AutoCAD SHX Text
3/4" THREADED PIPE NIPPLE (RED BRASS ASTM B43, SCHEDULE 40)
AutoCAD SHX Text
2" AWWA C515, GATE VALVE
AutoCAD SHX Text
PIPE SUPPORT, HOT DIP GALVANIZED, PLACER WATERWORKS (PW/PS) WITH STANDARD (PW/SDL-S) SADDLES
AutoCAD SHX Text
BRASS REDUCER BUSHING, 3/4" MALE TO 1/4" FEMALE NPT REDUCING BUSHINGS (SWAGELOK 12-RB-4 OR EQUAL)
AutoCAD SHX Text
27
AutoCAD SHX Text
27
AutoCAD SHX Text
BOURDON TUBE PRES. GAGES (WIKA TYPE 213.53DW, LIQUID FILLED)
AutoCAD SHX Text
MIN 72" X 72" DOUBLE LEAF HATCH, , " STEEL Z-BAR FRAME, " STEEL DIAMOND 14" STEEL Z-BAR FRAME, " STEEL DIAMOND 14" STEEL DIAMOND PLATE, STAINLESS STEEL HARDWARE AND SAFETY ARMS, TORSION ASSIST, FOUR " 12" SECURITY BOLTS, H20 TRAFFIC RATED
AutoCAD SHX Text
6" AWWA C515 GATE VALVE, FL X FL, AWWA NUT OPERATORS
AutoCAD SHX Text
3" AWWA C515 GATE VALVE, FL X FL, AWWA NUT OPERATOR
AutoCAD SHX Text
CORE DRILL OR FORMED HOLES; FILL ANNULAR VOID WITH NON-SHRINK CONSTRUCTION GROUT, SAKRETE, SIKAGROUT, FIVE STAR, OR EUQAL
AutoCAD SHX Text
25
AutoCAD SHX Text
25
AutoCAD SHX Text
PRECAST CONCRETE VAULT, MINIMUM 6'-0" I.D. X 6'-0" I.D., SEE SPECIFICATIONS
AutoCAD SHX Text
9
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
LOW POINT OF FLOOR SLOPE TO SUMP
AutoCAD SHX Text
5
AutoCAD SHX Text
1'-6"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. COMPONENTS, FITTINGS AND OTHER DETAILS SHOWN HEREON, HAVE BEEN DRAWN TO COMPONENTS, FITTINGS AND OTHER DETAILS SHOWN HEREON, HAVE BEEN DRAWN TO APPROXIMATE DIMENSIONS. SHOP DRAWINGS SHALL BE SUBMITTED TO THE DISTRICT FOR APPROVAL PRIOR TO CONSTRUCTION. SHOP DRAWINGS SHALL SHOW COMPLETE DETAILS OF THE INSTALLATION INCLUDING SIZE, LOCATION, MANUFACTURERS NAME, MODEL AND DIMENSIONAL AND ENGINEERING DATA OF ALL COMPONENTS. 2. SEE SITE PLAN FOR LOCATION OF ALIGNMENTS AND OUTLETS.SEE SITE PLAN FOR LOCATION OF ALIGNMENTS AND OUTLETS.
AutoCAD SHX Text
28
AutoCAD SHX Text
2' X 2' DRAINAGE INLET BOX W/ FRAME AND GRATE
AutoCAD SHX Text
29
AutoCAD SHX Text
FLAP VALVE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
DISCHARGE BOX
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SEE STD DWG, THIS SHEET
AutoCAD SHX Text
29
AutoCAD SHX Text
28
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
PROFILE
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
29
AutoCAD SHX Text
28
AutoCAD SHX Text
UNDISTURBED EARTH
AutoCAD SHX Text
6"
AutoCAD SHX Text
4" MIN
AutoCAD SHX Text
2" TO 4" DRAIN ROCK
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 15: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
6"W
AutoCAD SHX Text
6"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
10"W
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
PRV STATION - RELOCATION
AutoCAD SHX Text
C13
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
SCALE: 1"=4'
AutoCAD SHX Text
PRV RELOCATION DETAIL
AutoCAD SHX Text
MEKO
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
HOKAN CIRCLE
AutoCAD SHX Text
(E) PRV (TO BE REMOVED)
AutoCAD SHX Text
(E) EDGE OF PAVEMENT
AutoCAD SHX Text
12" CEDAR
AutoCAD SHX Text
5'-0"
AutoCAD SHX Text
13'-0"
AutoCAD SHX Text
PROPOSED PRV, SEE DETAIL W13A/C12. EXCAVATION AND BACKFILL PER DISTRICT STANDARDS
AutoCAD SHX Text
R I G H T O F W A Y
AutoCAD SHX Text
N
AutoCAD SHX Text
DISCHARGE BOX PER STD CCWD DETAIL W14
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C13 - PRV LOCATION DETAIL.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
COMPLETE 10" TEE AND 10" GATE VALVES PER DETAIL 2/C15
AutoCAD SHX Text
NOTES: 1. ALL BENDS ON 6" LINE TO BE MECHANICALLY ALL BENDS ON 6" LINE TO BE MECHANICALLY RESTRAINED IN ADDITION TO THRUST BLOCKS.
AutoCAD SHX Text
2" GRAVITY DRAIN
