+ All Categories
Home > Business > Technical Services Mannual_Communic Asia 2012

Technical Services Mannual_Communic Asia 2012

Date post: 14-May-2015
Category:
Upload: suganya-chatkaewmorakot
View: 1,454 times
Download: 3 times
Share this document with a friend
Description:
Exhibitor Manaual for Communic Asia 2012
Popular Tags:
39
Important Note: This document forms part of your contract to exhibit. It must be read carefully and all forms must be duly completed and submitted online. Organiser: Singapore Exhibition Services Pte Ltd No.1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303 Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected] Website: www.CommunicAsia.com www.goto-enterpriseIT.com Worldwide Associate: Overseas Exhibition Services Ltd 12th Floor, Westminster Tower 3 Albert Embankment, London, SE1 7SP United Kingdom Tel: (44) 207 840 2121 Fax: (44) 207 840 2111 E-mail: [email protected] Website: www.allworldexhibitions.com Endorsed by: Hosted by: 19 – 22 June 2012 Marina Bay Sands, Singapore 19 – 22 June 2012 Marina Bay Sands, Singapore www.CommunicAsia.com The 23rd International Communications and Information Technology Exhibition & Conference www.goto-enterpriseIT.com The 9th International Information Technology Exhibition & Conference for the Enterprise TECHNICAL SERVICES MANUAL
Transcript
Page 1: Technical Services Mannual_Communic Asia 2012

Important Note: This document forms part of your contract to exhibit. It must be read carefully and all forms must be duly completed and submitted online.

Organiser:

Singapore Exhibition Services Pte Ltd No.1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303 Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]: www.CommunicAsia.com www.goto-enterpriseIT.com

Worldwide Associate:

Overseas Exhibition Services Ltd 12th Floor, Westminster Tower3 Albert Embankment, London, SE1 7SPUnited KingdomTel: (44) 207 840 2121 Fax: (44) 207 840 2111E-mail: [email protected]: www.allworldexhibitions.com

Endorsed by:

Hosted by:

19 – 22 June 2012Marina Bay Sands, Singapore

19 – 22 June 2012Marina Bay Sands, Singapore

www.CommunicAsia.com

The 23rd International Communications and Information Technology Exhibition & Conference

www.goto-enterpriseIT.com

The 9th International Information Technology Exhibition & Conference for the Enterprise

TECHNICAL SERVICESMANUAL

Page 2: Technical Services Mannual_Communic Asia 2012

2

CommunicAsia2012 • EnterpriseIT2012

2

Please submit your technical forms (Forms 11 – 23) online.

Your login ID and password should have been sent to you.Please contact the Organiser if you have not received your password.

> For CommunicAsia exhibitors, go to www.CommunicAsia.com

For EnterpriseIT exhibitors, go to www.goto-enterpriseIT.com

> Click on the “Exhibitors’ Only” button.

> Select “Technical Services Manual”. You will be prompted to enter your login ID and password given to you by the Organiser.

> Complete ALL forms (Forms 11 – 23) according to the instructions given online and submit by the stipulated deadlines.

Note:

* Exhibitors are reminded to click on the “Submit” button found at the bottom of each form to ensure that their submission are being saved.

* Uponsubmittingtheforms,anemailnotificationwillbesenttotheexhibitor as an acknowledgement of submission received online (by the Organiser). This email will reach the exhibitor within 72 hours. TheOrganiseradvisesall exhibitors toprintandfileacopyof theemail acknowledgement received.

Important

Page 3: Technical Services Mannual_Communic Asia 2012

3

CommunicAsia2012 • EnterpriseIT2012

3

TEChNICAl SErvICES Form ChECklIST

Dear Exhibitor

The Terms & Conditions of Contract/Rules & Regulations should be read together with the Publicity and Technical Services Manual, which form part of your contract to exhibit.

Please use this checklist of forms to help you plan your work schedule and participation. All forms (regardless of whether the service is required or not) must be returned by the exhibitors by the deadline stated on the form. Services cannot be guaranteed for forms that are submitted after the stipulated deadline.

Exhibitors who contract for space after the deadline are to return All forms immediately.

When in doubt, please contact the organiser’s Operations Department (contact details can be found on page 9). Thank you.

Submission DeadlineServices

oThEr CoNTENTS Page No

General Information 4

Exhibition Rules & Regulations 5 – 7

Shipping Information 8

Useful Contact List 9 – 10

Form Page

No No 6 mar 6 Apr 6 may

Stand Arranged by Organiser 11 11 4

Stand Arranged by Exhibitor 12 16 4

Telephone & Telecommunication Lines 13A 19 4

Internet Package 13B 20 4

Furniture 14 21 4

Lighting 15A 24 4

Power Supply 15B 25 4

Temporary Frequency/Satellite Feeds/Cable TV 16 27 4

Water and Drainage 17 29 4

Badges – Exhibitor 18A 30 4

Badges – Contractor 18B 32 4

Heavy/Large/Tall Exhibits 19 34 4

Manpower & Secretarial Services 20 35 4

Hotel Reservations 21 36 4

Audio Visual Equipment 22 37 4

Computers 23 38 4

Page 4: Technical Services Mannual_Communic Asia 2012

4

CommunicAsia2012 • EnterpriseIT2012

4

General Information1. venue10 Bayfront AvenueSingapore 018956

2. Dates & TimeBuild-up : 15 – 17 June 2012 0830 – 2200 hrs 18 June 2012 0830 – 1700 hrsShowdays : 19 – 21 June 2012 1030 – 1800 hrs 22 June 2012 1030 – 1600 hrsTear-down : 22 June 2012 1600 – 2200 hrs 23 June 2012 0830 – 1800 hrs

3. Exhibitors’ Check-InAll exhibitors should register at the Exhibitors’ Check-In Counter on arrival at the exhibition site to collect badges and the exhibitor’s information pack.

4. Exhibits move-InCargoes which are consigned to the exhibition site should NOT arrive at the exhibition hall earlier than 15 June 2012.

Exhibitors, their agents or contractors are responsible for the early installation of their heavy or large exhibits according to the move-in schedule provided by the Organiser. When stand structures are erected, it may not be possible to move-in/install heavy and large exhibits that arrive late.

All packing should be clearly marked with the following details:

(Name of Freight Forwarder)c/o CommunicAsia2012/EnterpriseIT2012(Name of Exhibiting Company)(Stand Number), (Exhibition Hall Number)Marina Bay Sands, Singapore.(Case No... of ...)

Pleasenotethatofficialfreightforwardersmustbeappointedformechanical handling within the exhibition hall(s). Forklifts, cranes and pallet trucks from exhibitors and other forwarders will not be permitted into the exhibition hall(s).

Exhibitsarrivingonsitewithoutapre-appointedofficialfreightforwarderwillbereferredtoanofficialfreightforwarderbytheOrganiser. All costs incurred will be borne by the exhibitor.

5. Double Tax Deduction for Eligible ExhibitorsCommunicAsia2012/EnterpriseIT2012 an “Approved International Fair (AIF)” under the International Exhibition City (IEC) Programme is supported by Singapore Tourism Board and Singapore Exhibition & Convention Bureau.Hence, all Singapore registered companies participating in the event and satisfying Section 14B/K of the Income Tax Act would be eligible to apply for double tax deduction for eligible expenses.

Application forms for the Double Tax Deduction Scheme are available from Singapore Tourism Board. The application should pertain to the eligible expenses incurred through participating in the event and be submitted to Singapore Tourism Board no later than 7 days before the event.

6. Application for Exhibition of Telecommunication EquipmentApplication for display of Telecommunication equipment and services at exhibitions is required to be submitted to Infocomm Development Authority of Singapore (IDA) for approval.

Application must be completed by the exhibitor and submitted by the Organiser of the exhibition. All documents relevant to the application such as technical specification, schematic diagram

etc should be attached. Where applicable, fees such as Frequency Fees, etc. may be charged by the authorities and this will be billed to the exhibitor accordingly.

Please visit website www.ida.gov.sg or contact Mr Badrul Hisham of IDA (please refer to page 10 for contact details) for more information. Application form can be downloaded from the website and returned to Singapore Exhibition Services (please refer to page 9 for contact details) duly completed for onwards submission to IDA.

7. Customs requirementsAll goods to be imported for display at the exhibition must bedeclared to Customs at the entry point and must be covered byproper Customs documents. These documents should be retained at the exhibition as they are subject to Customs inspection on-site. Please refer to www.customs.gov.sg html for information on Exhibition Customs requirements and procedures.

8. Goods & Services Tax (GST)The current GST rate is 7%.

All Singapore registered companies are subject to the prevailing GST. For foreign exhibitors, GST is zero-rated i.e. they do not have to pay GST for space rental in the exhibition. Foreign exhibitors are however subject to the prevailing GST in the event the exhibition goods imported into Singapore are sold locally. Prior approval in this instance must be sought from the relevant authority. The GST is payable on the goods sold at the prevailing GST rate of the CIF value or selling price whichever is higher.

All goods imported into Singapore are subject to prevailing GST. GST is not applicable if the goods are brought in using Carnets, The Temporary Import Scheme (TIS) or the Security Deposit Scheme (SDS). However, this exemption does not apply to liquors and tobacco. Please refer to: www.customs.gov.sg for more information.

Goods for exhibition may be imported 3 weeks before the exhibition and should be re-exported within 3 weeks of the exhibition closure. Requests for an extension period must be made in writing, and will be considered on a case-by-case basis.

GST will apply if any of these goods are eventually sold locally or unaccounted for at the time of re-export. Payment of duty/GST must be made within 14 days after exhibition closure.

Brochures and SouvenirsGST is not applicable if brochures, pamphlets and gifts or souvenirs are imported by post or by air, and total value does not exceed SGD 400.

hand-Carried GoodsTravellers to Singapore with hand-carried goods are requested to refer to www.customs.gov.sg for information.

Controlled and Prohibited GoodsPrior approval must be obtained from the Customs before such goods may be temporarily imported for exhibition purpose. Please refer to www.customs.gov.sg for more information on Prohibited items and Controlled and Restricted items.

9. SmokingIn accordance with the Smoking (Prohibition in Certain Places) Act, it is prohibited by law to smoke in the exhibition halls, meeting rooms, atrium, air-con walkways, function areas, restaurants with food services and 5m from the entrance or exit of any commercial/industrial building.

Page 5: Technical Services Mannual_Communic Asia 2012

5

CommunicAsia2012 • EnterpriseIT2012

5

Exhibition rules and regulations1. AdmissionProfessionals, trade and business visitors only. Minors and members of the general public will not be admitted. The organiser reserves the right to refuse admission or to remove any person without giving a reason. This also applies to build-up and dismantling periods.

For safety reasons, children below the age of 16 will not be allowed into the exhibition halls at any time, from build-up to tear-down periods.

2. Sales‘over the counter’ sales are not permitted. The Organiser reserves the right to take appropriate action as deemed necessary to stop such activities.

3. Promotions during the ShowExhibitors are asked not to place stickers, signs or postersanywhere in the halls other than within their own stand and on paid advertising poster sites and billboards. Likewise,exhibitor’s representatives may not distribute brochures,invitations etc at the registration areas, entrances/exits ofthe exhibition halls, F&B outlets, show hospitality areas, or any other areas which, in the opinion of the Organisers, isdeemed inappropriate and causes inconvenience to visitors and other exhibitors.

4. Segways and other Wheeled TransportationThe use of Segways, rollerblades, bicycles, skateboards, or other wheeled transportation not for the use of the physically challenged, is strictly forbidden from use within Marina Bay Sands.

5. Product Demonstrations & PresentationsThe Organiser appreciates that demonstrations and presentations form an integral part of exhibitions. Exhibitors, however, should exercise discretion to other exhibitors when carrying out demonstrations and presentations.

Loudspeakers/sound devices and/or image projection equipments are to be placed in such a way that sound/image is directed downwards and into the stand, and not towards or across the aisles. The operation of any sound device or image projector must not interfere with, or be an annoyance to neighbouring stands. Sound levels recorded at adjacent or opposite stands should not exceed 70dB for all speech, music and sound effects.

