Description:
Thanks to: S. Akhtar P. Bonnal P. Burla I. Collins L. Ducimetière C. Fischer R. Genand J. C. Guillaume C. Hauviller J. M. Jimenez G. Kouba J. Kühnl-Kinel D. Lacarrère M. Meddahi G. Peon B. Pirollet P. Proudlock M. Sassowsky K. Schirm D. Smekens R. Trant R. Valbuena R. Veness - PowerPoint PPT Presentation
24
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001 Temporary warm line for sector test Volker Mertens, LHC-TCC, 21. 9. 2001 Outline: Situation Assumptions / constraints Status of injection elements (MSI, MKI, TDI/TCDD) Temporary optics Magnets Other components + services Planning Summary Thanks to: S. Akhtar P. Bonnal P. Burla I. Collins L. Ducimetière C. Fischer R. Genand J. C. Guillaume C. Hauviller J. M. Jimenez G. Kouba J. Kühnl- Kinel D. Lacarrère M. Meddahi G. Peon B. Pirollet P. Proudlock M. Sassowsky K. Schirm D. Smekens R. Trant R. Valbuena R. Veness A. Verdier
Transcript
Page 1: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Temporary warm line for sector test

Volker Mertens, LHC-TCC, 21. 9. 2001

Outline:

Situation

Assumptions / constraints

Status of injection elements (MSI, MKI, TDI/TCDD)

Temporary optics

Magnets

Other components + services

Planning

Summary

Thanks to:S. AkhtarP. BonnalP. BurlaI. CollinsL. DucimetièreC. FischerR. GenandJ. C. GuillaumeC. HauvillerJ. M. JimenezG. KoubaJ. Kühnl-KinelD. LacarrèreM. MeddahiG. PeonB. PirolletP. ProudlockM. SassowskyK. SchirmD. SmekensR. TrantR. ValbuenaR. VenessA. VerdierE. Weisse...

Page 2: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Situation

IP8

UX85 centre

~ 215 m to substitute

0

50

100

150

200

250

300

350

480 530 580 630 680 730 780

-0.5

0

0.5

1

1.5

2

2.5

x y Dx

Page 3: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Assumptions / constraints

• Substitute definitive LHC part between MSIs and triplet left of IP8

• Install definitive injection elements(MSI, MKI, TDI/TCDD - as far as available)

• Reproduce basic geometry and optics around MSI - MKI - TDI to set up + test injection under real conditions

• Match to TI 8 and 8-7 arc optics

• Do not require triplet powering

• Install definitive vacuum elements and instrumentation (where reasonable + available)

• Use elements foreseen for TI 2 (+ SPS spares) to fill the holes(magnets, vacuum, instrumentation, p.

converters)

• Find (keep) space in UA87 (+ UA83 ?) to locate power converters

• Pull short cables (e.g. through holes between UA87 and RA87)

• LHCb magnet in place, remainder of UX85 covered by solid platform

• Avoid unnecessary costs

Page 4: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Injection septa (MSIA/B)

MSIB pre-series magnet at CERN

IHEP / Protvino

• 2/3 of series produced

Page 5: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

MSIA/B status (vacuum chambers + interconnects)

side view

J. M. Fraigne / EST

Page 6: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Injection kicker (MKI) layout

UA87

RA87 MKIs

MKI

PFNs

PFN

Beam

J. Grieger / EST

Page 7: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

MKI prototype magnet

mounting of matching capacitors

magnet inside LEP separator tank

Page 8: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

MKI prototype magnet

• prototype assembly + tests 10/01• series construction 12/02• series tests 04/03• finished 10/03

Page 9: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Injection stopper (TDI) design

absorber

beam view

• design ~12/01• finished ~06/03

side views

V. Maire / EST

Page 10: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

D1 shielding (TCDD) early design

beam viewside view

V. Maire / EST

• design ~06/02• finished ~09/03

Page 11: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Overall substitution scenario (+ VAC + BI details)

