TEMPLATE SHE Plan REVISION Change index Date Name Change This document was prepared electronically and is valid without signature.
Transcript
Page 1: TEMPLATE SHE Plan - Mondi Group

TEMPLATE SHE Plan REVISION

Change index

Date Name Change

This document was prepared electronically and is valid without signature.

Page 2: TEMPLATE SHE Plan - Mondi Group

Page 1/23

Contents 1. Introduction ................................................................................................................................................ 4

1.1 Purpose, scope ................................................................................................................................... 4

1.2 Goals ..................................................................................................................................................... 4

1.3 Legal basis .......................................................................................................................................... 4

1.4 Other applicable documents .......................................................................................................... 4

2. Information on the project ......................................................................................................................... 5

2.1 Project name ....................................................................................................................................... 5

2.2 Name and address of customer ....................................................................................................... 5

2.3 Customer project management ..................................................................................................... 5

2.4 Construction site address ............................................................................................................... 5

2.5 Extent of delivery and services on-site ....................................................................................... 5

2.6 Other applicable documents .......................................................................................................... 5

3. Organization ............................................................................................................................................... 5

3.1 Description of functions .................................................................................................................. 5

3.2 Subcontractors .................................................................................................................................. 5

3.3 Other applicable documents .......................................................................................................... 6

3.4 Attachments........................................................................................................................................ 6

4. Hazard analysis/risk assessment ......................................................................................................... 6

4.1 LMRA (Last Minute Risk Analysis) ............................................................................................... 6

4.2 Other applicable documents .......................................................................................................... 6

4.3 Attachments........................................................................................................................................ 6

5. Inspections/audits .................................................................................................................................... 6

5.1 Other applicable documents .......................................................................................................... 6

5.2 Attachments........................................................................................................................................ 7

6. Personnel .................................................................................................................................................... 7

6.1 Sign-in and sign-out ......................................................................................................................... 7

7.2 Qualifications ..................................................................................................................................... 7

6.3 Occupational medical exams ......................................................................................................... 7

6.4 Language ............................................................................................................................................. 7

6.5 Working time ...................................................................................................................................... 8

6.6 Alcohol/smoking prohibition .......................................................................................................... 8

6.7 Training ................................................................................................................................................ 8

6.8 Instructions ......................................................................................................................................... 8

Page 3: TEMPLATE SHE Plan - Mondi Group

Page 2/23

6.9 Visitors ................................................................................................................................................. 8

6.10 Other applicable documents .......................................................................................................... 8

6.11 Attachments........................................................................................................................................ 8

7. Personal protective equipment (PPE) ................................................................................................. 9

7.1 Determining the type of PPE .......................................................................................................... 9

7.2 Other applicable documents .......................................................................................................... 9

7.3 Attachments........................................................................................................................................ 9

8. Access to and transport on construction site grounds ................................................................. 9

8.1 Private vehicles.................................................................................................................................. 9

8.2 Motor vehicle traffic within plant premises ................................................................................ 9

8.3 Access to construction and work areas ..................................................................................... 9

8.4 Other applicable documents .......................................................................................................... 9

8.5 Attachments...................................................................................................................................... 10

9. Construction site facilities ................................................................................................................... 10

10. Order and cleanliness ............................................................................................................................. 10

10.1 Barriers .............................................................................................................................................. 10

10.2 Other applicable documents ........................................................................................................ 10

10.3 Attachments...................................................................................................................................... 10

11. Equipment .................................................................................................................................................. 11

11.1 General ............................................................................................................................................... 11

11.2 Workplace lighting .......................................................................................................................... 11

11.3 Vehicles ............................................................................................................................................. 11

11.4 Electrical equipment ....................................................................................................................... 11

11.5 Lifting equipment/slings ................................................................................................................ 11

11.6 Mobile phones: ................................................................................................................................ 11

11.7 Other applicable documents ........................................................................................................ 11

11.8 Attachments...................................................................................................................................... 11

12. Emergency management .................................................................................................................. 11

12.1 First aid organization ..................................................................................................................... 11

12.2 Emergency medical services ....................................................................................................... 11

12.3 Accident registration and reporting, near-miss reporting ................................................... 11

12.4 Event analysis .................................................................................................................................. 12

12.5 Other applicable documents ........................................................................................................ 12