AutoCAD SHX Text
REPLACE 6" ACP (E) WITH 6" DI PIPE BETWEEN 10"W AND NEW PRV STATION
AutoCAD SHX Text
PLACE THRUST BLOCK, TYP SEE NOTE 1
AutoCAD SHX Text
CUT-IN ISOLATION VALVE INTO 6" TECHITE PIPE PER DETAIL 3/C15
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
Page 16: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
SECTIONS & DETAILS-1
AutoCAD SHX Text
C14
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
2
AutoCAD SHX Text
-
AutoCAD SHX Text
4
AutoCAD SHX Text
-
AutoCAD SHX Text
6
AutoCAD SHX Text
-
AutoCAD SHX Text
5
AutoCAD SHX Text
-
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE, TYP
AutoCAD SHX Text
(E) 6" ACP
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
(N) 10" X 6" FL DUCTILE IRON CROSS
AutoCAD SHX Text
(N) 6" TRANSITION COUPLING
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C14 - SECTIONS & DETAILS-1.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
STA 8+89
AutoCAD SHX Text
TEMP 10" X 14" FL REDUCER, TYP
AutoCAD SHX Text
(N) 10" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(E) 14" TECHITE PIPE, TYP
AutoCAD SHX Text
(N) DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
TEMP 10" X 14" REDUCER, TYP
AutoCAD SHX Text
TEMP 14" FCA
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) 10" X 6" FL DUCTILE IRON CROSS
AutoCAD SHX Text
BYPASS AND/OR FUTURE HYDRANT
AutoCAD SHX Text
(N) 10" FL DUCTILE IRON TEE
AutoCAD SHX Text
(N) 10" X 6" FL REDUCER
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) 10" FL DUCTILE IRON TEE
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 10" X 6" FL REDUCER
AutoCAD SHX Text
STA 11+30
AutoCAD SHX Text
STA 16+94
AutoCAD SHX Text
STA 13+35
AutoCAD SHX Text
STA 40+94
AutoCAD SHX Text
STA 22+45
AutoCAD SHX Text
STA 29+00
AutoCAD SHX Text
STA 52+00
AutoCAD SHX Text
(N) 6" FL GATE VALVE, SEE DETAIL 1/C15
AutoCAD SHX Text
(N) 6" FL GATE VALVE, SEE DETAIL 1/C15
AutoCAD SHX Text
(N) 10" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE
AutoCAD SHX Text
(N) 10" X 6" FL DUCTILE IRON TEE
AutoCAD SHX Text
(N) 10" DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE
AutoCAD SHX Text
(N) 10" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE, TYP
AutoCAD SHX Text
TEMP 14" FCA, TYP
AutoCAD SHX Text
(E) 14" TECHITE PIPE, TYP
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
FLANGE COUPLING ADAPTOR, TYP
AutoCAD SHX Text
TEMP 10" X 14" FL REDUCER, TYP
AutoCAD SHX Text
TEMP 14" FCA, TYP
AutoCAD SHX Text
(E) 14" TECHITE PIPE, TYP
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
(N) 6" DUCTILE IRON SPOOL
AutoCAD SHX Text
(N) 10" DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) FCA
AutoCAD SHX Text
(E) 6" ACP
AutoCAD SHX Text
(N) 6" TRANSITION COUPLING
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) FCA
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
(N) 10" X 6" FL DUCTILE IRON TEE
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
STA 0+20
AutoCAD SHX Text
6" DUCTILE IRON TEMPORARY BYPASS PIPE
AutoCAD SHX Text
CONNECTION TO FH 1109
AutoCAD SHX Text
(N) 10" FL GATE VALVE
AutoCAD SHX Text
(N) 10" DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
STA 40+18
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-06-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
AutoCAD SHX Text
PROVIDE 10'
AutoCAD SHX Text
SEPARATION
AutoCAD SHX Text
PROVIDE 10'
AutoCAD SHX Text
SEPARATION
AutoCAD SHX Text
THRUST BLOCK
AutoCAD SHX Text
THRUST BLOCK
AutoCAD SHX Text
6" DUCTILE IRON TEMPORARY BYPASS PIPE
Page 17: TECHITE WATER PIPELINE REPLACEMENT NUO LAT AY C T … · all requireme對nts, standards, and specifications of all agencies having jurisdiction over the work shall be done to the