The Organiser may also require such demonstrations or presentations to be carried out in accordance to a timetable as laid down after the consultations with the exhibitors involved.

Exhibitors planning to stage demonstrations or presentations must provide a reasonable space for the audience within the confinesofthestand.

6. AnimalsUnless otherwise stated, animals are not allowed to be used as a stand attraction, for performance or demonstration purposes at the exhibition.

7. Utilities

Electrical main supply cables and piped services (water and compressed air) shall be brought on to the stand from the ceiling above. This applies to exhibition halls A, B, C at Level 1 and halls D, E, F at Basement 2.

Note: Persons responsible for designing the layout of stands or electrical installation of stands should acquaint themselves with the cabling coming from overhead to ensure that the stand layouts can, or are designed to, permit the termination of main cables over, or as close as possible to, the designated drop location.

8. Power Supply and lightingHall Ceiling Lighting : 300 luxSupply Voltage : – 3 phase 4 wire system (plus

earth), 400 volts ±6% – Single-phase 3 wire system,

230 volts ±6%Frequency : 50 Hz with variation maintained

within ±5%Power Factor : Not less than 0.85 lagging

The following must be complied with:(a) Starting arrangement of motors: All motors must have

independent automatic protection against excessive current using one of the following starters:(i) Up to 5 HP : Direct-on-line(ii) 5 to 25 HP : Star-Delta(iii) Above 25 HP : Auto transformer

(b) All electrical installation work from source of supply at the exhibition must be carried out solely by the Organiser’sofficialcontractor.

(c) Exhibitors requiring different voltages, stabilizers, frequency or special connections to equipment should arrange for their own transformers, converters, boosters, etc and keep the Organiser informed.

(d) All electrical equipments should be tested and approved by the Organiser’s appointed licensed engineers prior to turning on the electrical supply.

9. Floor loading Capacity

Booth in exhibition halls - 12KN/sqm (245 lbs/sq ft) of concreteflooring.

Booth in ballooms on Level 5. - 5KN/sqm (102 lbs/sq ft) offlooring.The permitted floor loadings stipulated by the venue owners must not be exceeded. However, on a case-by-case basis subject to the approval of the venue owner, special arrangements including the provision of steel base plates may be required for any exhibit exceeding these limits. The Organiser’s delivery schedule for heavy and large exhibits must be strictly adhered to.

Page 6: Technical Services Mannual_Communic Asia 2012

6

CommunicAsia2012 • EnterpriseIT2012

6

10. Working Exhibits(a) Movingmachinerymustbefittedwithsafetydevices

when the machines are in operation. These safety devices may be removed only when the machines are disconnected from the source of power.

(b) Working machines must be placed at a relatively safe distance from the audience. We strongly recommend the use of safety guards.

(c) All pressure vessels or equipment under pressure must conform to the safety standards & regulations. Prior approval must be sought from the Organiser before operating such equipment.

(d) No motors, engines, contrivances or power-driven machinery may be used without adequate protection againstriskoffire.

11. Dangerous materials(a) Notemporarygas(LPG)ornakedliveelectricalfittings

are to be used in the exhibition halls at any time.(b) No explosives, petrol, dangerous gases or highly

inflammablesubstancesareallowedinthehalls.(c) No radioactive substances are allowed unless prior

approval in writing is obtained from the Organiser. Any radioactive substances being used must strictly comply with the rules and regulations stipulated by the relevant regulatory body.

12. hot Work DemonstrationsNonakedor openflame equipment is to be used in theexhibition hall at any time.

13. Stand Boundaries and Design restrictionAll stands must be carpeted or laid with some form of flooringascleardemarcationofcontractedspace.Exceptfor“island” booths (4-side open), a backwall must be installed for every stand. Stands with immediate neighbour(s) should also be provided with the necessary sidewall(s).

Exhibitors may not place any display material or exhibit, norextendtheirstandstructuresandfittings,beyondtheircontracted boundary with the exception of 300mm (max.) protrusion allowable for fascia or tower above 2.44m. The Exhibitor may be charged for area exceeded, and the Organiser reserves the right to remove the infringing

material. Likewise, any projection of programmable moving lights (e.g. cyber lights) are restricted within the perimeter of their stand. The prevailing rate for space rental on per square metre basis will be charged to exhibitors who fail to comply to the above14. Structural height restrictionThe permitted stand height is 2.44m (8ft). The fascia panel fronting an aisle may be permitted to rise up to 3.00m (9ft. 10in.); where the depth of the fascia panel does not exceed 40mm. Any design for a structure exceeding 2.44m in height must be submitted for approval at least 10 weeks prior to the exhibition and will be considered on a case-by-case basis. If approved, this structure (except the fascia panel) will be restricted to a distance of 1 metre (3ft. 3in.) away from the dividing walls of the adjoining stands. This restriction also applies to overhead structure suspended from the existing hall ceiling.a) Booths in Halls A - F : Maximum Height allowed: 7.5m Hall Ceiling Height: 9.45m Except booths in row BY starting with numbering BY2-01 to BY5-03 in Hall F. Maximum height allowed

is 3.5m(b) Booths in ballrooms on Level 5 Maximum height allowed : 6m Room Ceiling height : 7.5m Except booths with numbering 5C4, D4, E4, F4,

G4, H4, K4, L4, M4, N4, L5, M5. Maximum height allowed is 4m

15. open FrontagesAll stands in the exhibition, irrespective of height, must have at least half of any frontage facing an aisle left open orfittedwithtransparent(clearsee-through)material.Thisarea must be left visibly free of obstruction.

16. riggingRigging using the existing hall ceiling structure is only allowed for banners, curtain drapes, lighting trusses and any decorative items provided which the item to be suspended is endorsed by a local professional engineer. Due to safety concerns, rigging of booth structures is strictly not allowed as all booth constructors must ensure that the booths they build are structurally safe.

Illustrations for rules & regulations 13, 14 and 15

NoTES:1 No structure, display material or exhibit to

extend beyond the contracted boundary2 1m setback for structure above 2.44m high3 At least half of any frontage facing an aisle

must be left open.4 Fascia Panel fronting and aisle may be permit-

ted to rise up to 3mH (max); where the depth of the fascia panel does not exceed 40mm.

No structure above 2.44m high is allowed in the shaded boundary.

Page 7: Technical Services Mannual_Communic Asia 2012

7

CommunicAsia2012 • EnterpriseIT2012

7

17. Building material: Materials for the construction of the exhibition booths shall haveaminimumflamespreadratingofClass2.

18. Workplace Safety and health ActUnder Workplace Safety and Health Act, every contractor must submit the Risk Assessment (RA) and Safe Work Procedures (SWPs) to the organiser prior to the commencement of work. The RA and SWPs must be submitted by a competent person who has attended a Risk Management course conducted by a MOM Approved Training Provider or equivalent. A copy of the training certificatehas tobe submitted togetherwith theRAandSWPs.

19. Double Storey Stands Double storey stands are applicable for contracted ground area of 60 square metres and above (to be considered on a case-by-case basis).

The design, construction and tear-down of double storey stands are to comply with the guidelines, rules and regulations laid down by the relevant authorities including that of the Fire Safety & Shelter Department, the Organiser and the venue owner. Please refer to Form 12 for details.Designs and layout plans of the double storey stand mustbe submitted to the Organiser for approval at least 3 months prior to the exhibition.

20. Damage to Stand Structures and Exhibition Premises

No person under any circumstances shall cut into or through anyfloorcoveringorwallnoralterstandservicestructureexcept when authorized in writing by the Organiser. Any such damage to stand service structures will be invoiced to the Exhibitor.

21. official Contractors(a) TheOrganiserhasappointedofficialcontractorsfor

variousservicessoastoensureamoreefficientandregulated build-up and dismantling.

Please refer to the Useful Contact List for details.

Unless otherwise stated, Exhibitors may appoint their ownstandfittingcontractorsubjecttoapprovalfromtheOrganiser. In this instance, exhibitors are responsible for making their own arrangements for services.

(b) The services of the official contractors are for theconvenience of Exhibitors, and the Organiser will accept no liability in respect of any contract between Exhibitors and such contractors for the negligence or default of any such persons, their servants and agents.

(c) Where mechanical handling within the exhibition hall isrequired,onlytheofficialfreightforwardersmaybeappointed.

22. Stand Fitting ContractorIn adherence to safety requirements, only the Organiser’s official contractor may carry out electrical and pipe installations.

Exhibitors may appoint their own contractor for stand design and construction subject to them being approved by the Organiser, and all approved contractors must lodge

a deposit of SGD 20 per sqm subject to a minimum of SGD 500 per stand. This serves as a performance bond as well as a damage deposit. This deposit will be refunded after deduction for services and damages if any.

Exhibitors are responsible and liable for their appointed contractor’s observance of all rules and regulations.

23. StorageDirect arrangements should be made with an appointed official freight forwarder. Otherwise, exhibitors must arrange for their cartons and cases to be transported back to their own premises. Exhibitors are not to store such items within the exhibition halls.

The organiser reserves the right to remove/dispose of any carton, cases and/or packing materials left in the exhibition halls. Any cost incurred will be borne by the exhibitor.

24. Stand CleaningDuring the exhibition days, the Organiser will be responsible for the general cleaning of stand carpets and gangways daily. During the build-up and dismantling periods, exhibitors and/or appointed contractors are responsible for the removal of stand construction debris and rubbish on a daily basis. All aisles must be left clear.

25. Security(a) General security will be provided by the Organiser

round the clock. Exhibitors and their staff will not be allowedintheexhibitionhalloutsidetheofficialhallopening hours.

(b) Security guards will patrol the exhibition hall in general, but their duties will not include specific attention to individual stands.

(c) If your displays are valuable or sensitive and you wish to hire security personnel to attend to your stand exclusively, please contact the appointed agency for security services. Please note that you may not use your own staff or personnel from other security agencies.

(d) For security and safety reasons, exhibit movement in or out of the halls during the show hours is not permitted.

(e) All personnel in the exhibition halls must wear identificationbadges.Please refer toForm18Aand18B for Exhibitor’s passes, Contractor’s passes and Temporary passes as well as Security Procedures for the exhibition.

26. regulatory AuthoritiesWhere applicable, the above rules and regulations are additional to rules and directions set by the Regulatory Authorities. All exhibitors and their contractors must abide by the code of practices set by the relevant Regulatory Authorities.

27. Food & Beverages ( F & B )No external F & B suppliers/caterers are allowed to supply or cater any form of food and beverage in the centre. The centre provides an extensive range of F & B services to suit any event. Please approach the centre for all F & B requirements.

Page 8: Technical Services Mannual_Communic Asia 2012

8

CommunicAsia2012 • EnterpriseIT2012

8

lATEST ArrIvAl DATES

To ensure the timely delivery of your exhibits, customs-cleared to the exhibition site, the following latest arrival dates should be observed.

Videotapes/CDs via courier : 6 – 8 June 2012

Seafreighted ETA Singapore : 8 - 10 June 2012

Airfreighted ETA Singapore : 6 – 8 June 2012

CoNSIGNEE

When arranging shipment, the consignee’s name on both Bills of Lading and Airway Bills must be addressed to your appointed freight forwarder/site installation contractor.

The consignee should be advised by telefax or email at the time of shipment.

DoCUmENTATIoNS:

For customs clearance, the following will be required:

Seafreight : 2 originals and 3 copies of Bill of Lading, 3 copies of Commercial Invoice/Packing List 1 copy of Insurace Policy (if insured)

Airfreight : 2 originals and 3 copies of Airway Bill 3 copies of Commercial Invoice/Packing List 1 copy of Insurance Policy (if insured)

Film & : 2 sets of Commercial Invoice and brief description of content to accompany videotapeVideotapes (including video CD or laser disc). Censorship exemption can be submitted to Media

Development Authority (MDA). To begin with, you will need a SingPass ID for product video or corporate video exemption through online submission, please logon to www.mda.gov.sg.clickonLicences>OnlineServices>ClassificationServices>VideoClassificationServices > Declaration for Video Exemption > SingPass ID > Company Exemption Form.