12.6 Attachments...................................................................................................................................... 12

Page 4: TEMPLATE SHE Plan - Mondi Group

Page 3/23

13. Fire safety.............................................................................................................................................. 12

13.1 Other applicable documents ........................................................................................................ 12

13.2 Attachments...................................................................................................................................... 12

14. Hazardous substances ........................................................................................................................... 12

14.1 Gas supply and storage ................................................................................................................ 12

14.2 Refueling systems/refueling ........................................................................................................ 12

14.3 Other applicable documents ........................................................................................................ 12

14.4 Attachments...................................................................................................................................... 12

15. Environmental protection ...................................................................................................................... 12

15.1 Other applicable documents ........................................................................................................ 12

15.2 Attachments...................................................................................................................................... 12

16. Waste disposal .................................................................................................................................... 13

16.1 Other applicable documents ........................................................................................................ 13

16.2 Attachments...................................................................................................................................... 13

17. Work for which a work permit is required at Mondi Frantschach ......................................... 14

18. Particularly dangerous work areas ................................................................................................ 15

18.1 Working in high workplaces with a risk of falling .................................................................. 15

18.2 Activities posing a fire hazard ..................................................................................................... 15

18.3 Work in/on containers or in confined spaces .......................................................................... 15

18.4 Working near overhead lines ....................................................................................................... 15

18.5 Non-destructive weld inspections .............................................................................................. 15

18.6 Heat treatments................................................................................................................................ 15

18.7 Pressure tests .................................................................................................................................. 15

Page 5: TEMPLATE SHE Plan - Mondi Group

Page 4/23

1. Introduction

1.1 Purpose, scope

1.2 Goals Does the company have an OHS policy and what does it say: e.g.:

• Safety first – no accidents, no injuries! • Ensure health and safety at work for all employees, customers, contractors

and subcontractors as per the norms, standards and contractual requirements

• Ensure a safe work environment, tested equipment and established working methods

• Avoid property damage and harm to the environment • Compliance with and monitoring of our own requirements and any legal

requirements as well as the requirements of the customer • Ongoing improvement of occupational health, safety and environmental

protection

Does the company have KPIs about, e.g., work accidents, reporting of near misses, etc.

Each person involved in the project must observe and comply with the applicable safety rules and the code of conduct!

1.3 Legal basis

1.4 Other applicable documents

Page 6: TEMPLATE SHE Plan - Mondi Group

Page 5/23

2. Information on the project

2.1 Project name

2.2 Name and address of customer

2.3 Customer project management

2.4 Construction site address

2.5 Extent of delivery and services on-site

2.6 Other applicable documents

• Mondi SHE Standard Annex J • Mondi Requirements (scaffolding, safe angle grinding, Mondi rules, etc.) • Mondi work permits • Mondi LoTo regulations

3. Organization

3.1 Description of functions

Site manager

Supervisor

Workers

Safety officer

Safety representative

First responders

Fire safety

3.2 Subcontractors

The following services are awarded to subcontractors:

Page 7: TEMPLATE SHE Plan - Mondi Group

Page 6/23

Contracts are only awarded to qualified companies.

Responsible supervisors must be fluent in written and spoken German. The site manager of the company coordinates the work ………………….

The contractor verifiably trains all the subcontractors prior to the start of work. Verifiable training for Mondi safety regulations and established toolbox talks are also done.

Own SHE Plan for subcontractors

3.3 Other applicable documents

3.4 Attachments

4. Hazard analysis / Risk assessment As per the legal provisions, expected hazards or risks are determined, assessed and the necessary measures defined and implemented.

The results of the determination and assessment of the hazards and the measures established for risk prevention should be documented and verifiably introduced to employees and subcontractors

4.1 LMRA (Last Minute Risk Analysis)

4.2 Other applicable documents

4.3 Attachments

• Determination and assessment of hazards

5. Inspections / Audits The construction site manager must conduct and document a weekly inspection/audit.

The defects found and the measures for corrective actions are found on the form.

Control of the processing is carried out by those responsible and must also be documented. The effectiveness of the corrective action taken must be checked during the next inspection.

5.1 Other applicable documents

Page 8: TEMPLATE SHE Plan - Mondi Group

Page 7/23

5.2 Attachments

6. Personnel

6.1 Check-in and check-out

6.2 Qualifications

The staff employed at the construction site must be personally and professionally qualified for the work assigned to them.

