1/4 TECHNICAL REFEREE REPORT DOMESTIC BUILDER (LIMITED TO EARTHWORKS & EXCAVATON) This report must be completed by the referee and accompanies the domestic builder (limited to earthworks and excavation) registration application form. To be a referee you should be a registered domestic builder (unlimited) or be registered in the class of building work for which the applicant is applying. You must have directly supervised the applicant carrying out the work listed in the reference. Use this form to tell us about domestic building work that the applicant carried out under your supervision. The VBA uses your referee report to help determine whether an applicant should be registered as a building practitioner. We may contact you to confirm the information in this reference. PART A ABOUT YOU (THE TECHNICAL REFEREE) Title: Mr Ms Other_____________________________ First name Mrs Middle name Miss Surname Date of birth / / Your registration number Your contact number If you are not a registered building practitioner, were you the applicant’s: Site supervisor Construction manager Your email address PART B EMPLOYER DETAILS Name of company that employed the applicant during supervision period ABN State Postcode Address Street no. and name Employer contact number Suburb Employer email address
Transcript
  • 1/4

    TECHNICAL REFEREE

    REPORT

    DOMESTIC BUILDER (LIMITED TO EARTHWORKS & EXCAVATON)

    This report must be completed by the referee and accompanies the domestic builder (limited to earthworks and excavation) registration application form.

    To be a referee you should be a registered domestic builder (unlimited) or be registered in the class of building work for which the applicant is applying. You must have directly supervised the applicant carrying out the work listed in the reference.

    Use this form to tell us about domestic building work that the applicant carried out under your supervision.

    The VBA uses your referee report to help determine whether an applicant should be registered as a building practitioner. We may contact you to confirm the information in this reference.

    PART A

    ABOUT YOU (THE TECHNICAL REFEREE)Title: ☐Mr ☐Ms ☐Other_____________________________First name

    ☐Mrs Middle name

    ☐MissSurname Date of birth

    / /

    Your registration number Your contact number

    If you are not a registered building practitioner, were you the applicant’s: ☐ Site supervisor ☐ Construction managerYour email address

    PART B

    EMPLOYER DETAILSName of company that employed the applicant during supervision period

    ABN

    State Postcode Address Street no. and name

    Employer contact number

    Suburb

    Employer email address

  • 2/4 Domestic builder (limited to earthworks and excavation) - Technical Referee Report SD-TRR-030 V3, June 2021

    PART C

    APPLICANT DETAILS (FOR WHOM YOU ARE PROVIDING THIS REPORT)First name Surname

    PART D

    EXPERIENCE Supervised building experience (for up to three projects) Please complete detail for the applicant’s domestic building project experience that you supervised.

    Applicant’s role (e.g. Project manager, Supervisor,

    Subcontractor, or other)

    Period of supervision: From – To (mm/yyyy) Project site address From To

    0BExplanation of terms

    Please indicate the components of building work that the applicant either assisted, carried out or managed under your supervision (may be one project only).

    Assisted Is when the applicant has assisted a competent and qualified practitioner in the carrying out of a particular component of building work.

    Carried out The actual hands-on carrying out of building work. It refers to when the applicant has been solely responsible for that component of building work.

    Managed The management of building work. It refers to when the applicant was not involved in the actual carrying out of that component other than engaging a competent practitioner to do so; however, they as the manager/supervisor were responsible for the quality and compliance of that component of work.

    / - /

    / - /

    / - /

    Project 1

    Project 3

    Project 2

    Did you assist, or manage any of the following components of building work per project?

    Component of building work Project 1 Project 2 Project 3

    Assisted Managed Assisted Managed Assisted Managed

    Area of Experience (AoE) 1 – Apply for a building permit for the work

    Determined requirement for building permit

    Obtained building permit/or approvals from other authorities Area of Experience (AoE) 2 – Enter into and administer appropriate contracts and insurances

    Prepared contracts for the building work

    Administered appropriate contracts

  • 3/4 Domestic builder (limited to earthworks and excavation) - Technical Referee Report SD-TRR-030 V3, June 2021

    Did you assist, or manage any of the following components of building work per project?

