Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker Hughes, Azerbaijan
Transcript
Page 1: TeleCoil Intelligent Coiled Tubing Services

Live well deployment of long perforating gun

system using combined CT technologies

SPE ICoTA European Well Intervention Conference

Aberdeen - 12 November, 2014

Simon Smith, Technical Support Manager

Baker Hughes, Azerbaijan

Page 2: TeleCoil Intelligent Coiled Tubing Services

High Level Case Study

▪ Major operator – Caspian sea

▪ Live well deploying guns not new

– Identify key successes & best practices

project planning…

to job execution

Page 3: TeleCoil Intelligent Coiled Tubing Services

Challenge

▪ Quick oil - perforate new reservoir

– 1,007 ft of 3 3/8” guns

– perf 5 ½” tbg and 7 5/8” tbg

– highly deviated well

▪ Perforated w e-line tractor historically

– 16 runs required

– sand problem for tractor?

▪ Single run solution

– reduce HSE exposure

▪ one well entry / exit

▪ elec + hyd firing system

– reduce rig time

Page 4: TeleCoil Intelligent Coiled Tubing Services

What’s New? - Proprietary Connectors, Firing Head & Intelligent CT

▪ Simple, Robust Connectors

– extensive debris testing

– set down motion only to engage

– compatible with universally available quad BOP

▪ New generation intelligent CT used

– better disconnect contingency

– improved safety

▪ hydraulic redundant firing option

– first time combination of firing head with intelligent CT

Page 5: TeleCoil Intelligent Coiled Tubing Services

Job Planning

▪ “Quick incremental oil” – aggressive time frame

– planning team in place

▪ Manufacturing of connectors & BOP rams reqd

▪ Extensive tubing force analysis

– long BHA through multiple dog-legs

– firing loads on CT

▪ Extensive rig-up geometry checks

▪ Educate/train local team

– custom training course

– work through job check sheets -20000

-15000

-10000

-5000

0

5000

10000

15000

0 500 1000 1500 2000 2500 3000 3500 4000 4500

Expected Weight Gauge and Operating Limits During RIH - 2.0" CT 37832Base Oil in Well & CT, Air in 300 m of 3.375" Guns, 0.24 FC, 1500 lbsF Stripper Drag

We

ight

Gaug

e R

ea

din

g [lb

f]

BHA Depth [m]

Weight Gauge Friction Lock Limit Actual Weight Gauge Failure Limit

Project Title: 2" CT Gun Deployment

Field-Well: Chirag A-09 Z

Company-Client: BP Azerbaijan

File: \\bjsazb02\Engineering\Coiled Tubing\Deployment System - Snapshot\CIRCA\A-09z CT Perf.c32

Analysis: Monday, November 26, 2012 4:55:21 PM

Scenario: Simon Perf Guns TFA RIH on 2.0" CT 37832

Page 6: TeleCoil Intelligent Coiled Tubing Services

Job Planning

▪ PCE Selection

– two x PCE stacks considered

▪ Contingency retrieve BHA’s

– if not possible to latch connector

▪ Choice of gun charges

– extensive CT end force modelling

– high force / low debris

▪ Well condition when fire

– allow immediate flowback

– mitigate sand influx

▪ static ov.balance

▪ dynamic un.balance

Page 7: TeleCoil Intelligent Coiled Tubing Services

Lower Deployment Stack

Skid Deck

Wellbay

Koomey Unit 1

Koomey Unit 2

Koomey Unit 3

7 1/16” Shear Seal BOP

4 1/16” Deployment BOP

4 1/16” Hyd Gate Valve

4 1/16” Flow Cross

4 1/16” Gate Valve

4 1/16” Annular BOP

Shear Seal Ram Disconnect Ram

Locate Ram Slip Ram

Page 8: TeleCoil Intelligent Coiled Tubing Services

Pre-Job Yard Testing

▪ Function test connectors (pair them)

▪ Pull test connectors

▪ Pressure test connectors

▪ Slip rams – hold weight of guns

▪ Elec comms check to firing head

▪ Fish tools catch connectors

▪ Elevators fit connectors

▪ Koomey units function test

Page 9: TeleCoil Intelligent Coiled Tubing Services

Koomey Unit Yard Test

▪ Variable closing force to locate ram

▪ Variable closing force to disconnect ram

▪ Max closing force to slip ram

▪ Regulated closing force to annular BOP

Page 10: TeleCoil Intelligent Coiled Tubing Services

Well Control

▪ Check at different stages of operation

▪ Barriers - dead well deploy guns

– Bridge plug / liner hanger packer

– KW brine

– SS BOP cannot be closed

▪ Barriers - live well retrieve guns

– Stripper / BHA check’s

– Gate valves (during break out tools)

– CT BOP

– SS BOP cannot be closed when guns at surface

Page 11: TeleCoil Intelligent Coiled Tubing Services

Drills Carried Out Pre-RIH

▪ Cannot close SS BOP on guns

– how to secure well during gun deployment?

▪ Emergency procedures before RIH:

1. rig to place guns at deploy BOP in emergency

2. drop guns in well

Page 12: TeleCoil Intelligent Coiled Tubing Services

Job Execution

▪ All guns fired electrically first attempt

▪ No over-pull post firing

▪ All gun connectors performed as expected

▪ BHA gauges confirmed model pressures

▪ Zero HSE incidents

▪ Very close to zero NPT

▪ Just over two days to retrieve all guns

▪ Four days rig time saved vs e-line tractor

Page 13: TeleCoil Intelligent Coiled Tubing Services

Conclusions

▪ Combination of technologies simple to use and reliable

▪ First time combination of firing head + intelligent CT

▪ Early identification of planning team - essential to delivery

▪ Deployment check sheets - essential to execution

Lessons Learned ▪ Further time savings possible

– remove more drill pipe from derrick

▪ Add additional swivel below centralizer in retrieve BHA

▪ Annular BOP optional

▪ Make up connector on every gun

▪ Add flow cross between deploy BOP and lower GV

Page 14: TeleCoil Intelligent Coiled Tubing Services

Thank you – Questions?