TENANT DESIGN MANUAL UPDATED JUNE 2015
Transcript
Page 1: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

TENANT DESIGN MANUAL

UPDATED JUNE 2015

Page 2: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

PROJECT OVERVIEW

2

Found in the heart of the prestigious Mission Valley area of San Diego, CA, Fashion Valley is

located at Friars Road and Highway 163. It is adjacent to I-8, the principal East/ West

thoroughfare for the city.

Page 3: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

PROJECT OVERVIEW

3

FASHION VALLEY IS ANCHORED BY BLOOMINGDALES, JC PENNEY, MACY*S, NEIMAN MARCUS, NORDSTROM

AND SAKS FIFTH AVENUE. IT FEATURES OVER 200 LUXURY AND SPECIALTY RETAILERS, RESTAURANTS AND

BISTRO CAFÉS IN A GORGEOUS OUTDOOR SETTING.

Page 4: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

SITE PLAN

4

Page 5: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

SITE PLAN

5

The ADA Accessibility Plan

is required to be submitted

with the Tenant’s

Construction Documents for

permitting.

Page 6: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

TENANT INFORMATION PACKAGE

COMPONENT DESCRIPTION

TIP Index Will provide a comprehensive list of topics to help

locate information

Tenant Design

Manual

Provide mall specific architectural, sign and

engineering design criteria

Kiosk Design Manual

Architectural Criteria Outline submission requirements and will provide

necessary guidelines to design your store.

MEP/FP Criteria (same as Architectural Criteria)

Bulletins

6

• The Tenant Information Package (TIP) is intended to provide you with the

project’s design and construction criteria and consists of seven parts:

Page 7: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

7

TENANT INFORMATION PACKAGE

• The Tenant Information Package can be accessed from Simon’s website – simon.com.

» Select the business header, search for the property name, click on the Tenant Info Package link on

the right side of the page.

» If you have any difficulties working with the website, please contact your Tenant Coordinator.

*For questions regarding the Landlord’s design and construction requirements, please

contact your Tenant Coordinator or call 317-636-1600 and ask for Tenant Coordination.

Page 8: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

Occupancy/ Use: Mercantile

Construction Classification: Type II B

Building Levels: Two (2) Levels

Sprinkler System: Fully Sprinkled

MALL BUILDING DATA

8

Page 9: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STOREFRONT ZONE PLAN – LOWER LEVEL

9

USE THIS PLAN AS A GUIDE TO THE BUILDING STOREFRONT SIGN MODELS ON THE PAGES THAT FOLLOW.

Page 10: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STOREFRONT ZONE PLAN – UPPER LEVEL

10

USE THIS PLAN AS A GUIDE TO THE BUILDING STOREFRONT SIGN MODELS ON THE PAGES THAT FOLLOW.

Page 11: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• The mall is not enclosed and therefore is subject to sun, rain and wind conditions.

• All storefronts projecting beyond the face of the Landlord's shell must have a sloped roof or include drainage

in a flat roof form to prevent the accumulation of dirt and debris and drain properly.

• Tenants on both levels must consider their storefronts to be exterior construction and take all necessary

weatherproofing precautions. A minimum 8" high, hard surface, non-porous base must be provided at all

storefronts.

• All upper-level Tenant's must maintain the integrity of the existing membrane when providing a continuous

membrane connection to their storefront. A waterproof membrane must seal the width of the entire storefront

at the base.

• The only acceptable means for a storefront entry is recessed out-swinging doors. Doors shall not extend

past the maximum storefront projection when fully open.

• Neutral piers vary in size and shape throughout the Mall. Tenant to field verify whether the condition is a

round or square pier or simply a ¾” reveal, as in the case in the “International Court”.

GENERAL STOREFRONT CRITERIA

11

Page 12: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STREET SCENE - LOWER LEVEL ELEVATION

12

Tenants may project a maximum of 2'-0"

beyond the face of the neutral pier (field

verify condition) and may extend the height

of their storefront to the underside of the

existing overhang (approximately 15'-0").

