BR / SSD / SNP 1 Fixed Satellite Service PLAN (Appendix 30B) Technical and Regulatory Examinations BR-SSD e-Learning Center
Transcript
Page 1: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

BR / SSD / SNP 1

Fixed Satellite Service PLAN (Appendix 30B)

Technical and Regulatory Examinations

BR-SSD e-Learning Center

Page 2: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

2

Outline

Introduction

Limits and Criteria

BR Software used for Technical Examinations

View examination results

Page 3: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

3

Page 4: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

4

Appendix 30B Procedures

Plan: Allotment

List: Assignments MIFR

Additional Systems

conversion notification

Page 5: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

5

Ensure COMPATIBILITY

FSS Plan:

Allotments

List:

Assignments

Compatible

New systems

(conversion, additional systems…)

New systems

(conversion, additional systems…) C

om

patib

le

Compatible Compatible

Terre

stria

l serv

ices …

AP30B

Page 6: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

6

Hard limits • If exceeded, the

submission is unfavorable and returned to the notifying administration.

• To preserve current and future use of Radiocommunincation services in general

Coordination Trigger Limits • Agreements of identified affected

administrations is required

• To protect existing frequency assignments of the space services

• To protect existing and future use of terrestrial services on territories of administrations

Protection Criteria Categories

Page 7: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

7

Hard Limits in AP30B

• Downlink PFD hard limit on the surface of the Earth

Article 21 of Radio regulations

• Downlink PFD hard limit on any portion of the surface of the Earth

• Uplink PFD hard limit towards any location in the GSO-satellite orbit located beyond the coordination arc

• Downlink PFD hard limit on any portion of the surface of the Earth

• Uplink PFD hard limit towards any location in the GSO-satellite orbit located beyond the coordination arc

Annex 3 of Appendix 30B

Page 8: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

8

Article 21 Protection of terrestrial services

In application of Articles 6,7 and 8 of Appendix 30B

Downlink PFD hard limit on the surface of the Earth

(Article 21 of Radio regulations)

Frequency band Service

Limit in dB(W/m2) for angles

of arrival (d) above the horizontal plane Reference

bandwidth 0°-5° 5°-25° 25°-90°

4 500-4 800 MHz

5 670-5 725 MHz

(Nos. 5.453 and

5.455)

7 250-7 850 MHz

Fixed-satellite

(space-to-Earth)

Meteorological-

satellite

(space-to-Earth)

Mobile-satellite

Space research

–152 –152 + 0.5(d – 5) –142 4 kHz

10.7-11.7 GHz Fixed-satellite

(space-to-Earth)

(geostationary-

satellite orbit)

–150 –150+0.5(d – 5) –140 4 kHz

Page 9: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

9

Downlink PFD hard limit

on any portion of the surface of the Earth

-127.5dB (W/m2.MHz) in 4GHz

-114.0dB (W/m2.MHz) in 10/11GHz

Uplink PFD hard limit

towards any location in the geostationary-satellite orbit

located beyond the coordination arc

-140.0dB (W/m2.MHz) beyond10° in 4GHz

-133.0dB (W/m2.MHz) beyond 9° in 10/11GHz

Annex 3 of Appendix 30B

Page 10: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

10

Coordination Arc Coordination Arc

Examined

Annex 3 of Appendix 30B

coordination arc : 10° in 6725-7025MHz band 9 ° in 12.75-13.25GHz band

Page 11: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

11

Coordination Requirements in AP30B

Service area coverage

( §6.6 of AP30B)

Identify the administrations whose territory is partially or wholly included in the

service area of the network under examination

C/I degradation

(Annex 4 AP30B)

Identify the allotments or assignments potentially affected

by the network under examination

Uplink

single-entry C/I

(test points)

Downlink single-entry

C/I

(test points & grid points)

Aggregate C/I

(test points)

Page 12: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

12

Compatibility within coordination arc

Agreement is required when at least one of the following three

conditions is not satisfied

Uplink single-entry C/I ≥ 30dB, or (C/N)up +9dB,

or accepted value

Downlink single-entry C/I ≥ 26.65dB or (C/N)down +11.65dB

or accepted value (test points and grid points)

Over all aggregate C/I ≥ 21dB or (C/N)total+7dB

or accepted value

Computation precision is 0.05dB for all

Tolerance is 0.25dB for aggregate C/I criteria of assignments not

stemming from conversion (beyond the envelop characteristics of the

initial allotment)

Annex 4 of Appendix 30B

Page 13: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

13

The examination at grid points was introduced by WRC-07 to properly protect the

service area of allotments and assignments from shaped beams whose antenna

diagrams contain a number of “holes” towards certain specific downlink test

points.