CALIFORNIA

DATER.C.E. No. 060311 - REGISTRATION EXPIRES 06-30-20SIMON N. GRAY

CALAVERAS COUNTY

APP DATEREVISIONSNO. DESIGNED UNDER THE DIRECTION OF:BAR IS ONE INCHAT FULL SCALE

IF NOT ONE INCHON THIS SHEET

SCALE ACCORDINGLY

0 1"

OF SHEETS

SHEET NUMBER

DRAWING NUMBER

SCALETECHITE WATER PIPELINE REPLACEMENT

DESIGN:

DRAWN:

CHECKED:

DATE:

DATE:

DATE:

COLEMAN ENGINEERING1358 BLUE OAKS BLVD

ROSEVILLE, CA 95678(916) 791-1188

SUITE 200

YTNU

OCSAREVALAC

TCIRTSIDRE

TAW SNG

WCJ

SNG

02-26-19

02-26-19

02-26-19 02-26-19

02-26-19

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
FAX: (209) 754-1069
AutoCAD SHX Text
PHONE: (209) 754-3543
AutoCAD SHX Text
SAN ANDREAS, CA 95249
AutoCAD SHX Text
P.O. BOX 846
AutoCAD SHX Text
120 TOMA COURT
AutoCAD SHX Text
WATER DISTRICT
AutoCAD SHX Text
CALAVERAS COUNTY
AutoCAD SHX Text
SECTIONS & DETAILS-2
AutoCAD SHX Text
C15
AutoCAD SHX Text
17
AutoCAD SHX Text
17
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
2
AutoCAD SHX Text
-
AutoCAD SHX Text
4
AutoCAD SHX Text
-
AutoCAD SHX Text
5
AutoCAD SHX Text
-
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONNECTION DETAIL
AutoCAD SHX Text
REMOVE (E) GV AND REPLACE W/6" FL X MJ GATE VALVE, TYP
AutoCAD SHX Text
REMOVE (E) ACP AND REPLACE W/6" DUCTILE IRON PIPE TO PROPOSED PRV
AutoCAD SHX Text
10" X 6" FL DUCTILE IRON TEE
AutoCAD SHX Text
10" FL GATE VALVE, TYP
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PRV BYPASS DETAIL
AutoCAD SHX Text
S:\_PROJECTS\CCWD14-001 - TECHITE PIPE REPLACEMENT\CADD\C15 - SECTIONS & DETAILS-2.DWG
AutoCAD SHX Text
2/26/19
AutoCAD SHX Text
STA 57+00 HOKAN CIRCLE
AutoCAD SHX Text
(N) 6" FL GATE VALVE, TYP
AutoCAD SHX Text
(E) 6" ACP
AutoCAD SHX Text
TO SYSTEM
AutoCAD SHX Text
TO PRV
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) 6" TRANSITION COUPLING
AutoCAD SHX Text
THRUST BLOCK
AutoCAD SHX Text
(N) 6" FL DUCTILE IRON TEE
AutoCAD SHX Text
(E) 6" ACP, SEE NOTE 1
AutoCAD SHX Text