The Invoice/Packing List must be in English Language, made out to yourselves c/o your stand at the exhibition with an individual value for each item and the total value C.I.F. Singapore. The following clause should also be included:

“The invoiced goods are of (country) origin and intended for exhibition purpose.”

Shouldyourequirefurtherinformation,pleasecontactanyoftheOfficialFreightForwarders(contactdetailson page 9) for this trade event. You may also like to visit the Customs & Excise website @ www.customs.gov.sg

Shipping Information

Page 9: Technical Services Mannual_Communic Asia 2012

9

CommunicAsia2012 • EnterpriseIT2012

9

The organiserSingapore Exhibition Services Pte LtdNo.1 Jalan Kilang Timor, #09-02, PacificTechCentreSingapore 159303Contact : Ms Christina ChanTel : (65) 6233 6638Fax : (65) 6233 6633Email : [email protected] : www.sesallworld.com

official Standfitting ContractorCityneon Events Pte Ltd84 Genting Lane #05-01Cityneon Design CentreSingapore 349584Contact : Mr Goh Cheong Wei Tel : (65) 6571 6403Fax : (65) 6749 7716Email : [email protected] Website : www.cityneon.net

official Freight ForwardersRogers Expo Services (Singapore) Pte Ltd6 Harper Road #05-03Leong Huat BuildingSingapore 369674Contact : Ms Chen Kui SiangTel : (65) 6846 0055Fax : (65) 6846 1376Email : [email protected]

Schenker Singapore (Pte) Ltd2 Changi South Street 2Singapore 486759Contact : Mr Joseph Lam / Ms Yee Puay ShanTel : (65) 6545 9788Fax : (65) 6245 5385Email : [email protected] / [email protected] : www.schenker.com.sg

Agility Fairs & Events Logistics Pte Ltd5 Changi North Way, 3rd Floor, Singapore 498771Contact : Ms Alice LumTel : (65) 6571 5606Fax : (65) 6214 9592/3Email : [email protected] : www.agilitylogistics.com

manpower AgencyGMP Recruitment1RafflesPlace#55-00OUBCentreSingapore 048616Contact : Ms Yvonne OngTel : (65) 6260 1221Fax : (65) 6533 3846Email : [email protected] : www.gmprecruit.com

Adecco Personnel Pte Ltd10 Anson Road #12-16International PlazaSingapore 079903Contact : Mr Bernard LeeTel : (65) 6336 1533Fax : (65) 6336 5011Email : [email protected] : www.adecco.com.sg

Audio-visual Equipment & Computer rentalAscend Com Pte Ltd12 Lorong Bakar Batu #07-10/11Singapore 348745Contact : Mr Marvin CheowTel : (65) 6846 0903 Fax : (65) 6846 0983Email : [email protected] : www.ascendcom.com.sg

FloristCity Garden Pte LtdLot 101/102 Seletar West Farmway 6 (Off Jalan Kayu)Singapore 798037Contact : Ms Tan Lai FoongTel : (65) 6481 6694Fax : (65) 6481 6695Email : [email protected]

Travel AgentCrest Travel & Tours Pte Ltd18, Cross Street #10-05Marsh & Mclennan CentreChina Square CentralSingapore 048423Contact : Ms Marjorie Chua / Ms Rose LeeTel : (65) 6884 4906Fax : (65) 6884 4116Email : [email protected]

SecuritySecuritas Singapore Manpower Services Pte LtdNo.10, Ubi Crescent #05-18 Ubi Tech ParkSingapore 408564Contact : Mr Dave ChiamTel : (65) 6338 8217Fax : (65) 6338 8927Email : [email protected] : www.securitas.com

Useful Contact list

Page 10: Technical Services Mannual_Communic Asia 2012

10

CommunicAsia2012 • EnterpriseIT2012

10

Printing ContractorWah Seong Press5 Kung Chong RoadSingapore 159142Contact : Mr Winston YamTel : (65) 6473 1611Fax : (65) 6473 1633Email : [email protected]

In-house CatererMarina Bay Sands - Attn: Banquet Operations(At Show Floor, B2 Level 1 & Level 5)10 Bayfront AvenueSingapore 018956Tel : (65) 6688 8856Fax : (65) 6688 8842Email : [email protected]

Marina Bay Sands - Attn: Robyn Kang(At Meeting Rooms)10 Bayfront AvenueSingapore 018956Tel : (65) 6688 3888Fax : (65) 6688 3889Email : [email protected]

Insurance AgentMacs-UIB Insurance Brokers Pte Ltd141 Market Street #07-00International Factors BuildingSingapore 048944Contact : Mr Sam TanTel : (65) 6323 3411Fax : (65) 6324 2788Email : [email protected] : www.macs-uib.com

Satellite FeedsCommercial Industrial Supplies & Services Pte Ltd371 Guillemard RoadSingapore 399779Contact : Mr Lim Ee CheongTel : (65) 6747 3855Fax : (65) 6744 5649Email : [email protected]

Frequency ApplicationLicensing Administrative OfficeInfocomm Development Authority of Singapore10 Pasir Panjang Road #10-01Mapletres Business City Singapore 117348Contact : Mr Badrul HishamTel : (65) 6211 1948Fax : (65) 6659 2503Email : [email protected] : www.ida.gov.sg

CustomsSingapore Customs55 Newton Road #10-01, Revenue HouseSingapore 307987Tel : (65) 6355 2000Fax : (65) 6250 9606Email : [email protected] : www.customs.gov.sg

lucky Draw ApplicationHead, Gambling Suppression391 New Bridge Road Blocck CPolice Cantonment ComplexSingapore 088762Contact : LuckyDrawOfficerTel : (65) 6435 8220Fax : (65) 6220 7142Eail : [email protected]

videotapes/Films CensorshipMedia Development Authority Licensing Services (Films and Publications)3 Fusionopolis Way#16-22 SymbiosisSingapore 138633Tel : (65) 1800 478 5478Fax : (65) 6577 3602Email : [email protected] : www.mda.gov.sg

visa ApplicationVisitor Services Immigration & Checkpoints Authority10 Kallang RoadSingapore 208718Tel : (65) 6391 6100Website : www.ica.gov.sg

Employment Pass/Work PermitMinistry of Manpower18 Havelock RoadSingapore 059764Tel : (65) 6534 1522Fax : (65) 6534 4840Website : www.mom.gov.sg

Page 11: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

11

Form 11STAND ArrANGED BY

orGANISEr

Deadline: 6 march 2012

CoNTINUED ovErlEAF >>

Cancellation clause : Full cost shall apply for any cancellation of stand package after 27 march 2012.

Exhibitor: _______________________________________________________________________________________Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________Signature: __________________________________________ Date: _____________________________________Tel: ________________________ Fax: __________________________ E-mail: _________________________Company Address (or company stamp) ________________________________________________________________________________________________________________________________________________________________

*Delete as necessaryWhere there is an open side, no side wall(s) will be provided in order to give better visibility to the stands.

Backwall

Sidewall /Open*

Sidewall /Open*

Open FrontImportant!Exhibitors with Standard Package or Premium Package, please indicate in layout plan above the preferred installation locations of:

Thequantityapplicableisaccordingtotherespectivespecificationslistedoverleaf.Foradditionalrequirements,pleaseorder using Form 14 and 15A.

13amp, 1/phase socket Wall shelving (if applicable)

Please tick nas appropriate:nThis form is not applicable, we will be building our own stand - please complete and return Form 12.nWe have already contracted for the organisers’ Stand Package, details as below:nWe have not, but wish to contract for the Organisers’ Stand Package as marked below.

TYPE LETTERINGS COLOUR THEME nShell Stand Black Orange

nStandard Package Black Blue

nCounter Package Black Yellow

nLime Green nBurgundy Red nMocha Brown

Type of Booth: nCentre nCorner nIsland

Our Company Name on the booth fascia is (in uppercase):

Only one fascia name is allowed on each exhibiting stand. However, approval for more than one fascia name may be granted by the Organiser for individual stand sizes of 18 square metres & above. Exhibitors are required to complete and return Form 12 for any additional stand construction works to be carried out to the Organisers’ stand package. For display of banners/balloons at your stand, please submit drawing with duly completed Form 7C (Advertising Opportunities) in the Publicity Manual.

4

BlacknPremium Package

Page 12: Technical Services Mannual_Communic Asia 2012

12

CommunicAsia2012 • EnterpriseIT2012

12

organiser’s Stand Specifications

Allpackageslistedhavethefollowingspecifications:a) Walls: 2.44m (8ft) high, white laminated 3mm thick plywood panel, joined by aluminium sections.b) Fascia: 35 - 42cm (14in - 17in) high, with inscription of exhibitor’s name and stand number in Franklin Gothic typeface.c) Floor to be directly laid with needlepunch polypropene carpet.d) Lightings & Electrics: Fluorescent tubes 1.22m (4ft), 40 watts, (1 tube for approx. every 4 sqm) are mounted behind fascia board.

The quantity entitled is in accordance with the given table.e) For Premium Package Stands, any order of logo for tower will be accompanied with an arm-spotlight at no additional cost.

ShEll STAND Entitlement

Stand Area in m2 9 12 15 18 21 24 27 30 33 36 39Numberoffluorescenttube 2 3 3 4 5 6 6 7 8 9 9

(S$65 per square metre in addition to basic space cost)

CoUNTEr PACkAGE Entitlement

Stand Area in m2 9 12 15 18 21 24 27 30 33 36 39Numberoffluorescenttube 2 3 3 4 5 6 6 7 8 9 92-tier counters (1m wide) 3 4 5 6 7 8* 9 10* 11* 12* 13*Reception desk 1 1 1 2 2 2 2 2 2 2 2Folding chair 2 2 2 2 2 2 2 2 2 3 3Wastepaper Basket 1 1 1 1 1 2 2 2 2 2 2

(S$85 per square metre in addition to basic space cost)

up to up to up to up to up to

* No. of counters will be dependent on the no. of built-up walls provided by the Organiser.

Page 13: Technical Services Mannual_Communic Asia 2012

13

CommunicAsia2012 • EnterpriseIT2012

13

STANDArD PACkAGE Entitlement

Stand Area in m2 9 12 15 18 21 24 27 30 33 36 39Numberoffluorescenttube 2 3 3 4 5 6 6 7 8 9 9Number of 13 Amp sockets 1 1 1 2 2 2 2 2 2 3 3Reception desk 1 1 1 2 2 2 2 2 2 2 2Folding chair 1 1 1 2 2 2 2 2 2 3 3Coffee table 1 1 1 1 1 1 1 2 2 2 2Easy chair 2 2 2 4 4 4 4 4 4 6 6Display block 1 1 1 2 2 3 3 3 3 4 4Wastepaper Basket 1 1 1 1 1 2 2 2 2 2 2Please tick ONE:

Wall shelving OR 2 2 2 4 4 4 4 4 4 6 6 Display board 2 2 2 2 2 3 3 4 4 4 4

(S$75 per square metre in addition to basic space cost)

Page 14: Technical Services Mannual_Communic Asia 2012

14

CommunicAsia2012 • EnterpriseIT2012

14

PrEmIUm CENTrE/CorNEr PACkAGE Entitlement

Stand Area in m2 15 18 21 24 27 30 33 36-47 48-59 60Numberoffluorescenttube 3 4 5 6 6 7 8 9-12 12-15 15Number of 13Amp sockets 1 1 1 2 2 2 2 3 4 5Reception Counter 1 1 1 1 1 1 1 2 2 2Barstool 1 1 1 1 1 1 1 2 2 2Coffee table 1 1 1 1 1 1 1 2 3 4Easy chair 2 2 2 4 4 4 4 6 8 10Wastepaper basket 1 1 1 2 2 2 2 2 2 2Lockable cabinet 2 2 2 3 3 3 3 4 6 8Display block 2 2 2 3 3 3 3 4 6 8

(S$95 per square metre in addition to basic space cost)Applicable to 15 square metres and above only.