Projected storefronts must be reviewed for

code exiting approval. A 10’-0” minimum

unrestricted walkway must be maintained.

Page 13: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STREET SCENE - UPPER LEVEL ELEVATION

13

Tenants may project a maximum of 3'-0"

beyond the face of the neutral pier (field

verify condition) and may extend the height

of their storefront from the minimum 15'-0" to

a maximum of 17'-0" (where conditions

allow). Projected storefronts must be

reviewed for code exiting approval. A 10’-0”

minimum unrestricted walkway must be

maintained.

Page 14: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

WALL SHOPS LOWER LEVEL ELEVATION

14

These Tenant spaces are shallow in depth and flank the entry to the department store. Tenants must extend their

storefront to the bottom of the soffit above and if they are projecting they must provide a minimum slope of 30 degrees

at the top to prevent the accumulation of dirt and debris. Tenant shall field verify neutral pier condition.

Page 15: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

WALL SHOPS UPPER LEVEL ELEVATION

15

These Tenant spaces are shallow in depth and flank the entry to the department store. Tenants must extend their

storefront to the bottom of the soffit above and if they are projecting they must provide a minimum slope of 30 degrees

at the top to prevent the accumulation of dirt and debris. Tenant shall field verify neutral pier condition.

Page 16: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

INTERNATIONAL COURT LOWER LEVEL ELEVATION

16

14’-0” A.F.F. Storefront Height

Tenants may project their storefront from the face of the building as long as this does not extend past the lease line and

beyond the face of the Upper Level overhang and maintains 10’-0” clearance from any fixed object. A black painted ¾”

x ¾” reveal must separate Tenant’s storefront material on top and sides of storefront.

Page 17: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

EAST MALL – SIDE CONCOURSES

17

14’-0” A.F.F. Storefront Height

Upper Level Tenant's shall provide a minimum 30 degree sloped roof if not located underneath an overhang.

Maximum projection of 2’-0” is allowed as long as storefront is confined within the leasable area and maintains a 10’-0”

clearance from any fixed object. A painted black ¾” x ¾” reveal must separate Tenant’s storefront material on sides of

storefront.

Page 18: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

CONVERTED ANCHOR BUILDING LOWER LEVEL ELEVATION

18

Lower level (under canopy) Tenants shall construct to the underside of the mall bulkhead at 15’-0” A.F.F. A painted

black ¾” x ¾” reveal shall separate Tenant spaces unless a plaster finish column already exist.

Page 19: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

CONVERTED ANCHOR BUILDING UPPER LEVEL ELEVATION

19

Upper level Tenant(s) shall construct to the underside of the mall bulkhead at 12’-0” A.F.F.

Page 20: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

NEUTRAL PIER DETAIL

20

Page 21: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STOREFRONT SIGNS, AWNINGS AND CANOPIES

21

Page 22: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

STOREFRONT BLADE SIGNS

22

To give added dimension and vitality to the center and greater exposure to the Tenant, the use of blade sign(s) is

required where allowed. Such signs would be in addition to the occupant signs on the storefront. The Tenant shall

install a blade sign suspended from the bracket available from the Landlord at Tenant’s expense. Please contact

the Mall Management office. Overall weight permitted to hang from the bracket including attachment to the bracket

and any lighting or electrical components is 50 pounds.

Page 23: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

BLADE SIGN PROFILES

23

The required blade sign bracket to be supplied and

installed by landlord’s sign vendor at the tenant’s

expense.

Page 24: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

BLADE SIGN BRACKET DETAIL

24

Page 25: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

FOOD COURT ELEVATION

25

Mall Bulkhead

see included detail for

sign cabinet design and size

Neutral pier

constructed by

Tenant if not

existing.

Projecting metal

canopy shelf

provided by Tenant.

Tenant required

sign design.

(see detail

following.)

Dorma Door Co. sliding glass doors

(all aluminum to be “champagne” color)

8’-0” A.F.F.

