TECHNICAL STANDARDS TO MANAGE AIR POLLUTION Version 5.1 Published by the Minister of the Environment and Climate Change February 27 th , 2018 PIBs # 7306e05
Transcript
  • TECHNICAL STANDARDSTO

    MANAGEAIR POLLUTION

    Version 5.1

    Published by the

    Minister of the Environment and Climate Change

    February 27th, 2018

    PIBs # 7306e05

  • Technical Standards to Manage Air Pollution

    Cette publication hautement spécialisée Technical Standards to Manage Air Pollution n'est disponible qu'en anglais conformément au Règlement 671/92, selon lequel il n’est pas obligatoire de la traduire en vertu de la Loi sur les services en français. Pour obtenir des renseignements en français, veuillez communiquer avec le ministère de l'Environnement et de l’Action en matière de changement climatique au 327-5519 ou par courriel à [email protected].

    Translation: This highly specialized publication Technical Standards to Manage Air Pollution is available in English only in accordance with Regulation 671/92, which exempts it from translation under the French Language Services Act. To obtain information in French, please contact the Ministry of the Environment and Climate Change at (416) 327-5519 or [email protected].

    Ontario Ministry of the Environment and Climate Change

    mailto:[email protected]:[email protected]:[email protected]:[email protected]

  • February, 2018

    As Minister of the Environment and Climate Change, I am pleased to publish Version 5.1 of this “Technical Standards to Manage Air Pollution” (the Technical Standards publication) under section 38 of Ontario Regulation 419/05: Air Pollution - Local Air Quality.

    This publication now includes amendments to the Petroleum Refining – Industry Standard, the Petrochemical – Industry Standard and other minor administrative edits.

    All technical standards are available on our ministry website as well as through the ministry’s Public Information Centre.

    Technical Standards to Manage Air Pollution

    Ministry of the Ministère de Environment l'Environnemen and Climate t et de l’Action Change en matière de

    changement Office of the Minister climatique

    77 Wellesley Street West 11th Floor, Ferguson Block Bureau du ministre Toronto ON M7A 2T5 Tel.: Fax:

    416-314-6790 416-314-6748 77, rue Wellesley Ouest 11e étage, edifice Ferguson

    Toronto ON M7A 2T5 Tél. : 416-314-6790 Téléc: 416-314-6748

    Ontario Ministry of the Environment and Climate Change

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    FOREWORD

    This document, “Technical Standards to Manage Air Pollution, February 27th, 2018, version 5.1” (the Technical Standards publication) sets out the requirements that facilities must follow if they are registered for a technical standard. As per section 38 of Ontario Regulation 419/05: Air Pollution - Local Air Quality, a technical standard can be either an industry standard or an equipment standard. All technical standards will be made available through a website maintained by the Ministry of the Environment and Climate Change on the Internet and through the Ministry’s Public Information Centre.

    The Technical Standards publication will include both industry standards and equipment standards. It will specify the classes of facilities the technical standard applies to, with reference to the North American Industry Classification System (NAICS) codes; the contaminants the technical standard applies to; the steps that shall be taken to comply with the technical standard; and, the time periods within which the steps shall be taken. It will describe requirements relating to technology to be used at the facility, the operation of the facility, the monitoring and reporting of information relating to the facility, and any other related matter. In the event of a conflict between this document and the references to sections in O. Regulation 419/05, the language in O. Regulation 419/05 shall be used.

    The contents of this document may also be updated from time to time. Any changes will be based upon public consultation consistent with the Ontario Environmental Bill of Rights legislation. All web site addresses referred to in this document were current at the time of release.

    For any addenda or revisions to the Technical Standards publication, please visit the MOECC website or contact:

    Ontario Ministry of the Environment and Climate Change Environmental Assessment and Permissions Branch 40 St. Clair Avenue West, 7th Floor Toronto, Ontario M4V 1M2

    Telephone: (416) 327-5519 Fax: (416) 327-2936

    Ontario Ministry of the Environment and Climate Change i

    http://www.ontario.ca/page/rules-air-quality-and-pollution

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    Table of Contents

    TECHNICAL STANDARDS TO MANAGE AIR POLLUTION

    FOREWORD............................................................................................................................... i

    1.1 INTRODUCTION ......................................................................................................... 1

    1.2 Industry Standards ........................................................................................... 31.3 Equipment Standards ....................................................................................... 41.4 Combination of industry standards and equipment standards...................... 41.5 Updating of Technical Standards..................................................................... 5

    2.0 FOUNDRIES – INDUSTRY STANDARD ..................................................................... 6

    3.0 FOREST PRODUCTS – INDUSTRY STANDARD......................................................73

    4.0 PULP AND PAPER – INDUSTRY STANDARD..........................................................87

    5.0 METAL FINISHERS – INDUSTRY STANDARD.......................................................156

    6.0 PETROLEUM REFINING – INDUSTRY STANDARD...............................................187

    7.0 PETROCHEMICAL – INDUSTRY STANDARD ........................................................239

    Appendix A: Record of Publications....................................................................................292

    Ontario Ministry of the Environment and Climate Change ii

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    CHAPTER 1 INTRODUCTION

    Ontario Regulation 419/05: Air Pollution – Local Air Quality (the Regulation or O. Reg. 419/05) made under the Environmental Protection Act (EPA) is the regulation that is intended to protect communities against adverse effects from local sources of air emissions. The Regulation places limits on the concentration of contaminants in the natural environment that are caused by emissions from a facility. Under certain conditions, the Regulation also allows for a person to register for a technical standard in respect of a facility for certain contaminants, as identified in this Technical Standards publication document. Registering for and complying with a technical standard is an alternative to complying with the air standards that are based on contaminant concentrations.

    This Technical Standards publication is published under the authority of section 38 of the Regulation.

    Technical Standards publication - O. Reg. 419/05, s. 38.

    38 (1) The Minister shall ensure that, with respect to the Technical Standards publication, all of the following criteria are met:

    1. Every technical standard set out in the Technical Standards publication is specifically identified in thepublication as an industry standard or an equipment standard.

    2. For each industry standard that is set out in the Technical Standards publication,i. the Technical Standards publication specifies which classes of facilities the industry

    standard applies to, and those classes are identified with reference to NAICS codes,ii. the Technical Standards publication specifies which contaminants the industry standard

    applies to,iii. the Technical Standards publication sets out the steps that shall be taken to comply with the

    industry standard, andiv. the Technical Standards publication sets out the time periods, if any, within which the steps

    specified under subparagraph iii shall be taken.3. The Technical Standards publication indicates that, with respect to each class specified under

    subparagraph 2 i to which an industry standard applies, and with respect to at least one contaminantto which that standard applies, the Minister is of the opinion that,

    i. with respect to at least two facilities in the class that are located in Ontario,A. it is not technically feasible to comply with section 19 or 20, whichever is applicable, orB. it is not economically feasible to comply with section 19 or 20, whichever is applicable,

    ii. compliance, in accordance with subsection 42 (5), with the industry standard that applies tothe class and the contaminant,A. is technically and economically feasible with respect to at least one facility in the class

    that is located in Ontario, and

    B. will permit efforts that would otherwise be made to comply with section 19 or 20 to be putto better use to protect the natural environment, having regard to subparagraph I,

    iii. including the industry standard that applies to the class and the contaminant in theTechnical Standards publication is more efficient than having the Director consider separaterequests under section 32 for approval of alterations to the standard for the contaminant thatwould otherwise apply to facilities in the class.

    Ontario Ministry of the Environment and Climate Change 1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    4. For each equipment standard that is set out in the Technical Standards publication,i. the Technical Standards publication specifies which classes of facilities the equipment

    standard applies to, and those classes are identified with reference to NAICS codes,ii. the Technical Standards publication specifies which contaminants the equipment standard

    applies to,iii. the Technical Standards publication specifies which sources of contaminant the

    equipment standard applies to,iv. the Technical Standards publication sets out the steps that shall be taken to comply with

    the equipment standard, andv. the Technical Standards publication sets out the time periods, if any, within which the

    steps specified under subparagraph iv shall be taken.5. The Technical Standards publication indicates that, with respect to each class specified under

    subparagraph 4 i to which a equipment standard applies and with respect to at least onecontaminant and source of contaminant to which that standard applies, the Minister is of theopinion that,

    i. at least two facilities in the class that are located in Ontario have the source ofcontaminant, and

    ii. compliance, in accordance with subsection 43 (4), with the equipment standard thatapplies to the class, the contaminant and the source of contaminant is technically andeconomically feasible with respect to at least one facility in the class that is located inOntario.

