+ All Categories
Home > Documents > TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires...

TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires...

Date post: 11-Aug-2018
Category:
Upload: truongcong
View: 219 times
Download: 0 times
Share this document with a friend
20
TELECOMMUNICATIONS ENERGY CONSTRUCTION
Transcript
Page 1: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

TELECOMMUNICATIONSENERGY CONSTRUCTION

Page 2: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

ENERGY

TELECOMMUNICATIONS

CONSTRUCTION

"Latvijas Energoceltnieks" (LEC) was established in 1992 and is among leading construction companies in Latvia holding remarkable international experience. The company currently employs around 400 people. LEC gained its initial experience by working abroad where it has been performing orders in the energy, construction and telecommunications markets of Germany, as well as Georgia, Croatia, Malta, Kenya, Kazakhstan, Russia and other countries since 1992. Since its foundation, LEC has implemented numerous large-scale infrastructure projects in Latvia. Today LEC is among leading construction companies in Baltics with well-established market positions in construction, energy and telecommunications construction areas.

In 2014 LEC restarted operations in Germany and Scandinavia. The company has a subsidiary company in Germany - LEC Construction International GmbH, which was established in 2014 for business development on the German market.

LEC provides full project lifecycle services (turn-key projects), where engineering, carried out by own specialists, plays an important role. Since 2003 the company has been providing engineering services delivering a full range of services starting from an idea to its implementation. The broad range of services and professionalism allow performing the work requested by customers at the top quality level and within the agreed deadlines.

OUR ADVANTAGES

We build for development!

We will continuously master the global experience, we will base our operations on international standards and modern, state-of-the-art technologies.

OUR MISSION AND VISION

The company is run by the Management Board consisting of the Chairman of the Board and three Board Members, each being in charge of a particular business area.

Chairman of the Board

Board Member ENERGY

Board Member TELECOMMUNICATIONS

Board Member CONSTRUCTION

COMPANY MANAGEMENT

32

MAIN BUSINESS AREAS

Page 3: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

ENER

GY

54

MAIN BUSINESS AREAS:

Construction of high-voltage and medium-voltage substations

Construction of high-voltage and medium-voltage overhead power lines

Construction of high-voltage and medium-voltage cable lines

Renovation, maintenance and assembly of hydropower plant (HPP) units and equipment

Construction of heat power plants and district heating (DH) networks

Engineering of cable lines, overhead power lines and substations

CONSTRUCTION AND ASSEMBLY:0.4 kV – 400 kV cables and terminations

Overhead line insulators, power line fittings, conductors and OPGW wires

Secondary cables

Substation insulators, busbars and earthing circuits

Poured and precast foundations, supports for equipment

Power transformers and their devices

High-voltage equipment and medium-voltage switchgears for substations

Steel, wooden and concrete supports

Relay protection, automation and auxiliary supply panels

ENERGY

Page 4: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

76

ENER

GY

ENERGY SECTOR – OUR PERFORMANCE

330 kV substation Ventspils330 kV switchgear with 5 double busbar feeders, a 330/110 kV autotransformer and shunt reactors.

330/110 kV substation in JelgavaConstruction of 330 kV switchgear with seven double busbar feeders – two 330/110 kV autotransformers with shunt reactors, four 330 kV line bays and a bus coupler.

SUBSTATIONSLEC has accomplished numerous projects essential for the energy system of Latvia and has implemented most of the recent renovation projects of 110 kV and 330 kV network substations in the position of the main contractor.

POWER TRANSMISSION LINESDuring the recent years the intensity of the reconstruction and construction of high-voltage lines of the transmission grid has increased. Every year LEC replaces a high number of supports in 110 kV and 330 kV power transmission lines and installs several hundreds of kilometers of high-voltage line conductors and OPGW wires.

MEDIUM-VOLTAGE EQUIPMENT AND CABLE LINESA high number of medium voltage switchgear equipment has been installed and several hundreds of kilometers of medium and low voltage overhead lines and cable lines have been constructed over many years. New 110 kV and 330 kV cables have been laid in Riga, at Plavinas HPP and at other infrastructure sites.

COMBINED HEAT AND POWER PLANTS (CHPP) AND DH NETWORKSActing as the main contractor, LEC has taken part in the construction of the biggest CHPPs in Latvia where power distribution equipment and pipelines were constructed and heat production and power generation equipment was installed.

HYDROPOWER PLANTS (HPP�)The best experts of the industry who have gained experience by performing the repairs of the biggest HPPs hydro power units and generators are employed by LEC. LEC has acted as the main contractor in the reconstruction of gates and cranes.