The grid points are evenly generated within the service areas of the interfering

networks. To ensure a good coverage despite potential service areas having an

irregular shape, points are also added on the border of the service areas.

At grids points as well as at test points, the calculated space-to-Earth (downlink)

single-entry C/I are examined against the corresponding reference value. The

reference value at a grid point is interpolated from the reference values on the

test points.

Grid points for downlink examination

Page 14: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

14

Grid points for downlink examination (see note 19 of Annex 4 to AP 30B)

Introduced by WRC-07 to properly protect the service area of allotments / assignments from shaped beams

whose antenna diagrams contain a number of “holes” towards certain specific downlink test points.

The grid points are evenly generated inside and on the border of the service areas of the interfering networks.

The reference value at a grid point is interpolated from the reference values on the test points.

Nt

hTh

Nt

hThTh

d

dR

EgV

1

2

1

2

)(

)(

Note: If the value (RTh – ((C/N)d,Th – (C/N)d,Eg)) is lower than RTh, then

(RTh – ((C/N)d,Th – (C/N)d,Eg)) shall be used in the equation instead of RTh,

where: (C/N)d,Th: the downlink C/N value at test point Th;

(C/N)d,Eg: the downlink C/N value at test point Eg.

Page 15: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

15

Criteria in “Other provisions”

• Earth station e.i.r.p limits for angle from horizon <= 5°

(§21.8- 21.12 of RR)

• Earth station elevation angle must be >3 ° (§21.14 of RR)

• Downlink PFD Limits in table 21-4 of RR (§21.16 -21.17 of RR)

• Uplink e.i.r.p limits towards GSO orbit for 3 ° or more

off the main-lobe axis (§22.26-22.31 and §22.37 of RR)

• Longitude tolerance (+/-0.1 ° ) (§22.8 of RR)

• Pointing accuracy (§22.19 of RR)

Page 16: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

16

Page 17: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

17

BR Software

AP30B Provisions

Criteria software Publications

§6.3 a) “Other provisions” GIBC/PFD AP30B/A6A/ Special Section (§6.7 of AP30B)

§6.3 b) Annex 3 of AP30B GBIC/Appendix 30B

§6.4 Annex 4 of AP30B

§6.6 (service area)

§6.19 a) (service area) GBIC/Appendix 30B AP30B/A6B/ Special Section (§6.23 or §6.25

of AP30B)

§6.19 b) “Other provisions” GIBC/PFD

§6.19 c) Annex 3 of AP30B GBIC/Appendix 30B §6.21

Annex 4 of AP30B §6.22

Used For Examinations Under Article 6 of AP30B

Page 18: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

18

1 2

Article 21 PFD examination

Using GIMS, and AP30B databases

Page 19: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

Using GIMS, and AP30B databases

19

Annex 3 and 4 Examinations

1 2

Page 20: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

20

The Bureau has produced video presentations to assist administrations in

using the GIBC software package:

http://www.itu.int/en/ITU-R/space/plans/Pages/AP30B.aspx

Video demonstration

- gibc_ap30b_ci (MPEG-4 or avi format) shows how to perform C/I degradation analysis

with respect to Appendix 30B Annex 4 protection criteria using GIBC-Appendix 30B.

- gibc_ap30b_pfd_sa (MPEG-4 or avi format) shows how to perform PFD and Service Area

coverage analysis using GIBC Appendix 30B application.

- AP30BTexCap_A6B (MPEG-4 or avi format) shows how to update reference situations

(AP30B#A6B and AP30B#A7).

- AP30BTexCap_A6A (MPEG-4 or avi format) shows how to establish the reference

situation of the examined network and store examination results, affected administrations

and networks in the SNS-format AP30B database.

- AP30BTexCap_A6A_ViewResults (MPEG-4 or avi format) shows how to view and print the

Annex 4 C/I examination results

- gibc_ap30b_ci (MPEG-4 or avi format) shows how to perform C/I degradation analysis

with respect to Appendix 30B Annex 4 protection criteria using GIBC-Appendix 30B.