    (2) Before a technical standard is set out in the Technical Standards publication, the Minister shallconsider whether provisions dealing with the following matters should be included in thetechnical standard:

    1. Notification of and consultation with affected persons before making an application forregistration in respect of the technical standard.

    2. The making and retention of records.3. Circumstances in which notice is required to be given to the Ministry.4. Progress reports relating to implementation of the technical standard.

    (3) Before an industry standard that applies to a class of facilities is set out in the TechnicalStandards publication, the Minister shall consider whether compliance, in accordance withsubsection 42 (5), with the industry standard may reduce the regulatory burden applicable tofacilities in that class for which compliance with section 19 or 20 would otherwise be required.

    (4) Before an equipment standard that applies to a class of facilities and a source of contaminant isset out in the Technical Standards publication, the Minister shall consider whether compliance,in accordance with subsection 43 (4), with the equipment standard may reduce the regulatoryburden applicable to facilities in that class for which consideration of the source of contaminantwould otherwise be necessary when using an approved dispersion model for the purposes ofthis Part.

    A facility may be registered for an industry standard, an equipment standard or a combination of industry standard and equipment standard. A brief description of these technical standards is provided below. For more information, please refer to the Regulation.

    Ontario Ministry of the Environment and Climate Change 2

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    1.1 Industry Standards

    In general, a person is exempt from Part II of the Regulation for a contaminant if the person is registered with respect to a sufficient number of industry standards to address all sources of that contaminant at their facility. Subsections 42(1) and (2) provide that:

    42. (1) Subject to subsection (2), this Part, except for this section and sections 24, 27.1 and 38 to 41,does not apply to a person in respect of a facility and contaminant if one or more industry standards set out in the Technical Standards publication apply to the facility and the contaminant, and

    (a) the facility is part of only one class identified by a NAICS code, and the person isregistered on the Ministry’s Technical Standards Registry – Air Pollution in respect of allof the industry standards that apply to the facility and the contaminant; or

    (b) the facility is part of two or more classes that are identified by NAICS codes, industrystandards apply to all of those classes and to the contaminant, and the person isregistered on the Ministry’s Technical Standards Registry – Air Pollution in respect of allof those industry standards.

    (2) This Part applies for the purpose of determining whether the Director may give a person a noticeunder section 24 or 27.1 and for the purpose of preparing a report required by a notice undersection 24 or 27.1

    In other words, if all of the sources of a contaminant at that facility are addressed in one or more industry standards, and that facility is registered for all of the industry standards, then that facility is exempt from the air standards in Schedules 2 or 3 of O. Reg. 419/05 for the contaminant(s) for which the person is registered for in respect of the facility. As such, it is not necessary for such a facility to assess any other sources of the contaminant(s) for which the facility is registered.

    If a person is registered for an industry standard(s) in respect of a facility and a contaminant, but all sources of the contaminant at the facility are not addressed by the industry standard(s) (i.e. there are sources of contaminant at the facility that are part of another NAICs code), the person may exclude the sources of contaminant that are associated with the NAICS code addressed in the industry standard when modelling under the Regulation. Section 42(4) provides:

    42 (4) A person who uses an approved dispersion model for the purposes of this Part in respect of a facility and a contaminant is not required to consider a source of contaminant that discharges the contaminant if,

    (a) subsection (1) does not apply to the person in respect of the facility and the contaminant;

    (b) the source of contaminant is in a part of the facility that is a part of a class of facilities towhich an industry standard applies in respect of the facility and the contaminant; and

    (c) the person is registered on the Ministry’s Technical Standards Registry – Air Pollution inrespect of the industry standard, facility and contaminant.

    Ontario Ministry of the Environment and Climate Change 3

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    1.2 Equipment Standards

    In general, a person is exempt from Part II of the Regulation for a contaminant if the person is registered with respect to a sufficient number of equipment standards to address all sources of that contaminant at their facility. Section 43(1) and (2) provide that:

    43 (1) Subject to subsection (2), this Part, except for this section and sections 24, 27.1 and 38 to 41, does not apply to a person in respect of a facility and contaminant if,

    (a) equipment standards set out in the Technical Standards publication apply to everysource of the contaminant in the facility; and

    (b) the person is registered on the Ministry’s Technical Standards Registry – Air Pollution inrespect of the facility, the contaminant and every equipment standard that applies to asource of contaminant in the facility.

    (2) This Part applies for the purpose of determining whether the Director may give a person a noticeunder section 24 or 27.1 and for the purpose of preparing a report required by a notice undersection 24 or 27.1.

    However, if an equipment standard or combination of equipment standards does not address all sources of contaminants from that facility, then a person who uses an approved dispersion model for the purposes of Part II of the Regulation in respect of a facility and a contaminant is not required to consider the source of contaminant referenced in the equipment standard(s) for which the person is registered. Section 43(3) of the Regulation provides:

    43 (3) A person who uses an approved dispersion model for the purposes of this Part in respect of a facility and a contaminant is not required to consider a source of contaminant that discharges the contaminant if,

    (a) subsection (1) does not apply to the person in respect of the facility and the contaminant;

    (b) an equipment standard set out in the Technical Standards publication applies to thefacility, the contaminant and the source of contaminant; and

    (c) the person is registered on the Ministry’s Technical Standards Registry – Air Pollution inrespect of the equipment standard, facility, contaminant and source of contaminant.

    1.3 Combination of industry standards and equipment standards

    In general, a person is exempt from Part II of the Regulation for a contaminant if the person is registered with respect to a combination of one or more industry standards and one or more equipment standards such that all sources of that contaminant at their facility are addressed. Section 44(1) and (2) provide that:

    Ontario Ministry of the Environment and Climate Change 4

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    44. (1) Subject to subsection (2), this Part, except for this section and sections 24, 27.1 and 38 to 41,does not apply to a person in respect of a facility and contaminant if,

    (a) the person is registered on the Ministry’s Technical Standards Registry – Air Pollution inrespect of one or more industry standards, the facility and the contaminant;

    (b) there is one or more sources of contaminant in a part of the facility that is not part of aclass of facilities to which any of the industry standards referred to in clause (a) apply;and

    (c) with respect to each source of contaminant to which clause (b) applies, the person isregistered on the Ministry’s Technical Standards Registry – Air Pollution in respect of anequipment standard, the facility, the contaminant and the source of contaminant.

    (2) This Part applies for the purpose of determining whether the Director may give a person a noticeunder section 24 or 27.1 and for the purpose of preparing a report required by a notice undersection 24 or 27.1.

    In other words, if all of the sources of a contaminant at that facility are addressed in one or more industry standards and one or more equipment standards, and that facility is registered for all of those industry and equipment standards, then that facility is exempt from the air standards in Schedules 2 or 3 of O. Reg. 419/05 for the contaminant(s) for which the person is registered for in respect of the facility. As such, it is not necessary for such a facility to assess any other sources of the contaminant(s) for which the facility is registered.

    1.4 Updating of Technical Standards

    Part IV (Application for Review) of the Environmental Bill of Rights (EBR) gives the people of Ontario a formal process for proposing that an existing policy, Act, regulation or instrument of Ontario should be reviewed, changed or improved in order to protect the environment. A person may also ask the government to consider establishing new ones. Under this authority, any two people may request the Minister to review a technical standard. The following are factors that could be considered in making this request:

    1. The length of time the technical standard has been in place.

    2. New technically and/or economically feasible options that have become commerciallyavailable.

    3. Any new scientific information relating to the nature of any contaminant to which thetechnical standard applies.

    For more information on how to request a review, please go to http://www.eco.on.ca.

    Ontario Ministry of the Environment and Climate Change 5

    http://www.eco.on.ca/

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    CHAPTER 2 - FOUNDRIES – INDUSTRY STANDARD

    Version 2.0 Created March 8, 2016

    Preamble

    • This technical standard is an industry standard as defined in section 1 of O. Reg.419/05.

    • With respect to facilities, this industry standard applies to every facility that is part of aclass identified by NAICS code 3315 (Foundries). Facilities in this class include 33151(Ferrous Metal Foundries), 331511 (Iron Foundries), 331514 (Steel Foundries), 33152(Non-ferrous Metal Foundries), 331523 (Non-ferrous Die-casting Foundries) and 331529(Non-ferrous Foundries (except Die-casting)) but do not include secondary lead smelters.

    • With respect to contaminants, this standard applies to contaminants listed in Appendix2 - 1.

    • Each source of contaminant associated with NAICS code 3315 that discharges acontaminant mentioned in the above bullet has been considered in development of thisindustry standard. As such, a person that meets the criteria set out in subsection 42 (1)or subsection 44 (1) of O. Reg. 419/05 is, in general, exempt from Part II of theRegulation in respect of the facility and contaminant(s) for which it is registered. In otherwords, there is no need to model, in a facility’s Emission Summary and DispersionModelling report, discharges of a registered contaminant from any source ofcontaminant associated with NAICS code 3315. (For more information, please see theIntroduction to the Technical Standards Publication.)

