1 Technologies Framework Required to Support Pipeline Integrity ESRI UC 2013, Paper 824 Chris Vana, Gas IT Director, Pacific Gas & Electric Tom Helmer, Solutions Architect, Black & Veatch
Transcript
Page 1: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

1

Technologies Framework Required to Support Pipeline Integrity ESRI UC 2013, Paper 824 Chris Vana, Gas IT Director, Pacific Gas & Electric Tom Helmer, Solutions Architect, Black & Veatch

Page 2: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

2

BLACK & VEATCH PIPELINE INTEGRITY REFERENCE FRAMEWORK

Concepts and Technologies

Page 3: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

3

GIS Based Gas Utility Applications

Linear Ref Editing ROW Current

Work Status Inspection/

Maintenance

Leak Tracking/ Mitigation

SOP Compliance Reporting

ILI Alignment Clearances Property Tax

GIS Core Functions

Land and Gas Facility Data Model

• Network model creation & maintenance

• Spatial model creation & maintenance

• Shared data with external agencies

• Facility management • Map distribution • Creation & maintenance • Thematic analysis • Network analysis • Inquiry/reports • Spatial layering • Web and field view • Schematic view

Planning Mobile Data

System (mGIS/MDT/mCMS))

Scheduling& Dispatching

System

Supply Chain WMS Content Mgmt

SCADA

Native GIS Proposed Applications

Proposed Interfaces

Pipeline Integrity

Design USA One Call AIDT Station

Integrity

Cathodic Protection

Major PG&E Enhancements

Alignment Sheet

Generator

HCA Identification

HCA Data

Maintenance

CIS

Case Study Mgmt

One Call Clearance

Load Forecasting

Depth of Cover

Geocode Webservice

GPSrecieve Webservice

Black & Veatch Reference Architecture

HR

Crew Availability

MAOP Calculator

Material Traceability

ILI

Page 4: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

4

Black & Veatch FIS Reference Framework

FeatureHistory

GIS

EAM

LR Events & Feature Updates

Serialized FeatureValidations

Mobile Workforce

Management

Mobile Client (mGIS, MDT)

Document Management

As-BuiltUpdates

FacilitiesMaps

Scheduled CM Orders,PM Order for Dispatching,

BOMs

CM/PM/IM Results

Work Order TasksPM Notification TasksCM Notification TasksIM Notification TasksLocate NotificationsSurvey Notifications

BOMs

OrderCompletion

Data

CAD Design Tool

Features& LBStation Drawings

Transmission Pipeline Designs

Job Designs,Related

Documents& Images,

SOPs

AssetAnalytics/

OPS Awarenes

(Spatial BI)

Historical Feature Events,Integrity Results,

Risk Results

Asset History, Active Clearances

Work Notification History

DesignStandards

As-Built&Related

Drawings

Integrity &Risk

Analysis

NetworkAnalysis

NetworkModel Deltas

Planning Analysis Results

Historical Readings

Pipeline buffers, Events, Feature History,

Stationing locations,Environmental Overlays

PM History

ModelingResults

Supervisors, Regional/Area Engineers,

Corrosion Supervisors,Maintenance Engineers

Mappers

As-builtsMTRs, BOMs,

EventsRelated drawings

& documents

I&MConstructionCrew

Repair Completion Detail,%CompletePM Results,

Follow-up Notifications,Redlines

CP, Station, Leak, Valve Inspection Results,

Follow-up Notifications,Associated pictures,

Field test results

One Call(USA)Locate Request

LocateCompletion

Status

Locate Request

Locate Clear/Confirm

FeatureLocation/Types

ManagersSupervisors, Regional/

Area Engineers

Asset Performance Analysis

MaterialsTraceability

MaterialsTraceability

PM/CM StatusPM/CM Results

Survey Crews

Asset Location

Asset Investment

Decision ToolPlant

Accounting

Leak Indications,Survey Completions,Locate Confirmations

Notifications

LoadFore-

castingLoad Forecasts

SCADA Historian

Historic ReadingsCurrent State

Notifications

ProposedPipeline Feature

List (PFLs)