(S$95 per square metre in addition to basic space cost)Applicable to 15 square metres and above only.

*Logos are not included in the Premium PackagePlease contact the Official Standfitting Contractor (details on page 9) for a quotation

Premium Centre Package

Premium Corner Package

Page 15: Technical Services Mannual_Communic Asia 2012

15

CommunicAsia2012 • EnterpriseIT2012

15

PrEmIUm ISlAND PACkAGE Entitlement

Stand Area in m2 36-47 48-59 60Numberoffluorescenttube 9-12 12-15 15Number of 13Amp sockets 3 4 5Reception Counter 2 2 2Barstool 2 2 2Coffee table 2 3 4Easy chair 6 8 10Wastepaper basket 2 2 2Lockable cabinet 4 6 8Display block 4 6 8

(S$95 per square metre in addition to basic space cost)Applicable to 36 square metres and above only.

*Logos are not included in the Premium PackagePlease contact the Official Standfitting Contractor (details on page 9) for a quotation

NoTES:All items entitled in the package are not interchangeable. Exhibitors may opt to have part or all of the items listed. Please cross out (X) the items that you DO NOT require.Pictures shown are only artist’s impressions. Exact number of sidewalls and furniture will depend on each individual location and/or exhibitors’ own indicated preferences.Logos are not included in the package cost. Please contact the official stand builder directly for a quotation on logo(s)production.

Premium Island Package

Page 16: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

16

STAND ArrANGED BY EXhIBITor

Form 12Deadline: 6 march 2012

ThisformisapplicabletoexhibitorswhohavecontractedforSPACEONLYandwillbeengagingtheirownstandfittingcontractor or are building their own stands.

Inadherencetosafetyrequirements,onlytheOrganiser’sofficialcontractormaycarryoutelectrical&pipeinstallations.Exhibitors may appoint their own contractor for stand design and/or construction subject to them being approved by the organiser. All approved contractors must lodge a refundable deposit equivalent to SGD 20 per square metre based on contracted space, subject to a minimum of SGD 500 per booth.

All painting contractors are required to post a refundable deposit of SGD1,000.

This is to ensure that the rules & regulations are abided by and to cover any damages arising directly or indirectly from any infringement. This is without prejudice to any additional claim the organiser may have on the contractor and/or exhibitor if the damages exceed the deposit.

This form must be jointly signed by the exhibitor and the appointed stand fitting contractor.

Stand fitting Contractor: __________________________________________________________________________Address: ___________________________________________________________________________________________________________________________________________ Country: ____________________________________Tel: _____________________ Fax: ____________________ E-mail: _____________________________________

Person in charge: __________________________________________ Mobile Phone: _________________________Signature: __________________________________________ Date: ______________________________________

Under the Workplace Safety and Health Act, every contractor must submit the Risk Assessment (RA) and Safe Work Procedures (SWPs) to the organiser prior to the commencement of work. The RA and SWPs must be submitted by a competent person who has attended a Risk Management course conducted by a MOM Approved Training Provider or equivalent.

We enclose herewith detailed drawings (elevations, layout plans & perspective views) with dimensions and heights, illustrating the design of our stand for the exhibition. Relative locations of all equipment/machinery on display are also depicted on the layout.

For display of banners/balloons at your stand, please complete Form 7C – Other Advertising Opportunities in the publicity manual

We, the exhibitor and contractor, agree to abide by all Rules & Regulations (including those for double-storey exhibition stands) of the exhibition, as well as the code of practices set by the relevant Regulatory Authorities.

If painting is required, please provide painting contractor’s details. Badges for painters will be applied separately by the painting contractor.

Painter Company: __________________________________________________________________________________________

Address: ___________________________________________________________________________________________________

Tel: ____________________________________________________ Mobile Number: ___________________________________

Company Owner: ____________________________________ E-mail: _______________________________________________

Signature: _______________________________________________ Date: ____________________________________________

Exhibitor : _________________________________________________________________________________________________

Stand No.________________________________________________ Stand Area: ____________________________________ m2

Person in charge of exhibition details: ____________________________________________________________________________

Signature: _______________________________________________ Date: ____________________________________________

Tel: ________________________ Fax: ______________________ E-mail: __________________________________________

Company Address (or company stamp) ___________________________________________________________________________

___________________________________________________________________________________________________________rUlES & rEGUlATIoNS

refer to overleaf

Page 17: Technical Services Mannual_Communic Asia 2012

17

CommunicAsia2012 • EnterpriseIT2012

17

observance of rules and regulationsExhibitors are responsible for their contractor’s observance of all rules and regulations, and are liable for any damages arising directly or indirectly from any infringement.

IdentificationAll workers employed in the construction of the stand must wearidentificationbadgesprovidedbytheorganiseratalltimes when they are in the exhibition halls. Personnel without proper badges will be refused entry into the exhibition halls. Please refer to Form 18B for Contractor’s Badges.

removal of rubbishDuring the build-up period, exhibitors and their contractors will be responsible for day-to-day removal of debris (i.e. empty paint cans, lumber scraps, etc.). Failure to do so will result in the exhibitors being liable for the service fees involved in removing the debris.

Building regulationsTo comply with local building regulations, detailed drawings of stands must be submitted to the organiser by the stipulated deadline for the approval of the relevant government authorities and the organiser to ensure that the interests of all exhibitors are observed.

The exhibiting company and their appointed contractor(s) shall ensure the structural integrity of their booth design.

hall StructureIntheconstructionofthebooth,existingfixturesorwallsmaynotbeusedinanyway(eg.nailing,wiringorfixingofitems to any existing structure).

Work ScheduleExhibitors and their appointed contractors must strictly adhere to the schedule given by the organiser.

In accordance with the organiser’s build-up schedule, carpet and main structures must be installed within 24 hours of the commencement date.

Failure to comply with these regulations may result in the delay of installation of electrics and equipment move-in, and any consequential costs incurred will be charged to the exhibitor.

Fire regulations/Covered CeilingsAll materials used in the stand construction must be fire-retardant in accordancewith local regulations, i.e. aminimumflamespreadratingofClass2.

rules & regulations for Stand Construction

Approval for covered ceilings in exhibition stands must be sought from the Fire Safety & Shelter Department through the organiser, and plans and sample of material with certificatemustbesubmittedat least twomonthspriortothe exhibition. Late submissions will not be accommodated. Provisionofpowderedfirespinklerballisrequiredforevery9sqm of covered ceiling.

Floor CoveringAll booths must be carpeted or laid with some form of flooringascleardemarcationofcontractedspace.Allcarpetandfloorcoveringmustbeaffixedwithdouble-sidedtapes.These tapes are to be removed during the dismantling period.Theuseofpaintorotheradhesivesonthefloorofthe exhibition hall is strictly forbidden .Timber underlays of minimum 15mm must be provided for booth that are erected in existing carpeted areas of meeting rooms, ballrooms and common corridors.

Backwall/SidewallsWith the exception of “island” (4-side open) booths, a backwall must be installed for every booth. Booth with adjoining neighbour(s) must also be installed with the necessary sidewall(s).

height restrictionThe permitted stand height is 2.44m (8ft). The fascia panel fronting an aisle may be permitted to rise up to 3.00m (9ft. 10in.); where the depth of the fascia panel does not exceed 30mm.Any design for a structure exceeding 2.44m in height must be submitted for approval at least 8 weeks in advance and will be considered on a case-to-case basis. If approved, this structure (except the fascia panel) will be restricted to a distance of 1 metre (3ft. 3in.) away from the dividing walls of the adjoining stands. This restriction also applies to overhead structure suspended from the existing hall ceilings.

open FrontageAll stands in the exhibition, irrespective of height, must have at least half of any frontage facing an aisle left open, orfittedwithtransparent(clearsee-through)material.Thisarea must be left visibly free of obstruction.

DismantlingAt the close of the exhibition, it is the joint responsibility of the exhibitor and contractor to dismantle and remove the standinaccordancewiththedismantlingschedulespecifiedby the organiser. All debris and carpets must be cleared by the exhibitors and/or their contractors as per the tear-down schedule given by the organiser. Failure to do so will result in the contractors/ exhibitors being liable for service fees incurred.

Unforeseen occurrencesIn the event of any occurrence not foreseen in these Rules & Regulations,thedecisionoftheorganisershallbefinal.

NOTE:General Information on page 4 and Exhibition Rules & Regulations on page 5-7 should be read together with this form.

Page 18: Technical Services Mannual_Communic Asia 2012

18

CommunicAsia2012 • EnterpriseIT2012

18

Additional rules & regulationsfor Double Storey Stand Construction

1. The exhibitor of the lower level of a particular booth must be the same as that of the upper level.

2. Therentalratesforthecontractedfloorareaattheupperlevelshallbe50%thatofthelowerlevel.Thatis,iftherentalrateforthelowerlevelfloorareaisattheSGD620persquaremetre,therentalratefortheupperlevelareaischeck price rate for the lower SGD 310 per square metre.

3. Doublestoreyboothwillonlybeallowedprovidedtheminimumcontractedfloorareaforthelowerleveloftheparticular booth is 60 square metres and that the minimum length of any dimensions of the area is 6 metres.

4. Thecontractedfloorareaattheupperlevelshallnotexceed50%ofthecontractedfloorareaatthelowerleveloftheparticular booth.

5. Any additional cost incurred in extending the build-up/tear-down period will be fully borne by the exhibitor.

6. Subject to the ceiling height limitations, all objects exceeding 2.44 metres in height must be placed at a minimum distance of 1 metre from all boundaries adjoining a neighbouring booth.

7. Thepermissibleoccupantloadoftheupperfloorshallbebasedontherationofonepersonto1.5m2. A notice in 25mm plain block letters indicating the limitation of occupant load should be conspicuously positioned at the head & foot of the staircase.

8. All booth designs and construction must comply with the guidelines, rules and regulations laid down by the relevant government authorities, as well as both the organiser’s and the exhibition hall owner’s requirements.

9. Stand designs and layout plans must be submitted to the organiser at least 3 months prior to the exhibition. The exhibiting company and their appointed contractor must submit in quadruplicate the detailed drawings (to scale in 1:200)withendorsementfromalocalqualifiedengineertogetherwithstructuralcalculationsoftheproposedstanddesign.

The exhibitor or appointed contractor must submit the detailed drawings and endorsement to the Fire Safety & Shelter Department for comments / approval. More details can be obtained at www.scdf.gov.sg

10. A copy of the approval letter from Fire Safety & Shelter Department must be submitted to the Organizer 2 weeks prior to the exhibition. Only upon approval from all relevant authorities can the exhibiting company commence work on-site.

11. The booth must be constructed in accordance with the approved design and be ready within the build-up period specifiedbytheorganiser.

12. Theexhibitorshallensurethattheboothisdismantledinasafe,systematicandorganisedmanner;withinthespecifieddismantling period.

13. With regards to other issues in general, the rules and regulations stipulated in this Technical Services Manual are still to be complied with.

Page 19: Technical Services Mannual_Communic Asia 2012

19

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors’ Only” then “Technical Services Manual”.Marina Bay Sands Pte Ltd10 Bayfront Avenue, Singapore 018956Tel: (65) 6688 3888 Fax: (65) 6688 3889 Email: [email protected]

Form 13ATElEPhoNES/

TElECommUNICATIoN lINES

Deadline: 6 march 2012

We do not require this service. We require this service.

Please order early to ensure supply. Late order, after 6 May 2012 if supply is available, will be subjected to a surcharge imposed by the authorities/suppliers, ranging from 50% to 100%.

Exhibitors are to collect the hired telecommunication equipment / accessories from Sands Expo and Convention Centre’s Event Services Concierge on Level 1 by 18 June 2012. and a deposit will be required. All loaned items must be returned at the end of the exhibition on 22 June 2012.