13’-11” A.F.F.

to bottom

of canopy

10’-0” A.F.F.

Page 26: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

FOOD COURT SIGN DETAIL

26

Page 27: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

27

HVAC – RETAIL TENANTS

This is an open air mall. Engineer is required to accommodate conditions that may affect the performance of the

HVAC system for their store (ie. Windows, window treatment, sun exposure and open doors).

• Equipment

» Upper level: Roof top packaged heat pumps. Unit(s) to be located in designated structural bays. Modify existing roof structure to support

equipment.

» Lower level: Split system. 75,000 BTUH maximum size per unit in converted Anchor building.

• Condensate Drain Provide minimum ¾” copper line to a City approved receptor.

• Outside/Relief Air Economizer and barometric or fan powered relief through Tenant installed components. Lower level Tenants

to install louvers in underside of mall canopy or rear exterior wall concealed from public view. Connect to Landlord provided

outside air duct in converted Anchor building.

• Return Plenum (Ducted return is for odor producing Tenants only and subject to Landlord approval).

• Smoke Exhaust/Relief None required.

• Toilet Exhaust By Tenant including fan, ductwork and roof cap. Connect to Landlord provided toilet exhaust duct if existing.

• Odor, Thermal & Process Equipment Exhaust Size for application by Tenant.

• Temperature Controls Stand-alone digital electric/electronic control system by Tenant.

• Test & Balance Tenant shall employ a TAB, NEBB or AABC Certified Air Balance Contractor to perform final testing and

balancing.

• See Criteria Sheet MEP-1 for further information.

Page 28: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

28

PLUMBING – RETAIL TENANTS

• Water Redistributed by Landlord via overhead mains. 1” minimum valved connection at designated connection point within or adjacent to space at pressure available from public system minus distribution losses. Tenant supplied meter w/remote reader for large water users only.

• Waste 4” wye connection off Landlord main. Designated connection point within or adjacent to space.

• Vent 2 ½” minimum connection stubbed from Landlord system.

• Grease Waste No Landlord provisions.

• Toilet Rooms As required by code. Provide watertight tray under room to prevent leaks to lower level.

• Drinking Fountain Per code and ADA requirements.

• Service Sink As required by code.

• See Criteria Sheet MEP-1 for further information.

Page 29: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Implementation Tenant shall directly employ the Landlord designated contractor to install and/or modify existing grid or utilize

connection provided.

• Tenant Flow Switch Not permitted.

• Valve for Tenant Space Not permitted.

• See Criteria Sheet MEP-1 for further information.

29

FIRE PROTECTION – RETAIL TENANTS

Page 30: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Voltage

» Lower level: 120/208V, 3ph, 4-wire. 277/480V, 3ph, 4-wire in converted Anchor building.

» Upper level: 277/480V, 3ph, 4-wire (portion of Upper level constructed in 1981 is 120/208V, 3 ph, 4-wire)

• Landlord Equipment Metering switchboard with disconnecting means. Empty conduit to space. 2” conduit to Tenants in

converted Anchor building.

• Power Provided by local utility.

• Metering Tenant to provide fusing, cable, meter (if not existing) and connect to Landlord switchboard. Reuse existing, if

applicable.

• Capacity Submit connected and demand electrical load data to support electric service size requested.

• Telephone 3/4” minimum conduit with pull wire to designated connection point in central locations

• Fire Alarm Interface with Landlord system is only required when the Tenant occupancy requires a system to meet Code. Duct

detectors to shut down RTU equipment to be annunciated within Tenant space only. Tenants under the Food Court must install

smoke detectors that tie into the Landlord Simplex fire alarm system.

• See Criteria Sheet MEP-1 for further information.

