Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Temporary warm line for sector test
Volker Mertens, LHC-TCC, 21. 9. 2001
Outline:
Situation
Assumptions / constraints
Status of injection elements (MSI, MKI, TDI/TCDD)
Temporary optics
Magnets
Other components + services
Planning
Summary
Thanks to:S. AkhtarP. BonnalP. BurlaI. CollinsL. DucimetièreC. FischerR. GenandJ. C. GuillaumeC. HauvillerJ. M. JimenezG. KoubaJ. Kühnl-KinelD. LacarrèreM. MeddahiG. PeonB. PirolletP. ProudlockM. SassowskyK. SchirmD. SmekensR. TrantR. ValbuenaR. VenessA. VerdierE. Weisse...
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Situation
IP8
UX85 centre
~ 215 m to substitute
0
50
100
150
200
250
300
350
480 530 580 630 680 730 780
-0.5
0
0.5
1
1.5
2
2.5
x y Dx
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Assumptions / constraints
• Substitute definitive LHC part between MSIs and triplet left of IP8
• Install definitive injection elements(MSI, MKI, TDI/TCDD - as far as available)
• Reproduce basic geometry and optics around MSI - MKI - TDI to set up + test injection under real conditions
• Match to TI 8 and 8-7 arc optics
• Do not require triplet powering
• Install definitive vacuum elements and instrumentation (where reasonable + available)
• Use elements foreseen for TI 2 (+ SPS spares) to fill the holes(magnets, vacuum, instrumentation, p.
converters)
• Find (keep) space in UA87 (+ UA83 ?) to locate power converters
• Pull short cables (e.g. through holes between UA87 and RA87)
• LHCb magnet in place, remainder of UX85 covered by solid platform
• Avoid unnecessary costs
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Injection septa (MSIA/B)
MSIB pre-series magnet at CERN
IHEP / Protvino
• 2/3 of series produced
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
MSIA/B status (vacuum chambers + interconnects)
side view
J. M. Fraigne / EST
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Injection kicker (MKI) layout
UA87
RA87 MKIs
MKI
PFNs
PFN
Beam
J. Grieger / EST
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
MKI prototype magnet
mounting of matching capacitors
magnet inside LEP separator tank
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
MKI prototype magnet
• prototype assembly + tests 10/01• series construction 12/02• series tests 04/03• finished 10/03
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Injection stopper (TDI) design
absorber
beam view
• design ~12/01• finished ~06/03
side views
V. Maire / EST
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
D1 shielding (TCDD) early design
beam viewside view
V. Maire / EST
• design ~06/02• finished ~09/03
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Overall substitution scenario (+ VAC + BI details)
IP8
UX85 centre
~ 215 m to substitute
definitive BI equip’t
temporary BI equip’t
BPM
BTV (OTR)
BLM
definitive VAC chambers
temporary VAC chambers
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
0
50
100
150
200
250
300
350
0 200 400 600 800 1000
-0.5
0
0.5
1
1.5
2
2.5
Insertion optics for sector test
A. Verdier / SL
V 6.2
x y Dx
TI 8 >D.S. IP8
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Temporary magnets
IP8
UX85 centre
MQI
B280
QTL
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
UA87 cross sections (normal injection elements)
MKI
MSI
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
UA87 cross sections (temporary elements)
QTL B280
No obvious problems, but this does not replace a detailed integration study MIWG / ICL
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Area around RA87 / UA87 (principle)
UA87
RA87 MKIPFN
details (placement of converters + cabling paths) to be studied PIWG
CDD LHCEY___8004 source: J. C. Guillaume / ST
MSI
transformer + switchboard
power converters ?
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Area around UX85 (principle)
power converters ?
only LHCb magnet in place
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
UX85 with LHCb magnet and “half” platform
R. Valbuena + D. Parchet / EST
principle shown; details to be checked: e.g.
behaviour of platform under emergency breaking with load
maquette KR082007PL
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
UX85 with LHCb magnet and “half” platform
principle shown, details to be worked out, e.g. vacuum supports, in part. at magnet crossing R. Valbuena + D. Parchet / EST
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Connectivity to triplet on left side of IP8
source: R. Veness / LHC
preliminary
sector 8-7 >
< IP8
detailed hand-over point to be agreed as function of availability of components
maquette BP502066PL
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Some more info on equipment (prelim.) + open points
Vacuum:• Install definitive part for and around MSI - MKI - TDI/TCDD.• Fill up straight sections with TI 2 material (60/63 mm) (check for supports).• Increase pumping to 1 VPIA / ~ 15 m (TI 8: 1 VPIA / ~ 60 m).• Put 1 - 2 400 l pumps before entry of cold section.• Put temporary power supplies + controls in UA87.• Part bridging LHCb magnet only to be put up shortly before the sector test.
Power converters / AC supply / cabling:• Baseline assumption: install converters in UA87 (+ UA83 ?) (SR8 pretty full)• Clarify rating + availability of transformer + switchboard (ERD1/87).
Cooling:• Baseline assumption: draw from the available pipeline, using flexible hoses.• Clarify availability of IP8 water station (normally ok by that time).
This is the starting point … detailed layouts to be studied ...
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Overall planning: 20042003 2004
LHC side
SPS side
sector 8-7
TI 8
installation of warm line
dismantling of warm line
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
model A: 22 t
Further provisions for sector test: temporary beam dump
• have temporary beam dump at end of arc• choose model / dump performance according integrated + instantaneous
intensities (to be specified)• mind INB regulations: containment, zoning, intensities logging, ...
model B: 2 t
Temporary warm line for sector test / V. Mertens / LHC-TCC / 21. 9. 2001
Summary
Substitute for sector test LHC part between MSIs and triplet left of IP8.
Baseline assumptions:• Install definitive injection elements (MSI, MKI, TDI/TCDD with their associated
vacuum + instrumentation; certain surrogates are possible).
• Reproduce basic geometry and optics around MSI - MKI - TDI to set up + test definitive injection choice of elements.
• Holes mainly to be filled up “à la TI 8” (material mainly to be “borrowed” from TI 2) (magnets, vacuum, instrumentation).
• Candidates for active components found (magnets, power converters).
• Many details need still to be worked out (proper integration study, exact location of power converters, cabling paths, location of controls equipment, pumping scheme, BI + vacuum integration, vacuum across LHCb magnet, …).
• Specify performance of temporary beam dump at the end of the arc (INB !).
• Planning should not pose particular problems (once TI 8 is (success)fully installed).