    Component of building work Project 1 Project 2 Project 3

    Assisted Managed Assisted Managed Assisted Managed

    Area of Experience (AoE) 2 – Enter into and administer appropriate contracts and insurances

    Managed contract variations and defects

    Arranged/attended mandatory inspections

    Completed handover including certificates of compliance

    Managed the building work from start to finish

    Area of Experience (AoE) 3 – Produce cost estimates and apply business financial management skills

    Conducted business and financial aspects for projects

    Prepared cost estimates and quotations for project/part of project

    Area of Experience (AoE) 4 – Co-ordinate onsite construction works Developed and monitored progress schedules for the work

    Provided on-site day to day supervision of the project

    Supervised subcontractors/trades to ensure work was conducted safely & to standard S

    ite su

    perv

    isio

    n

    Area of Experience (AoE) 5 – Ensure works are planned and conducted safely

    Managed site safety throughout the project

    Did you assist, carry out or manage any of the following components of building work per project?

    Component of building work

    Project 1 Project 2 Project 3

    Assisted Carried out

    Managed Assisted Carried out

    Managed Assisted Carried out

    Managed

    Area of Experience (AoE) 6 – Domestic Building work that you carried Established the construction site

    Protected public assets including footpaths/driveways/servicesLocated & abolished existing services to the site

    Pre-

    base

    wor

    k

    Interpreted architectural/engineering drawings prior to commencement of site works

    Marked out of services & setting out site including levels and excavation depths Maintained site drainage requirements & silt management during excavation

  • 4/4 Domestic builder (limited to earthworks and excavation) - Technical Referee Report V3, June 2021 End of form

    PART E

    REFEREE DECLARATIONThe information provided in this form must be true and correct. It is an offence under section 246 of the Building Act 1993 to give false or misleading information in relation to an application for registration, and this offence carries a maximum penalty of 120 penalty units.

    ☐ I declare that the information contained in this form is true and correct to the best of my knowledge.

    ☐ I understand that the VBA may make enquiries to verify the information I have provided, and I consent for thisinformation to be shared with any other third party for that purpose.

    Referee name

    Referee signature: Date of signature:

    / /(must be handwritten)

    To see how the VBA uses and discloses your personal information view the full VBA Privacy Policy.

    Did you assist, carry out or manage any of the following components of building work per project?

    Component of building work

    Project 1 Project 2 Project 3

    Assisted Carried out

    Managed Assisted Carried out

    Managed Assisted Carried out

    Managed

    Area of Experience (AoE) 6 – Domestic Building work that you carried cont.

    Removed spoil during site excavation works

    Programmed licenced operators & plant for site excavation worksMonitored stability of existing site during excavation works