    • In accordance with subsection 38 (3) of O. Reg. 419/05, compliance with this industrystandard, in accordance with subsection 42 (5) or subsection 44 (3), may reduce theregulatory burden applicable to facilities in this class.

    • This standard contains requirements that relate to a source of contaminant that is part ofone or more of the following processes:

    • a metal melting process• a furnace tapping process• a molten metal pouring process• a casting cooling process• a process that involves trimming, grinding, cutting, finishing, or media

    blasting of castings• a sand reclamation process• a materials handling process – scrap, charge, sand, slag and molten

    metal handling processes and material storage are considered to bematerials handling processes

    • a mold production process (hot box and warm box)• a core production process (shell core and cold box)• a casting process, including a cooling, breakout and shakeout process• a process that involves using a torch to cut metal• a liquid spray coating process

    Ontario Ministry of the Environment and Climate Change 6

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    • For this industry standard, with respect to lead and lead compounds and suspendedparticulate matter, the publication of this industry standard indicates that the followingcriteria of paragraph 3 of subsection 38 (1) of O. Reg. 419/05 are met:(a) with respect to at least two facilities located in Ontario to which this standard applies,it is not economically feasible to comply with section 19 or 20 of O. Reg. 419/05,whichever is applicable,(b) compliance, in accordance with subsection 42 (5) of O. Reg. 419/05, with thisstandard,

    (i) is technically and economically feasible with respect to at least one facilitylocated in Ontario to which this industry standard applies, and

    (ii) will permit efforts that would otherwise be made to comply with section 19 or20 of O. Reg. 419/05 to be put to better use to protect the naturalenvironment, having regard to clause (a), and

    (iii) including this industry standard in the “Technical Standards to Manage AirPollution” is more efficient than having the Director consider separaterequests under section 32 of O. Reg. 419/05 to set site-specific standards forthe contaminant that would otherwise apply to facilities in the class.

    Ontario Ministry of the Environment and Climate Change 7

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    CONTENTS1. Definitions2. Application2.1 Transition3. Reduction of priority metals4. Operational practices – minimization of SPM from roadways and indoor and outdoor

    material handling processes4.1 Operational practices – minimization of SPM from foundry processes that operate

    outdoors 5. Reducing fugitive emissions5.1 Ventilation program5.2 Volumetric flow rates in and out of the building areas5.3 Building differential pressure5.4 Change management – proposed changes to ventilation5.5 Multi-tenant buildings – SPM6. Ventilation assessment – optimizing capture of lead6.1 Notice – ventilation assessment report – optimizing capture7. Ventilation and pollution control – optimizing capture of lead8. Ventilation and pollution control – optimizing capture of SPM – new or modified facilities9. Ventilation and pollution control – optimizing capture of lead – new or modified facilities9.1 Vertical and unimpeded discharges10. Coke-fired cupola furnaces10.1 Thermal sand reclaimers – chlorinated or fluorinated compounds10.2 Thermal sand reclaimers – VOCs10.3 Thermal sand reclaimers – SPM10.4 Thermal oxidizers – temperature and residence time10.5 Catalytic oxidizers – temperature and residence time10.6 Liquid spray coating process10.7 Electric arc furnace or argon oxygen decarburizer10.8 Pollution control – torch cutting metal to charge a furnace10.9 Pollution control – aluminum reverberatory furnace – scrap metal11. Operating Parameter Summary Table11.1 Measurement of operating parameters11.2 Deviations from operating parameters11.3 Notification of deviations from operating parameters11.4 Phase-in for new air pollution control devices11.5 Inspection and maintenance table11.6 Inspection and maintenance activities11.7 Deviations – inspection and maintenance11.8 Recurring malfunctions12. Operational practices – minimization of VOCs13. Pollution control – minimization of total amines14. Operational practices – minimization of sulphur dioxide15. Pollution control – minimization of sulphur dioxide16. Complaint procedure17. Identifying managed sources17.1 Requirement to continue the management of sources17.2 Changes to managed sources17.3 Specified management of sources17.4 Notification of changes to management of sources

    Ontario Ministry of the Environment and Climate Change 8

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    18. Summary reports19. Records

    APPENDIX 2-1: All Contaminants APPENDIX 2-2: Priority Metals APPENDIX 2-3: Suspended Particulate Matter APPENDIX 2-4: Volatile Organic Compounds APPENDIX 2-5: Hydrogen Chloride and Fluorides (as HF) APPENDIX 2-6: Amines APPENDIX 2-7: Sulphur Dioxide APPENDIX 2-8: Lead and Lead Compounds

    Ontario Ministry of the Environment and Climate Change 9

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    Definitions 1. (1) For the purposes of this industry standard for foundry facilities,

    “Act” means the Environmental Protection Act; “air pollution control device” means a device that removes contaminants from a gaseous stream

    and includes electrostatic precipitators, wet scrubbers, lime scrubbers, baghouses, cyclones, adsorption systems, thermal oxidizers, catalytic oxidizers and afterburners;

    “adsorption system” means a technology where a pollutant is adsorbed on the surface (mostly the internal surface) of a granule, bead, or crystal of adsorbent material. Typically fixed beds of adsorbents such as activated carbon are used to remove VOCs;

    “afterburner” means a device in which combustible waste gases pass over or around a burner flame where oxidation of the waste gases is furthered;

    “bag leak detection system” means a system that detects leaks in a baghouse and includes systems that measure pressure drop, opacity or an electrical signal to detect leaks;

    “baghouse” means a device that uses fabric bags or cartridge filters to remove particulate from a gaseous stream prior to its discharge into the air;

    “block average” means an average of the values measured during a discrete block of time that does not consider measurements before or after that time period. For example, a 30-minute block average calculated from 4:31 pm to 5:00 pm would not consider any values from 4:01pm to 4:30pm;

    “building differential pressure” means the difference between the pressure measured inside a facility building and the pressure measured outside of the facility building;

    “CAS No.” has the same meaning as in subsection 1 (1) of O. Reg. 419/05; “catalytic oxidizer” means a technology that passes a gas over a support material coated with a

    catalyst that promotes oxidation of organic material in the gas; “coke-fired cupola furnace” means a coke-fired continuous type furnace, generally used as a

    melt furnace; “cold box” means a technology that uses cold setting resins that include the addition of a

    gaseous catalyst such as sulphur dioxide; “cold setting resins” means resins that cure at ambient temperatures and include resins that

    may require the addition of a catalyst to cure at ambient temperatures; “cupola afterburner” means an afterburner that treats combustion gases from a cupola furnace; “District Manager” means the District Manager of the appropriate local district office of the

    Ministry, where the foundry facility is geographically located; “existing foundry facility” means a foundry facility,

    (a) the construction of which was completed or began on or before February 1, 2010, or(b) for which an application was made on or before February 1, 2010 for a certificate of

    approval in respect of the facility;“foundry facility” means a facility at which molten metal is poured into a mold or die to form a

    casting and that is part of a class identified by NAICS code 3315, and includes a ferrous metal foundry facility, iron foundry facility, steel foundry facility, non-ferrous metal foundry

    Ontario Ministry of the Environment and Climate Change 10

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    facility, non-ferrous die-casting foundry facility, and non-ferrous foundry facilities (except die-casting) and does not include secondary lead smelters;

    “general exhaust ventilation” means an opening in a building designed to exhaust directly from the building into the air. For the purpose of this industry standard, general exhaust ventilation excludes a washroom fan;

    “highest-ranking individual” means the most senior individual at a foundry facility who has management responsibilities relating to the facility;

    "HVLP spray equipment" means high volume low pressure spray equipment that, (a) bears a permanent label identifying the piece of equipment as HVLP spray equipment or

    is otherwise identifiable as HVLP spray equipment,(b) is used to apply coating at a high volume and under low pressure, and(c) is designed and operated with an atomizing air pressure between 0.1 and 10 pounds per

    square inch, as measured at the centre of the air cap and the centre of the air cap horns;“industry standard” has the same meaning as in subsection 1 (1) of O. Reg. 419/05; “local exhaust ventilation system” means a system used to capture a contaminant at or near the

    point where the contaminant is generated and may be composed of one or more of the following pieces of equipment: a hood, blast gate, ductwork, damper and fan;