Relevant qualification documents are available from the site manager for the staff (and subcontractors).

Employees (and subcontractors) who disrupt peaceful working relationships, violate accident prevention regulations or who do not follow the instructions given by the site management or the client are subject to disciplinary measures.

6.3 Occupational medical exams

All employees assigned to the construction site are subject to an occupational medical exam, depending on their work.

• Hearing exam: mandatory for every employee on the construction site • Welding fume exam for all welders • Chrome/nickel/manganese – exam for those working with the processing

high-alloy steels

The occupational medical service conducts the necessary occupational medical exams and confirms that all employees (including subcontractors) are qualified and suitable for the work (e.g.: working at heights, working in confined spaces, welding, etc.)

The exam records and suitability results are available in the company headquarters and, if necessary, on the construction site.

6.4 Language

The official language on the construction site is German.

A responsible supervisor who is fluent in written and spoken German is present in the work area at all times.

All documents and certificates required in accordance with Austrian law and regulations are available in German.

Page 9: TEMPLATE SHE Plan - Mondi Group

Page 8/23

6.5 Working time

6.6 Alcohol/smoking prohibition

6.7 Training

Operational employees

Management staff

Subcontractors

Training for dangerous work, supporting documents

6.8 Instructions

What internal instruction material is available and how were the employees instructed?

Is there documentation of toolbox talks held on the construction site and how often?

Subsequently, all employees on the construction site, including subcontractor employees, receive “project briefing” from their supervisor before starting work.

The contents of this instruction include the relevant rules and regulations of the client (e.g., Mondi requirements, Mondi work permits, Mondi safety rules, Mondi toolbox talks, Mondi LoTo system) and the risk assessment _ supporting documents?

6.9 Visitors

Visitors must check-in with the construction management.

The construction manager will give them instructions at the beginning of their visit to the site.

6.10 Other applicable documents

6.11 Attachments

Page 10: TEMPLATE SHE Plan - Mondi Group

Page 9/23

7. Personal protective equipment (PPE)

Please heed the following items:

• Selecting PPE • Using and storing PPE • Medical exams • Instructing employees in working with PPE • Procuring and issuing PPE • Disposing of PPE

7.1 Determining the type of PPE

The extent and type of PPE are determined as part of the risk assessment (e.g., head protection, foot protection, hearing protection, etc.).

The following PPE must be worn on the construction site:

Contractors:

Visitors:

7.2 Other applicable documents

7.3 Attachments

8. Access to and transport on construction site grounds

8.1 Private vehicles

8.2 Motor vehicle traffic within plant premises

8.3 Access to construction and work areas

Entering other parts of the operations and plant is prohibited!

8.4 Other applicable documents

Page 11: TEMPLATE SHE Plan - Mondi Group

Page 10/23

8.5 Attachments

9. Construction site facilities

Construction site layout

Accommodation on-site

Construction site signage

10. Housekeeping and cleanliness

General construction site grounds

Workplaces

Bathroom facilities, washing facilities

10.1 Barriers

If barriers have to be installed, the reason for the barrier, its duration and the responsible party (including phone number) must be indicated and this must be visibly attached to the barrier.

10.2 Other applicable documents

10.3 Attachments

Page 12: TEMPLATE SHE Plan - Mondi Group

Page 11/23

11. Equipment

11.1 General

All equipment in use has been tested in accordance with national regulations. Tested equipment is provided with a test label or color marking.

11.2 Workplace lighting

11.3 Vehicles

11.4 Electrical equipment

11.5 Lifting equipment/slings

11.6 Mobile phones:

11.7 Other applicable documents

11.8 Attachments

12. Emergency management All construction site personnel must familiarize themselves with site-specific emergency measures, escape and rescue routes and assembly points.