The rates below are quoted as of January 2012 and for line usage from 19 to 22 June 2012. These rates serve as a guide and will be subject to change by the authorities/suppliers. Full cost shall apply for any cancellation after 16 may 2012.

ImPorTANT: If line connection to an overseas destination is required, it is important that you specify the countries of destination(s) so that the telco can check on the availability of international linkage.

Please refer to Form 23 for rental of computer hardwares such as desktop, laptop, modem & router, etc, which are to be arranged by the exhibitors at own cost.

Exhibitor: _______________________________________________________________________________________Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________Signature: __________________________________________ Date: _____________________________________Tel: ________________________ Fax: __________________________ E-mail: _________________________Company Address (or company stamp) ________________________________________________________________________________________________________________________________________________________________

18

Please submit your forms online at www.CommunicAsia.com, www.goto-enterpriseIT.com or www.interactiveDME.com,click on “Exhibitors’ Only” then “Technical Services Manual”.Singapore Exhibition Services Pte Ltd47 Scotts Road 11th Floor Goldbell Towers Singapore 228233Tel: (65) 6738 6776 Fax: (65) 6835 3029 / 6732 6776 E-mail: [email protected]

PRIVATE LEASED LINE Symbol Unit Cost (SGD) Qty Please specify countries of destination &Site to Site (Local destination only) its purpose/usage

7,800 2MB)1(9,880 4MB)2(11,700 6MB)3(14,560 10MB)4(

FORM 13A

We do not require this service. We require this service.Please order early to ensure supply. Late orders after 10 May 2008 if supply is available, will be subject to a surcharge imposed by theauthorities/suppliers, ranging from 50% to 100%.Exhibitors are to collect the hired telecommunication equipment/accessories from the Organiser’s office by 16 June 2008 and a depositwill be required. All loaned items must be returned at the end of the exhibition on 20 June 2008.The rates below are quoted as of June 2007 and for line usage from 17 to 20 June 2008. These rates serve as a guide and will be subject tochange by the authorities/suppliers. Full cost shall apply for any cancellation after 20 May 2008.

IMPORTANT: If line connection to an overseas destination is required, it is important that you specify the countries of destination(s) sothat the telco can check on the availability of international linkage.Please refer to Form 23 for rental of computer hardwares such as desktop, laptop, modem & router, etc, which are to be arranged by theexhibitors at own cost.

TELEPHONE LINE (PABX) Symbol Unit Cost (SGD) Qty Please specify countries of destination &its purpose/usage

023Lylno ssecca lacoL )1(:seirtnuoC023Issecca DDI & lacoL )2(

ISDN LINE (Digital) Symbol Unit Cost (SGD) Qty Please specify countries of destination &its purpose/usage

004BI)spbK 821( IRB 2-NDSI )1( Countries:Please tick NT Box Diva Modem

0582PI)spbK 0291( IRP 03-NDSI )2( Purpose:

Purpose:

Site A (Stand No):Site B (address & contact details):

IMPORTANT: For OVERSEAS destination, order must be submitted by 6 March 2012 . Prices will be quoted upon submissionof full address & contact details of Site B.

P

TELEPHONE &TELECOMMUNICATION LINES

Deadline: 15 February 2008

MISCELLANEOUS Symbol Unit Cost (SGD) Qty Remarks

003)dedulcnI toN eniL( enihcam xaF)i(tseuqeR nopU:yficeps esaelP – srehtO)ii(

)srotibihxe lacol ot elbacilppA( etar TSG gniliaverp ot tcejbus tsoC.ylppus rewop rof redro ot B51 mroF ot refer esaelPTo facilitate installation of line(s), please provide a copy of your booth layout plan showing the position for the line(s) to be terminated.

Exhibiting Company: ______________________________________________________________________________Stand No. ______________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________Signature: _________________________________________ Date: _____________________________________Tel: ________________________ Fax: ___________________________ E-mail: _________________________Company Address (or company stamp) _______________________________________________________________________________________________________________________________________________________________

Please refer to Form 15B to order for power supply. To facilitate installation of line(s), please provide a copy of your booth layout plan showing the position for the line(s) to be terminated

Upon r

eque

st

Page 20: Technical Services Mannual_Communic Asia 2012

20

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors’ Only” then “Technical Services Manual”.Marina Bay Sands Pte Ltd10 Bayfront Avenue, Singapore 018956Tel: (65) 6688 3888 Fax: (65) 6688 3889 Email: [email protected]

19

Please submit your forms online at www.CommunicAsia.com, www.goto-enterpriseIT.com or www.interactiveDME.com,click on “Exhibitors’ Only” then “Technical Services Manual”.Singapore Exhibition Services Pte Ltd47 Scotts Road 11th Floor Goldbell Towers Singapore 228233Tel: (65) 6738 6776 Fax: (65) 6835 3029 / 6732 6776 E-mail: [email protected]

FORM 13BINTERNET PACKAGES

Deadline: 10 April 2008

We do not require this service. We require this service.Please order early to ensure supply. Late orders after 10 May 2008 if supply is available, will be subject to a surcharge imposed by the authorities/suppliers, ranging from 50% to 100%.Exhibitors are to collect the hired telecommunication equipment/accessories from the Organiser’s office by 16 June 2008 and a deposit will berequired. All loaned items must be returned at the end of the exhibition on 20 June 2008.The rates below are quoted as of June 2006 and for line usage from 17 to 20 June 2008. These rates serve as a guide and will be subject to changeby the authorities/suppliers. Full cost shall apply for any cancellation after 20 May 2008.

IMPORTANT: The Internet services provided by the local ISP (Starhub) do not have control over the global Internet cloud and the servicedelivered is based on best effort Service Level Agreement. For demo requiring consistent quality content/video stream, kindly contact theOrganiser for alternative solutionsPlease refer to Form 23 for rental of computer hardwares such as desktop, laptop, modem & router, etc, which are to be arranged by the exhibitors atown cost.

Symbol Unit Cost (SGD) Qty Remarks

(1) Dedicated Bandwidth Internet Connection Unlimited access package with Dynamic IP (no IP address will be given). RJ 4-5 connection. Router will be provided. Please kindly refer to specifications upon confirmation of service order.

1601 1MB DHCP Internet)i(0012 2MB DHCP Internet)ii(0572 4MB DHCP Internet)iii(

(2) ADSL StaticUnlimited access package with 8 Static IP address (5 usable); iPoA; RJ45 connection: Router will be provided. Bandwidth specs given isbased on LOCAL connectivity on best effort service level agreement.

(i) 512 Kbps (Downstream up to/upstream up to 512Kbps) 1760(ii) 1 MB (Downstream up to 1MB/upstream up to 768Kbps) 3520(iii) 2 MB (Downstream up to 2MB/upstream up to 768Kbps) 6260

021sserdda PI lanoitiddA)vi(

(3) 3.5G Wireless Mobile Datacard

Purpose:

Purpose:

Please note:Ideal for laptop email access and generalweb-surfing. A driver is required to be installed in the laptop

PI

A

Exhibiting Company: ______________________________________________________________________________Stand No. ______________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________Signature: _________________________________________ Date: _____________________________________Tel: ________________________ Fax: ___________________________ E-mail: _________________________Company Address (or company stamp) _______________________________________________________________________________________________________________________________________________________________

To facilitate installation of line(s), please provide a copy of your booth layout plan showing the position for the line(s) to be terminated.

)srotibihxe lacol ot elbacilppA( etar TSG gniliaverp ot tcejbus tsoC.ylppus rewop rof redro ot B51 mroF ot refer esaelP

tseuqeR nopU

Form 13BINTErNET PACkAGES

We do not require this service. We require this service. Please order early to ensure supply. Late order, after 6 May 2012 if supply is available, will be subjected to a surcharge imposed by the

authorities/suppliers, ranging from 50% to 100%. Exhibitors are to collect the hired telecommunication equipment / accessories from Sands Expo and Convention Centre’s Event Services Concierge

on Level 1 by 18 June 2012. and a deposit will be required. All loaned items must be returned at the end of the exhibition on 22 June 2012. The rates below are quoted as of January 2012 and for line usage from 19 to 22 June 2012. These rates serve as a guide and will be subjected to

change by the authorities/suppliers. Full cost shall apply for any cancellation after 16 may 2012.

ImPorTANT: The Internet services provided by the local ISP do not have control over the global Internet cloud and the service delivered is based on best effort Service level Agreement. For demo requiring consistent quality content/video stream, kindly contact the organiser for alternative solutions

Please refer to Form 23 for rental of computer hardwares such as desktop, laptop, modem & router, etc, which are to be arranged by the exhibitors at own cost.

Deadline: 6 April 2012

Exhibitor: _______________________________________________________________________________________Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________Signature: __________________________________________ Date: _____________________________________Tel: ________________________ Fax: __________________________ E-mail: _________________________Company Address (or company stamp) ________________________________________________________________________________________________________________________________________________________________

Please refer to Form 15B to order for power supply. To facilitate installation of line(s), please provide a copy of your booth layout plan showing the position for the line(s) to be terminated

Page 21: Technical Services Mannual_Communic Asia 2012

21

FUrNITUrE

Form 14

Exhibitor: _______________________________________________________________________________________

Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: __________________________________________ Date: _____________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Total cost without GST

Total cost with 7% GST

*Please refer to Form 15B for power point

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Cityneon Events Pte Ltd84 Genting Lane #05-01 Cityneon Design Centre Singapore 349584Tel: (65) 6571 6418 Fax: (65) 6749 7716 Email: [email protected]

We do not require this service We require this service Exhibitors who are using the Organiser’s Stand Package are reminded to refer to Form 11 for the list of entitlement

supplied under the package. Form 14 is only for ADDITIONAL orders. Late order received after the form deadline will be subject to availability, and a 30% surcharge for orders received

after 6 may 2012, and a 50% surcharge for orders received after 4 June 2012. Full cost shall apply for cancellation received after 16 may 2012.

All items are on rental basis.

Item Description Unit Cost Quantity Cost in SGD

Easy chair SGD 45Folding chair SGD 20Bar stool SGD 45Coffee table SGD 35 Square table Round Table SGD 45Desk SGD 50Lockable Cabinet SGD 60Display block 0.5mH 0.75mH SGD 45Display board SGD 45Wall shelving flat slope SGD 35Wastepaper basket SGD 5Low showcase SGD 150Lowshowcasewithfluorescenttube SGD250High showcase SGD 180High showcase with downlights SGD 3502-tier counter SGD 753-tier counter SGD 100 Refrigerator without power supply* SGD 180

Deadline: 6 April 2012

Page 22: Technical Services Mannual_Communic Asia 2012
Page 23: Technical Services Mannual_Communic Asia 2012
Page 24: Technical Services Mannual_Communic Asia 2012

24

Item Description Symbol Unit Cost (SGD) Qty Cost (SGD)

A) Supply & install light fittings including cabling work

40W Fluorescent Tube 53

100W Spotlight 58

100W Spotlight with arms 63

50W Halogen Downlight 63

50W Halogen Spotlight 68

50W Halogen Spotlight with arm 73

150W Floodlight 115

300W Floodlight 195B) Supply & connection including cabling work to light fittings (fitting to be supplied & installed by client)

Perlightfittingupto100Weach 39

Perlightfittingupto300Weach 110

Perlightfittingupto500Weach 165

C) Supply & install 6A/230v single-phase outlet for lightbox up to 500W maximum 185 (Lightbox & fitting to be supplied & installed by client)

D) Supply & connection excluding cabling work to light fittings - upon application with detailed single line drawing.

lIGhTING

Form 15ADeadline: 6 April 2012

We do not require this service We require this service

All lighting must be ordered on this form and returned by the deadline. Subject to availability of electrical power, a 30% surcharge for orders received after 6 may 2012, and a 50% surcharged for orders received after 4 June 2012.Cancellation clause: Full cost shall apply for any cancellation received after 16 may 2012.Exhibitors who are using the Organiser’s stand package are reminded to refer to Form 11 for their lighting entitlement supplied under the package. Form 15A is only for ADDITIONAL orders

6A

150

300

100

300

500

Using the given symbols, indicate the position of the various lighting you have ordered.