30

ELECTRICAL – RETAIL TENANTS

Page 31: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

31

ELECTRICAL SERVICE PLAN – LOWER LEVEL

Page 32: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

32

ELECTRICAL SERVICE PLAN – LOWER LEVEL

Page 33: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

HVAC – FOOD COURT TENANTS

33

This is an open air mall. Engineer is required to accommodate conditions that may affect the

performance of the HVAC system for their store (ie: windows, window treatment, sun exposure

and open doors).

• Equipment Downflow heat pump rooftop unit on full curb. Split systems are allowed with Landlord approval.

• Condensate Drain Provide minimum ¾” copper line to a City approved receptor.

• Return Ducted (Plenum return is for non-odor producing Tenants only and subject to Landlord approval).

• Smoke Exhaust/Relief None required.

• Toilet Exhaust By Tenant including fan, ductwork and roof cap.

• Odor, Thermal & Process Equipment Exhaust Size for application by Tenant.

• Grease Exhaust Per code. Protect roof with “Grease Guard” containment system.

• Replacement Air From Tenant outside air and dedicated makeup air units.

• Temperature Controls Stand-alone digital electric/electronic control system by Tenant.

• Test & Balance Tenant shall employ a TAB, NEBB or AABC Certified Air Balance Contractor to perform final testing and balancing.

• See Criteria Sheet MEP-1 for further information.

Page 34: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Water Redistributed by Landlord via overhead mains. 1 1/4” minimum valved connection at designated connection point within or

adjacent to space at pressure available from public system minus distribution losses. Tenant supplied meter w/remote reader.

• Waste 4” connection off Landlord main. Designated connection point within or adjacent to space.

• Vent Through roof by Tenant.

• Grease Waste 4” connection off Landlord main to central grease interceptor.

• Natural Gas 3” gas line is available from the utility for cooking use at exterior pipe and regulator connections.

• Toilet Rooms Per code. Provide watertight tray under room to prevent leaks to lower level.

• Drinking Fountain Per code.

• Service Sink Consult with Health Department for specific requirements.

• See Criteria Sheet MEP-1 for further information.

34

PLUMBING – FOOD COURT TENANTS

Page 35: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Implementation Tenant shall directly employ the Landlord designated contractor to install using connection provided and/or

modify the existing grid in compliance with all Codes & Landlord’s Insurance requirements.

• Tenant Flow Switch Not permitted.

• Valve for Tenant Switch Not permitted.

• See Criteria Sheet MEP-1 for further Information

35

FIRE PROTECTION – FOOD COURT TENANTS

Page 36: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Voltage

– Upper level: 277/480 V, 3ph, 4-wire

• Landlord Equipment Metering switchboard with disconnecting means. Empty conduit to space.

• Power Provided by local utility company. Tenant to provide fusing, meter (if not existing) and connect to Landlord switchboard. Reuse existing, if applicable.

• Metering By Tenant.

• Capacity. Submit connected and demand electrical load data to support electric service size requested.

• Telephone 1” conduit with pull wire to designated connection point in central locations.

• Fire Alarm Food Court/Restaurant Tenants to connect hood extinguishing alarm to Landlord system. Any other interface with Landlord system is only required when the Tenant occupancy requires a system to meet code. Duct detectors to shut down RTU equipment to be annunciated within Tenant space only.

• See Criteria Sheet MEP-1 for further information.

36

ELECTRICAL – FOOD COURT TENANTS

Page 37: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

HVAC – DESIGNATED RESTAURANT/ FOOD TENANTS

37

This is an open air mall. Engineer is required to accommodate conditions that may affect the

performance of the HVAC system for their store (ie: windows, window treatment, sun exposure

and open doors).

• Equipment Downflow heat pump rooftop unit on full curb or split systems. Unit(s) to be located in designated structural bays. Modify existing roof structure to support equipment.

• Condensate Drain Provide minimum ¾” copper line to a City approved receptor.

• Return Ducted (Plenum return is for non-odor producing Tenants only and subject to Landlord approval).

• Smoke Exhaust/Relief None required.

• Toilet Exhaust By Tenant including fan, ductwork and roof cap.