- gibc_ap30b_pfd_sa (MPEG-4 or avi format) shows how to perform PFD and Service Area

coverage analysis using GIBC Appendix 30B application.

- AP30BTexCap_A6B (MPEG-4 or avi format) shows how to update reference situations

(AP30B#A6B and AP30B#A7).

- AP30BTexCap_A6A (MPEG-4 or avi format) shows how to establish the reference

situation of the examined network and store examination results, affected administrations

and networks in the SNS-format AP30B database.

- AP30BTexCap_A6A_ViewResults (MPEG-4 or avi format) shows how to view and print the

Annex 4 C/I examination results

Page 21: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

21

Examination Results (1)

A5

Coordinations

A1f1

Notifying

adm.

A1f3

Inter. sat.

org.

BR80

Status of

identified

network

A1a Sat. Network /

A1b Plan beam identification

BR6a

Id. no.

A4a1

Orbital long.

BR79

Max. degradation

App.30B, Art.6, § 6.5 - Annexe 4

App.30B, Art.6, § 6.5 - Annex 4

Ap.30B, Art.6, § 6.5 - Anexo 4

附录30B, 第6条, 第6.5段- 附件4

Пр. 30B, Ст. 6, п. 6.5 – Дополнение 4

4امللحق – 5.6، الفقرة 6، املادة 30Bالتذييل

§2.1 (6/4 GHz) BGD Pending BANGSAT-30B-133E-A 112559030 133 E 26.854

Pending BANGSAT-30B-133E-B 112559031 133 E 23.807

Allotment BGD00000 90558032 133 E 26.854

CHN Pending CHINASAT-30B-125E 112559006 125 E 2.589

List CHINASAT-FSS3 105559021 125 E 4.290

Allotment CHN00002 90558050 135.5 E 6.906

HOL Pending NSS-FSS 130E 111559002 130 E 12.084

LAO Pending LAOSAT-FSS-128.5E 113559013 128.5 E 9.789

RUS Allotment RUS00003 105559056 138.5 E 5.781

§2.1 (13/10-11 GHz) BGD Pending BANGSAT-30B-133E-A 112559030 133 E 22.439

Pending BANGSAT-30B-133E-B 112559031 133 E 0.143

Allotment BGD00000 90558032 133 E 22.439

CHN Pending CHINASAT-30B-125E 112559006 125 E 0.467

Pending CHINASAT-30B-126E 112559034 126 E 0.443

HOL Pending NSS-FSS 130E 111559002 130 E 0.781

LAO Pending LAOSAT-FSS-128.5E 113559013 128.5 E 0.242

NPL Allotment NPL00000 90558155 123.3 E 1.302

§2.2 (6/4 GHz) BGD Pending BANGSAT-30B-133E-A 112559030 133 E 19.159

Pending BANGSAT-30B-133E-B 112559031 133 E 28.976

Allotment BGD00000 90558032 133 E 19.159

CHN Pending ASIASAT-30B-122 112559002 122 E 4.697

Pending CHINASAT-30B-125E 112559006 125 E 7.035

Pending CHINASAT-30B-126E 112559034 126 E 5.663

List CHINASAT-FSS3 105559021 125 E 3.831

Allotment CHN00002 90558050 135.5 E 6.834

List STATSIONAR-D6 101559040 128 E 12.476

§2.2 (13/10-11 GHz) BGD Pending BANGSAT-30B-133E-A 112559030 133 E 11.271

Pending BANGSAT-30B-133E-B 112559031 133 E 28.882

Allotment BGD00000 90558032 133 E 11.271

AP30B/A6A/ Special Sections:

Affected networks and maximum degradations (results of examination under Annex 4 of AP30B)

Page 22: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

22

Examination Results (2)