Exhibitor: ____________________________________________________Stand no: Person in charge of exhibition details:Signature: Date: Tel: Fax: E-mail: Company address (or company stamp):

Total cost without GST

Total cost with 7% GST

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Cityneon Events Pte Ltd84 Genting Lane #05-01 Cityneon Design Centre Singapore 349584Tel: (65) 6571 6418 Fax: (65) 6749 7716 Email: [email protected]

Sidewall/Open*

Sidewall/Open*

Open Front

Backwall

Page 25: Technical Services Mannual_Communic Asia 2012

25

PoWEr SUPPlY

Form 15B

CoNTINUED ovErlEAF >>ImPorTANT NoTES

Exhibitor: ______________________________________________________ Stand No: ________________

Deadline: 6 April 2012

ImPorTANTPower supply under this section must

not be used for lighting. We do not require this service

We require this service

All electrical power must be ordered on this form and returned by the deadline.

Late order received after the form deadline will be subject to availability, and a 30% surcharge for orders received after 6 may 2012, and a 50% surcharge for orders received after 4 June 2012. Full cost shall apply for cancellation received after 16 may 2012.

Exhibitors who are using the Organiser’s stand package are reminded to refer to Form 11 for their electrical entitlement supplied under the package. Form 15B is only for ADDITIONAL orders

Item Description Unit Cost (SGD) Qty Cost (SGD)

Symbol max Normal 24hrs Normal 24hrs

13Amps/230V single-phase power 13A 800W 58 77

15Amps/230V single-phase power 15A 2KW 72 88

30Amps/230V single-phase power 30A 4KW 185 205

15Amps/400V three-phase power 15A 5KW 200 230

30Amps/400V three-phase power 30A 10KW 500 580

60Amps/400V three-phase power 60A 20KW 950 1130

100Amps/400V three-phase power 100A 30KW 1500 1850

Using the given symbols, indicate the position of the various power you have ordered.

Total cost without GST

Total cost with 7% GST

For three-phase power, please indicate below details of each piece of equipment for purpose of load balancing and supply stability:

No. of rating of each *methods of Full loadDescription of Equipment Qty voltage motors motor (hP/watts) Starting Current (Amps)

*Please refer to No. 6(a) of the Exhibition Rules and Regulations on page 5 on approved starting arrangement of motors.

Sidewall/Open*

Sidewall/Open*

Open Front

Backwall

Page 26: Technical Services Mannual_Communic Asia 2012

26

CommunicAsia2012 • EnterpriseIT2012

26

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Cityneon Events Services Pte Ltd84 Genting Lane #05-01 Cityneon Design Centre Singapore 349584Tel: (65) 6571 6418 Fax: (65) 6749 7716 Email: [email protected]

Exhibitor: ____________________________________________________Stand no:

Person in charge of exhibition details:

Signature: Date:

Company address (or company stamp):

Tel: Fax: E-mail:

Important Notes:

• Allpricesquotedshallincludelocallicensingfees,installation(whereapplicable)andpowerconsumption.Pleasecontact the organiser for a quotation of any electrical requirement not listed in this form.

• OnlytheOfficialElectricalContractorwillbepermittedtoundertakeelectricalworksfromthesourceofsupplyuptothe booth in the exhibition.

• Allelectricalconnectiontoequipmentmustbetestedandapprovedbytheorganiser’sappointedlicensedengineerpriorto the turning on of the power supply. The organiser reserves the right to terminate power supply to any installation which are found dangerous or may cause any disruption to the power supply.

• Exhibitionrequiringdifferentvoltageorfrequency,stabilisers,orspecialrequirementsmustarrangefor theirowntransformers, converters, boosters, stabilisers, UPS, etc. and keep the organiser informed.

• Electricalmainsupplycablesshallbebroughtontothestandfromtheceilingabove.

machine/Equipment hook-up Fee (payment to be made directly to the Official Electrician on-site):Optional – it is advisable that exhibitors do their own hook-up to machine/equipment from electrical point(s) installed in theirbooths.However,ifassistanceisrequiredfromtheOfficialElectrician,thehook-upfeeisasgivenbelow:

Item Unit Price (SGD) Qty Cost (SGD)

15A/400V 3-phase 28

30A/400V 3-phase 50

60A/400V 3-phase 100

100A/400V 3-phase 170

Total cost without GST

Total cost with 7% GST

Page 27: Technical Services Mannual_Communic Asia 2012

27

Form 16

We do not require this service

We require this service

Cancellation Clause: 30% Cost Shall Apply For Cancellation received after 6 May 2012 and full cost shall apply for cancellation received after 16 May 2012

Thepricequotedisforfiberoption.Ifyourequireaco-axialoption,pleaseprovideuswiththetechnicalspecificationsand we will quote you separately.

Deadline: 6 April 2012

TEmPorArY FrEQUENCY/SATEllITE FEEDS/CABlE Tv

Exhibitor: ______________________________________________________ Stand No: ________________

CoNTINUED ovErlEAF >>

Description

MeaSat 3a (91.5°E), H Polarity, Extd C Band, Receive Only

MeaSat 3 (91.5°E), V Polarity, Extd C Band, Receive Only Feed

AsiaSat 5 (100.5°E), H Polarity, Extd C Band, Receive Only

AsiaSat 5 (100.5°E), V Polarity, Extd C Band, Receive Only

Intelsat 8 (166°E), H Polarity, Extd C Band, Receive only

Intelsat 8 (166°E), V Polarity, Extd C Band, Receive only

HDTV, including Digital (DVB-T) and TV Mobile TV Feed (basedonfiberopticstransmitterandreceiversystem)

Each Additional Point for Digital TV and Satellite Feeds

Unit Cost(SGD)

7,560

7,560

6,560

6,560

8,160

8,160

4,700

150

QtyTotal Cost

(SGD)

* Payment upon presentation of invoice Total cost without GST

Total cost with prevailing GST

Page 28: Technical Services Mannual_Communic Asia 2012

28

CommunicAsia2012 • EnterpriseIT2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

27

Please submit your forms online at www.CommunicAsia.com, www.goto-enterpriseIT.com or www.interactiveDME.com,click on “Exhibitors’ Only” then “Technical Services Manual”.Singapore Exhibition Services Pte Ltd47 Scotts Road 11th Floor Goldbell Towers Singapore 228233Tel: (65) 6738 6776 Fax: (65) 6835 3029 / 6732 6776 E-mail: [email protected]

CommunicAsia2008 EnterpriseIT2008 InteractiveDME

Exhibitor: _______________________________________________________________________________________

Stand No. ______________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: _________________________________________ Date: _____________________________________

Tel: ________________________ Fax: ___________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

_______________________________________________________________________________________________

** Application for display of Telecommunication equipment and services at exhibitions is required to be submitted to InfocommDevelopment Authority of Singapore (IDA) for approval.

Application must be completed by the exhibitor and submitted by the organiser of the exhibition. All documents relevant tothe application such as technical specification, schematic diagram etc should be attached. Where applicable, fees such asFrequency Fees, etc. may be charged by the authorities and this will be billed to the exhibitor accordingly.

Please visit website www. ida.gov.sg or contact Mr Tan Eng Soon of IDA (please refer to page 10 for contact details) for moreinformation. Application form can be downloaded from the website and returned to Singapore Exhibition Services (pleaserefer to page 9 for contact details) duly completed for onwards submission to IDA.

ytQ)DGS( tsoC tinUnoitpircseD metI

RF-TV FEED082

004latigiD

Late order received after the form deadline will be subject to availability, and a 30% surcharge received after 10 May 2008, anda 50% surcharge for orders received after 20 May 2008.

CABLE TV (Digital Terrestrial Television) Please tick Sports Package

(ESPN, STAR Sports, SuperSports)

News Package(CNN, CNBC, BBC, Bloomberg TV)

Entertainment Package(Discovery Channel, MTV S.E.A., Star World)

Order form with pricing from

Starhub will be provided upon receipt

27

Please submit your forms online at www.CommunicAsia.com, www.goto-enterpriseIT.com or www.interactiveDME.com,click on “Exhibitors’ Only” then “Technical Services Manual”.Singapore Exhibition Services Pte Ltd47 Scotts Road 11th Floor Goldbell Towers Singapore 228233Tel: (65) 6738 6776 Fax: (65) 6835 3029 / 6732 6776 E-mail: [email protected]

CommunicAsia2008 EnterpriseIT2008 InteractiveDME

Exhibitor: _______________________________________________________________________________________

Stand No. ______________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: _________________________________________ Date: _____________________________________

Tel: ________________________ Fax: ___________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

_______________________________________________________________________________________________

** Application for display of Telecommunication equipment and services at exhibitions is required to be submitted to InfocommDevelopment Authority of Singapore (IDA) for approval.

Application must be completed by the exhibitor and submitted by the organiser of the exhibition. All documents relevant tothe application such as technical specification, schematic diagram etc should be attached. Where applicable, fees such asFrequency Fees, etc. may be charged by the authorities and this will be billed to the exhibitor accordingly.

Please visit website www. ida.gov.sg or contact Mr Tan Eng Soon of IDA (please refer to page 10 for contact details) for moreinformation. Application form can be downloaded from the website and returned to Singapore Exhibition Services (pleaserefer to page 9 for contact details) duly completed for onwards submission to IDA.

ytQ)DGS( tsoC tinUnoitpircseD metI

RF-TV FEED082

004latigiD

Late order received after the form deadline will be subject to availability, and a 30% surcharge received after 10 May 2008, anda 50% surcharge for orders received after 20 May 2008.

CABLE TV (Digital Terrestrial Television) Please tick Sports Package

(ESPN, STAR Sports, SuperSports)

News Package(CNN, CNBC, BBC, Bloomberg TV)

Entertainment Package(Discovery Channel, MTV S.E.A., Star World)

Order form with pricing from

Starhub will be provided upon receipt

Late order received after the form deadline will be subjected to availability, and a 30% surcharge received after 6 may 2012, and a 50%

surcharge for orders received after 16 may 2012. Full cost shall apply for cancellation received after 16 May 2012.

Application for display of Telecommunication equipment and services at exhibitions is required to be submitted to Infocomm Development Authority of Singapore (IDA) for approval.

Application must be completed by the exhibitor and submitted by the organiser of the exhibition. All documents relevant totheapplicationsuchastechnicalspecification,schematicdiagrametcshouldbeattached.Whereapplicable,feessuch as Frequency Fees, etc. may be charged by the authorities and this will be billed to the exhibitor accordingly.

Please visit website www. ida.gov.sg or contact Mr Badrul Hisham of IDA (please refer to page 10 for contact details) for more information. Application form can be downloaded from the website and returned to Singapore Exhibition Services (please refer to page 9 for contact details) duly completed for onwards submission to IDA.

**

Analog (with Digital Set-up Box)Upon req

uest

27

Please submit your forms online at www.CommunicAsia.com, www.goto-enterpriseIT.com or www.interactiveDME.com,click on “Exhibitors’ Only” then “Technical Services Manual”.Singapore Exhibition Services Pte Ltd47 Scotts Road 11th Floor Goldbell Towers Singapore 228233Tel: (65) 6738 6776 Fax: (65) 6835 3029 / 6732 6776 E-mail: [email protected]

CommunicAsia2008 EnterpriseIT2008 InteractiveDME

Exhibitor: _______________________________________________________________________________________

Stand No. ______________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: _________________________________________ Date: _____________________________________

Tel: ________________________ Fax: ___________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

_______________________________________________________________________________________________

** Application for display of Telecommunication equipment and services at exhibitions is required to be submitted to InfocommDevelopment Authority of Singapore (IDA) for approval.

Application must be completed by the exhibitor and submitted by the organiser of the exhibition. All documents relevant tothe application such as technical specification, schematic diagram etc should be attached. Where applicable, fees such asFrequency Fees, etc. may be charged by the authorities and this will be billed to the exhibitor accordingly.