Page 5: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

98

ENER

GY

110/10 kV substation Mežaparks and 110 kV power transmission lineConstruction of 110/10 kV substation Mežaparks and the control building, installation of 110 kV GIS equipment, 10 kV switchgear, assembly of a cable and relay protection system.

Kurzeme Ring, Phase One of 330/110 kV power transmission line Construction of 110/330 kV power transmission line Ventspils-Grobiņa. The total length 117 km. Construction of 110/330 kV double-circuit overhead line, including engineering and delivery of materials.

Kurzeme RingInstallation of the power transmission line conductors.

110/10 kV substation Mežaparks110/10 kV GIS switchgear.

110 kV power transmission line to substation MežaparksReconstruction.

Kurzeme RingErection of a support of the power transmission line.

Page 6: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

1110

ENER

GY

Ytterby SubstationAssembly of AC and DC power equipment and secondary cables at Ytterby AC/DC transformer substation in the Åland Islands, Finland.

110 kV power transmission line Cēsis – IeriķiReplacement of supports and conductors at certain sections.

Power Supply for the Latvian National LibraryConstruction of a transformer substation and a medium voltage cable line.

Power supply unit for a ship dockInstallation of a 6 kV set at Riga Commercial Port in the Krievu Island.

Kurzeme RingErection of a support using a helicopter.

Page 7: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

1312

ENER

GY

The gates of Pļaviņas HPP Repair work and anticorrosion treatment of the gates at Pļaviņas Hydropower Plant.

Crane structure at Pļaviņas HPPRenovation and assessment of the load carrying capacity of the rails and steel and reinforced concrete structures, as well as installation of communications cables.

Pļaviņas HPP structures Phase One of Riga Combined Heat and Power Plant № 2 (TEC 2)A 330 kV/110 kV substation with 330 kV switchgear and 4 double busbar feeders, 110 kV switchgear with 22 connections, autotransformer and shunt reactors installed within Phase One construction of TEC 2.

Gas turbine for Riga TEC 2 second power unit (400 MW electrical power)

Pipework for the second power unit at Riga TEC-2Manufacture and installation of the pipeline system for the station, installation of auxiliary and cathodic protection systems.

Page 8: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

1514

ENER

GY

Cable Line in Riga cityInstallation of a 330 kV cable with the length of 2 km by applying the horizontal drilling method under the riverbed of the river Daugava.

DH line in Jelgava cityConstruction of two 450 mm DH pipelines in Jelgava city, 2 x 700 mm bores by applying the horizontal drilling method under the riverbed of the river Lielupe.

Page 9: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

1716

TELECOMMUNICATIONS

MAIN BUSINESS AREAS:

Mobile telecommunication networks

Fixed telecommunication networks

Railway communication systems

Technology system installations

Telecommunications, video surveillance and view towers

Infrastructure engineering for communication projects

CONSTRUCTION AND ASSEMBLY:Turn-key services for mobile telecommunication networks

Assembly of GSM, UMTS and LTE equipment

Operation and maintenance of mobile telecommunication networks

Installation and adjustment of antennas

Construction and installation of base stations

Construction of telecommunication networks

Construction of optic broadband networks (FTTC, FTTH)

Welding and tests of optic fibres

Telecommunication, signaling and power supply networks for railways

Installation of railway communication equipment and specialized devices

Cargo scanners

Radars for road and air traffic

Assembly and installation of towers

TELE

COM

MU

NIC

ATIO

NS

Page 10: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

1918

Installation and adjustment of a radio relay antenna at the base station telecommunications tower

Mobile telecommunication network base stationsInstallation of optic, coaxial cables and power supply cabinets. Installation of the equipment of mobile communications network base stations.

Installation of UMTS/LTE antennas at the mobile telecommunication network tower

TELE

COM

MU

NIC

ATIO

NS

MOBILE TELECOMMUNICATION NETWORKS

COMBINED TURN-KEY SERVICES:Selection of the locations of base stations and related legal services

Engineering

Construction and assembly works of towers and base stations

Construction and assembly of antennas, equipment and feeders

Integration of base stations in the network

ASSEMBLY OF GSM, UMTS AND LTE EQUIPMENTAssembly and adjustment of GSM/UMTS/LTE antennas

