Otherwise, it is possibleto access the above
Sliding Feed-in Premium
250 kW
1000 kW
Application time frame Rankingpublication date
Procedure n. Opening date Closing date
1 Sep 30th 2019 Oct 30th 2020 Jan 28th 2020
2 Jan 31st 2020 Mar 1st 2020 May 30th 2020
3 May 31st 2020 Jun 30th 2020 Sep 28 2020
4 Sep 30th 2020 Oct 30th 2020 Jan 28th 2020
5 Jan 31st 2021 Mar 2nd 2021 May 31st 2021
6 May 31st 2021 Jun 30th 2021 Sep 28 2021
7 Sep 30th 2021 Oct 30th 2021 Jan 28th 2022
Among group A and B quotas, reallocation criteria apply , based on the outcome of the procedures.
For all groups, starting from the 2nd procedure, the capacity not granted by the previous procedure is reallocated.
÷ ÷
•
•
Renewable source / technology Group TypeCapacity
Incentive time
span
Reference
tariff
kW years €/MWh
WindA
Con-shore
1<P≤100 20 150
100<P<1.000 20 90
P≥1.000 20 70
PhotovoltaicA
20<P≤100 20 105
100<P<1.000 20 90
P≥1.000 20 70
A-2installed on building roofs or rural building
roofs with removal of asbestos
20<P≤100 20 105
100<P<1.000 20 90
HydroelectricB
C
Run-of-river or on acqueducts
1<P≤400 20 155
400<P<1.000 25 110
P≥1.000 30 80
With reservoir1<P<1.000 25 90
P≥1.000 30 80
Sewage gasesB
C
1<P≤100 20 110
100<P<1.000 20 100
P≥1.000 20 80
•
•
.
89 89 89
66
21
127 127 127
110
70
124115
93
66
96 103
89
75
6352
43
55
124 124 124
108
69
2012 session 2013 session 2014 session 2016 session 2019 session
€/M
Wh
Possible range Base tariff Min admitted reduction Max admitted reduction Electricity price
70
74
,7
57
,2 64
,1
75
,1
57
,4 63
,0
74
,2
55
,6 61
,3
71
,1
54
,1 61
,0
77
,1
49
,5
59
,7
74
,1
50
,1 57
,5
72
,2
54
,0 61
,3
. . .