Final Telegraph Ave parking-protected bikeway design, 20th to 29th Streets. 100% design as of 11/1/2015.
7
SCALE: DATE: AS SHOWN SHEET NO. OF PROJECT NO. MAY 1, 2015 DESIGNED BY DRAWN BY CHECKED BY BY No. REFERENCE DATE BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT CITY OF OAKLAND BUREAU OF ENGINEERING AND CONSTRUCTION 250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612 (510) 238-3467 * FAX (510) 238-7415 TELEGRAPH AVENUE COMPLETE STREETS PROJECT CITY OF OAKLAND CONSTRUCTION PLANS PROJECT NO. RM/CN LC/DD RR 7 PROJECT NO. C369640 PROJECT NO. PR# [TBD] SS-1 NOTES, LEGEND, AND DETAILS 1 CONSTRUCTION NOTES CONSTRUCTION NOTE NUMBER DETAIL NUMBER PER CALTRANS STD PLANS Traffic lines as cardinal number Arrows as roman numeral TRAFFIC SIGNAL CROSSWALK/LIMIT LINE (SOLID ONE FOOT WHITE LINE), UNLESS OTHERWISE NOTED PAINT CURB RED PAINT CURB YELLOW BIKE LANE SYMBOL & ARROW Install bike lane symbol and bike lane arrow markings 20 feet after curb return (as measured from base of symbol) and/or as noted. Space symbol and arrow 6 feet apart. See Detail. GREEN BACK SHARROW Install first sharrow marking 20 feet after curb return or as noted. Install other sharrow markings as noted. See Detail C. PARKING TEE AT 18' FROM FACE OF CURB Install short stem toward curb, distance measured from center of cross. Spacing between tees to be determined by engineer. See City Standard Detail. LEGEND BIKE DETECTOR SYMBOL Install bike detector pavement marking 1 foot from limit line and centered in lane, or as noted. See Detail. LADDER CROSSWALK Install 2 foot stripes spaced 2 feet apart, bounded by standard 1 foot crosswalk stripes, white unless otherwise noted. See Detail D. WHITE CYCLE TRACK BUFFER STRIPING Install 6 inch white striping every 15 feet at 45 degree angle. See Detail F. YELLOW BUFFER STRIPING Install 6 inch yellow striping every 8 feet at 45 degree angle, or as noted. REMOVE CONFLICTING STRIPING REMOVE CONFLICTING MARKINGS CONSTRUCT NEW TYPE A DIAGONAL CURB RAMP CONSTRUCT NEW TYPE A DIRECTIONAL CURB RAMP GRAVEL EPOXY TREATMENT See Detail A. GREEN THEMOPLASTIC BIKE CORRAL See Detail B. INSTALL TWO-STAGE LEFT-TURN BOX BUS STOP PAVEMENT MARKING INSTALL NEW SIGN ON POLE See Detail E. REMOVE EXISTING SIGN EXISTING SIGN TO REMAIN LF SF FIRE HYDRANT BLUE FIRE HYDRANT MARKER EXISTING TO REMAIN LINEAR FEET SQUARE FEET NEW SIGN ON POLE (TYPE AS NOTED) EXISTING SIGN ETR
Transcript
Page 1: Telegraph Ave protected bikeway design 11.1.2015

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-1

NOTES, LEGEND,

AND DETAILS

1

CONSTRUCTION NOTES

CONSTRUCTION NOTE NUMBER

DETAIL NUMBER PER CALTRANS STD PLANSTraffic lines as cardinal numberArrows as roman numeral

TRAFFIC SIGNAL

CROSSWALK/LIMIT LINE (SOLID ONE FOOTWHITE LINE), UNLESS OTHERWISE NOTED

PAINT CURB RED

PAINT CURB YELLOW

BIKE LANE SYMBOL & ARROWInstall bike lane symbol and bike lane arrow markings 20 feetafter curb return (as measured from base of symbol) and/oras noted. Space symbol and arrow 6 feet apart. See Detail.

GREEN BACK SHARROWInstall first sharrow marking 20 feet after curb return or asnoted. Install other sharrow markings as noted. See Detail C.

PARKING TEE AT 18' FROM FACE OF CURBInstall short stem toward curb, distance measured fromcenter of cross. Spacing between tees to be determined byengineer. See City Standard Detail.

LEGEND

BIKE DETECTOR SYMBOLInstall bike detector pavement marking 1 foot from limit lineand centered in lane, or as noted. See Detail.

LADDER CROSSWALKInstall 2 foot stripes spaced 2 feet apart, bounded bystandard 1 foot crosswalk stripes, white unless otherwisenoted. See Detail D.

WHITE CYCLE TRACK BUFFER STRIPINGInstall 6 inch white striping every 15 feet at 45 degree angle.See Detail F.

YELLOW BUFFER STRIPINGInstall 6 inch yellow striping every 8 feet at 45 degree angle, oras noted.

REMOVE CONFLICTING STRIPING

REMOVE CONFLICTING MARKINGS

CONSTRUCT NEW TYPE A DIAGONAL CURB RAMP

CONSTRUCT NEW TYPE A DIRECTIONAL CURB RAMP

GRAVEL EPOXY TREATMENT See Detail A.

GREEN THEMOPLASTIC

BIKE CORRAL See Detail B.

INSTALL TWO-STAGE LEFT-TURN BOX

BUS STOP PAVEMENT MARKING

INSTALL NEW SIGN ON POLE See Detail E.