Installation of GSM/UMTS/LTE antenna amplifiers, splitters, frequency dividers

Installation and adjustment of RRL antennas and equipment

Installation and connection of power supply cables and overvoltage protection

Installation of DC power supply and batteries at base stations

Installation and connection of optic cables and terminations

Installation of ½” to 1 5/8” coaxial cables with connectors on antenna supports

Installation of racks - FlexiEDGE/UMTS/LTE, FlexiLite, Metrosite, UltraSite

Putting into operation, programming and integration of base stations in the network

OPERATION AND MAINTENANCE OF MOBILE TELECOMMUNICATION NETWORKSInspection, reconstruction and renovation of base station structures

Inspection, dismounting and assembly of antennas, devices, feeders

Operational maintenance (24/7)

Technical examination

Page 11: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

2120

Broadband optic cable telecommunications network in LatviaJetting of 1600 km of cables, installation of 533 optic cable couplings, 1240 connecting wells and 81 connection points.

Broadband optic cable (FTTC) network in GermanyJetting of micro pipes.

Installation of optic distribution boxes Welding of optic fibres

TELE

COM

MU

NIC

ATIO

NS

FIXED TELECOMMUNICATION NETWORKS

CONSTRUCTION OF TELECOMMUNICATION NETWORKSEngineering

Construction of cable routes

Laying and installation of cables

Blowing of optic cables and fibres

Welding of optic fibres

Installation of distribution cabinets

Cable line measurements

Page 12: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

2322

Modernisation of the East-West corridor of the Latvian railwayInstallation of signaling and power supply cables with the total length of 250 km.

Modernization of railway communications, signaling and power supplyModernisation of railway communication systems

TELE

COM

MU

NIC

ATIO

NS

RAILWAY

CONSTRUCTION OF COMMUNICATION, SIGNALLING AND POWER SUPPLY NETWORKSCable routes and cables

Catenary systems

INSTALLATION OF EQUIPMENT:Points and signals interlocking systems

Level crossing signalling systems

Electric point heating

Track circuit systems

Axle counters and other devices

Page 13: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

2524

Radiotechnical station at airport RēzekneEngineering and construction of the military aviation communications and power supply systems.

Vehicle speed camerasInstallation of speed cameras, engineering and construction of power supply connections.

Engineering and construction of a civil aviation radar systemProduction and installation of radar towers, construction of the infrastructure.

TELE

COM

MU

NIC

ATIO

NS

TECHNOLOGY SYSTEM INSTALLATIONSFixed cargo scanners

Fixed speed cameras on roads

Air traffic radar systems

Air-to-ground communications systems

Railroad cargo control stationary scannerInstallation of equipment, infrastructure engineering and construction.

Stationary detector for radiometric controlInstallation of equipment, infrastructure engineering and construction.

Page 14: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

2726

Telecommunication tower of the Latvian National Radio and TV Centre in Riga

View tower in JūrmalaConstruction of an architectonical view tower and installation of a mobile network operator antenna.

Mobile telecommunication network towersConstruction of a mobile telecommunication network tower in Ķekava district.

Construction of the surveillance tower facilities for the Border Guard of the Republic of Latvia on the Eastern State Border

Antennas for the civil aviation radar systemReconstruction of a radio locator facilities in Riga.

Mobile telecommunication network tower in Carnikava district

TELE

COM

MU

NIC

ATIO

NS

TOWERSCOMMUNICATION, VIDEO SURVEILLANCE AND VIEW TOWERS

Design, engineering

Production and supply of tower structures

Construction of foundations

Installation of towers

Installation of equipment

Commissioning

Page 15: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

CON

STRU

CTIO

N

2928

MAIN BUSINESS AREAS:

Construction, reconstruction and renovation of public and private buildings

Construction of infrastructure facilities

Energy efficiency improvement of buildings

CONSTRUCTION

CONSTRUCTION AND ASSEMBLY:Development of technical projects (engineering)

Author’s supervision and construction supervision

Construction of building foundation structures

Construction of monolith concrete buildings

Assembly of reinforced concrete and steel structure building frames

Construction of ceilings

Assembly of façade structures of various materials

Assembly of roof structures

Interior and exterior finishing works

Construction of interior and exterior engineering networks

Territory landscaping

Page 16: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

3130

Daugavpils UniversityConstruction of the Natural Sciences and Mathematics faculty buildings and new natural sciences and engineering laboratories building. The project received the Annual Award of Construction Industry of Latvia 2014: “New building – a public building”, the project of the laboratory building of Daugavpils University.

The Ogre State Gymnasium and elementary school buildingReconstruction of the building including the energy efficiency improvement works.