NOTES: 1. REPLACE (E) 6" ASBESTOS CONCRETE PIPE (ACP) WITH DIP REPLACE (E) 6" ASBESTOS CONCRETE PIPE (ACP) WITH DIP UPON COMPLETION OF NEW 10" WATER MAIN PER DETAIL 6/C14.
AutoCAD SHX Text
(E) 6" ACP
AutoCAD SHX Text
(N) 6" FL GATE VALVE
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE, CONNECT TO TEMP BYPASS
AutoCAD SHX Text
(N) 6" FL GATE VALVE
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) FCA, TYP
AutoCAD SHX Text
(N) 6" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 10" X 6" FL DUCTILE IRON CROSS
AutoCAD SHX Text
(N) 10" DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
TEMP 10" X 14" FL REDUCER, TYP
AutoCAD SHX Text
TEMP 14" FCA
AutoCAD SHX Text
(E) 6" ACP
AutoCAD SHX Text
(N) 6" DUCTILE IRON SPOOL, TYP
AutoCAD SHX Text
STA 60+42 MIDO WAY
AutoCAD SHX Text
10" DUCTILE IRON PIPE, TYP
AutoCAD SHX Text
STA 69+10 MEKO DRIVE
AutoCAD SHX Text
(E) 14" TECHITE PIPE, TYP
AutoCAD SHX Text
TO (E) FH
AutoCAD SHX Text
TEMP 6" BYPASS DUCTILE IRON SPOOL
AutoCAD SHX Text
(N) 8" X 10" FL DUCTILE IRON WYE
AutoCAD SHX Text
(N) 8" X 6" FL DUCTILE IRON WYE
AutoCAD SHX Text
10" PUSH-ON CAP FOR FUTURE EXTENSION
AutoCAD SHX Text
RECONNECT 8" DUCTILE IRON PIPE UPON COMPLETION
AutoCAD SHX Text
(N) 8" FL GATE VALVE
AutoCAD SHX Text
(N) 10" DUCTILE IRON PIPE
AutoCAD SHX Text
(E) 8" DUCTILE IRON PIPE
AutoCAD SHX Text
(E) 6" DUCTILE IRON PIPE
AutoCAD SHX Text
(N) 10" FL GATE VALVE, TYP
AutoCAD SHX Text
(N) 6" TRANSITION COUPLING, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
TEMP BYPASS CONNECTION DUCTILE IRON SPOOL
AutoCAD SHX Text
THRUST BLOCK, TYP
AutoCAD SHX Text
(N) FCA, TYP
AutoCAD SHX Text
TEMP 6" GATE VALVE
AutoCAD SHX Text
(N) FCA, TYP
AutoCAD SHX Text
(N) FCA, TYP
AutoCAD SHX Text
EXISTING V100
AutoCAD SHX Text
No. C60311
AutoCAD SHX Text
Exp. 06-30-20
AutoCAD SHX Text
V
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
D
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
F
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
.
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
Y
AutoCAD SHX Text
(N) 6" DUCTILE IRON PIPE