PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Waste water Input / output data As per Doc. No. PLTU1-10-IS-WWTP-001
1. - U/G RECEIVING PIT (T-01)
Capacity 10000
Size 100 x 50 x 2 m
Material Reinforced Concrete
- WASTE WATER TRANSFER PUMPS (P-01A/B)
NO. REQUIRED 2
CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE CENTRIFUGAL
PERFORMANCE :
Rated/normal capacity 200 m3/hr
Total head / NPSHA by Vendor
Speed by Vendor
Sp. Gr. 1
BKW, Shaft Power / End Curve Power by Vendor
Efficiency at rated capacity by Vendor
Head characteristic Continuously rise to shut-off
Minimum continuous flow by Vendor
NPSHR by Vendor
NPSHA-NPSHR Min 3 ft (1 m)
Sound Level Max. 85 dBA @ 1 m
CONSTRUCTION FEATURE:
Nozzle: size / rating / face / location
Suction by Vendor / 150# / RF / END
Discharge by Vendor / 150# / RF / TOP
No. of stages 1
Casing mounting Horizontal
Impeller : by Vendor
Bearing Type
Radial by Vendor
Thrust by Vendor
Coupling :
Manufacturer by Vendor
Model Flexible Disc w/ Spacer
Baseplate Horizontal / CS
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Case gasket Non Asbestos
SHAFT SEAL :
Type Gland Packing
Sheet 2 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure TEFC, IP-55
Insulation class / temperature rise F / B
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Final Machining and Mounting of Coupling Half Yes, by Vendor
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Pumps Yes, by Vendor
Coupling and Guard Yes, by Vendor
Baseplate/Soleplate Yes, by Vendor
Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor
with Liners and Shims
Driver Setting Bolts and Nuts Yes, by Vendor
Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)
Auxiliary Piping Within The Skid Yes, by Vendor
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
Constant level oiler Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
- SUBMERSIBLE SLUDGE PUMPS (PORTABLE) (P-05A/B)
NO. REQUIRED 2
CODE AND STANDARD Manufacturer Std
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE Centrifugal (Submersible)
PERFORMANCE :
Normal/Rated capacity 5 m3/hr
Normal head by Vendor
Speed by Vendor
Sheet 3 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
BKW, Shaft Power / Peak Power by Vendor
Efficiency at rated capacity by Vendor
Sound Level Max. 85 dBA@ 1 m
CONSTRUCTION FEATURE:
Discharge Nozzle by Vendor
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Motor Stainless Steel
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure IP-68
Insulation class F
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
SCOPE OF SUPPLY:
Pump Yes, by Vendor
Motor Driver Yes, by Vendor
2. - RAPID MIX TANK (T-02)
APPLICABLE CODE API 650 Latest Edition
DESIGN CONDITIONS
Capacity 120 m3
Dimension :
Shell ID by Vendor
Shell Height by Vendor
Nozzle by Vendor
Thickness :
Shell 6 mm
Bottom 9 mm
Operating / Design Pressure ATM / Full Water
Operating / Design Temperature 25 / 60
Hydrostatic Test Pressure Full Water
Radiographic examination Spot
Type of Roof OPEN ROOF
Joint efficiency 0.85
Corrosion allowance (shell, bottom) 1.7 / 1.7
Insulation None
Flange rating by Vendor
Material Data :
Sheet 4 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Shell & Bottom A 283 C
Internals (Vortex Breaker) A 106 B
Nozzle necks A 106 B
Flange A 105
Bolts & nuts A 193 B7 / A 194 2H
Gasket Non asbestos sheet gasket
Foundation bolts/nuts A 307 B / A 563 A
Stiffener A 36
Painting (internal) Coal Tar Epoxy
Painting (external) as per painting spec
Unit weight estimate (erection) 40.743
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Fabrication at Field Yes
Inspection and Testing Yes
Packing Yes
Documentation Yes
SCOPE OF SUPPLY
Body (shell, bottom, roof, etc) Yes
Ladders and Handrail Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Anchor bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Bird screen Yes, if required
Moisture trap Yes, if required
Vortex breaker Yes, if required
Roof reinforcement Yes, if required
External pipe support Yes, if required
Internal Piping Yes, if required
Internal Ladder Yes, if required
Internal and External Coating Yes, if required
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
- AGITATOR AND MOTOR (A-01)
SERVICE RAPID TANK MIXER
MANUFACTURER BY VENDOR
MODEL BY VENDOR
CODE AND STANDARD BY VENDOR
Sheet 5 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
OPERATING CONDITION
Liquid WATER
Service temperature AMBIENT
Sp. Gr. at service temp BY VENDOR
Viscosity at service temp 1-3
Corr/Err caused by H2S, CO2, S COMPOUND
Capacity: Normal BY VENDOR
Rated BY VENDOR
Process ( chemical/physical) MIXING / HOMOGENIZE
Baffles 3 at 120
Working Volume BY VENDOR
Agitator location RAPID MIX TANK
Type of Tank ( clilindrical )
CONSTRUCTION
Shaft Diameter at propoller BY VENDOR
Shaft diameter at coupling BY VENDOR
Shaft Length BY VENDOR
Mounting VERTICAL CENTERED ON TOP
Mechanical Seal YES
Seal Type LIP SEAL