IP8

UX85 centre

~ 215 m to substitute

definitive BI equip’t

temporary BI equip’t

BPM

BTV (OTR)

BLM

definitive VAC chambers

temporary VAC chambers

Page 12: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

0

50

100

150

200

250

300

350

0 200 400 600 800 1000

-0.5

0

0.5

1

1.5

2

2.5

Insertion optics for sector test

A. Verdier / SL

V 6.2

x y Dx

TI 8 >D.S. IP8

Page 13: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Temporary magnets

IP8

UX85 centre

MQI

B280

QTL

Page 14: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

UA87 cross sections (normal injection elements)

MKI

MSI

Page 15: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

UA87 cross sections (temporary elements)

QTL B280

No obvious problems, but this does not replace a detailed integration study MIWG / ICL

Page 16: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Area around RA87 / UA87 (principle)

UA87

RA87 MKIPFN

details (placement of converters + cabling paths) to be studied PIWG

CDD LHCEY___8004 source: J. C. Guillaume / ST

MSI

transformer + switchboard

power converters ?

Page 17: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Area around UX85 (principle)

power converters ?

only LHCb magnet in place

Page 18: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

UX85 with LHCb magnet and “half” platform

R. Valbuena + D. Parchet / EST

principle shown; details to be checked: e.g.

behaviour of platform under emergency breaking with load

maquette KR082007PL

Page 19: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

UX85 with LHCb magnet and “half” platform

principle shown, details to be worked out, e.g. vacuum supports, in part. at magnet crossing R. Valbuena + D. Parchet / EST

Page 20: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Connectivity to triplet on left side of IP8

source: R. Veness / LHC

preliminary

sector 8-7 >

< IP8

detailed hand-over point to be agreed as function of availability of components

maquette BP502066PL

Page 21: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Some more info on equipment (prelim.) + open points

Vacuum:• Install definitive part for and around MSI - MKI - TDI/TCDD.• Fill up straight sections with TI 2 material (60/63 mm) (check for supports).• Increase pumping to 1 VPIA / ~ 15 m (TI 8: 1 VPIA / ~ 60 m).• Put 1 - 2 400 l pumps before entry of cold section.• Put temporary power supplies + controls in UA87.• Part bridging LHCb magnet only to be put up shortly before the sector test.

Power converters / AC supply / cabling:• Baseline assumption: install converters in UA87 (+ UA83 ?) (SR8 pretty full)• Clarify rating + availability of transformer + switchboard (ERD1/87).

Cooling:• Baseline assumption: draw from the available pipeline, using flexible hoses.• Clarify availability of IP8 water station (normally ok by that time).

This is the starting point … detailed layouts to be studied ...

Page 22: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Overall planning: 20042003 2004

LHC side

SPS side

sector 8-7

TI 8

installation of warm line

dismantling of warm line

Page 23: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

model A: 22 t

Further provisions for sector test: temporary beam dump

• have temporary beam dump at end of arc• choose model / dump performance according integrated + instantaneous

intensities (to be specified)• mind INB regulations: containment, zoning, intensities logging, ...

model B: 2 t

Page 24: Temporary warm line for sector test

Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001

Summary

Substitute for sector test LHC part between MSIs and triplet left of IP8.

Baseline assumptions:• Install definitive injection elements (MSI, MKI, TDI/TCDD with their associated

vacuum + instrumentation; certain surrogates are possible).

• Reproduce basic geometry and optics around MSI - MKI - TDI to set up + test definitive injection choice of elements.

• Holes mainly to be filled up “à la TI 8” (material mainly to be “borrowed” from TI 2) (magnets, vacuum, instrumentation).

• Candidates for active components found (magnets, power converters).

• Many details need still to be worked out (proper integration study, exact location of power converters, cabling paths, location of controls equipment, pumping scheme, BI + vacuum integration, vacuum across LHCb magnet, …).

• Specify performance of temporary beam dump at the end of the arc (INB !).

• Planning should not pose particular problems (once TI 8 is (success)fully installed).


Recommended