Supply Chain

Unitized Assets

AnalysisResults

operations

Current State,Crew Locations,

Order Status,Clearances,

Hydraulic Modeling Results

AIDT results

timesheets

Manufacturers

MaterialsSpecifications,

Test results

Valve Status,Alarms,Analogs

In-line Inspections

ILI data

Crews,Engineers

AlignmentSheets

IM Analysis Results

Pictures, IM test results

Document Management

As-Built&Related

Drawings

Job Designs,Related Documents,

SOPs

EAM

AssetAnalytics/

OPS Awarenes(Spatial BI)

Crew Location

Supply Chain

Material Reservations

Material Requisitions

Material Availability

Material Forecasts

Stock Number

Pipeline, Station Designs

Page 5: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

5

Benefits of Reference Architecture

• GIS Centerline editing paradigm to support linear asset management and pipeline integrity event management

• EAM with linear asset management (LAM) functionality • Linear Asset Repository managed by GIS, EAM, and

Content Management • Single software framework to build applications to support

asset management and survey planning, monitoring and compliance reporting for leak surveys, CP surveys, valve inspections, regulator inspections

• Fully integrated field workforce environment bringing mGIS, work order and document management functionality

• Single software framework (spatially enabled BI) to support asset manager and operations center

• Case Study Management environment reused for planning, integrity management and operational awareness

Page 6: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

6

Planning and Coordination of Corrective and Preventive Maintenance work

• eGIS planning application • eGIS work order status application • eGIS compliance reporting framework: program to date,

ytd, rest of year forecast by month • eGIS cathodic protection area generation application • eGIS scheduling application integrated with EAM and

MWM for ‘area’ based surveys: CP, Leaks

Page 7: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

7

Mobile GIS Applications

• Center on current work order • Pre-fill work order with

location, environmental and facility information

• Show list of related drawings • Show list of related SOP

instructions • Highlight current GPS

location • Show route from current

location to next work order • Show route for all selected

work orders • Show route for all work

orders

• Show key valves for current work order

• Show known HCA areas in proximity

• Show known leaks in proximity

• Show ROWs • Show Easements • Show access

instructions/contact information

• Show current clearances on line

• Show current abnormal states, configurations and SCADA readings

Page 8: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

8

Engineering/Planning

• Case Study Management Environment • Integrations with load forecasting system, CIS and

SCADA • Show thematic map driven from SCADA historian

readings and Hydraulic Modeling calculations • Allow user to view gas system either schematically or

geo-referenced • Allow user to turn on satellite imagery behind geo-

referenced view • Allow user to view Hydraulic forecasted degree days

results • Allows user to view overlay of current operating

conditions with planning results • Allow user to publish planning results as a degree day

Page 9: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

9

Design Drawing Coordination

• Integration with GIS for reference design layers • Design Vault to Content Management for drawing

coordination • Drawings made available to field force in integrated

fashion

Page 10: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

10

Operational Awareness • Typically requires Spatially Enabled BI technology, SCADA

integration, MWM integration, Hydraulic Model integration • Show current crew locations • Show thematic map of crews locations sized based on time to make

current location safe (location with availability view) • Show thematic map driven from SCADA readings and Hydraulic

Model calculations • Show dashboard based on SCADA readings and Hydraulic Model

calculations • Allow user to view gas system either schematically or geo-

referenced • Allow user to turn on satellite imagery behind geo-referenced view • Allow user to view Hydraulic Model forecasted degree days results • Allows user to view overlay of current operating conditions with

planning results

Page 11: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

11

Asset Manager’s Environment

• Typically requires Spatially Enabled BI technology integrated with: Leaks, repairs, survey areas, CP circuits, ILI data