Please visit website www. ida.gov.sg or contact Mr Tan Eng Soon of IDA (please refer to page 10 for contact details) for moreinformation. Application form can be downloaded from the website and returned to Singapore Exhibition Services (pleaserefer to page 9 for contact details) duly completed for onwards submission to IDA.

ytQ)DGS( tsoC tinUnoitpircseD metI

RF-TV FEED082

004latigiD

Late order received after the form deadline will be subject to availability, and a 30% surcharge received after 10 May 2008, anda 50% surcharge for orders received after 20 May 2008.

CABLE TV (Digital Terrestrial Television) Please tick Sports Package

(ESPN, STAR Sports, SuperSports)

News Package(CNN, CNBC, BBC, Bloomberg TV)

Entertainment Package(Discovery Channel, MTV S.E.A., Star World)

Order form with pricing from

Starhub will be provided upon receiptPrices will be provided upon request.

Page 29: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

29

WATEr AND DrAINAGE

Form 17Deadline: 6 April 2012

Exhibitor: _______________________________________________________________________________________

Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: __________________________________________ Date: _____________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Equipment/Usage Pressure Quantity

Inlet & Outlet

with sinkC

SGD 480 each

CostSGD

(in PSI or Bar)

Sidewall/Open*Saidewall/

Open*

Open Front

* Please delete as necessaryPlease indicate the positions for the termination point of the supply hose.

Backwall

Total cost without GST

Total cost with 7% GST

We do not require this service We require this service.

Late order received after the form deadline will be subject to availability, and a 30% surcharge for orders received after 6 may 2012, and a 50% surcharge for orders received after 4 June 2012. Full cost shall apply for cancellation received after 16 may 2012.

Please note : - Due to infrastructure constrains, exhibitors in ballroom area will not be able to place order for water and drainage.

- Water Pipes shall be brought on to the stand from ceiling above.

Page 30: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

30

Form 18AEXhIBITorS’ BADGES

Exhibitor: _______________________________________________________________________________________

Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: __________________________________________ Date: _____________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Deadline: 6 may 2012

CommunicAsia / EnterpriseIT2012 will be introducing Qr code on exhibitors’ and visitors’ badges. The QR code will capture basic information (name, company and email address) when scanned. More information on how exhibitors can use this free service will be sent to you separately.

In order for the badges to effectively serve as your colleagues’ business card at the event, please indicate the respective email address of the personnel so that the badges can be printed with QR codes containing their information. If the personnel’s email address is not provided, the default email will be what is submitted in your Publicity Form 5 for your company’s entry in the show directory.

Exhibitor’sbadgesaretobecollectedfromtheExhibitor’sCheck-InCounteron-sitefromthefirstdayofbuild-up.Pleaseprovide below details (in BLOCK LETTERS) of all personnel from your company and associated companies who will be manning the exhibition stand.

This form does not replace the visa application process for countries mentioned below. Please visit website http://www.ica.gov.sg for latest information or procedure for visa application.Afghanistan, Algeria, Armenia, Azerbaijan, Bangladesh, Belarus, Egypt, Georgia, India, Iran, Iraq, Jordan, Kazakhstan, Kyrgyzstan, Lebanon, Libya, Moldova, Morocco, Myanmar, Nigeria, Pakistan, People’s Republic of China, Russia, Saudi Arabia, Somalia, Sudan, Syria, Tajikistan, Tunisia, Turkmenistan, Ukraine, Uzbekistan, Yemen

Pleasephotocopythisformifthegivenspaceisinsufficient.

Company Name (in full) Job Title Email address Country of Residence

Page 31: Technical Services Mannual_Communic Asia 2012

31

CommunicAsia2012 • EnterpriseIT2012

31

ImPorTANT NoTES

Security Procedures

The following security measures will be taken during the build-up, show days and tear-down period:

a) Allpersonnelenteringtheexhibitionhallmustwearidentificationbadgeswhichwillbeissuedbytheorganiserupon submission of Form 18A (for exhibitors) or 18B (for contractors). Badges are not transferable.

• Exhibitors’ badges (Form 18A refers) will be issued at the exhibitor’s check-in counter on-site to exhibitors and their representatives who will be manning the booth.

• Temporary badges will be issued to delivery personnel. This will be issued at the entry point upon surrendering their identity card, valid work pass or passport for foreigners. Each delivery visit will be restricted to 1 hour maximum.

• Contractors’ badges (Form 18B refers) will be issued individually to the appointed contractor upon submission of:

i) duly endorsed and signed Form 12 & 18B together with copy of identity card, valid work pass for foreign workers, and a recent passport-size photo.

ii) Contractors’ badges must be returned on last day of build-up in exchange for show days badges. iii) performance deposit (refundable) equivalent to SGD 20 per square metre, subject to a minimum of

SGD 500 per booth

b) Movement in and out of the exhibition halls will be restricted to designated control points and this includes freight movement.

c) Random identification & security checks will be carried out at the entry points for all personnel, includingexhibitors, visitors and contractors.

Page 32: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

32

CoNTrACTorS’ BADGES

Exhibitor: _______________________________________________________________________________________

Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: __________________________________________ Date: _____________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Deadline: 6 may 2012

Form 18B

This form must be endorsed by the exhibitor and handed over to their appointed contractor to supply the information required along with Form 12.

Printing of all Contractors’ badges will be the responsibility of the appointed contractors. Please approach the Organisers at the email address below for more information.

ThisprintedphotoidentificationbadgeistobesubmittedtotheOrganiserforendorsementandallapprovedbadgeswillbestampedwiththeOfficialShow Logo(s). There is a stamping fee of S$2 per badge (inclusive of GST). Please arrange the payment of the stamp fee together with the performance bond. You can submit the badges once they are ready but the badges will only be returned after all relevant documents have been received. The required documents are highlighted overleaf under ‘Contractors’ badges’. The Organiser will supply the plastic badge holders when the badges are approved and will advise you on the collection details. Please observe the submission deadline as indicated above.

Fulldetailsbelowmustbesubmittedandcopiesofallproperidentificationmustbeincludedduringsubmissionofthisform(Front/backofidentitycardsfor Singaporeans or valid work permits for foreigners).

Please photocopy this form if the given space is insufficient.

Name of Contractor: No. of Badges Required:

S/No Full Name NRIC/Passport No Nationality Work Permit / ProfessionalVisit/Employment Pass No.

Page 33: Technical Services Mannual_Communic Asia 2012

33

CommunicAsia2012 • EnterpriseIT2012

33

ImPorTANT NoTES

ministry of manpower requirements

All foreigners involved in exhibition works on short-term basis, must secure a Temporary Work Permit (for Malaysian),Temporary Employment Pass/Professional Visit Pass or exemption from Singapore Immigration & Registration (SIR).For further details or application, please visit: Temporary Work Pass @ http://www.mom.gov.sg Employment Pass @ http://www.mom.gov.sg E-Notification @ https://app.enotifywpe.mom.gov.sg/frontend/welcome.aspx

Personnel working in the exhibition must carry the orIGINAl work pass (Work Permit Card/Employment Pass) with them at all times and to produce it for inspection upon request. Photocopied work pass is not allowed. Under the Employment of Foreign Workers Act, any person caught employing foreigners without a valid work permit will be charged in court.

Security Procedures

The following security measures will be taken during the build-up, show days and tear-down period:

a) Allpersonnelenteringtheexhibitionhallmustwearidentificationbadgeswhichwillbeissuedbytheorganiserupon submission of Form 18A (for exhibitors) or 18B (for contractors). Badges are not transferable.

• Exhibitor’s badges (Form 18A refers) will be issued at the exhibitor’s check-in counter on-site to exhibitors and their representatives who will be manning the booth.

• Temporary badges will be issued to delivery personnel. This will be issued at the entry point upon surrendering their identity card, valid work pass or passport for foreigners. Each delivery visit will be restricted to 1 hour maximum.

• Contractor’s badges (Form 18B refers) will be issued individually to the appointed contractor upon submission of:

i) Duly endorsed and signed Form 12 & 18B together with copy of identity card (front/back), valid work pass for foreign workers.

ii) Printed badges in the required format as detailed. iii) Performance deposit (refundable) equivalent to S$20 sqm, subject to a minimum of S$500 per booth. Stamping fee of S$2 per badge.The Organiser reserves the right to reject the application of the badges should they not meet with our requirementsor are in contradiction to Singapore’s employment laws.

b) Movement in and out of the exhibition halls will be restricted to designated control points and this includes freight movement.

c) Only vehicle for delivery purpose will be allowed into the freight yard. All vehicles will be inspected jointly by the appointed security agency and the venue owner at entry point.

d) Random identification & security checks will be carried out at the entry points for all personnel, includingexhibitors, visitors and contractors.

e) Please safeguard all badges, a penalty of S$20 per badge will be levied for all lost badges. Badges need not be returned after the show but do return all plastic badge holders to do our part in recycling.

Page 34: Technical Services Mannual_Communic Asia 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, click on “Exhibitors Only” then “Technical Services Manual”.Singapore Exhibition Services Pte LtdNo 1 Jalan Kilang Timor, #09-02, Pacific Tech Centre Singapore 159303Tel: (65) 6233 6638 Fax: (65) 6233 6633 E-mail: [email protected]

34

hEAvY/lArGE/TAll EXhIBITS

Form 19

Exhibitor: _______________________________________________________________________________________

Stand No.________________________________________ Stand Area: _________________________________m2

Person in charge of exhibition details: _________________________________________________________________

Signature: __________________________________________ Date: _____________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Deadline: 6 April 2012

heavy Exhibits : Exceeding 1000 kg (for exhibits in exhibition halls) Exceeding 400 kg (for exhibits on level 5, ballroom)large Exhibits : Exceeding 3.5m (length) x 1.5m (width) x 1.5m (height)Tall Exhibits : Exceeding 2.44m (height) on display (relative location of tall exhibits must be submitted for approval)

Suchexhibitsmustarriveingoodtimeforportclearanceandreachtheexhibitionsiteonthefirstdayofthe build-up period. If such exhibits arrive later than the scheduled move-in dates, they may not be permitted entry into the exhibition site.

Allsuchexhibits,withoutexception,mustbehandledbyanofficialfreightforwarderon-site.Listofofficialfreightforwarders can be found on page 9.

Exhibitorswithheavyexhibitsaretorefertothefloorloadingcapacity(ExhibitionRules&Regulation,item9),andmust provide steel plates for load spreading if necessary.

Ouron-siteofficialfreightforwarderis: ________________________________________________________________

*Please attach a booth layout showing the positions of the above exhibit(s).

Description of Exhibit Dimensions in metre Weight in kg Date of arrival (l x B x h)

Page 35: Technical Services Mannual_Communic Asia 2012

35

Qty Category

A. Exhibition Stand Assistant/Reception

B. Exhibition Secretary

C. Interpreters

D. Others (please specify):

*ratePer hour

SGD 15.00

Upon Request

Upon Request

Form 20mANPoWEr & SECrETArIAl

SErvICES

Deadline: 6 April 2012

We do not require this service We require this service.

Date &Times

Special DresscodeInstruction required

(Please state language required)

Exhibitor: ________________________________________________________ Stand No. ___________________

Person in charge of exhibition details: _________________________________________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

A : Handling enquiries, attending to visitors to booth, collect and compile name cards of visitors who make enquiries, hand out collaterals. Pleasant disposition.

B : Take minutes, organise meetings, admin duties such as typing and data entry. Confident and pleasant personality.

•Allcostsaresubjecttoprevailing7%GST(forlocalexhibitorsonly).•Minimumperiodofengagementis6hoursperday.

Please remit payment by (tick in the box below):

[ ] Credit Card (Master Card or Visa), please provide credit card no, full name of holder and expiry date.

