SS 192 Km 79 – P.O. Box 163 - 95045 Misterbianco (CT) – Italy Tel. +39 095 7130011 – Fax. +39 095 7130115 e-mail: [email protected] – www.cementsilos.eu - Client: MECCANICA INDUSTRIALE SRL - Year: 2014 - Installation Site: Italy - Project: n.1 x 320 m3 silos for cement storage
Manufacturing in process
- Client: TBS Transportbeton Serv. GmbH - Year: 2014 - Installation Site: Germany - Project: n.2 x 455 m3 silos for cement storage
- Client: Intercem Engineering GmbH - Year: 2014 - Installation Site: Uganda - Project: n.4 x 810 m3 silos for cement storage
Installation in process
- Client: LCC Norcem Kola – Heidelberg Group - Year: 2014 - Installation Site: Russia - Project: n.3 x 1.795 m3 silos for cement terminal
Installation in process
- Client: HC Trading Italia - Year: 2014 - Installation Site: Italy - Project: 3.090 m3 silos for cement storage
Installation in process
- Client: CATABETON - Year: 2013 - Installation Site: Italy - Project: n.2 x 3.090 m3 silos for cement storage
- Client: OAO Kirovsky SSC - Year: 2013 - Installation Site: Russia - Project: 1480 m3 silos for cement storage
LIST OF MAIN CLIENTS
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Client: UC Ltd - Year: 2013 - Installation site: Malta - Project: 5.100 m3 silos for cement storage plant
- Client: Sbk - Year: 2013 - Installation site: Belarus - Project: n.6 x 410 m3 silos for cement storage
- Client: TBS Transportbeton Serv. GmbH - Year: 2012 - Installation site: Germany - Project: n.2 x 320 tons silos for cement Storage
- Client: RAZEL - CMC - Year: 2012 - Installation site: Algeria - Project: n.4 x 1500 tons silos for cement storage
- Client: PROM DETAL - Year: 2012 - Installation site: Siberia - Project: n.4 x 550 tons silos for cement storage
- Client: OOO TECHORPROJECT - Year: 2012 - Installation site: Russia - Project: n.1 x 900 tons silos for cement storage
Delivered and installed
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Client: Consorzio CONSTRUTOR BELO MONTE - Year: 2012 - Installation site: Brasil - Project: n.20 x 1200 tons silos for cement storage
- Client: Techorgprojekt - Year: 2011 - Installation site: Russia - Project: 600 tons silos for cement storage
Delivered and installed
- Client: Gorka Cement – Gruppo Mapei - Year: 2011 - Installation site: Poland - Project: Engineering, production and installation of 6.800 tons storage plant, cement cooling and handling system, bucket elevators, unloading points, integral insulated cover, automation. Turnkey project. - Client: Seredil - Year: 2011 - Installation site: Italy - Project: 4.110 m3 cement storage
- Client: Heidelberg Cement Klaipeda - Year: 2011 - Installation site: Lithuania - Project: 2.000 tons cement storage plant
- Year: 2011 - Installation site: Switzerland - Project: 2.420 tons cement storage plant – centralized silo loading system – 3 x 100 ton/h unloading points
- Year: 2011 - Client: OOO Wjatska Porto di Fiume
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Installation site: Russia - Project: 980 tons silos for cement storage
Delivered and installed
- Client: Seredil - Year: 2010 - Installation site: Italy - Project: Mobile system for the cement transfer from vessel to tankers
- Client: SBS Steel Belt System Srl - Year: 2010 - Installation site: Serbia - Project: Sulfur storage and handling system – comply with ATEX regulation
- Client: Maya Enterprise Inc - Year: 2009 - Installation site: Costa Rica - Project: 2.700 tons cement storage plant + plant for cement unload on tankers
- Client: Enel - Year: 2009 - Installation site: Port of Civitavecchia (Roma) – Italy - Project: Shiploader – capacity 400 ton/h of wet ash and gypsum
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Client: Kovako Materials Handling B.V. - Year: 2009 - Installation site: Nigeria - Project: 4 x 3.090 m3 cement storage
- Client: Holcim Marocco – Gruppo Holcim - Year: 2008 - Installation site: Morocco - Project: 8.000 tons cement storage plant
- Client: Salini Costruttori - Year: 2007 - Installation site: Uganda - Project: 3.600 tons silo battery
- Client: A.C. S.p.A - Year: 2007 - Installation site: Port of Gaeta (LT) – Italy - Project: Mobile system for the cement transfer from vessel to tankers
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Client: Rolcim SpA – Holcim Group - Year: 2006 - Installation site: Porto di Marghera (VE) - Italy - Project: 15.000 tons cement storage plant
- Client: Enel - Year: 2006 - Installation site: Brindisi – Italy - Project: Shiploader – capacity 400 ton/h of wet ash and gypsum
- Client: C.M.C. Ravenna - Year: 2005 - Installation site: Algeria - Project: 2.600 tons cement storage plant
- Client: Enel - Year: 2005 - Installation site: Port of Sulcis (Cagliari) - Italy - Project: System of belts for coal unloading from vessels
TECHNOLOGY FOR CONCRETE AND CEMENT INDUSTRY EQUIPMENT FOR BULK MATERIAL STORAGE AND HANDLING
TURNKEY PROJECTS
- Client: Italcementi Group S.p.A - Year: 2005 - Installation site: Cuneo - Italy - Project: Coal storage plant – comply with ATEX regulation
- Client: Silos Granari - Italcementi Group S.p.A - Year: 2004 - Installation site: Port of Ancona - Italy - Project: 10.000 tons cement storage plant