    “major modification” means any modification made to a foundry facility that involves adding or replacing a source of contaminant that is part of one or more of the following processes: 1. A metal melting process.2. A furnace tapping process.3. A molten metal pouring process.4. A casting cooling process.5. A process that involves trimming, grinding, cutting, finishing, or media blasting of

    castings.6. A sand reclamation process.7. A breakout or shakeout process;

    “make-up air unit” means equipment used to supply air into a building or an area of a building in a controlled manner;

    "Minister" means the Minister of the Environment and Climate Change or such other member of the Executive Council as may be assigned the administration of this Act under the Executive Council Act;

    "Ministry" means the ministry of the Minister; “NAICS” has the same meaning as in subsection 1 (1) of O. Reg. 419/05; “naphthalene depleted solvent resin” means a resin where the maximum naphthalene

    (CAS#91-20-3) concentration within the solvent fraction is less than three per cent; “new foundry facility” means a foundry facility, the construction of which began after February 1,

    2010 and no application was made on or before that day for a certificate of approval in respect of the facility;

    Ontario Ministry of the Environment and Climate Change 11

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    “non-ferrous metal foundry facility that uses lead” means a foundry facility that uses non-ferrous metal to form castings and is part of a class identified by NAICS code 33152, and uses raw materials containing greater than 0.2 per cent by weight of lead and lead compounds;

    “O. Reg. 419/05” means Ontario Regulation 419/05 (Air Pollution – Local Air Quality) made under the Act;

    “priority metal” means a contaminant listed in Appendix 2-2; “raw material” means an ingredient that is used in the production of castings and includes

    incoming scrap; “record” includes a written procedure, a measurement result, a written notification, a table, a

    report, a document, information provided to the highest-ranking individual for review, a written practice, anything required by this industry standard to be recorded and an update to any of the preceding;

    “registered contaminant” means a contaminant that may be discharged into the air from a foundry facility if a person is registered in respect of this industry standard, the facility and the contaminant;

    “registered person” means a person that is registered on the Ministry’s Technical Standards Registry – Air Pollution in respect of this industry standard, a foundry facility and one or more contaminants listed in Appendix 2-1;

    “registration” means registration on the Ministry’s Technical Standards Registry – Air Pollution in respect of this industry standard;

    “SPM” means suspended particulate matter that has a diameter of less than 44 microns and includes the contaminants that are listed in Appendix 2-3;

    “spray booth” means a structure used for coating operations by spray application and incorporating the capability of entrapping and capturing coating overspray;

    “static pressure” means pressure exerted by a gas. For example when a gas is flowing, static pressure is measured perpendicular to the direction of flow and when a gas is at rest, static pressure is the pressure exerted in all directions by the gas;

    “sulphur dioxide” means the contaminant that has a CAS No. of 7446-09-5; “technical standard” has the same meaning as in subsection 1 (1) of O. Reg. 419/05; “thermal oxidizer” means a technology where combustible waste gases pass over or around a

    burner flame into a residence chamber where oxidation of the waste gases is completed; “VOCs” means volatile organic compounds and includes the contaminants that are listed in

    Appendix 2-4; “ventilation coordinator” means an individual, appointed in writing by a registered person, who

    has a level of authority adequate to be responsible for the design, installation, modification, operation and maintenance requirements related to optimizing the capture of contaminants by the ventilation systems at a foundry facility;

    “wet scrubber” means a device that uses a scrubbing liquid to remove contaminants from a gaseous stream prior to its discharge into the air.

    (2) In this industry standard, a reference to the Director means,(a) the Director appointed under section 5 of the Act in respect of the section of this

    industry standard in which the reference appears; or

    Ontario Ministry of the Environment and Climate Change 12

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (b) if no Director described in clause (a) has been appointed in respect of a section ofthis industry standard, any Director appointed under section 5 of the Act in respect ofsection 27.1 or paragraph 3 of subsection 11 (1) of O. Reg. 419/05.

    Application 2. (1) This industry standard applies, in accordance with subsections (2) and (4), to a

    person who is registered on the Ministry’s Technical Standards Registry – Air Pollution in respect of,

    (a) this industry standard;(b) a foundry facility; and(c) one or more of the contaminants listed in Appendix 2-1.

    (2) If the person mentioned in subsection (1) is registered with respect to a facility type setout in Column 1 of Table 2-2 and one or more of the contaminants listed in an Appendix set out opposite the facility in Column 2 of Table 2-2, the sections set out opposite the Appendix in Column 3 of Table 2-2 apply in respect of the person.

    (3) For greater clarity,(a) the contaminants listed in Appendix 2-2 to 2-8 are also listed in Appendix 2-1;(b) the contaminants listed in Appendix 2-2 are also listed in Appendix 2-3;(c) the contaminants listed in Appendix 2-8 are also listed in Appendix 2-2 and 2-3; and(d) the contaminants listed in Appendix 6 are also listed in Appendix 2-4.

    (4) Subject to section 2.1, a person mentioned in subsection (1) is required to comply withthe sections of this industry standard that apply to the person in accordance with subsection (2) on or before the date the person registers on the Ministry’s Technical Standards Registry – Air Pollution unless a different date is specified in this industry standard.

    TABLE 2-2: Application

    Item Column 1 Facility Type

    Column 2 Appendix

    Column 3 Applicable Sections

    1. Foundry facility Appendix 2-1 1, 2, 2.1, 5.1, 5.2, 5.3, 5.4, 6.1, 9.1, 10, 11except for 11 (5) and 11 (9), 11.1, 11.2, 11.4 to 11.8, 16 to 19

    2. Foundry facility Appendix 2-2 3 3. Foundry facility Appendix 2-3 4, 4.1, 5, 5.5, 8, 10.3, 10.7, 10.8, 10.9 4. Foundry facility Appendix 2-4 10.2, 10.4, 10.5, 10.6, 11 (5) (b), 11.3, 12 5. Foundry facility Appendix 2-5 10.1, 11 (5) (b), 11.3 6. Foundry facility Appendix 2-6 13 7. Foundry facility Appendix 2-7 11 (5) (b), 11.3, 14, 15 8. Non-Ferrous Metal Foundry Facility That

    Uses Lead Appendix 2-8 6, 7, 9, 11 (5) (a) and 11 (9), 11.3

    Transition 2.1 (1) For the purposes of this section,

    “transition period” means the period that is after March 8, 2016 and before March 8, 2017. (2) Subject to subsections (3) and (5), subsection 2 (4) does not apply during the transition

    period.

    13Ontario Ministry of the Environment and Climate Change

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s2s1http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s2s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (3) Subsection (2) does not apply in respect of a registered contaminant listed in anAppendix set out in Column 2 of Table 2-2.1 and a section set out in Column 1 of Table 2-2.1 if, prior to March 8, 2016, a person is registered for the contaminant.

    (4) Subsection 2 (4) does not apply to a person mentioned in subsection (3) during thetransition period if the person complies with the section set out in Column 3 of Table 2-2.1 opposite the section mentioned in subsection (3), set out in Column 1 of Table 2-2.1.

    (5) Subsection (2) does not apply with respect to this section and section 2.

    TABLE 2 – 2.1: Transition

    Item Column 1 Section in industry standard published [March 2016]

    Column 2 Appendix

    Column 3 Section in industry standard published in December 2009

    1. 3 Appendix 2-2 3 2. 4 Appendix 2-3 4 3. 5, 5.1 to 5.3 Appendix 2-3 5 4. 5.4 Appendix 2-3, 2-4 or 2-7 17 (3) to 17 (5) 5. 6 Appendix 2-8 6 6. 7 Appendix 2-8 7 7. 8 Appendix 2-3 8 8. 9 Appendix 2-8 9 9. 10 Appendix 2-1 10 10. 11 to 11.4 Appendix 2-1 11 and 18 (3) 11. 11.5 to 11.8 Appendix 2-1 11 12. 12 Appendix 2-4 12 13. 13 Appendix 2-6 13 14. 14 Appendix 2-7 14 15. 15 Appendix 2-7 15 16. 16 Appendix 2-1 16 17. 17 to 17.4 Appendix 2-1 17 (1) and (2) 18. 18 Appendix 2-1 18 19. 19 Appendix 2-1 19

    Reduction of priority metals 3. (1) If a registered contaminant listed in Appendix 2-2 may be discharged into the air

    from a foundry facility, the registered person shall ensure that a written procedure is developed and implemented to reduce, where feasible, the weight percent of each registered contaminant listed in Appendix 2-2 in raw materials and products.

    (2) Where appropriate, the procedure mentioned in subsection (1) shall include arequirement to offer customers products that contain less of a registered contaminant listed in Appendix 2-2 than other commercially available similar products.