Seal liquid reservoir/tank and accessories BY VENDOR
Distance Propoller to bottom BY VENDOR
Ring size BY VENDOR
Blades size BY VENDOR
Blade Type BY VENDOR
Driver Support BY VENDOR
Agitator Support BY VENDOR
Coupling BY VENDOR
Fastening Flanges BY VENDOR
Erection weight BY VENDOR
Total weight BY VENDOR
Agitator weight BY VENDOR
Coupling weight BY VENDOR
Motor/Gear weight BY VENDOR
Local instruments BY VENDOR (if any)
Miscellaneous
Name plate BY VENDOR
Stainless steel shim plates BY VENDOR
Setbolts for mounting driver BY VENDOR
Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR
Sparepart for 1 (one) year operation Separate Quotation
Special tools BY VENDOR (if any)
Shop inspection and testing REQUIRED; WITNESSED
Painting (as per REK's spec) BY VENDOR
Painting material for field touch up BY VENDOR; 5% of Painting Material
Packing & rust prevention BY VENDOR; 6 month storage
Vendor Documents Required (as per Requisition) BY VENDOR
Sheet 6 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
PERFORMANCE
Performance curve BY VENDOR
Min Continuity, Capacity BY VENDOR
Power Design BY VENDOR
Rotating Facing Coupling end BY VENDOR
Submergence Required BY VENDOR
Maximum Thrust Up/down BY VENDOR
Rated Speed 60-70
Start Torque BY VENDOR
Normal Torque BY VENDOR
Driving System ELECTRICAL MOTOR
Duty CONTINUOUS 24 HR
Max allowable sound level/Expected max 85 dBA
MATERIAL
Casing SS 304
Inner case parts BY VENDOR
propeller SS 304
Mounting Plate BY VENDOR
Shaft SS 304
Shaft sleeve SS 304
Mounting Bolt & Nut SS
BEARING AND LUBRICATION
Lubrication BY VENDOR
DRIVER :
INDUCTION MOTOR
Code and Standard IEC
Manufacturer BY VENDOR
IP Protection IP 55 (minimum)
Rated power BY VENDOR
Volt / Phase / Freq. 380 / 3 / 50
Enclosure TEFC
Insulation class / temperature rise F / B
INSPECTION AND TEST
Performance WITNESSED
Mechanical running WITNESSED
All other inspection & test per req./spec. NON WITNESSED
EXPERIENCES Similar project
DELIVERY TIME BY VENDOR
- FeSO4 DOSING UNIT (D-01)
Dosing Pump
Manufacturer By Vendor
Quantity 2
Motor Power kW By Vendor
Sheet 7 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
- Ca(OH)2 DOSING UNIT (D-02)
Dosing Pump
Manufacturer By Vendor
Quantity 2
Motor Power kW By Vendor
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
3. - REACTOR TANK (T-03)
APPLICABLE CODE API 650 Latest Edition
DESIGN CONDITIONS
Capacity 197 m3
Dimension :
Shell ID by Vendor
Shell Height by Vendor
Nozzle by Vendor
Thickness :
Shell 6 mm
Bottom 9 mm
Operating / Design Pressure ATM / Full Water
Operating / Design Temperature 25 / 60
Hydrostatic Test Pressure Full Water
Sheet 8 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Radiographic examination Spot
Type of Roof OPEN ROOF
Joint efficiency 0.85
Corrosion allowance (shell, bottom) 1.7 / 1.7
Insulation None
Flange rating by Vendor
Material Data :
Shell & Bottom A 283 C
Internals (Vortex Breaker) A 106 B
Nozzle necks A 106 B
Flange A 105
Bolts & nuts A 193 B7 / A 194 2H
Gasket Non asbestos sheet gasket
Foundation bolts/nuts A 307 B / A 563 A
Stiffener A 36
Painting (internal) Coal Tar Epoxy
Painting (external) as per painting spec
Unit weight estimate (erection) 40.743
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Fabrication at Field Yes
Inspection and Testing Yes
Packing Yes
Documentation Yes
SCOPE OF SUPPLY
Body (shell, bottom, roof, etc) Yes
Ladders and Handrail Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Anchor bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Bird screen Yes, if required
Moisture trap Yes, if required
Vortex breaker Yes, if required
Roof reinforcement Yes, if required
External pipe support Yes, if required
Internal Piping Yes, if required
Internal Ladder Yes, if required
Internal and External Coating Yes, if required
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
Sheet 9 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
- AGITATOR AND MOTOR (A-02)
SERVICE REACTOR TANK MIXER
MANUFACTURER BY VENDOR
MODEL BY VENDOR
CODE AND STANDARD BY VENDOR
OPERATING CONDITION
Liquid WATER
Service temperature AMBIENT
Sp. Gr. at service temp BY VENDOR
Viscosity at service temp 1-3
Corr/Err caused by H2S, CO2, S COMPOUND
Capacity: Normal BY VENDOR
Rated BY VENDOR
Process ( chemical/physical) MIXING / HOMOGENIZE
Baffles 3 at 120
Working Volume BY VENDOR
Agitator location REACTOR TANK
Type of Tank ( clilindrical )
CONSTRUCTION
Shaft Diameter at propoller BY VENDOR
Shaft diameter at coupling BY VENDOR
Shaft Length BY VENDOR
Mounting VERTICAL CENTERED ON TOP
Mechanical Seal YES
Seal Type LIP SEAL
Seal liquid reservoir/tank and accessories BY VENDOR
Distance Propoller to bottom BY VENDOR
Ring size BY VENDOR
Blades size BY VENDOR
Blade Type BY VENDOR
Driver Support BY VENDOR
Agitator Support BY VENDOR
Coupling BY VENDOR
Fastening Flanges BY VENDOR
Erection weight BY VENDOR
Total weight BY VENDOR
Agitator weight BY VENDOR
Coupling weight BY VENDOR
Motor/Gear weight BY VENDOR