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Adecco Personnel Pte Ltd10 Anson Road #12-16 International Plaza Singapore 079903Tel: (65) 6336 1533 Fax: (65) 6336 5011Attn: Mr Bernard Lee Email: [email protected]

GMP Recruitment1 Raffles Place #55-00 OUB Centre Singapore 048616Tel: (65) 6260 1221 Fax: (65) 6533 3846Attn: Ms Yvonne Ong Email: [email protected]

Page 36: Technical Services Mannual_Communic Asia 2012

36

Form 21Deadline: 6 April 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Crest Travel & Tours Pte Ltd18 Cross Street, #10-05, Marsh & McLennan Centre, China Square Central, Singapore 048423Tel: (65) 68844 906 Fax: (65) 68844 116Attn: Ms Marjorie Chua Email: [email protected]

Exhibitor: ________________________________________________________ Stand No. ___________________

Person in charge of exhibition details: _________________________________________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Terms and Conditions:• TheaboveratesquotedareinSingaporedollarsandapplicableforsingle/twinoccupancy.• Ratesaresubjectto10%servicechargeandprevailing7%Goods&Servicestax(GST).• Aonenightnon-refundabledepositisrequiredforeachroombooked.• Ratesareinclusiveofcomplimentaryin-roominternetaccess.• Ratesaresubjecttoavailabilityandchange.

Book early to enjoy complimentary breakfast for one person for the duration of stay on a first-come-first-serve basis.(not applicable for Marina Bay Sands Hotel).

Please reserve hotel accommodation as indicated below:

Hotel Code Room Category

Rates

Oxford Hotel OX Standard SGD 165IBIS Singapore on Bencoolen

IB Standard SGD 190

Hotel Royal @Queens HR Superior SGD 190Landmark Village Hotel LH Deluxe SGD 210Parkroyal on Kitchener Road Singapore

PK Deluxe SGD 210

Peninsula Excelsior Hotel PEH Superior SGD 210Albert Court Village Hotel AC Deluxe SGD 210HotelGrandPacificSingapore

HG Premier SGD 215

River View Hotel Singapore

RH Superior SGD 230

Hotel Code Room Category

Rates

Swissotel Merchant Court Singapore

SM Classic SGD 250

Grand Copthorne Waterfront Singapore

GC Superior SGD 250

M Hotel Singapore MH Superior SGD 250Swissotel The Stamford Singapore

TS Classic SGD 270

Marina Mandarin Singapore

MM Deluxe SGD 275

Marina Orchard Singapore ME Deluxe SGD 275Marina Bay Sands Singapore

MBS Deluxe SGD 290

BookING Form

Mr/ Ms Full Name of Guest(according to travel document)

Hotel Code Single/twinoccupancy

Arrival Date/ Flight No.

Departure Date/ Flight No.

Ashotelroomsareinhighdemandduringtheshowdays,aonenightnon-refundabledepositisrequireduponreservation.Pleaserefertoourofficialtravel agent, Crest Travel & Tours Pte Ltd for terms and conditions of the respective hotels. You may pay by bank TT or guarantee by credit card.

I authorize payment of SGD _____________to be made as follows:

qBank Telegraphic Transfer

q Name of Card Holder: ________________________________ Expiry Date: ______________________

Credit Card No: _____________________________________Visa / Mastercard / Amex (delete accordingly)

___________________________Signature & Date

hoTEl rESErvATIoNS

Page 37: Technical Services Mannual_Communic Asia 2012

37

Form 22AUDIo vISUAl EQUIPmENT

Deadline: 6 April 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Ascend Com Pte Ltd12 Lorong Bakar Batu #07-10/11 Singapore 348745Tel: (65) 6846 0903 Fax: (65) 6846 0983Attn: Mr Marvin Cheow Email: [email protected]

lCD Display Panels

19” LCD data monitor 10020” LCD data monitor 20022” LCD data monitor 24032” LCD monitor, HD ready 35042” LCD monitor, HD ready 65042” LCD monitor, full HD 900LCD Floorstand 150Plasmas Displays monitors

50” plasma display monitors c/wspeakersandwall-mountbracketsorfloorstand 1,000

60” plasma display monitors c/wspeakersandwall-mountbracketsorfloorstand 2,400SeamlessLCDconfigurationof2by2 4,800SeamlessLCDconfigurationof3by3 10,800Projectors

2000 Ansi Lumens LCD Projector c/w standard lens 6004000 Ansi Lumens LCD Projector c/w standard lens 1,600Pull up screens 6ft x 6 ft tripod front projection screen 120Pull up screens 8ft x 8 ft tripod front projection screen 180Audio PA Systems

Portableaudiosystemsc/w2speakers,amplifierand4channelmixer 680SoundSystemsc/w2speakers,amplifierand8channelmixer 1,350Wired handheld Microphone 200Wireless Handheld/Lavalier/Headset Microphone 320DVD Plyer 80– Generic & Intelligent lighting, professional sound systems, Upon truss & rigging hardware system design / set up Request

Exhibitor: ________________________________________________________ Stand No. ___________________

Person in charge of exhibition details: _________________________________________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Ordersreceivedafterthedeadlinearesubjecttoavailability.Paymentisrequireduponreceiptofconfirmationandpaymentinstruction/invoice.Fullcostshallapplyforcancellationofordersafterconfirmationisreceived.

Cost/Event(SGD)

Qty Preferred Delivery Cost

(SGD)Date TimeEquipment

All cost are subjected to 7% GST. Installation, maintenance & dismantling servies are included.Please refer to Form 15B for power point requirement. Upon receipt of your order, an acknowledgement with payment instructions will be sent to you.

Total cost without GST

Total cost with 7% GST

Page 38: Technical Services Mannual_Communic Asia 2012

38

Form 23ComPUTErS

Deadline: 6 April 2012

Please submit your forms online at www.CommunicAsia.com, www.goto-EnterpriseIT.com, which will be returned to:Ascend Com Pte Ltd12 Lorong Bakar Batu #07-10/11 Singapore 348745Tel: (65) 6846 0903 Fax: (65) 6846 0983Attn: Mr Marvin Cheow Email: [email protected]

Exhibitor: ________________________________________________________ Stand No. ___________________

Person in charge of exhibition details: _________________________________________________________________

Tel: ________________________ Fax: __________________________ E-mail: _________________________

Company Address (or company stamp) ________________________________________________________________

________________________________________________________________________________________________

Cost

(SGD)

Ordersreceivedafterthedeadlinearesubjecttoavailability.Paymentisrequireduponreceiptofconfirmationandpaymentinstruction/invoice.Fullcostshallapplyforcancellationofordersafterconfirmationisreceived.

Items Unit Cost

Per event (SGD)

300

360

1,000

440

480

100

200

240

350

650

900

150

120

300

500

50

100

150

50/point

70/point

90/point

Qty Preferred Delivery

Date Time

Total cost without GST

Total cost with prevailing GST

All cost are subjected to prevailing GST. Installation, maintenance & dismantling servies are included.Please refer to Form 15B for power point requirement. Upon receipt of your order, an acknowledgement with payment instructions will be sent to you.

Pentium 4 3.0 Ghz Processor, 512MB Ram, 80GB HDD, DVD / CDRW Drive, 10/100 Ethernet Adapter, 17” LCD Monitor, preloaded with OS Win XP

Pentium Core 2Duo 2.0 Ghz Processor, 2GB Ram, 80GB HDD, DVD / CDRW Drive, 10/100 Ethernet Adapter, 17” LCD Monitor, preloaded with OS Win XP

Notebooks

Apple macbook Pro 13.3 Intel Core2Duo 2.26 Ghz Preload with MAC OS 10.6

Notebook Pentium m 1.8Ghz, 512MB Ram, 30GB HDD, DVD / CDRW Combo Drive, preloaded wih OS Win XP

Notebook Pentium Core 2Duo 2Ghz, 2GB Ram, 120GB HDD, DVD / CDRW Drive, preloaded wih OS Win XP monitors / Display Panels 19” LCD data monitor

20” LCD data monitor

22” LCD data monitor

32” LCD monitor, HD ready

42” LCD monitor, HD ready

42” LCD monitor, Full HD

LCD Floorstand

Printers

HP Deskjet Colour Printer (16ppm) c/w existing cartridges (new cartridges @SGD50/pc) HP Laserjet B/W Printer (24ppm) c/w existing toner (new toner @SGD150/pc)

HP Laserjet Colour Printer (17ppm, A4) c/w existing toner (new toner @SGD190/pc)

various Ethernet switch (8 port)

Ethernet switch (16 port)

Ethernet switch (24 port)

Network connectivity - laying of UTP cables below 20ms

Network connectivity - laying of UTP cables below 50ms Network connectivity - laying of UTP cables below 70ms

Page 39: Technical Services Mannual_Communic Asia 2012

❖ AnaLabAsia The International Scientific and Analytical Technology Exhibition &

Conference

Bakery&Pastry The International Exhibition of Equipment, Ingredients and Supplies for the

Bakery and Pastry Industries

❖ BroadcastAsia The International Digital Multimedia & Entertainment Technology Exhibition

& Conference

❖ CommunicAsia The International Communications and Information Technology Exhibition &

Conference

EnterpriseIT The International Information Technology Exhibition & Conference for the

Enterprise

❖ FHA – Food&HotelAsia The International Food & Drinks, Hotel, Restaurant, Bakery & Foodservice

Equipment, Supplies & Services Exhibition & Conference with FHA Culinary Challenge

FHA Culinary Challenge Asia’s Most Prestigious Culinary Event

FoodAsia The International Exhibition of Food & Drinks

HospitalityStyleAsia The International Hospitality Interiors, Contract Furnishings, Lighting &

Tableware Exhibition

Hospitality Technology The International Hospitality Technology Exhibition

HotelAsia The International Exhibition of Hotel, Restaurant & Foodservice Equipment,

Supplies & Services

iAutomation The International Intelligent Automation Exhibition

MetalAsia The International Machine Tools and Metalworking Exhibition & Conference

MetrologyAsia The International Precision Measurement and Testing Exhibition

❖ MTA The Precision Engineering Industry Event

❖ OSEA - The Oil & Gas Event The International Oil & Gas Industry Exhibition & Conference

Outsource&SubCon The International Contract Manufacturing and Subcontracting Exhibition

ProfessionalAudioTechnology The International Trade Showcase for Professional Audio Equipment, Services

& Technology

ToolTec The International Exhibition of Tools & Tooling Technology

WeldTech The Asian International Welding, Surface Treatment & Joining Technology

Exhibition

Wine&SpiritsAsia The International Exhibition of Wine & Spirits

WSA Wine Challenge Asia's Premier Wine Competition

Exhibitions held in Vietnam

Automation Hanoi The Vietnam International Industrial Automation Exhibition

Automation Vietnam The Vietnam International Industrial Automation Exhibition

Food&HotelVietnam The International Food & Drinks, Hotel, Restaurant, Bakery & Foodservice

Equipment, Supplies & Services Exhibition and Conference

Metrology Hanoi The Vietnam International Precision Measurement & Testing Exhibition

Metrology Vietnam The Vietnam International Precision Measurement & Testing Exhibition

MTA HANOI The Vietnam International Precision Engineering, Machine Tools and

Metalworking Exhibition & Conference

MTA VIETNAM The Vietnam International Precision Engineering, Machine Tools and

Metalworking Exhibition & Conference

Subcon Hanoi The Vietnam Contract Manufacturing and Subcontracting Exhibition

Subcon Vietnam The Vietnam Contract Manufacturing and Subcontracting Exhibition

ToolTec Hanoi The Vietnam International Exhibition of Tools & Tooling Technology

ToolTec Vietnam The Vietnam International Exhibition of Tools & Tooling Technology

WeldTech Hanoi The Vietnam International Welding, Surface Treatment & Joining

Technology Exhibition

WeldTech Vietnam The Vietnam International Welding, Surface Treatment & Joining

Technology Exhibition

❖ An “UFI Approved Event” by UFI – The Global Association of the Exhibition Industry

Successful Events for AsiaSingapore Exhibition Services

Makes Them Happen


Recommended