    Installed trench/excavation shoring support during excavation works

    https://www.vba.vic.gov.au/legal/privacy

    Part A_01: OffPart A_02: OffPart A_03: OffPart A_04: OffPart A_05: OffPart A_06: Part A_07: Part A_08: Part A_09: Part A_10: Part A_11: Part A_12: Part A_13: Part A_14: Part A_15: Part A_16: Part A_17: Part A_18: Part A_19: Part A_20: OffPart A_21: OffPart A_22: Part B_1: Part B_2: Part B_3: Part B_4: Part B_5: Part B_6: Part B_7: Part B_8: Part C_1: Part C_2: Part D_1: Part D_2: Part D_3: Part D_4: Part D_5: Part D_6: Part D_7: Part D_8: Part D_9: Part D_10: Part D_11: Part D_12: Part D_13: Part D_14: Part D_15: Part D_16: Part D_17: Part D_18: Part D_19: Part D_20: Part D_21: Part D_22: Part D_23: Part D_24: Part D_25: Part D_26: Part D_27: Part D_28: Part D_29: Part D_30: Part D_31: Part D_32: Part D_33: Part D_34: Part D_35: Part D_36: Part D_37: Part D_38: Part D_39: Part D_40: Part D_41: Part D_42: Part D_1_1: OffPart D_1_2: OffPart D_1_3: OffPart D_1_4: OffPart D_1_5: OffPart D_1_6: OffPart D_2_1: OffPart D_2_2: OffPart D_2_3: OffPart D_2_4: OffPart D_2_5: OffPart D_2_6: OffPart D_3_1: OffPart D_3_2: OffPart D_3_3: OffPart D_3_4: OffPart D_3_5: OffPart D_3_6: OffPart D_4_1: OffPart D_4_2: OffPart D_4_3: OffPart D_4_4: OffPart D_4_5: OffPart D_4_6: OffPart D_5_1: OffPart D_5_2: OffPart D_5_3: OffPart D_5_4: OffPart D_5_5: OffPart D_5_6: OffPart D_6_1: OffPart D_6_2: OffPart D_6_3: OffPart D_6_4: OffPart D_6_5: OffPart D_6_6: OffPart D_7_1: OffPart D_7_2: OffPart D_7_3: OffPart D_7_4: OffPart D_7_5: OffPart D_7_6: OffPart D_8_1: OffPart D_8_2: OffPart D_8_3: OffPart D_8_4: OffPart D_8_5: OffPart D_8_6: OffPart D_9_1: OffPart D_9_2: OffPart D_9_3: OffPart D_9_4: OffPart D_9_5: OffPart D_9_6: OffPart D_10_1: OffPart D_10_2: OffPart D_10_3: OffPart D_10_4: OffPart D_10_5: OffPart D_10_6: OffPart D_11_1: OffPart D_11_2: OffPart D_11_3: OffPart D_11_4: OffPart D_11_5: OffPart D_11_6: OffPart D_12_1: OffPart D_12_2: OffPart D_12_3: OffPart D_12_4: OffPart D_12_5: OffPart D_12_6: OffPart D_13_1: OffPart D_13_2: OffPart D_13_3: OffPart D_13_4: OffPart D_13_5: OffPart D_13_6: OffPart D_14_1: OffPart D_14_2: OffPart D_14_3: OffPart D_14_4: OffPart D_14_5: OffPart D_14_6: OffPart D_15_1: OffPart D_15_2: OffPart D_15_3: OffPart D_15_4: OffPart D_15_5: OffPart D_15_6: OffPart D_15_7: OffPart D_15_8: OffPart D_15_9: OffPart D_16_1: OffPart D_16_2: OffPart D_16_3: OffPart D_16_4: OffPart D_16_5: OffPart D_16_6: OffPart D_16_7: OffPart D_16_8: OffPart D_16_9: OffPart D_17_1: OffPart D_17_2: OffPart D_17_3: OffPart D_17_4: OffPart D_17_5: OffPart D_17_6: OffPart D_17_7: OffPart D_17_8: OffPart D_17_9: OffPart D_18_1: OffPart D_18_2: OffPart D_18_3: OffPart D_18_4: OffPart D_18_5: OffPart D_18_6: OffPart D_18_7: OffPart D_18_8: OffPart D_18_9: OffPart D_19_1: OffPart D_19_2: OffPart D_19_3: OffPart D_19_4: OffPart D_19_5: OffPart D_19_6: OffPart D_19_7: OffPart D_19_8: OffPart D_19_9: OffPart D_21_1: OffPart D_21_2: OffPart D_21_3: OffPart D_21_4: OffPart D_21_5: OffPart D_21_6: OffPart D_21_7: OffPart D_21_8: OffPart D_21_9: OffPart D_22_1: OffPart D_22_2: OffPart D_22_3: OffPart D_22_4: OffPart D_22_5: OffPart D_22_6: OffPart D_22_7: OffPart D_22_8: OffPart D_22_9: OffPart D_23_1: OffPart D_23_2: OffPart D_23_3: OffPart D_23_4: OffPart D_23_5: OffPart D_23_6: OffPart D_23_7: OffPart D_23_8: OffPart D_23_9: OffPart D_24_1: OffPart D_24_2: OffPart D_24_3: OffPart D_24_4: OffPart D_24_5: OffPart D_24_6: OffPart D_24_7: OffPart D_24_8: OffPart D_24_9: OffPart E_1: YesPart E_2: YesPart E_3: Part E_4: Part E_5: Part E_6: Part E_7: Part E_8: Part E_9: Part E_10: Part E_11: Part D_20_1: OffPart D_20_2: OffPart D_20_3: OffPart D_20_4: OffPart D_20_5: OffPart D_20_6: OffPart D_20_7: OffPart D_20_8: OffPart D_20_9: Off