Local instruments BY VENDOR (if any)
Miscellaneous
Name plate BY VENDOR
Stainless steel shim plates BY VENDOR
Setbolts for mounting driver BY VENDOR
Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR
Sparepart for 1 (one) year operation Separate Quotation
Sheet 10 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Special tools BY VENDOR (if any)
Shop inspection and testing REQUIRED; WITNESSED
Painting (as per REK's spec) BY VENDOR
Painting material for field touch up BY VENDOR; 5% of Painting Material
Packing & rust prevention BY VENDOR; 6 month storage
Vendor Documents Required (as per Requisition) BY VENDOR
PERFORMANCE
Performance curve BY VENDOR
Min Continuity, Capacity BY VENDOR
Power Design BY VENDOR
Rotating Facing Coupling end BY VENDOR
Submergence Required BY VENDOR
Maximum Thrust Up/down BY VENDOR
Rated Speed 60-70
Start Torque BY VENDOR
Normal Torque BY VENDOR
Driving System ELECTRICAL MOTOR
Duty CONTINUOUS 24 HR
Max allowable sound level/Expected max 85 dBA
MATERIAL
Casing SS 304
Inner case parts BY VENDOR
propeller SS 304
Mounting Plate BY VENDOR
Shaft SS 304
Shaft sleeve SS 304
Mounting Bolt & Nut SS
BEARING AND LUBRICATION
Lubrication BY VENDOR
DRIVER :
INDUCTION MOTOR
Code and Standard IEC
Manufacturer BY VENDOR
IP Protection IP 55 (minimum)
Rated power BY VENDOR
Volt / Phase / Freq. 380 / 3 / 50
Enclosure TEFC
Insulation class / temperature rise F / B
INSPECTION AND TEST
Performance WITNESSED
Mechanical running WITNESSED
All other inspection & test per req./spec. NON WITNESSED
EXPERIENCES Similar project
Sheet 11 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
DELIVERY TIME BY VENDOR
- BLOWER AND MOTOR
Number 2
Blower Power kW by vendor
Air Flow m3/hr by vendor
Fan Speed rpm by vendor
Manufacturer by vendor
Motor
- Rated kW kW by vendor
- Area Classification non hazardous
- Manufacturer by vendor
- Full Load Speed rpm by vendor
- Ph / Freq / Voltage 3/50/400
- Enclosure IP 55
Painting as per Spec
4. - SOLID CONTACT TANK/CLARIFIER (T-04)
APPLICABLE CODE API 650 Latest Edition
DESIGN CONDITIONS
Capacity 690 m3
Dimension :
Shell ID by Vendor
Shell Height by Vendor
Nozzle by Vendor
Thickness :
Shell 6 mm
Bottom 9 mm
Operating / Design Pressure ATM / Full Water
Operating / Design Temperature 25 / 60
Hydrostatic Test Pressure Full Water
Radiographic examination Spot
Type of Roof OPEN ROOF
Joint efficiency 0.85
Corrosion allowance (shell, bottom) 1.7 / 1.7
Insulation None
Flange rating by Vendor
Material Data :
Shell & Bottom A 283 C
Internals (Vortex Breaker) A 106 B
Nozzle necks A 106 B
Flange A 105
Bolts & nuts A 193 B7 / A 194 2H
Gasket Non asbestos sheet gasket
Foundation bolts/nuts A 307 B / A 563 A
Stiffener A 36
Painting (internal) Coal Tar Epoxy
Painting (external) as per painting spec
Unit weight estimate (erection) 40.743
Sheet 12 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Fabrication at Field Yes
Inspection and Testing Yes
Packing Yes
Documentation Yes
SCOPE OF SUPPLY
Body (shell, bottom, roof, etc) Yes
Ladders and Handrail Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Anchor bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Bird screen Yes, if required
Moisture trap Yes, if required
Vortex breaker Yes, if required
Roof reinforcement Yes, if required
External pipe support Yes, if required
Internal Piping Yes, if required
Internal Ladder Yes, if required
Internal and External Coating Yes, if required
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
- AGITATOR AND MOTOR (A-03)
SERVICE SOLID CONTACT TANK MIXER
MANUFACTURER BY VENDOR
MODEL BY VENDOR
CODE AND STANDARD BY VENDOR
OPERATING CONDITION
Liquid WATER
Service temperature AMBIENT
Sp. Gr. at service temp BY VENDOR
Viscosity at service temp 1-3
Corr/Err caused by H2S, CO2, S COMPOUND
Capacity: Normal BY VENDOR
Rated BY VENDOR
Process ( chemical/physical) MIXING / HOMOGENIZE
Baffles 3 at 120
Working Volume BY VENDOR
Sheet 13 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Agitator location SOLID CONTACT TANK
Type of Tank ( clilindrical )
CONSTRUCTION
Shaft Diameter at propoller BY VENDOR
Shaft diameter at coupling BY VENDOR
Shaft Length BY VENDOR
Mounting VERTICAL CENTERED ON TOP
Mechanical Seal YES
Seal Type LIP SEAL
Seal liquid reservoir/tank and accessories BY VENDOR
Distance Propoller to bottom BY VENDOR
Ring size BY VENDOR
Blades size BY VENDOR
Blade Type BY VENDOR
Driver Support BY VENDOR
Agitator Support BY VENDOR
Coupling BY VENDOR
Fastening Flanges BY VENDOR
Erection weight BY VENDOR
Total weight BY VENDOR
Agitator weight BY VENDOR
Coupling weight BY VENDOR
Motor/Gear weight BY VENDOR
Local instruments BY VENDOR (if any)
Miscellaneous
Name plate BY VENDOR
Stainless steel shim plates BY VENDOR
Setbolts for mounting driver BY VENDOR
Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR
Sparepart for 1 (one) year operation Separate Quotation
Special tools BY VENDOR (if any)
Shop inspection and testing REQUIRED; WITNESSED