REMOVE EXISTING SIGN

EXISTING SIGN TO REMAIN

LF

SF

FIRE HYDRANT

BLUE FIRE HYDRANT MARKER

EXISTING TO REMAIN

LINEAR FEET

SQUARE FEET

NEW SIGN ON POLE (TYPE AS NOTED)

EXISTING SIGN

ETR

Page 2: Telegraph Ave protected bikeway design 11.1.2015

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-22

MA

TCH

LIN

E A

MA

TCH

LIN

E A

10' 40'20' 80'GRAPHIC SCALE (IN FEET)

MA

TCH

LIN

E B

TELEGRAPH AVE

60 LF

170 LF

65 LF

106 LF

75 LF

160 SF

220 SF

75 LF

266 SF

170 SF 170 SF22 LFMODIFIED

96 SF

60 LF

103 LF

3 TEES

44 LF

40 LFMODIFIED

96 SF

475 SF 165 SF

35 LF

35 LF

40 LFMODIFIED

140 SF205 SF165 SF

100 SF

335 SF

307 SF

44 LFMODIFIED

112 SF

15 LF

15 LF

139 SF

62 SF

CENTEREDON LANE

Page 3: Telegraph Ave protected bikeway design 11.1.2015

10' 40'20' 80'GRAPHIC SCALE (IN FEET)

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-33

MA

TCH

LIN

E B

MA

TCH

LIN

E C

MA

TCH

LIN

E C

MA

TCH

LIN

E D

TELEGRAPH AVE

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

Page 4: Telegraph Ave protected bikeway design 11.1.2015

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-44

MA

TCH

LIN

E D

MA

TCH

LIN

E E

MA

TCH

LIN

E E

MA

TCH

LIN

E F

TELEGRAPH AVE

TELEGRAPH AVE

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

Page 5: Telegraph Ave protected bikeway design 11.1.2015

10' 40'20' 80'GRAPHIC SCALE (IN FEET)

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-55

MA

TCH

LIN

E F

MA

TCH

LIN

E G

MA

TCH

LIN

E G

TELEGRAPH AVE

22N

D S

T

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

Page 6: Telegraph Ave protected bikeway design 11.1.2015

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-66

MA

TCH

LIN

E I

MA

TCH

LIN

E I

20' 80'40' 160'GRAPHIC SCALE (IN FEET)

W74 (CA)

R3-7 WITH "EXCEPTBICYCLES" PLACARD

R3-7

MA

TCH

LIN

E J

R3-7

R3-7

R13A(CA)

R30(CA) "NO PARKINGMON, WED, FRI

12AM-3AMEXCEPT HOLIDAYS"

R30(CA) "NO PARKINGMON, WED, FRI

12AM-3AMEXCEPT HOLIDAYS"

"WELCOME TONORTHGATE BUSINESS

DISTRICT"

R30(CA)W1-1

R30(CA) "NO PARKINGTUE, THUR,SAT12AM-3AMEXCEPT HOLIDAYS"

R30(CA) "NO PARKINGTUE, THUR, SAT12AM-3AMEXCEPT HOLIDAYS"

R30(CA) "NO PARKINGTUE, THUR, SAT

12AM-3AMEXCEPT HOLIDAYS"

R2-1 (25)

R30(CA) "NO PARKINGMON, WED, FRI

12AM-3AMEXCEPT HOLIDAYS"

R30(CA) "NO PARKINGMON, WED, FRI

12AM-3AMEXCEPT HOLIDAYS"

R32(CA)

R30(CA)R32(CA)

R2-1 (25)

R30(CA)

R30(CA) "NO PARKING 12AM-3AM EXCEPT HOLIDAYS"R32(CA) "2 HOUR PARKING8AM-6PM EXCEPT SUNDAYSAND HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM -6AMEXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

RIGHT LANE

MUSTTURN RIGHT

SIGN LEGEND

ON RED

R3-7

W11-2

W16-7P

R13A(CA)

R30(CA)

R30A(CA) MOD

R32(CA)

R3-1

R3-2

W74(CA)

SW50(CA)SENIOR

FACILITYCITIZEN

R30(CA) "NO PARKING 12AM-3AM EXCEPT HOLIDAYS"

Page 7: Telegraph Ave protected bikeway design 11.1.2015

SCALE:

DATE:AS SHOWN

SHEET NO.

OF

PROJECT NO.

MAY 1, 2015

DESIGNED BY

DRAWN BY

CHECKED BY

BYNo. REFERENCEDATE

BR

OA

DW

AY

/KE

ITH

AV

EN

UE

TO

GO

LDE

N G

ATE

WA

Y

BIK

E/P

ED

ES

TRIA

N P

RO

JEC

T C

ALD

EC

OTT

TU

NN

EL

SE

TTLE

ME

NT

CITY OF OAKLANDBUREAU OF ENGINEERING AND

CONSTRUCTION250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612

(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE

COMPLETE STREETS PROJECT

CITY OF OAKLAND

CONSTRUCTION PLANS

PROJECT NO.

RM/CN

LC/DD

RR

7

PROJECT NO.

C369640

PROJECT NO.

PR# [TBD]

SS-77

MA

TCH

LIN

E K

MA

TCH

LIN

E K

TELEGRAPH AVE

20' 80'40' 160'GRAPHIC SCALE (IN FEET)

R3-7

MA

TCH

LIN

E J

R13A(CA)

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

RELOCATER30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R13A(CA)INSTALL ON EXISTINGTRAFFIC SIGNAL POLE

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS" R30(CA)

"ILLEGAL TO LITTER"

FRO

M

TO

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

REPLACE EXISTINGR30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM-6AM EXCEPT HOLIDAYS"

RIGHT LANE

MUSTTURN RIGHT

SIGN LEGEND

ON RED

R3-7

W11-2

W16-7P

R13A(CA)

R30(CA)

R30A(CA) MOD

R32(CA)

R3-1

R3-2

W74(CA)

SW50(CA)SENIOR

FACILITYCITIZEN


Recommended