• Show planned work for the year by month • Show active ‘incidents’, historic repairs, environmental

conditions • Show events and related information from manual

inspections, automated inspections, historic repairs • Planning tools to increase number of PMs to reduce CM

Page 12: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

12 GIS EAM MWM CMS IM Engr SCADA

Spatial BI

As-Built Recording

• X X X

Preventative Maintenance

• X X X X X

Corrective Maintenance

• X X X X

Engineering Planning

• X X X X

Integrity Management

• X X X X X X X

OPS Awareness

• X X X X X X

Technology Heat Map

Page 13: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

13

PG&E’S IMPLEMENTATION ROADMAP

Where Business and Technology Meet

Page 14: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

14

Transmission Gas Roadmap Need for Linear Referenced Asset Management

IM Management

Asset Maintenance

Asset Repository Data Maintenance

Next Gen Linear Reference Asset Management Framework

IT Infrastructure

Centerline Editing PFL Design

PM Planning

PFL Risk Model

GIS (C&C)

WMS (SAP

LAM/PM)

EAM (SAP

LAM/PM)

Scheduling (Click, Ventyx)

CMS (Documentum)

SCM (SAP MM)

ESB (Oracle)

Leak Survey Planning CP Survey Planning

PM Scheduling

Leak Survey CP Survey

PM Dispatching

Field As-builts

PM Reporting

CM Planning CM Scheduling CM Dispatching

Work Order Completions

IM Testing Clearance Requests Locate & Mark

Portfolio Optimization

HCA Identification

Class Identification

PFL Criticality

Wants all pipeline events

in a linear referenced

fashion

Performs and records all

actions done to pipeline

facilities in single linear reference framework

Collects all assets and

related events in

single linear reference framework

Mobile Work/GIS/CMS

Asset Mgmt scorecards

Compliance Reporting

Spatially Enabled BI Reporting

PFLHealth

Maintains single linear reference framework in all asset mgmt and

record systems

Page 15: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

Business Area Roadmap 15

Projects • Mariner Integrity

Management and Risk Analysis Software

• Data Management of HCA & Class base features

• Asset Analytics Dashboard

Projects • Mariner Gas Preventative

Maintenance Valves and Regulators

• Mariner Gas Preventative Maintenance Corrosion

• Mariner Gas Preventative Maintenance Production (4 Phases Planned)

• Mariner Documentum Gas Preventative Maintenance Data & Document Modernization (PMDDM) – To be deployed in a PM phase

• Click Scheduling Tool Upgrade

• Mariner PLM mobilize PLM process for pipeline, CP & Line Equipment

• Mobilize preventative and corrective maintenance for station assets in SAP

Data Cleanup Projects • Mariner PLM pipeline and

corrosion migrated to SAP/GIS

Projects • GIS/SAP POC Sandbox • Next Generation Linear

Reference • eGIS UI Release 1.0 • eGIS UI Release 1.x • eGIS UI Release 2.0 • Design PFLs • Transmission Field As-

Built Automation • GT Station collaboration

(GT Station Critical Data Validation and Migration)

• Mariner Supply Chain Materials Traceability

• Utilize GIS functionality for all mobile applications

Data Cleanup Projects • Migrate PLM pipeline

actions • PODS data development • Centerline • PAS 55 Enabling Critical &

Health Coding of Assets in SAP & PLM

• Station MAOP Validation • Mariner Documentum Gas

Corrective Initiative • Station Assets in SAP • Updated GIS with Station

Assets

Projects • EZ Tech Release 1 • EZ Tech Release 2 • Pilot Leak Survey

Maintenance Plans in SAP & Documentum

• Leak Survey Redesign • Mariner Leak Survey

Schedule Migration • Replicate Spear Data in-

house for Analytics • Release 3 – Move Leak

Survey maintenance from Sharepoint to SAP: Completion of work tickets in SAP and scanning of documents

• Leak Survey Mobility – Moved to Ventyx

• Picarro

Projects • Mariner Gas Corrective

Maintenance – Leak Repair, Mobile Ready Development (GCM Phase 1)