Painting (as per REK's spec) BY VENDOR
Painting material for field touch up BY VENDOR; 5% of Painting Material
Packing & rust prevention BY VENDOR; 6 month storage
Vendor Documents Required (as per Requisition) BY VENDOR
PERFORMANCE
Performance curve BY VENDOR
Min Continuity, Capacity BY VENDOR
Power Design BY VENDOR
Rotating Facing Coupling end BY VENDOR
Submergence Required BY VENDOR
Maximum Thrust Up/down BY VENDOR
Rated Speed 60-70
Start Torque BY VENDOR
Normal Torque BY VENDOR
Driving System ELECTRICAL MOTOR
Sheet 14 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Duty CONTINUOUS 24 HR
Max allowable sound level/Expected max 85 dBA
MATERIAL
Casing SS 304
Inner case parts BY VENDOR
propeller SS 304
Mounting Plate BY VENDOR
Shaft SS 304
Shaft sleeve SS 304
Mounting Bolt & Nut SS
BEARING AND LUBRICATION
Lubrication BY VENDOR
DRIVER :
INDUCTION MOTOR
Code and Standard IEC
Manufacturer BY VENDOR
IP Protection IP 55 (minimum)
Rated power BY VENDOR
Volt / Phase / Freq. 380 / 3 / 50
Enclosure TEFC
Insulation class / temperature rise F / B
INSPECTION AND TEST
Performance WITNESSED
Mechanical running WITNESSED
All other inspection & test per req./spec. NON WITNESSED
EXPERIENCES Similar project
DELIVERY TIME BY VENDOR
- RAKE AND MOTOR (R-01)
SERVICE SOLID CONTACT TANK RAKE
MANUFACTURER BY VENDOR
MODEL BY VENDOR
CODE AND STANDARD BY VENDOR
OPERATING CONDITION
Liquid WATER+SLUDGE
Service temperature AMBIENT
Sp. Gr. at service temp BY VENDOR
Viscosity at service temp 1-3
Corr/Err caused by H2S, CO2, S COMPOUND
Capacity: Normal BY VENDOR
Rated BY VENDOR
Working Volume BY VENDOR
Sheet 15 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
CONSTRUCTION
Shaft Diameter at propoller BY VENDOR
Shaft diameter at coupling BY VENDOR
Shaft Length BY VENDOR
Mounting VERTICAL CENTERED ON TOP
Mechanical Seal YES
Seal Type LIP SEAL
Seal liquid reservoir/tank and accessories BY VENDOR
Distance Propoller to bottom BY VENDOR
Ring size BY VENDOR
Blades size BY VENDOR
Blade Type BY VENDOR
Driver Support BY VENDOR
Rake Support BY VENDOR
Coupling BY VENDOR
Fastening Flanges BY VENDOR
Erection weight BY VENDOR
Total weight BY VENDOR
Rake weight BY VENDOR
Coupling weight BY VENDOR
Motor/Gear weight BY VENDOR
Local instruments BY VENDOR (if any)
Miscellaneous
Name plate BY VENDOR
Stainless steel shim plates BY VENDOR
Setbolts for mounting driver BY VENDOR
Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR
Sparepart for 1 (one) year operation Separate Quotation
Special tools BY VENDOR (if any)
Shop inspection and testing REQUIRED; WITNESSED
Painting (as per REK's spec) BY VENDOR
Painting material for field touch up BY VENDOR; 5% of Painting Material
Packing & rust prevention BY VENDOR; 6 month storage
Vendor Documents Required (as per Requisition) BY VENDOR
PERFORMANCE
Performance curve BY VENDOR
Min Continuity, Capacity BY VENDOR
Power Design BY VENDOR
Rotating Facing Coupling end BY VENDOR
Submergence Required BY VENDOR
Maximum Thrust Up/down BY VENDOR
Rated Speed 60-70
Start Torque BY VENDOR
Normal Torque BY VENDOR
Driving System ELECTRICAL MOTOR
Duty CONTINUOUS 24 HR
Max allowable sound level/Expected max 85 dBA
Sheet 16 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
MATERIAL
Casing SS 304
Inner case parts BY VENDOR
propeller SS 304
Mounting Plate BY VENDOR
Shaft SS 304
Shaft sleeve SS 304
Mounting Bolt & Nut SS
BEARING AND LUBRICATION
Lubrication BY VENDOR
DRIVER :
INDUCTION MOTOR
Code and Standard IEC
Manufacturer BY VENDOR
IP Protection IP 55 (minimum)
Rated power BY VENDOR
Volt / Phase / Freq. 380 / 3 / 50
Enclosure TEFC
Insulation class / temperature rise F / B
INSPECTION AND TEST
Performance WITNESSED
Mechanical running WITNESSED
All other inspection & test per req./spec. NON WITNESSED
EXPERIENCES Similar project
DELIVERY TIME BY VENDOR
- SODIUM SULPHITE DOSING UNIT (D-03)
Dosing Pump
Manufacturer By Vendor
Quantity 2
Motor Power kW By Vendor
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
Sheet 17 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
- ALUM DOSING UNIT (D-04)
Dosing Pump
Manufacturer By Vendor
Quantity 2
Motor Power kW By Vendor
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
- ANION POLYMER DOSING UNIT (D-05)
Dosing Pump
Manufacturer By Vendor
Quantity 2
Motor Power kW By Vendor
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
5. - SOLID CONTACT PIT (T-06)
Capacity BY VENDOR
Size BY VENDOR
Material Reinforced Concrete
- SOLID CONTACT SLUDGE PUMPS (P-03A/B)
NO. REQUIRED 2
CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std
Sheet 18 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE CENTRIFUGAL
PERFORMANCE :
Rated/normal capacity by Vendor
Total head / NPSHA by Vendor
Speed by Vendor
Sp. Gr. 1
BKW, Shaft Power / End Curve Power by Vendor
Efficiency at rated capacity by Vendor
Head characteristic Continuously rise to shut-off
Minimum continuous flow by Vendor
