GROUP MEMBERS
KIKOLINE ANAK TIWAS
( CD130051)
ANGELA ANAK ABONG
(AI130145)NUR LATIFAH BT
ABD HADI
INTAN FARIZA BINTI A.GHANI
(AI130020)
MOHAMAD NORHISYAM BIN
ISA( CE120031)
INTRODUCTION
To request on the progress of our research project entitled :
‘Opinion of UTHM students about early marriage’.
WORK COMPLETED
•Topic approval, information gathering1st stage•Draft of the research proposal•Proposal presented2nd stage•Questionnaire•Finding and discussion3rd stage
WORK IN PROGRESS
Finding And Discussion Analyzing Data
WORK TO BE COMPLETED
Wor
k in
pr
ogre
ss Drafting research
reportAssemble the
contentSubmit the
report
PROBLEMS ARISEN
Time problem-Group mates have different class scheduling.
Respondents corporations- lack of cooperation However, the issues impacts the research in
minority, does not affect the overall study.
CONCLUSION
This memo updating the status of our research. The progress of our research continues smoothly. We were able to get feed back from sixty respondents, even
though lack of cooperation. The data is analysed in six types of graphs. The full report of the study will be submitted.
THANK YOU
THANK YOU