    Operational practices – minimization of SPM from roadways and indoor and outdoormaterial handling processes

    4. (1) A registered person shall ensure that a written procedure is developed andimplemented in accordance with good engineering practices to minimize the discharge of registered contaminants listed in Appendix 2-3 from each roadway at the foundry facility and each source of contaminant that is part of one or more of the following processes:

    1. An incoming scrap handling process.

    Ontario Ministry of the Environment and Climate Change 14

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    2. A charge handling process.3. A sand handling process.4. A slag handling process.5. Other materials handling processes such as material storage and molten metal

    handling.(2) The procedure mentioned in subsection (1) shall, where appropriate, include,

    (a) methods to minimize the discharge of fugitive dust from roadways, includingmethods to ensure,

    (i)vehicles travel at low speeds on roads at the foundry facility,(ii) signs that clearly display the low speed limits mentioned in subclause (i) are

    posted,(iii) frequently used unpaved roads are graded with large aggregate or gravel,(iv) paved roads are cleaned on a regular basis, and(v) water or other dust suppressant is used on unpaved roads at the foundry

    facility on a regular basis;(b) methods to minimize the discharge of fugitive dust from outdoor storage piles,

    including methods to ensure,(i) barriers are placed around outdoor storage piles,(ii) covers are placed on top of outdoor storage piles,(iii) fine materials are removed from materials prior to storing outdoor, and(iv) water or other dust supressant is used on outdoor storage piles as

    necessary to maintain adequate moisture;(c) methods to minimize the discharge of fumes during molten metal handling, including

    during the transfer of molten metal from one vessel to another, including methods toensure that,

    (i) fumes are minimized by ensuring that molten metal is poured at the lowestfeasible temperature,

    (ii) ladle covers are used when holding ladles of molten metal and whenmoving ladles of molten metal to a pouring area, and

    (iii) molten metal is poured carefully; and(d)general good housekeeping practices.

    Operational practices – minimization of SPM from foundry processes that operate outdoors

    4.1 (1) Subject to subsection (4), a registered person shall ensure that written procedures are developed and implemented, in accordance with good engineering practices, to minimize the discharge of a registered contaminant listed in Appendix 2-3 from a source of contaminant that is part of one or more of the following processes, during any period when the source of contaminant is operated outside of an enclosed structure:

    1. A molten metal pouring process.2. A casting cooling process in which the casting is confined within a mold.3. A breakout process.4. A process that involves trimming, grinding, cutting, finishing, or media blasting of

    castings.(2) The procedures mentioned in subsection (1) shall,

    (a) identify each process mentioned in subsection (1) carried out at the foundry facility inwhich a source of contaminant may be operated outside of an enclosed structure;

    (b) describe steps to be taken to ensure that each source of contaminant mentioned inclause (a) is operated inside an enclosed structure if feasible;

    Ontario Ministry of the Environment and Climate Change 15

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (c) include methods to minimize discharges associated with molten metal pouring,including, where appropriate, methods to ensure that molten metal is pouredcarefully;

    (d) include methods to minimize discharges associated with cooling, including, whereappropriate, methods to ensure that where a cooling canopy is unavailable, a castingthat is cooling in a mold is left undisturbed until cool, to minimize fugitive emissions;and

    (e) describe steps to be taken after a source of contaminant has been operated outsideof an enclosed structure to ensure that the operational area is returned to a state ofcleanliness.

    (3) If a source of contaminant mentioned in subsection (1) is located outside of an enclosedstructure, the registered person shall ensure that the following information is recorded:

    1. An identification of the source of contaminant that was operated outside of anenclosed structure.

    2. The date, time and duration that the source of contaminant was operated outside ofan enclosed structure.

    3. The reason that the source of contaminant was operated outside of an enclosedstructure during the period of time mentioned in paragraph 2.

    4. A description of any steps taken to prevent or minimize the discharge of a registeredcontaminant listed in Appendix 2-3 into the air during the period of time mentioned inparagraph 2.

    (4) The requirement in subsection (1) to develop and implement written procedures doesnot apply with respect to a source of contaminant that is operated inside a structure comprised of three walls and a roof.

    Reducing fugitive emissions 5. (1) A registered person shall ensure that a written procedure is developed and

    implemented to ensure that fugitive emissions of a registered contaminant listed in Appendix 2-3 are reduced from the following processes:

    1. A metal melting process.2. A furnace tapping process.3. A molten metal pouring process.4. A casting cooling process.5. A breakout or shakeout process.6. A process that involves trimming, grinding, cutting, finishing, or media blasting of

    castings.(2) A procedure mentioned in subsection (1) relating to a process set out in paragraph 1 of

    that subsection shall include, where appropriate, practices to ensure that molten metal in furnaces is covered with ceramic blankets or protective atmosphere.

    (3) A procedure mentioned in subsection (1) relating to a process set out in paragraph 3 ofthat subsection shall include, where appropriate, practices to ensure empty ladles are covered or stored upside down.

    (4) For greater clarity, subsection (1) applies to a person registered in respect of lead andlead compounds.

    Ventilation program 5.1 (1) A registered person shall appoint a ventilation coordinator and ensure that the

    ventilation coordinator develops and implements a ventilation program in accordance with this section.

    (2) For the purpose of the ventilation program, one of the following actions shall be taken:Ontario Ministry of the Environment and Climate Change 16

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018 1. A table is prepared in accordance with section 5.2.2. Measurements are taken in accordance with section 5.3.

    (3) The following information shall be recorded as part of the ventilation program:1. A description of each ventilation system at the foundry facility.2. For each ventilation system described for the purposes of paragraph 1, the

    specifications of each fan in the system, including the volumetric flow rate of the fan.3. A process flow diagram of each ventilation system described for the purposes of

    paragraph 1 drawn to scale that includes the following information:i. Each piece of equipment from which emissions may be captured by the

    ventilation system.ii. Each air pollution control device associated with a piece of equipment

    mentioned in subparagraph i.iii. Key information about the ventilation system, including volumetric flow

    rates.4. A drawing of each ventilation system described for the purposes of paragraph 1 that

    reflects as-built condition. The drawing shall be based on the specifications of thesystem that was installed, not the design specifications.

    5. One of the following:i. A table prepared in accordance with section 5.2.ii. Each block average recorded in accordance with section 5.3.

    6. For each 30-minute block average mentioned in subparagraph 5 ii that is positiveand for which an operational adjustment is required by subsection 7 (3),

    i. the date and time that the 30-minute block average of building differentialpressure was positive,

    ii. the measured values of the building differential pressure, expressed in 30minute block averages, taken during the time that the area was positivelypressured,

    iii. an explanation of the suspected cause of the positive pressure,iv. a description of the operational adjustments required to be made under

    subsection 7 (3) and the date each operational adjustment was completed,and

    v. the position title of personnel who assigned a person to make anoperational adjustment mentioned in subsection 7 (3).

    (4) A ventilation system mentioned in subsection (3) includes general exhaust ventilation, alocal exhaust ventilation system and an make-up air unit but does not include a ventilation system contained wholly within an area that is isolated from foundry processes.

    Volumetric flow rates in and out of the building areas 5.2 The table mentioned in paragraph 1 of subsection 5.1 (2) shall set out, for each area of

    the foundry facility in which a foundry process is enclosed, the following information in the manner illustrated by Table 2-5.2:

    1. Each make-up air unit in the area shall be listed in Column 1 of the table.2. Opposite each make-up air unit mentioned in paragraph 1, the volumetric flow rate

    of the unit shall be set out in Column 2 of the table.3. Each local exhaust ventilation system and each general exhaust ventilation in

    the area shall be listed in Column 3 of the table.4. Opposite each ventilation system mentioned in paragraph 3, the flow rate of

    the ventilation system shall be set out in Column 4 of the table.5. The sum of the flow rates listed in Column 2 of the table shall be set out in the

    last row of Column 2.6. The sum of the flow rates listed in Column 4 of the table shall be set out in the

    last row of Column 4.7. The table shall contain an indication of whether the sum mentioned in

    Ontario Ministry of the Environment and Climate Change 17

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018 paragraph 5 is greater than the sum mentioned in paragraph 6.

    TABLE 2-5.2: Volumetric flow rates in and out of the building areas

    Item Column 1 Make-up Air Units

    Column 2 Volumetric Flow Rate

    Column 3 Local Exhaust Ventilation Systems and General Exhaust Ventilation

    Column 4 Volumetric Flow Rate

    1. 2. 3.

    Total Flow Rate Entering Enclosed Area Total Flow Rate Exiting Enclosed Area

    Building differential pressure 5.3 (1) The measurements required to be taken by paragraph 2 of subsection 5.1 (2)

    shall be taken by continuously measuring the building differential pressure for each area that contains a pouring operation or a melt furnace and recording the building differential pressure in 30-minute block averages.