NPSHR by Vendor
NPSHA-NPSHR Min 3 ft (1 m)
Sound Level Max. 85 dBA @ 1 m
CONSTRUCTION FEATURE:
Nozzle: size / rating / face / location
Suction by Vendor / 150# / RF / END
Discharge by Vendor / 150# / RF / TOP
No. of stages 1
Casing mounting Horizontal
Impeller : by Vendor
Bearing Type
Radial by Vendor
Thrust by Vendor
Coupling :
Manufacturer by Vendor
Model Flexible Disc w/ Spacer
Baseplate Horizontal / CS
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Case gasket Non Asbestos
SHAFT SEAL :
Type Gland Packing
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure TEFC, IP-55
Insulation class / temperature rise F / B
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Final Machining and Mounting of Coupling Half Yes, by Vendor
Sheet 19 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Pumps Yes, by Vendor
Coupling and Guard Yes, by Vendor
Baseplate/Soleplate Yes, by Vendor
Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor
with Liners and Shims
Driver Setting Bolts and Nuts Yes, by Vendor
Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)
Auxiliary Piping Within The Skid Yes, by Vendor
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
Constant level oiler Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
6. - SLUDGE THICKENER (T-08)
APPLICABLE CODE API 650 Latest Edition
DESIGN CONDITIONS
Capacity 150 m3
Dimension :
Shell ID by Vendor
Shell Height by Vendor
Nozzle by Vendor
Thickness :
Shell 6 mm
Bottom 9 mm
Operating / Design Pressure ATM / Full Water
Operating / Design Temperature 25 / 60
Hydrostatic Test Pressure Full Water
Radiographic examination Spot
Type of Roof OPEN ROOF
Joint efficiency 0.85
Corrosion allowance (shell, bottom) 1.7 / 1.7
Insulation None
Flange rating by Vendor
Material Data :
Shell & Bottom A 283 C
Sheet 20 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Internals (Vortex Breaker) A 106 B
Nozzle necks A 106 B
Flange A 105
Bolts & nuts A 193 B7 / A 194 2H
Gasket Non asbestos sheet gasket
Foundation bolts/nuts A 307 B / A 563 A
Stiffener A 36
Painting (internal) Coal Tar Epoxy
Painting (external) as per painting spec
Unit weight estimate (erection) by vendor
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Sheet 21 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Fabrication at Field Yes
Inspection and Testing Yes
Packing Yes
Documentation Yes
SCOPE OF SUPPLY
Body (shell, bottom, roof, etc) Yes
Ladders and Handrail Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Anchor bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Bird screen Yes, if required
Moisture trap Yes, if required
Vortex breaker Yes, if required
Roof reinforcement Yes, if required
External pipe support Yes, if required
Internal Piping Yes, if required
Internal Ladder Yes, if required
Internal and External Coating Yes, if required
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
- AGITATOR AND MOTOR (A-04)
SERVICE SLUDGE THICKENER
MANUFACTURER BY VENDOR
MODEL BY VENDOR
CODE AND STANDARD BY VENDOR
OPERATING CONDITION
Liquid WATER
Service temperature AMBIENT
Sp. Gr. at service temp BY VENDOR
Viscosity at service temp 1-3
Corr/Err caused by H2S, CO2, S COMPOUND
Capacity: Normal BY VENDOR
Rated BY VENDOR
Process ( chemical/physical) MIXING / HOMOGENIZE
Baffles 3 at 120
Working Volume BY VENDOR
Agitator location SOLID CONTACT TANK
Type of Tank ( clilindrical )
CONSTRUCTION
Sheet 22 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Shaft Diameter at propoller BY VENDOR
Shaft diameter at coupling BY VENDOR
Shaft Length BY VENDOR
Mounting VERTICAL CENTERED ON TOP
Mechanical Seal YES
Seal Type LIP SEAL
Seal liquid reservoir/tank and accessories BY VENDOR
Distance Propoller to bottom BY VENDOR
Ring size BY VENDOR
Blades size BY VENDOR
Blade Type BY VENDOR
Driver Support BY VENDOR
Agitator Support BY VENDOR
Coupling BY VENDOR
Fastening Flanges BY VENDOR
Erection weight BY VENDOR
Total weight BY VENDOR
Agitator weight BY VENDOR
Coupling weight BY VENDOR
Motor/Gear weight BY VENDOR
Local instruments BY VENDOR (if any)
Miscellaneous
Name plate BY VENDOR
Stainless steel shim plates BY VENDOR
Setbolts for mounting driver BY VENDOR
Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR
Sparepart for 1 (one) year operation Separate Quotation
Special tools BY VENDOR (if any)
Shop inspection and testing REQUIRED; WITNESSED
Painting (as per REK's spec) BY VENDOR
Painting material for field touch up BY VENDOR; 5% of Painting Material
Packing & rust prevention BY VENDOR; 6 month storage
Vendor Documents Required (as per Requisition) BY VENDOR
PERFORMANCE
Performance curve BY VENDOR
Min Continuity, Capacity BY VENDOR
Power Design BY VENDOR
Rotating Facing Coupling end BY VENDOR
Submergence Required BY VENDOR
Maximum Thrust Up/down BY VENDOR
Rated Speed 60-70
Start Torque BY VENDOR
Normal Torque BY VENDOR
Driving System ELECTRICAL MOTOR
Duty CONTINUOUS 24 HR
Max allowable sound level/Expected max 85 dBA
MATERIAL
