+ All Categories
Home > Documents > Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and...

Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and...

Date post: 18-May-2018
Category:
Upload: trankhanh
View: 224 times
Download: 2 times
Share this document with a friend
14
Pipeline Commander Technical Presentation
Transcript
Page 1: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Pipeline Commander

Technical Presentation

Page 2: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 2

IntroductionMCS Pipeline Commander is an application suite comprising separate modules coveringdigital video recording, data processing, charting, project management, data viewer andreporting for all types of ROV Pipeline and Cable inspection.

Pipeline Commander is designed for:

• Pre-engineering Survey.

• Pre-lay Survey.

• Debris clearance survey.

• Pre and post trenching survey.

• As- laid, as-trenched and as-built surveys.

• Pipeline and cable inspection.

ROV PIPELINE COMMANDER

Page 3: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 3

Pipeline Commander Data FlowROV PIPELINE COMMANDER

Page 4: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 4

MCS Pipeline Commander Covers Four Phases

• Capable of recording 2D and 3D videos in either Standard or High Definition.• With an optional laser beam emitter calibrated with the ROV camera, accurate

measurements can be taken either online or offline.• Auto archiving for all logged data & videos.• Video broadcasting the ROV camera to be accessible via internet through 128kbps band

width satellite connection.• Offshore Automated System (OAS) to compress and stream raw data logged and video

recorded from the vessel to MCS Onshore Data Center via robust satellite connectionwhere an onshore team works concurrently in processing the data and handing out thedeliverables, hence decreasing the manning level onboard the vessel.

1.AcquisitionPhase

ROV PIPELINE COMMANDER

Page 5: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Pipeline Commander

Application Modules

Page 6: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 6

MCS Project Management solution manages multiple projectsthrough a centralized database , controlling the flow ofinformation and the confidentiality of the data through awide-ranging accessibility management system:

• Efficient time management ensuring best productivity andquality of each task / team member at all project intervals.

• Planning and implementing work activities, balancing theworkloads between the Vessels and the onshore datacenters through effective resource management.

• Monitor almost real-time logging & processing progresskeeping the client up to date with the latest projecttimeline and possible deviations from actual plan.

• Provides easy access to historical project information.• Multi level QA/QC for all offshore and onshore activities.

Project Manager Module

2.ProjectManagamentPhase

ROV PIPELINE COMMANDER

Page 7: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 7

3. Processing Phase:

• Automated QA/QC Protocols fullyimplemented to achieve the bestquality of the output product.

• Automated processing modules tominimize human interference.

• Real-time processing progressupdates keeping the client up todate with the latest timeline ofdelivery.

Offline Module

ROV PIPELINE COMMANDER

3.ProcessingPhase

Page 8: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 8

MCS takes pride in maintaining the highest level of quality in our final deliverables while keeping our high standards in delivery time. Our deliverables include:

Sample chart & Pipe sheet

• Survey Charts & Reports.• MCS 2D Pipeline Viewer.

• MCS 3D Pipeline Viewer.• MCS Web GIS Commander.

ROV PIPELINE COMMANDER

4.FinalDeliveryPhase

Page 9: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 9

4.FinalDeliveryPhase

4.1SurevyCharts&Reports

Automated Charting & Reporting modules facilitate the delivery of preliminary final reports within 48 hours from completing the last dive:

• Standard Inspection charts, Crossing Charts and Pipe Sheets charts.

• Standard Inspection Reports and HTML based reports (compatible with standard browsers).

Sample chart & Pipe sheet

ROV PIPELINE COMMANDER

Page 10: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 10

4.2MCS2DPipelineViewerMCS 2D Pipeline Viewer consolidates allthe ROV inspection data in a user-friendlyinterface where the client can access allthe data fully synchronized togetheralong with the videos in addition to theability to produce customized reports andprintouts from within the sameinterface.

2D Pipeline Viewer

ROV PIPELINE COMMANDER

Page 11: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 11

4.3MCS3DPipelineViewerIn addition to the benefits received from thestandard 2D viewer, MCS 3D Viewer adds avirtual new dimension to the way the clientcan assesses the data:Interactive 3D model of the pipeline and theseabed using Traffic Light System to show thecritical sections of the pipeline based on theas found anomalies.All survey events are represented withclickable 3D objects synchronized with thesurvey data.ILI Data (In Line Inspection using IntelligentPigging) is automatically aligned with theexternal data to achieve a completecomprehensive awareness of the pipelineboth internally and externally.

3D Pipeline Viewer

ROV PIPELINE COMMANDER

Page 12: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Pipeline Commander

Benefits

Page 13: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 13

MCSPipelineCommanderBenefits• Complete Integrated Solution - ROV Pipeline Commander consolidates all the ROV

inspection functionalities from data acquisition, digital video recording, eventing,navigation and scans processing, to reports and charts delivery, together with a desktopviewer for fast data access and review.

• Cost effectiveness -ROV Pipeline Commander has been successfully proven as the costeffective and efficient data acquisition system in many pipeline inspection surveys.

• Easy Data Accessibility -Delivering the survey outputs in digital media and Web basedGIS applications for robust data accessibility.

• Efficient Data Handling -The manner in which data is handled during a typical ROVinspection project is changing; from being a multi-platform task to become a singleintegrated production line.

• 3D representation -of pipeline, events and ROV synchronized with video.

• Offshore Automated System (OAS) – Using the OAS technology, enabled delivery of finalreports within only 7 days from demobilization

ROV PIPELINE COMMANDER

Page 14: Technical Presentation - MCS€¢ Pre and post trenching survey. • As- laid, as-trenched and as-built surveys. • Pipeline and cable inspection. ROV PIPELINE COMMANDER ...

Copyright (C) MCS 2013, All rights reserved. www.mcsoil.com 14


Recommended