Daugavpils UniversityAquaculture and technical equipment for laboratories.

Valmiera Business and Innovation Incubator buildingConstruction of new building, landscaping.

The Culture Centre of Skrunda

CON

STRU

CTIO

N

Page 17: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

3332

Multifunctional sports complex of Zemgale Olympics CentreDevelopment of the technical project, construction and landscaping.

Eastern Latvia s Centre for Creative Services "Zeimuļs"

Valmiera Elementary School buildingDevelopment of the technical project, construction and landscaping. The school admits 600 pupils.

Multifunctional sports complex of Zemgale Olympics CentreZemgale Olympics Centre with a sports hall, spectators seats, track and field athletics and football stadium and a BMX track.

CON

STRU

CTIO

N

Page 18: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

3534

ENGINEERINGInternal and external telecommunication networks

Telecommunication towers and lighting poles

Mobile telecommunication base stations structures on existing buildings/ constructions

Overhead and cable power transmission lines up to 1 kV

Overhead and cable power transmission lines up to 20 kV

Overhead and cable power transmission lines of 110 kV to 330 kV

Lightning protection facilities for buildings

Control and automation facilities

Power and lighting installations

Transformer substations, switching and distribution stations

Security, video surveillance and fire alarm systems

GEODESYDevelopment of topographic plans

Setting of building axis

Performance of digital measurements and their approval

Engineering DepartmentThe Engineering Department is equipped with up-to-date computer hardware and printing devices for graphic documents.

Engineering DepartmentExperts with experience in using advanced engineering software and practical experience in project implementation are employed in the Engineering Department.

Page 19: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

3736

SIA "Latvijas Energoceltnieks" has implemented a certified quality management system compliant with the requirements of ISO 9001 standard, an occupational health and safety management system compliant with the requirements of OHSAS 18001 standard and an environment management system compliant with the requirements of ISO 14001 standard.

Every year the company receives diplomas and awards of the Latvian Construction Association, Latvian Quality Association and Latvian Association of Power Engineers and Energy Constructors attesting the high quality of the completed works and the know-how of the personnel.

The major achievements and awards of LEC:

Latvian Association of Power Engineers and Energy Constructors awarded the 1st place to SIA “Latvijas Energoceltnieks” in the competition “Best project of the year in power construction, design of the power supply and power equipment of sites and production 2014” for the project “Expansion of the 330 kV distribution station of substation Grobiņa and construction of the 330 kV distribution station of substation Ventspils”.

Latvian Association of Power Engineers and Energy Constructors awarded the 3rd place to SIA “Latvijas Energoceltnieks” in the competition “Best project of the year in power construction, design of the power supply and power equipment of sites and production 2014” for the project “Reconstruction of the 10 kV distribution station of Šķirotava substation No. 18”.

QUALITY, HEALTH AND SAFETY

COMPANY GROWTH

Lithuanian Construction Association declared the new building “Construction of the building of the Faculty of Natural Sciences and Mathematics and the new natural sciences and engineering laboratories building” constructed by SIA “Latvijas Energoceltnieks” the best new construction in Latvia in 2014.

Annual Award 2014 of the Latvian Construction Association, the 1st place in the category “New building – a public building” for the site “Laboratories building of Daugavpils University”.

Annual Award 2013 of the Latvian Construction Association, the 1st place in the category “Engineering building”, 10/10 kV substation No. 118 Mežaparks”.

Latvian Association of Power Engineers and Energy Constructors awarded the 1st place for the best project in the Latvian Energy Construction, design and production of the power supply and power equipment of sites in 2012 in the category “Reconstruction and renovation projects”, reconstruction of the 330 kV distribution station of substation Imanta”.

Annual Award 2011 of the Latvian Construction Association, the 1st place in the category “Renovation”, renovation of floors 2-6 and the basement floor of building A of Vidzeme Hospital at Jumaras street 195, Valmiera,

Annual Award 2010 of the Latvian Construction Association, the 1st place in the category “New construction”, Valmiera Elementary School.

Page 20: TELECOMMUNICATIONS CONSTRUCTION line insulators, power line fittings, conductors and OPGW wires Secondary cables Substation insulators, busbars and earthing circuits Poured and precast

SIA Latvijas EnergoceltnieksLubānas iela 43, Rīga, LV-1073 Tel. +371 67241260 E-mail: [email protected]

LEC Construction International GmbHPotsdamer Platz 10, 10785 Berlin E-mail: [email protected]: +49 151 50874693


Recommended