Sheet 23 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Casing SS 304
Inner case parts BY VENDOR
propeller SS 304
Mounting Plate BY VENDOR
Shaft SS 304
Shaft sleeve SS 304
Mounting Bolt & Nut SS
BEARING AND LUBRICATION
Lubrication BY VENDOR
DRIVER :
INDUCTION MOTOR
Code and Standard IEC
Manufacturer BY VENDOR
IP Protection IP 55 (minimum)
Rated power BY VENDOR
Volt / Phase / Freq. 380 / 3 / 50
Enclosure TEFC
Insulation class / temperature rise F / B
INSPECTION AND TEST
Performance WITNESSED
Mechanical running WITNESSED
All other inspection & test per req./spec. NON WITNESSED
EXPERIENCES Similar project
DELIVERY TIME BY VENDOR
- SLUDGE THICKENER SLUDGE PUMPS (P-04A/B)
NO. REQUIRED 2
CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE SCREW
PERFORMANCE :
Rated/normal capacity by Vendor
Total head / NPSHA by Vendor
Speed by Vendor
Sp. Gr. by Vendor
BKW, Shaft Power / End Curve Power by Vendor
Efficiency at rated capacity by Vendor
Head characteristic Continuously rise to shut-off
Minimum continuous flow by Vendor
NPSHR by Vendor
NPSHA-NPSHR Min 3 ft (1 m)
Sound Level Max. 85 dBA @ 1 m
Sheet 24 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
CONSTRUCTION FEATURE:
Nozzle: size / rating / face / location
Suction by Vendor / 150# / RF / END
Discharge by Vendor / 150# / RF / TOP
No. of stages 1
Casing mounting Horizontal
Impeller : by Vendor
Bearing Type
Radial by Vendor
Thrust by Vendor
Coupling :
Manufacturer by Vendor
Model Flexible Disc w/ Spacer
Baseplate Horizontal / CS
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Case gasket Non Asbestos
SHAFT SEAL :
Type Gland Packing
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure TEFC, IP-55
Insulation class / temperature rise F / B
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Final Machining and Mounting of Coupling Half Yes, by Vendor
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Pumps Yes, by Vendor
Coupling and Guard Yes, by Vendor
Baseplate/Soleplate Yes, by Vendor
Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor
with Liners and Shims
Driver Setting Bolts and Nuts Yes, by Vendor
Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)
Auxiliary Piping Within The Skid Yes, by Vendor
Special Tools Yes (if any)
Sheet 25 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
Constant level oiler Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
7. - FLUSH WATER TANK (T-05)
APPLICABLE CODE API 650 Latest Edition
DESIGN CONDITIONS
Capacity 23 m3
Dimension :
Shell ID by Vendor
Shell Height by Vendor
Nozzle by Vendor
Thickness :
Shell 6 mm
Bottom 9 mm
Operating / Design Pressure ATM / Full Water
Operating / Design Temperature 25 / 60
Hydrostatic Test Pressure Full Water
Radiographic examination Spot
Type of Roof OPEN ROOF
Joint efficiency 0.85
Corrosion allowance (shell, bottom) 1.7 / 1.7
Insulation None
Flange rating by Vendor
Material Data :
Shell & Bottom A 283 C
Internals (Vortex Breaker) A 106 B
Nozzle necks A 106 B
Flange A 105
Bolts & nuts A 193 B7 / A 194 2H
Gasket Non asbestos sheet gasket
Foundation bolts/nuts A 307 B / A 563 A
Stiffener A 36
Painting (internal) Coal Tar Epoxy
Painting (external) as per painting spec
Unit weight estimate (erection) by vendor
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Fabrication at Field Yes
Inspection and Testing Yes
Packing Yes
Sheet 26 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Documentation Yes
SCOPE OF SUPPLY
Body (shell, bottom, roof, etc) Yes
Ladders and Handrail Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Anchor bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Bird screen Yes, if required
Moisture trap Yes, if required
Vortex breaker Yes, if required
Roof reinforcement Yes, if required
External pipe support Yes, if required
Internal Piping Yes, if required
Internal Ladder Yes, if required
Internal and External Coating Yes, if required
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
- FLUSH WATER PUMPS (P-02A/B)
NO. REQUIRED 2
CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE CENTRIFUGAL
PERFORMANCE :
Rated/normal capacity by Vendor
Total head / NPSHA by Vendor
Speed by Vendor
Sp. Gr. 1
BKW, Shaft Power / End Curve Power by Vendor
Efficiency at rated capacity by Vendor
Head characteristic Continuously rise to shut-off
Minimum continuous flow by Vendor
NPSHR by Vendor
NPSHA-NPSHR Min 3 ft (1 m)
Sound Level Max. 85 dBA @ 1 m
CONSTRUCTION FEATURE:
Nozzle: size / rating / face / location
Suction by Vendor / 150# / RF / END
Discharge by Vendor / 150# / RF / TOP
Sheet 27 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
No. of stages 1
Casing mounting Horizontal
Impeller : by Vendor
Bearing Type
Radial by Vendor
Thrust by Vendor
Coupling :
Manufacturer by Vendor
Model Flexible Disc w/ Spacer
Baseplate Horizontal / CS
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Case gasket Non Asbestos
SHAFT SEAL :
Type Gland Packing