Provision 11C2 Agreement symbol A1f1 Notifying adm. / BR5 Geographical area

30B#6.6 R AFG, ARS, AUS, AUS/CHR, AUS/HMD, AUS/ICO, AUS/NFK, BGD, BRM, BRU, BTN,

CBG, CHN, CHN/HKG, CHN/MAC, CLN, F/AMS, F/KER, F/NCL, F/OCE, F/REU,

F/WAL, FJI, FSM, G/DGA, IND, INS, IRN, J, KAZ, KGZ, KIR, KIR/PHX, KOR, KRE,

LAO, MAU, MAU/ROD, MHL, MLA, MLD, MNG, NPL, NRU, NZL, NZL/CKH, NZL/NIU,

NZL/TKL, OMA, PAK, PHL, PLW, PNG, QAT, RUS, SEY, SLM, SMO, SNG, SOM,

THA, TJK, TKM, TLS, TON, TUV, UAE, USA/ALS, USA/GUM, USA/HWA, USA/HWL,

USA/JAR, USA/JON, USA/MDW, USA/MRA, USA/PLM, USA/SMA, USA/WAK, UZB,

VUT, XZZ/ATA, XZZ/XSP, YEM

30B#6.6 O Néant / None / Ninguna

AP30B/A6A/ Special Sections show the affected

networks

(results of examination under Annex 4 of AP30B)

AP30B/A6A/ Special Sections: Administrations identified under §6.6 of AP30B

Page 23: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

23

Examination Results (3)

AP30BReport tool can be used to view and analyze detailed examination results (contained in output database).

output database contained in \Databases\AP30B\TEX_Results Folder in BR IFIC DVD

Page 24: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

24

Page 25: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

25

From §6.1 submission published in AP30B/A6A A6A

to §6.17 submission to enter

assignments into the List and be published in AP30B/A6B A6B

Page 26: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

BR IFIC ……

BR IFIC ……

BR IFIC YYYY

(30B_YYYY)

BR IFIC ……

BR IFIC ……

BR IFIC XXX1

BR IFIC XXX1

From §6.1 submission to §6.17 submission

BR IFIC XXXX (30B_XXXX)

Allotments… List…

Pending…

Network

§ 6.1 Submission

(A6A)

Allotments… List…

Pending...

Network

§ 6.17

Submission (A6B)

Page 27: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

A6B characteristics replace A6A in the database when AP30B/A6A was examined Annex 4 examination: to see if any network of other administrations is affected Unfavorable : any network AFFECTED, and required agreement NOT obtained Return the notice Favorable: NO affected network or all required agreements have been obtained Continue examination…

BR IFIC XXXX (30B_XXXX)

Allotments… List…

Pending…

Network

§ 6.1 Submission

(A6A)

Network § 6.17

Submission (A6B)

§ 6.21

Page 28: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

§6.22

Network

§ 6.17

Submission (A6B)

Will A6B Affect other networks received between AP30B/A6A and A6B submission?

Will A6B cause more

interference to those affected networks than A6A?

Considered networks

Network

§ 6.1 Submission

(A6A)

Page 29: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

BR IFIC YYYY

(30B_YYYY)

§6.22 Step 1

Allotments… List…

Pending…

Network

§ 6.17

Submission (A6B)

A6B characteristics replace A6A in the latest database available Annex 4 examination: to see if any network of other Administrations is affected Favorable: no affected network or required agreements obtained Otherwise Continue ….

Page 30: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

BR IFIC YYYY

(30B_YYYY)

§6.22 Step 2

Allotments… List…

Pending…

Annex 4 examination using latest database (without replace A6A with A6B) Comparison of C/I values at all test-points and grid-points with the results in Step 1

If C/I value at any affected test-point or grid-point in Step 1 results is lower than that in Step 2 results: A6B causes more interference, unfavorable finding will be given

Page 31: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

How to compare C/I value at one test-point/grid-point ?

Each Assignment Affected

by A6B characteristics

Results using A6A

characteristics

Results using A6B

characteristics

beam group C/I beam group C/I

Test-Point 1

Or

Grid-Point 1

Downlink

beam-EA group-1 14.22 beam-EM group-1 14.23

group-2 14.21 group-2 13.32

…. ….. …. …

group-N 14.23 group-M 14.22

beam-EB group-1 13.22

group-2 14.29

….. 14.22

Uplink Beam-RA… … …. Beam-RM

... … … … … …

Aggregate … .. … … … …

Test-Point 2

Or

Grid-Point 2

Downlink ……

uplink ……

Aggregate ……

For multiple C/I values at one test-point/grid-point Compare the worst (lowest) C/I value

Page 32: Technical and Regulatory Examinations (Appendix … and Regulatory Examinations BR-SSD e-Learning Center 2 Outline Introduction Limits and Criteria BR Software used for Technical Examinations

http://www.itu.int/ITU-R/go/space-plans/en General information relating to space plan services