12.1 First aid organization

First aid facilities:

First responders:

12.2 Emergency medical services

12.3 Accident registration and reporting, near-miss reporting

Page 13: TEMPLATE SHE Plan - Mondi Group

Page 12/23

12.4 Event analysis

12.5 Other applicable documents

12.6 Attachments

13. Fire safety

Extinguishing equipment:

Alarms and alerts:

13.1 Other applicable documents

13.2 Attachments

14. Hazardous substances

14.1 Gas supply and storage

14.2 Refueling systems/refueling

14.3 Other applicable documents

14.4 Attachments

15. Environmental protection

15.1 Other applicable documents

15.2 Attachments

Page 14: TEMPLATE SHE Plan - Mondi Group

Page 13/23

16. Waste disposal

16.1 Other applicable documents

16.2 Attachments

Page 15: TEMPLATE SHE Plan - Mondi Group

Page 14/23

17. Work for which a work permit is required at Mondi

Frantschach

Page 16: TEMPLATE SHE Plan - Mondi Group

Page 15/23

18. Particularly dangerous work areas

18.1 Working in high workplaces with a risk of falling

Technical measures

Organizational measures

Personal protective measures

Scaffolds

Ladders

18.2 Activities posing a fire hazard

Attachments

18.3 Work in confined spaces

Attachments

18.4 Working near overhead lines

18.5 Non-destructive weld inspections

18.6 Heat treatments

18.7 Pressure tests

Page 17: TEMPLATE SHE Plan - Mondi Group

Page 16/23

SAFETY and

HEALTH PROTECTION DOCUMENT as per §5 of the Employee Protection Act

(ASchG)

This document must be reviewed and, if necessary, adjusted if there are reasons according to § 4 paragraphs 4 and 5 (e.g., accident, justified suspicion of work-related illness, new work equipment, substances, processes, justified request from the Labor Inspection Office)!

Construction site:

Responsible person: (Site manager, workshop manager,..)

Brief description of work:

Start of installation:

Expected end of installation:

Number of employees:

Determined by:

Date:

Other involved persons:

Attachments:

Page 18: TEMPLATE SHE Plan - Mondi Group

Page 17/23

Information on the workplace (personal-related)

yes

no Notes

(e.g., if yes: which one?)

Are there employment bans or

- restrictions on:

- young people and apprentices?

- pregnant or nursing mothers?

- disabled employees?

Other personal information: (e.g., from when may apprentices be employed; required

special skills and knowledge; disabilities with which one is not permitted to work here)

yes

no Notes

(e.g., if yes: which one?)

Are aptitude and follow-up tests required?

Does specialist knowledge have to be verified? (§ 63 ASchG - e.g., for forklifts) and are the respective driving permits available?

Is personal protective equipment

(PPE) necessary? (possible attachment)

Are

- area labels or

- access restrictions required?

Are precautions for serious and

imminent danger required?

(§3 Abs. 3 & 4 ASchG)

Is work with hazardous substances being done? (§§ 40, 42 ASchG)

Are there testing obligations? (e.g., according to § 37 ASchG, e.g.: elevators, lifting platforms, etc.)

Are

- evacuation plans and

- explosion protection documents officially prescribed?

Page 19: TEMPLATE SHE Plan - Mondi Group

Dateinsame: _Gefährdungsermittlung_Risikobewertung.xls Page

21/23

Risk assessment

Project:

Creator:

Date:

Description of hazard and risk

Hazards Risk assessment (without protective

measure)

Measures Residual risk (with protective

measure)

W A RK W A RK

CONSTRUCTION SITE FACILITIES

General hazards

Plant traffic

Page 20: TEMPLATE SHE Plan - Mondi Group

Safety and health protection document as

per § 5 ASchG

Workplace/area:

Workplace description/activities/processes:

Plans/drawings attached: yes no

Working materials and equipment used:

Other applicable documents:

Relevant protection goals (underlying standards, regulations, rules of technology):

yes no Document(s)?

Are there employment bans or restrictions for: disabled employees? pregnant and nursing mothers?

young people and apprentices? Can unqualified or inexperienced workers be hired? Are there testing obligations? (measurement oblig./maintenance/test plans?) Is work being done with hazardous substances? Aptitude and follow-up testing Is verification of technical knowledge required?

Does personal protective equipment (PPE) have to be used?

Is an area label required? Is access declaration required? Other documents? Special record-keeping obligations?

Revision Evaluated by Other involved persons Date Type of change

Page 21: TEMPLATE SHE Plan - Mondi Group

(Workplace-related) measures plan

Workplace/area:

Con.

no.

Determined hazard

or Belastung

Measure(s) WER?R?

(to)

when?

1

2

3

4

5

6

7

8

9


Recommended