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure TEFC, IP-55
Insulation class / temperature rise F / B
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Final Machining and Mounting of Coupling Half Yes, by Vendor
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Pumps Yes, by Vendor
Coupling and Guard Yes, by Vendor
Baseplate/Soleplate Yes, by Vendor
Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor
with Liners and Shims
Driver Setting Bolts and Nuts Yes, by Vendor
Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)
Auxiliary Piping Within The Skid Yes, by Vendor
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
Sheet 28 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
Constant level oiler Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
8. - FILTER PRESS(F-01A/B)
Quantity 2
Capacity by Vendor
Plate Dimension by Vendor
NumbeShell ID by Vendor
MateriShell Height by Vendor
OveraNozzle by Vendor
Operating Time by Vendor
Pressing Time by Vendor
Washing Time by Vendor
Number of Cycle by Vendor
Unit weight estimate (erection) by vendor
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Final Machining Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Filter Press Yes, by Vendor
Skid Yes, by Vendor
Auxiliary Piping Within The Skid Yes, by Vendor
Accecories:
- Cake Discharge Chute Yes, by Vendor
- Drip Tray Yes, by Vendor
- Cake Conveyor Yes, by Vendor
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
- CATION POLYMER DOSING UNIT (D-06)
Dosing Pump
Manufacturer By Vendor
Sheet 29 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Quantity 2
Motor Power kW By Vendor
Capacity liter/hr By Vendor
Enclosure IP 65
Material Stainless steel / plastic
Mixing Tank
Quantity 1
Type By Vendor
Capacity liter By Vendor
Material FRP/Stainless Steel
Size (diameter x height) mm by Vendor
Agitator
Material Stainless steel
Motor Power for Agitator kW by Vendor
Motor Enclosure IP 55
Piping, Valve, Line Specification, & Accessories as per P&ID
9. - AIR COMPRESSOR
No. required 1 + 1
Manufacturer by Vendor
Model by Vendor
Type Screw or Reciprocating
Oil Lubricated
Max. Discharge pressure 10 barg
Gas Flow rate dry (Nominal) 80 (at 1 atm & 20°C)
MOTOR :
Sheet 30 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
No. required 2
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400 / 3 / 50
Enclosure TEFC / IP 54
Insulation class / temperature rise Class F / Class B
- AIR DRYER:
No. required 1
Manufacturer by Vendor
Model by Vendor
Type Heatless,Desiccant, Automatic
Dew point at maximum pressure -20
Capacity by Vendor
Desiccant type by Vendor
- PRE FILTER
No. required 2
Manufacturer by Vendor
Model by Vendor
Maximum oil content 0.01
Efficiency 99
Filter size 0.1 micron filtration
- AFTER FILTER
No. required 2
Manufacturer by Vendor
Model by Vendor
Efficiency 99
Maximum particle size 0.01
SCOPE OF WORK:
Engineering and Documentation Yes
Process Guarantee and Unit Warranty Yes
Manufacturing and Assembling Yes
Final Machining and Mounting of Coupling Half Yes
Mounting of Driver Yes
Inspection and Test at Shop Yes
Wiring and Tubing Within the Skid Yes
Prime Coating and Finish Coating at Shop Yes
Shipping and Transportation Yes
SCOPE OF SUPPLY:
Compressor, including motor driver and control panel Yes
H2S Filter Yes
Intake air with H2S Trap Yes
Ducting (Aluminium/SS) Yes
Flexible Connection Yes
Sheet 31 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
After coolers (air cooled type) made from stainless steel or aluminum Included
Motor starter DOL
Structural skid and baseplate Yes
Local control panel items:
IP 55 Electrical Enclosure Yes
Local manual starting system Yes
Local manual shutdown system Yes
Automatic start-up system Yes
Automatic system of compression & decompression Yes
Automatic mode for loading Yes
Terminal box inside panel Yes
Air dryer, incl. control panel (NEMA 4/IP 56) Yes
Dual type pre filter Yes
Dual type after filter Yes
Automatic drain solenoid valves Yes
Instrumentation and control Yes
Internal piping, tubing, fittings, and valves Yes
Space Heater for Motor > 10 kW Yes
Internal cabling, junction boxes, electrical items Yes
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes
1-year operation Yes
Price List of Recommended Spare Parts Yes
for 1-year Operation
Delivery time 5 months
- AIR RECEIVER
Dimension :
Shell ID BY VENDOR
Length TL to TL BY VENDOR
Head type 2 : 1 Ellipsoidal
Nozzle BY VENDOR
Thickness :
Shell BY VENDOR
Head (min after forming) BY VENDOR
Operating / Design Pressure BY VENDOR
Operating / Design Temperature BY VENDOR
Test Pressure Hydrostatic
Radiographic examination
Shell Spot
Head Full
PWHT as per code
Joint efficiency
Shell 0.85
Head 1
Corrosion allowance (shell, roof, bottom) 3 / 3 / 3 mm
Insulation None
Flange rating BY VENDOR
Material Data :
Sheet 32 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Shell, Head, & Reinforcing Pad A 516 70
Nozzle flanges A 105