• Gas Corrective Mobile • GCM Phase 2 –

integrated with Gas Corrective Mobile

Data Cleanup Projects • Mariner Gas Corrective

Maintenance – Doc and Data Cleanup

• Leak Repair Document & Data Clean-up Phase II

Projects • Pilot IRTH app and Map

Viewer • Mariner Locate & Mark

Device Replacement & IRTH Upgrade

• Decommission IRTH with SAP/Ventyx/GIS in-house One-Call replacement

Asset Strategist, Portfolio Managers

Leak Survey

Projects • Mariner project Portfolio

Management Tools (PPM)

• SAP and P6 Integrated • Risk Based Asset

Investment Portfolio Optimization Tool

Project Planning

Integrity Management

Preventative Maintenance

Corrective Maintenance

Locate and Mark

Design/Build/

Decommission

Internal/External Party, Integrity Management, local M&C, Damage

Prevention Supervisor, External IRTH staff

Mapper, Field Supervisor, Field,

Clerical, Asset Strategist

Asset Strategist, Clerical, T&R Supervisor,

Corrosion Mechanics, Gas Techs, M&C Mechanics, Gas

Mechanic, Mapper

IM, Asset Strategist, Mapper

Integrity Management, Mapper, Field

Supervisor, Field Mapper, Asset Strategist,

Supervisor, Field

Page 16: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

16

Mark & Locate

Leak Survey

Corrosion Protection

A-Forms

Daily LeakLogPlat Map

Can’t Get In (CGI) Log

GIS

SAP

PSRSIGIS/NLIS

Synergee

Integrity Management, Planning, & Engineering

Valve and Regulator

Maintenance

Valve RegulatorCards

EZTech Leak Survey Schedules

Supervisor Reviews and

Approves

Can’t Get In (CGI) Log

Plat Map

Valve RegulatorCards

Clerks manually enter data into

multiple systems

Construction

Job Files

Job Files

Valve Regulator Notifications

Current Data Management Processes

Update core enterprise systems

Unified platform of automated solutions and robust governance to provide and sustain real time, accurate, traceable,

verifiable, and complete asset information

Multiple systems with manual and automated methods

Complete MAOP Validation

Program

Current and Future Data Management

Page 17: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

17

• Largely segregated by equipment type (not hierarchical) • Does not include System, Route, or clear Pressure Isolation zone / Sub-systems for

Operations

GT Line Level Functional Location/Equipment Structure has supported current business activities but lack integrated linear capabilities that LAM provide.

Today

SAP Asset Hierarchy - Non Linear

Page 18: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

18

With LAM linear referencing, functional location / equipment structure is more fit for purpose with pipeline maintenance and promotes enterprise asset management (EAM) best practice.

SAP Asset Hierarchy with LAM

Length of Line

PoC

Page 19: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

19

Location of the equipment

Equipment records can also be linearized.

Asset Hierarchy with LAM

Page 20: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

20

Through the GEO.e tab on work orders, notifications and object master records asset detail information can be accessed using the drop down menu. Results can be reviewed for analysis in SAP list reporting.

Analyze- • Cost • Orders Types • Emergency Work • Notifications

SAP GEO.e Analyze Data

Page 21: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

21

Page 22: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support

22 GIS

Intrepid EAM

SAP LAM MWM Ventyx

CMS

Documentum IM

IRAS Engr

SynerGEE SCADA

PI

Spatial BI

SAP DW

As-Built Recording

• X X X

Preventative Maintenance

• X X X X X

Corrective Maintenance

• X X X X

Engineering Planning

• X X X X

Mark & Locate

• X X X X

Integrity Management

• X X X X X X X

OPS Awareness

• X X X X X X

Technology Heat Map

Page 23: Technologies Framework Required to Support Pipeline Integrityproceedings.esri.com/library/userconf/proc13/papers/824... · 2013-07-12 · 1 Technologies Framework Required to Support