    (2) Each measurement required by subsection (1) shall be taken by at least twomonitors that, in the opinion of the Director, accurately measure the building differential pressure.

    (3) For greater clarity, at least one monitor required by subsection (2) shall belocated inside the building and at least one monitor shall be located outside of the building.

    (4) In determining whether the monitors mentioned in subsection (2) accuratelymeasure building differential pressure, the Director shall consider the following information:

    1. The number of monitors used to take the measurements.2. The location of each monitor.3. The frequency of measurement.4. The wind rose or predominant wind direction.5. The configuration of the building.6. The roof heights of the building.

    (5) The location of each monitor required by subsection (2) shall be depicted in adiagram, drawn to scale, of the foundry facility.

    (6) If a change is proposed that would alter the information contained in thediagram required by subsection (5), the diagram shall be updated with the proposed change and submitted to the Director no later than 60 days before the proposed change occurs.

    Change management - proposed changes to ventilation 5.4 (1) Subject to subsection (5), prior to implementing any change to a ventilation

    system at a foundry facility, a registered person shall ensure that the following information is recorded:

    1. A description of the proposed change to the ventilation system.2. An evaluation of the possible impacts of the proposed change to the ventilation

    system on the ability of the ventilation system to capture contaminants underanticipated operating scenarios.

    3. An evaluation of the impact of the proposed change to the ventilation system on the

    18Ontario Ministry of the Environment and Climate Change

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018 balance of volumetric flow rates entering and exiting the enclosed area in which the ventilation system is located. The evaluation may be based on information such as an analysis of volumetric flow rates or an analysis of building differential pressures.

    (2) If an evaluation performed under paragraph 2 or 3 of subsection (1) indicates that thecapture of the ventilation system would be reduced, a registered person shall not implement or cause or permit the implementation of the proposed change to the ventilation system without a written record indicating that the highest-ranking individual at the foundry facility has reviewed the proposal and has confirmed that the proposed change meets the requirements set out in subsection 17.2 (2).

    (3) No later than three months after a change mentioned in subsection (1) is implemented,the registered person shall ensure that the information required by subsection 5.1 (3) is updated and a record is made of the date on which the change was implemented.

    (4) A ventilation system mentioned in subsection (1) includes general exhaust ventilation, alocal exhaust ventilation system and a make-up air unit but does not include a ventilation system contained wholly within an area that is isolated from foundry processes.

    (5) Subsection (1) does not apply if the following criteria are met:1. The ventilation system is associated only with natural gas or propane combustion.2. The proposed change to the ventilation system will result in a change to the

    volumetric flow rate entering or exiting the enclosed area of the foundry facility inwhich the ventilation system is located that is less than the absolute valuedetermined according to the following equation:

    |0.05 * (A – B)| where,

    A is the sum determined under paragraph 5 of section 5.2; and B is the sum determined under paragraph 6 of section 5.2.

    Multi-tenant buildings – SPM 5.5 (1) For the purposes of this section,

    “community use” means use of part of a building for any of the following uses: 1. Indoor recreational activities.2. An indoor gathering of people for civic, religious or social purposes;

    “non-foundry facility tenant” means a tenant that, (a) is an occupant in a building that contains a foundry facility; and(b) does not,

    (i) provide raw materials, products or services to the foundry facility, or

    (ii) use raw materials, products or services from the foundry facility.(2) Subject to subsections (3) and (4), if a foundry facility is located in a building that may

    have one or more non-foundry facility tenants, the registered person shall, (a) at least one time in every six-month period, ensure that each filter of every make-up air

    unit in the building that supplies air to a non-foundry facility tenant is replaced; and

    Ontario Ministry of the Environment and Climate Change 19

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (b) at least one time in every 12-month period, ensure that the following ducts in the buildingare cleaned:

    (i) Ducts that supply air to a non-foundry facility tenant that is a place listed insubsection 30 (8) of O. Reg. 419/05.

    (ii) Ducts that supply air to a non-foundry facility tenant that is a place used for acommunity use.

    (3) Clause (2) (a) does not apply with respect to a make-up air filter that is designed to becleaned if, at least one time in the preceding six-month period, the registered person ensures that the filter is cleaned.

    (4) Subsection (2) does not apply to a make-up air unit or ducts if the registered persondoes not have access to the make-up air unit or ducts and the registered person,

    (a) requests, in writing, access to the make-up air unit or ducts;(b) receives either,

    (i) no response to the request mentioned in clause (a), or

    (ii) a denial to the request mentioned in clause (a);

    (c) makes a written record of the date of the request, the date of the response, if any, and anindication of the response to the request, if any; and

    (d) provides the person responsible for the make-up air unit with a replacement filter for themake-up air unit.

    (5) The registered person mentioned in subsection (2) shall ensure that the followinginformation is recorded:

    1. For each filter required to be replaced or cleaned under this section, theidentification of the make-up air unit for which the filter was replaced or cleaned.

    2. The date that each filter mentioned in paragraph 1 was replaced or cleaned, asapplicable.

    Ventilation assessment – optimizing capture of lead 6. (1) The ventilation coordinator shall ensure that a report entitled “Ventilation

    Assessment Report” is prepared in accordance with this section and submitted to the Director of the Standards Development Branch of the Ministry.

    (2) The report required by subsection (1) shall contain the following information withrespect to each ventilation system at the foundry facility:

    1. The measured duct velocity of the ventilation system.2. The measured static pressure of the ventilation system, including, where feasible,

    the static pressure of each branch of each local exhaust ventilation system that maycapture or convey lead and lead compounds.

    3. The volumetric flow rate of the ventilation system. The report shall also include themethods used to determine the volumetric flow rate, including any calculations.

    (3) Based on the information required by subsection (2), the report required by subsection(1) shall contain the following information:

    1. A comparison of total make-up air flow rates to the total combined flow rates ofgeneral exhaust and the local exhaust ventilation systems.

    2. A comparison, where feasible, of the measured static pressure within productionareas of the building to the measured ambient static pressure outside of the building.

    Ontario Ministry of the Environment and Climate Change 20

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (4) If a ventilation system may capture emissions of lead and lead compounds from afurnace operation, a molten metal pouring operation or a casting cooling process, the report required by subsection (1) shall, in addition to the information required by subsections (2) and (3), include the following information:

    1. The face velocity of each hood in the ventilation system.2. The results of a visual evaluation of fugitive fume capture by the ventilation system.3. If the ventilation system is associated with a furnace operation, the results of a visual

    evaluation of fugitive fume capture by the ventilation system during melting, chargingand tapping.

    4. The exit velocity for each exhaust stack, if any, in the ventilation system.5. A depiction that shows the orientation and the configuration of each exhaust stack in

    the ventilation system.(5) Based on the information required by subsections (2) to (4), the report required by

    subsection (1) shall contain an indication of, (a) whether the ventilation systems at the foundry facility as a whole adequately captures

    fumes of lead and lead compounds; and(b) whether any part of a ventilation system is inadequate to capture fumes of lead and lead

    compounds.(6) If a report required by subsections (1) or (9) indicates that fumes of lead and lead

    compounds are not being adequately captured, the registered person shall ensure that, (a) a written plan is prepared and implemented that sets out actions to be taken to

    ensure that fugitive fumes of lead and lead compounds are adequately captured byventilation systems and the dates by which each action shall be taken; and

    (b) a written record is made of the date that each action mentioned in clause (a) isimplemented.

    (7) The Director mentioned in subsection (1) may deem a report submitted before July 1,2016 to be the report required by subsection (1) if, in the opinion of the Director, the information contained in the report substantially meets the information requirements set out in subsections (2) to (5).

    (8) A ventilation system mentioned in this section includes general exhaust ventilation, alocal exhaust ventilation system and a make-up air unit but does not include a ventilation system contained wholly within an area that is isolated from foundry processes.

    (9) The Director mentioned in subsection (1) may give a registered person written noticerequiring the registered person to prepare an updated version of the report mentioned in subsection (1) in accordance with the notice and to submit the updated report to the Director if the Director is of the opinion that,

    (a) a ventilation system, or part thereof, is not adequately capturing fumes of lead andlead compounds; or

    (b) the report was not prepared in accordance with this section.(10) Before the Director gives a person a notice under subsection (9), the Director shall

    give the person a draft of the notice and an opportunity to make written submissions to the Director during the period that ends 30 days after the draft is given.