Nozzle neck pipe A 106 B
Manhole neck A 516 70
Stud bolts & nuts A 193 B7 & A 194 2H
Lifting lug & Tailing lug A 283 C
Nameplate & Earth lug SS 304
Vessel support A 283 C
Base Plate A 36 / SS 400
Foundation bolts/nuts A 307 B & A 563 A
Gasket non-asbestos
Painting/coating (internal) none
Painting/coating (external) BY VENDOR
Unit weight estimate (erection) BY VENDOR
SCOPE OF WORKS
Design and Engineering Yes
Warranty and Guarantee Yes, Mechanical Guarantee
Supply of Material Yes
Fabrication at Shop Yes
Inspection and Testing Yes
Packing Yes
Documentation Yes
SCOPE OF SUPPLY
Body (shell, head, etc) Yes
Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes
Stud bolts and nuts Yes
Nameplate Yes
Lifting lug Yes
Earth lug Yes
Tailing lug Yes
External Support Yes
Internal Support No
Internal Part No
Internal and External Coating Yes
Spare parts
for Commissioning Yes
for One-year operation Yes
INSPECTION AND TESTING
Hydrotest Yes
NDE Yes
Visual and dimension check Yes
10. - WASH WATER RECOVERY PIT (T-07)
Capacity 10000
Size 100 x 50 x 2 m
Material Reinforced Concrete
- WASTE WATER RECOVERY PUMPS (P-04A/B)
NO. REQUIRED 2
Sheet 33 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std
MANUFACTURER by Vendor
COUNTRY OF ORIGIN by Vendor
MODEL by Vendor
TYPE CENTRIFUGAL
PERFORMANCE :
Rated/normal capacity by Vendor
Total head / NPSHA by Vendor
Speed by Vendor
Sp. Gr. 1
BKW, Shaft Power / End Curve Power by Vendor
Efficiency at rated capacity by Vendor
Head characteristic Continuously rise to shut-off
Minimum continuous flow by Vendor
NPSHR by Vendor
NPSHA-NPSHR Min 3 ft (1 m)
Sound Level Max. 85 dBA @ 1 m
CONSTRUCTION FEATURE:
Nozzle: size / rating / face / location
Suction by Vendor / 150# / RF / END
Discharge by Vendor / 150# / RF / TOP
No. of stages 1
Casing mounting Horizontal
Impeller : by Vendor
Bearing Type
Radial by Vendor
Thrust by Vendor
Coupling :
Manufacturer by Vendor
Model Flexible Disc w/ Spacer
Baseplate Horizontal / CS
MATERIAL :
Casing Stainless Steel
Impeller Stainless Steel
Shaft Stainless Steel
Case gasket Non Asbestos
SHAFT SEAL :
Type Gland Packing
MOTOR :
Manufacturer by Vendor
Rated power by Vendor
Volt / Phase / Freq. 400/3/50
Enclosure TEFC, IP-55
Insulation class / temperature rise F / B
SCOPE OF WORK:
Engineering and Documentation Yes, by Vendor
Guarantee and Warranty Yes, by Vendor
Manufacturing and Assembling Yes, by Vendor
Sheet 34 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Final Machining and Mounting of Coupling Half Yes, by Vendor
Mounting of Driver Yes, by Vendor
Inspection and Test at Shop Yes, by Vendor
Wiring and Tubing Within the Skid Yes, by Vendor (if any)
Prime Coating and Finish Coating at Shop Yes, by Vendor
Finish Color for Pump Yes, by Vendor
Packing and Rust Prevention Yes, by Vendor
Shipping and Transportation Yes, by Vendor
SCOPE OF SUPPLY:
Pumps Yes, by Vendor
Coupling and Guard Yes, by Vendor
Baseplate/Soleplate Yes, by Vendor
Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor
with Liners and Shims
Driver Setting Bolts and Nuts Yes, by Vendor
Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)
Auxiliary Piping Within The Skid Yes, by Vendor
Special Tools Yes (if any)
Spare parts :
Construction and commissioning Yes, by Vendor
One-year operation Yes, by Vendor
Price List of Recommended Spare Parts Yes, by Vendor, Optional
for One-year Operation
Lifting Lugs and Earth Lugs Yes, by Vendor
Constant level oiler Yes, by Vendor
DELIVERY TIME max. 6 months
Term by Vendor
11. - INCINERATOR (I-01)
Incinerator Type
Burner Capacity LPH by Vendor
Overall Dimension mm by Vendor
Material Of Chamber by Vendor
Volume of Chamber m3 by Vendor
Termperature of Chamber deg C by Vendor
Insulation by Vendor
Operation Time hour/day by Vendor
Retention Time second by Vendor
12. OTHERS
MCC PANEL Yes, by Vendor
MCC Panel Yes, by Vendor
PLC/DCS and Control Panel Yes, by Vendor
Stair and Walkway Platform Yes, by Vendor
Piping Yes, by Vendor
Instrumentation Yes, by Vendor
Process Building Yes, by Vendor
Chemical Storage Building Yes, by Vendor
Safety Shower Yes, by Vendor
Sheet 35 of 35
PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW
CLIENT : PT PLN (PERSERO)
JOB NO. : 07-1205
LOCATION : SURALAYA-BANTEN
TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE
NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA
Painting Yes, by Vendor
Special Tools Yes, by Vendor
Export Packing Yes, by Vendor
Inland Transportation Yes, by Vendor
Yes, by Vendor
Site Training for owner’s personnel Yes, by Vendor
Guarantee
Performance Guarantee required
Warranty Periode required for 1 year operation
Delivery Time
Duration / Condition max. 4 month
ABBREVIATION: ACCEPTABILITY
ü Comply With Requirement A : Acceptable
DA Deviation Accepted B : Acceptable With Note
X Deviation Not Accepted C : Not Acceptable
? To Be Clarifeid
Service for construction, pre-commissioning, commissioning, start-up and performance test