• Odor, Thermal & Process Equipment Exhaust Size for application by Tenant.

• Grease Exhaust Per code. Protect roof with “Grease Guard” containment system.

• Replacement Air From Tenant outside air and dedicated makeup air units.

• Temperature Controls Stand-alone digital electric/electronic control system by Tenant.

• Test & Balance Tenant shall employ a TAB, NEBB or AABC Certified Air Balance Contractor to perform final testing and balancing.

• See Criteria Sheet MEP-1 for further information.

Page 38: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Water Redistributed by Landlord via overhead mains. 2 1/2” minimum valved connection at designated connection point within or

adjacent to space at pressure available from public system minus distribution losses. Tenant supplied meter w/remote reader.

• Waste 4” connection off Landlord main. Designated connection point within or adjacent to space.

• Vent Through roof by Tenant.

• Grease Waste By Tenant to meet code.

• Natural Gas 4” gas line at 7” W.C. pressure is available from the utility for cooking stubbed to the space.

• Toilet Rooms Per code.

• Drinking Fountain Per code.

• Service Sink Consult with Health Department for specific requirements.

• See Criteria Sheet MEP-1 for further information.

38

PLUMBING – DESIGNATED RESTAURANT/ FOOD TENANTS

Page 39: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Implementation Tenant shall directly employ the Landlord designated contractor to install using connection provided and/or

modify the existing grid in compliance with all Codes & Landlord’s Insurance requirements.

• Tenant Flow Switch Not permitted.

• Valve for Tenant Switch Not permitted.

• See Criteria Sheet MEP-1 for further Information

39

FIRE PROTECTION – DESIGNATED RESTAURANT/ FOOD COURT TENANTS

Page 40: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Voltage

– Upper level: 277/480 V, 3ph, 4-wire

– Lower level: 120/208 V, 3ph, 4-wire

• Landlord Equipment Metering switchboard with disconnecting means. Empty conduit to space.

• Power Provided by local utility company. Tenant to provide fusing, meter (if not existing) and connect to Landlord switchboard.

Reuse existing, if applicable.

• Metering By Tenant.

• Capacity. Submit connected and demand electrical load data to support electric service size requested.

• Telephone 1” conduit with pull wire to designated connection point in central locations.

• Fire Alarm Food Court/Restaurant Tenants to connect hood extinguishing alarm to Landlord system. Any other interface with

Landlord system is only required when the Tenant occupancy requires a system to meet code. Duct detectors to shut down RTU

equipment to be annunciated within Tenant space only.

• See Criteria Sheet MEP-1 for further information.

40

ELECTRICAL – DESIGNATED RESTAURANT/ FOOD COURT TENANTS

Page 41: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

• Life Safety Interface Tenant shall employ Landlord’s designated Life Safety/Fire Alarm Contractor for all required components

and interfacing with the base building’s fire alarm system and BAS.

• Wiring By Tenant, in conduit from each life safety device to a junction box provided by the Tenant at a location selected by the

Landlord. Final connections in the junction box and to the building fire alarm system will be by the Landlord’s Contractor at

Tenant’s expense.

• Duct Detectors Shall shut down affected Tenant HVAC unit and send supervisory signal to the building fire alarm.

• Final Connections By Landlord’s Fire Alarm Contractor at Tenant’s Expense.

• Music & Security Systems Must interface with fire alarm system by installing a service interrupter.

41

LIFE SAFETY INTERFACE – ALL TENANTS

Page 42: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural

42

MEP CALCULATION FORMS

Tenant’s Engineer shall use their own form for HVAC Load Calculations:

• Appliance Heat Gain

• Electrical Load Summary

• Kitchen Exhaust Fan Specifications

• Kitchen Make-up Air Unit Specification

• RTU/Split System Specification

• Maintenance

Page 43: TENANT DESIGN MANUAL - Simon Property Group - Tenant... · Tenant Design Manual Provide mall specific architectural, sign and engineering design criteria Kiosk Design Manual Architectural