    Notice – ventilation assessment report – optimizing capture 6.1 (1) The Director may give a registered person written notice requiring that a Ventilation

    Assessment Report is prepared in accordance with the notice if,

    Ontario Ministry of the Environment and Climate Change 21

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (a) the Ministry is aware of two or more complaints related to a matter addressed in thisindustry standard having been made in respect of the foundry facility in the previous 12month period;

    (b) an area of the building that contains melting or pouring areas is not likely operating atnegative pressure; or

    (c) a static pressure measurement in respect of a local exhaust ventilation system is outsidethe range set out in Column 7 in the Operating Parameter Summary Table required bysection 11.

    (2) A notice given under subsection (1) shall specify each area at the foundry facility that issubject to the notice.

    (3) The report required by subsection (1) shall contain the following information withrespect to each registered contaminant, ventilation system and area at the foundry facility that is specified in the notice:

    1. The measured duct velocity of the ventilation system.2. The measured static pressure of the ventilation system, including, where feasible,

    the static pressure of each branch of each local exhaust ventilation system that maycapture and convey a registered contaminant.

    3. The volumetric flow rate of the ventilation system. The report shall also include themethods used to determine the volumetric flow rate, including any calculations.

    (4) Based on the information required by subsection (3), the report required by subsection(1) shall contain the following information:

    1. A comparison of total make-up air flow rates to the total combined flow rates ofgeneral exhaust ventilation and the local exhaust ventilation systems.

    2. A comparison, where feasible, of the measured static pressure within areas of thefoundry facility specified in the notice that contain foundry processes to themeasured ambient static pressure outside of the building.

    (5) If a ventilation system in an area of the foundry facility specified in the notice maycapture discharges of a registered contaminant in a non-negligible amount from a process set out in subsection (6), the report required by subsection (1) shall, in addition to the information required by subsections (3) and (4), include the following information:

    1. The face velocity of each hood in the ventilation system.2. The results of a visual evaluation of fugitive emissions from those processes.3. If the ventilation system is associated with a furnace operation, the results of a visual

    evaluation of fugitive fume capture by the ventilation system during melting, chargingand tapping.

    4. The exit velocity for each exhaust stack in the ventilation system, if any.5. A depiction that shows the orientation and the configuration of each exhaust stack in

    the ventilation system.(6) A process mentioned in subsection (5) includes the following processes:

    1. A metal melting process.2. A furnace tapping process.3. A molten metal pouring process.4. A casting cooling process.

    (7) Based on the information mentioned in subsections (3) to (5), the report required bysubsection (1) shall contain an indication of,

    (a) whether the ventilation systems in each area specified in the notice adequatelycapture fugitive emissions of one or more registered contaminants; and

    (b) whether any part of a ventilation system in an area specified in the notice isinadequate to capture fugitive emissions of one or more registered contaminants.

    Ontario Ministry of the Environment and Climate Change 22

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (8) If, in accordance with subsection (7), the report indicates that fugitive emissions of theregistered contaminants are not being adequately captured, the registered person shall ensure that,

    (a) a written plan is prepared and implemented that sets out actions to be taken toensure that fugitive emissions of registered contaminants are adequately capturedby ventilation systems and the dates by which each action shall be taken; and

    (b) a written record is made of the date that each action mentioned in clause (a) isimplemented.

    (9) A ventilation system mentioned in this section includes general exhaust ventilation,local exhaust ventilation system and a make-up air unit but does not include a ventilation system contained wholly within an area that is isolated from the foundry processes.

    (10) The registered person mentioned in subsection (1) shall ensure that the reportrequired by subsection (1) is submitted to the Director and to the Manager of the Standards Development Branch of the Ministry no later than the date specified in the notice.

    (11) Before the Director gives a person a notice under subsection (1), the Director shallgive the person a draft of the notice and an opportunity to make written submissions to the Director during the period that ends 30 days after the draft is given.

    Ventilation and pollution control – optimizing capture of lead 7. (1) If, for the purposes of subsection 5.1 (2), a table mentioned in paragraph 1 of

    subsection 5.1 (2) is prepared in respect of a non-ferrous metal foundry facility that uses lead, the registered person shall maintain each of the following areas at a negative pressure:

    1. An area that contains a melt furnace that may be used to melt an alloy containinggreater than 0.2 per cent by weight of lead and lead compounds.

    2. An area that contains a pouring operation that may be used to pour an alloycontaining greater than 0.2per cent by weight of lead and lead compounds.

    (2) If, for the purposes of subsection 5.1 (2), measurements mentioned in paragraph 2 ofsubsection 5.1 (2) are taken in respect of a non-ferrous metal foundry facility that uses lead, the registered person shall ensure that no more than one 30-minute block average of building differential pressure in the following areas is positive in a calendar day:

    1. An area that contains a melt furnace that may be used to melt an alloy containinggreater than 0.2 per cent by weight of lead and lead compounds.

    2. An area that contains a pouring operation that may be used to pour an alloycontaining greater than 0.2 per cent by weight of lead and lead compounds.

    (3) If a measurement taken for the purpose of paragraph 2 of subsection 5.1 (2) in an areamentioned in subsection (2) is positive, the registered person shall ensure that one or more operational adjustments are made as soon as practicable to return the area to negative pressure.

    (4) A registered person shall ensure that, as soon as practicable, a provincial officer isnotified in writing if an update of a table mentioned in paragraph 1 of subsection 5.1 (2) demonstrates that, for an area mentioned in subsection (1), the value in Column 2 of the table is greater than the value in Column 4.

    (5) No later than 30 days after notification is required to be given under subsection (4), theregistered person shall ensure that the following information is submitted, in writing, to the District Manager:

    1. The date that the table was updated.2. A copy of the updated table.3. An identification of each melt furnace and pouring operation that relates to an area

    mentioned in subsection (1).

    Ontario Ministry of the Environment and Climate Change 23

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (6) A registered person shall ensure that, as soon as practicable, a provincial officer isnotified in writing of a contravention of subsection (2).

    (7) If a person contravenes subsection (2) more than once in a calendar day, the personmay, instead of complying with subsection (6), notify a provincial officer in writing as soon as practicable after the end of the calendar day of the number of contraventions that occurred during the day.

    (8) No later than 30 days after notification is required to be given under subsection (6) or(7), the registered person shall ensure that the following information is submitted, in writing, to the District Manager:

    1. The date of the contravention.2. The number of contraventions that occurred on the date mentioned in paragraph 1

    and the time each contravention occurred.3. For each contravention mentioned in paragraph 2, the measured values of the

    building differential pressure.4. An identification of each monitor that indicated the positive building differential

    pressure.5. An identification of each piece of equipment located near each monitor mentioned in

    paragraph 4.(9) A registered person shall not operate or cause or permit the operation of a source of

    contaminant set out in subsection (10) unless the discharges from the source of contaminant are captured by a local exhaust ventilation system that is,

    (a) designed, installed and operated in accordance with good engineering practices; and(b) connected to,

    (i) a baghouse that has,(A) a bag leak detection system that operates continuously when the

    baghouse is operating,(B) audio and visual alarm equipment, and(C) mechanized cleaning of bags or cartridges, or

    (ii) a wet scrubber that has a flow monitor and audio and visual alarmequipment.

    (10) A source of contaminant mentioned in subsection (9) includes each source ofcontaminant that is part of one or more of the following processes:

    1. A metal melting process that uses lead and lead compounds.2. A furnace tapping process that uses lead and lead compounds.3. A molten metal pouring process that uses lead and lead compounds.4. A casting cooling process that uses lead and lead compounds.

    (11) The registered person mentioned in subsection (9) shall ensure that each alarmrequired by that subsection is located where employees can clearly hear and see the alarm.

    Ventilation and pollution control – optimizing capture of SPM – new or modified facilities 8. (1) On and after July 1, 2016, a registered person shall ensure that the ventilation

    coordinator complies with the requirements set out in this section. (2) Subject to subsection (3), no later than three months after a piece of ventilation

    equipment is installed at a new foundry facility or at a foundry facility that has undergone a major modification after the later of July 1, 2016 and the date the foundry facility was first registered to this industry standard, the following actions shall be taken:

    1. Perform ventilation balancing on each local exhaust ventilation system associatedwith the piece of ventilation equipment.

    Ontario Ministry of the Environment and Climate Change 24

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s3s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    2. Determine whether the ventilation balancing required by paragraph 1 demonstratesthat the local exhaust ventilation system is adequate to capture and convey eachregistered contaminant associated with the ventilation system.

    3. Perform a visual evaluation to determine whether the local exhaust ventilationsystem is adequately capturing and conveying SPM.

    4. Update the record required by subsection 5.1 (3) to include the following information:i. The results of the ventilation balancing required by paragraph 1 including

    the determination required by paragraph 2.ii. The results of the visual evaluation required by paragraph 3.iii. A summary of the commissioning activities performed with respect to each

    local exhaust ventilation system associated with the piece of ventilationequipment.

    (3) Subsection (2) only applies if the installed piece of ventilation equipment is part of alocal exhaust ventilation system that is capturing SPM emissions from a source of contaminant that is part of one or more of the following processes:

    1. A metal melting process.2. A furnace tapping process.3. A molten metal pouring process.4. A casting cooling process.5. A breakout or shakeout process.6. A process that involves trimming, grinding, cutting, finishing, or media blasting of

    castings.7. A sand reclamation process.

    Ventilation and pollution control – optimizing capture of lead – new or modified facilities 9. (1) A registered person shall not operate or cause or permit the operation of a source of

    contaminant set out in subsection (2) at a foundry facility unless the discharges from the source of contaminant are captured by a local exhaust ventilation system that is connected to at least one baghouse.

    (2) A source of contaminant mentioned in subsection (1) includes each source ofcontaminant at a new foundry facility, or source of contaminant that was added in a major modification after February 1, 2010, that is part of one or more of the following processes, if the process uses an alloy containing greater than 0.2 per cent by weight of lead and lead compounds:

    1. A metal melting process.2. A furnace tapping process.3. A molten metal pouring process.4. A casting cooling process.5. A process that involves trimming, grinding, cutting, finishing, or media blasting of castings.

    (3) A baghouse required by subsection (1) shall have,(a)automatic cleaning of bags and cartridges;(b)a bag leak detection system that operates continuously when the baghouse isoperating; and(c)audio and visual leak detection alarms that will alert employees to leaks.

    (4) The registered person mentioned in subsection (1) shall ensure that each alarmrequired by subsection (3) is located where employees can clearly hear and see the alarm.

    Ontario Ministry of the Environment and Climate Change 25

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s33s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    Vertical and unimpeded discharges 9.1 (1) On and after January 1, 2018, subject to subsection (2), a registered person shall

    not install or cause or permit the installation of a stack at a foundry facility unless the stack is vertical and the discharges from the stack are unimpeded.

    (2) Subsection (1) only applies to a stack that may discharge a registered contaminant.

    Coke-fired cupola furnaces 10. (1) If a foundry facility has a coke-fired cupola furnace, a registered person shall not

    operate or cause or permit the operation of the furnace unless, (a)the furnace is designed with a sufficient number of cupola afterburners to ensure thatthe combined firing rate of the cupola afterburners is at least 300,000 BTU per ton ofmetal melted per hour; and(b)the coke-fired cupola furnace has a local exhaust ventilation system that is connectedto a baghouse.

    (2) A registered person shall not operate or cause or permit the operation of a furnacementioned in subsection (1) unless each cupola afterburner required by clause (1) (a) operates continuously during the operation of the coke-fired cupola furnace.

    Thermal sand reclaimers – chlorinated or fluorinated compounds 10.1 (1) On and after January 1, 2019, a registered person shall not operate or cause or

    permit the operation of a thermal sand reclaimer that is associated with a registered contaminant set out in Appendix 2-5 at a foundry facility unless the thermal sand reclaimer is equipped with,

    (a) an afterburner operated at a temperature of at least 1200oC at all times when thethermal sand reclaimer is processing sand; or(b)subject to subsection (2), lime scrubber and an afterburner operated at a temperatureof at least 870oC at all times when the thermal sand reclaimer is processing sand.

    (2) Clause (1) (b) does not apply if the thermal sand reclaimer is equipped with limescrubber and the afterburner is operated at a temperature specified in an Environmental Compliance Approval.

    (3) The Director appointed under section 5 of the Act for the purposes of section 20.3 of theAct may, in an Environmental Compliance Approval, specify an operating temperature of less than 870oC for an afterburner mentioned in clause (1) (b) if the Director is of the opinion that,

    (a)no adverse effect is likely to occur if the afterburner is operated at or above thetemperature specified by the Director; or(b)each registered contaminant set out in Appendix 2 - 5 would be discharged from theafterburner in an amount that is negligible if the afterburner is operated at or above thetemperature specified by the Director.

    Thermal sand reclaimers – VOCs 10.2 (1) On and after January 1, 2019, subject to subsection (2), a registered person shall

    not operate or cause or permit the operation of a thermal sand reclaimer that is associated with a registered contaminant set out in Appendix 2-4 at a foundry facility unless the gas in the thermal sand reclaimer attains a temperature of at least 760oC for a residence time of at least 0.75 seconds.

    (2) Subsection (1) does not apply if the gas in the thermal sand reclaimer attains atemperature specified in an Environmental Compliance Approval.

    Ontario Ministry of the Environment and Climate Change 26

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s33s1http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s33s1http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s33s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 27th , 2018

    (3) The Director appointed under section 5 of the Act for the purposes of section 20.3 of theAct may, in an Environmental Compliance Approval, specify an operating temperature of less than 760°C for a thermal sand reclaimer mentioned in subsection (1) if the Director is of the opinion that,

    (a)no adverse effect is likely to occur if the thermal sand reclaimer is operated at or abovethe temperature specified by the Director; or(b)each registered contaminant set out in Appendix 2-4 would be discharged from thethermal sand reclaimer in an amount that is negligible if the thermal sand reclaimer isoperated at or above the temperature specified by the Director.

    Thermal sand reclaimers – SPM 10.3 On and after January 1, 2019, a registered person shall not operate or cause or

    permit the operation of a thermal sand reclaimer that is associated with a registered contaminant set out in Appendix 2-3 at a foundry facility unless the discharges from the thermal sand reclaimer are captured and conveyed to a baghouse.

    Thermal oxidizers – temperature and residence time 10.4 On and after January 1, 2019, a registered person shall not operate or cause or

    permit the operation of a thermal oxidizer at a foundry facility unless the gas in the thermal oxidizer attains a temperature of at least 760oC for a residence time of at least 0.75 seconds.

    Catalytic oxidizers – temperature and residence time 10.5 On and after January 1, 2019, a registered person shall not operate or cause or

    permit the operation of a catalytic oxidizer at a foundry facility unless the gas in the catalytic oxidizer attains a temperature of at least 400oC for a residence time of at least 0.75 seconds.

    Liquid spray coating process 10.6 (1) On and after January 1, 2019, subject to subsection (2), a registered person shall

    ensure that the following requirements are complied with: 1. The liquid spray coatings that are used at a foundry facility shall be applied only,

    i.within a spray booth, andii.by use of one of the following pieces of equipment:

    A. HVLP spray equipment that is identified by the manufacturer of the equipment ashaving a minimum transfer efficiency of 65 per cent.

    B. Electrostatic spraying equipment.C. Any other coating application equipment that is accompanied by documentation

    from the manufacturer of the equipment that states the equipment has aminimum transfer efficiency of 65 per cent.

    2. A foundry facility's spray booth exhaust stacks shall be vertical with no flowimpediments and shall discharge at a velocity of not less than 12 metres per second.

    3. A foundry facility's spray booths shall be equipped with filters that are specified bythe manufacturer of the filters to remove at least 95 per cent of particles from thespray booth exhaust stack's emissions.

    (2) Subsection (1) does not apply if either of the following criteria is met:

    Ontario Ministry of the Environment and Climate Change 27

    http://www.e-laws.gov.on.ca/html/regs/french/elaws_regs_090063_f.htm%23s33s1

  • Technical Standards to Manage Air Pollution Version 5.1 – February 20th , 2018

    1. The liquid spray coating is being applied with an applicator that is not refillable.2. The liquid spray coating is being applied with an applicator that is not capable of

    applying the coating at a rate of greater than one litre per hour.

    Electric arc furnace or argon oxygen decarburizer 10.7 A registered person shall not operate or cause or permit the operation of the following

    equipment unless the discharges from the equipment are captured by a local exhaust ventilation system that is connected to at least one baghouse:

    1. An electric arc furnace installed at a foundry facility on or after July 1, 2019.2. An argon oxygen decarburizer installed at a foundry facility on or after July 1, 2019.

    Pollution control - torch cutting metal to charge a furnace 10.8 On and after July 1, 2017, a registered person shall not prepare or cause or permit the

    preparation of material for charging a furnace in a process that involves using a torch to cut metal unless the discharges from the process are captured and conveyed to a baghouse.

    Pollution control – aluminum reverberatory furnace - scrap metal 10.9 A registered person shall not operate or cause or permit the operation of an aluminum

    reverberatory furnace that uses as raw material scrap metal that is not generated at the foundry facility and that was installed at the foundry facility on or after July 1, 2018, unless the discharges from the aluminum reverberatory furnace are, where technically and economically feasible, captured and conveyed to at least one baghous