+ All Categories
Home > Documents > Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of...

Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of...

Date post: 21-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
15
Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid and SHA Terms of Reference "External review of the SWISS HUMANITARIAN AID UNIT (SHA)" 01.05.2020 to 31.10.2020 Berne/February 2020
Transcript
Page 1: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

Federal Department of Foreign Affairs FDFA

Swiss Agency for Development and Cooperation SDC

Humanitarian Aid and SHA

Terms of Reference

"External review of the SWISS HUMANITARIAN AID UNIT (SHA)"

01.05.2020 to 31.10.2020

Berne/February 2020

Page 2: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

2/15

Contents

1 Purpose of this document .................................................................................................................4

2 Goal and content of the mandate .....................................................................................................4

2.1 Introduction ...............................................................................................................................4

2.2 The Future of the Swiss Humanitarian Aid Unit: Context and Rationale .................................6

2.3 Purpose, objectives and scope of the review ...........................................................................7

2.3.1 Purpose ............................................................................................................................7

2.3.2 Objectives .........................................................................................................................7

2.3.3 Scope................................................................................................................................7

2.4 Indicative review questions ......................................................................................................7

2.5 Methodology and process ........................................................................................................8

2.5.1 Methodology .....................................................................................................................8

2.5.2 Process .......................................................................................................................... 10

2.6 Deliverables ........................................................................................................................... 10

2.6.1 Inception Report ............................................................................................................ 10

2.6.2 Review Report ............................................................................................................... 11

2.7 Roles and responsibilities during the review ......................................................................... 11

2.7.1 SDC/HA Senior Management ....................................................................................... 11

2.7.2 Advisory group (AG) ...................................................................................................... 11

2.7.3 Review Team ................................................................................................................. 12

2.8 Volume of the mandate ......................................................................................................... 12

2.9 Time frame of the selection process ..................................................................................... 13

3 Formal aspects of the invitation to tender ..................................................................................... 13

3.1 Contracting authority ............................................................................................................. 13

3.2 Type of procedure ................................................................................................................. 13

4 Composition and content of the offer ............................................................................................ 13

5 Additional points to be noted by the bidder ................................................................................... 14

5.1 Address for submission of offers ........................................................................................... 14

5.2 Language of documents, language of bids ........................................................................... 14

5.3 Deadline for submitting a bid and validity .............................................................................. 14

5.4 General Terms and Conditions of Business (GTC) ............................................................... 14

5.5 Conclusion of contract ........................................................................................................... 14

5.6 Bidding consortia ................................................................................................................... 14

5.7 Subcontractors ...................................................................................................................... 14

5.8 Confidentiality ........................................................................................................................ 15

Page 3: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

3/15

5.9 Integrity clause ...................................................................................................................... 15

5.10 Protected rights ..................................................................................................................... 15

6 Annexes ......................................................................................................................................... 15

Page 4: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

4/15

1 Purpose of this document

This document contains the requirements relating to the mandate for the project " External

review of SWISS HUMANITARIAN AID UNIT (SHA)". At least three bids shall be collected. The

bidder offering the best value for money will be awarded the mandate.

2 Goal and content of the mandate

2.1 Introduction

Saving lives and alleviating suffering – This is the mandate of the Swiss Humanitarian Aid (SDC/HA)1.

It is the expression of Switzerland’s long and internationally recognized humanitarian tradition. In the

SDC/HA’s operations, the humanitarian needs of the affected population are consistently put in the

centre of attention. Operating before, during and after crisis and disasters, the SDC/HA assumes the

following triple role:

Implement projects as a pragmatic and effective operational actor in the field;

Be a reliable and flexible humanitarian partner and donor for humanitarian organisations;

Be an advocate for the respect of the humanitarian law and principles.

In order to implement its mandate, the SDC/HA has various instruments at its disposal: 1. The Swiss

Humanitarian Aid Unit: 2. Financial contributions to humanitarian partner organisations; 3. The

provision of relief goods as well as 4. Dialogue and advocacy in order to facilitate access and ensure

the respect of international law.

The main asset of the SDC/HA is its Swiss Humanitarian Aid Unit (SHA). The SHA – a pool of

approximately 700 experts with various professional backgrounds - is based on decree 172.211.312 of

the Swiss Government and Administration Organisation Act. The decree defines the SHA as being

attached to the Swiss Agency for Development and Cooperation (SDC); describes the SHA’s mission

to carry out emergency relief, reconstruction and disaster risk reduction interventions; defines the

leadership and authority of the Swiss Delegate for Humanitarian Affairs regarding the SHA.

1 Swiss Humanitarian Aid (SDC/HA) is part of the Swiss Agency for Development and Cooperation (SDC) and of

the Federal Department of Foreign Affairs (FDFA). 2 https://www.admin.ch/opc/de/classified-compilation/19880091/

Page 5: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

5/15

Figure 1 Organisational chart of SDC/HA

The SHA is currently structured into eleven expert groups as shown in figure 2 below.

Figure 2 The eleven expert groups of the Swiss Humanitarian Aid Unit (SHA)

Page 6: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

6/15

SHA experts can be deployed at any time to wherever humanitarian assistance is needed, whether it

is in crises, natural disaster or armed conflicts. They can be tasked to: 1. Carry out rapid response

actions after sudden and onset disasters; 2. Implement humanitarian projects of the SDC/HA (direct

actions); 3. Provide technical expertise to partner organisations (secondments) and 4. Support the HQ

or Swiss representations abroad (during crises).

In 2018, the Swiss Humanitarian Aid Unit celebrated its 45th birthday. It is in this context that the

SDC/HA launched a process on the future of its operational arm, the Swiss Humanitarian Aid Unit.

2.2 The Future of the Swiss Humanitarian Aid Unit: Context and Rationale

Since the establishment of the Swiss Humanitarian Aid Unit in 1973, the humanitarian landscape has

changed. The past years have shown an increase in the number of conflicts and humanitarian crises.

In addition, humanitarian crises tend to be more complex and last longer. According to OCHA, 86% of

the overall humanitarian funding in 2018 was invested in responses to protracted crises lasting longer

than five years. As a consequence, emergency aid is increasingly becoming a longer-term need and

must be combined with development cooperation measures.

At the same time, a behavioural change of affected countries can be observed with regard to natural

disasters. Many disaster prone countries have strengthened their coping mechanisms and are

increasingly willing and capable to deal with the crisis management and response. Therefore, affected

countries tend to be increasingly hesitant to request or accept international assistance or have

become very selective in terms of support, mainly focusing on neighbouring countries and regional

actors (e.g. ASEAN, AHA, ERCC etc.).

The institutional context for the SHA has evolved as well over time. Along the past decade, the FDFA

has undertaken measures to increase coherence, better integrate and mainstream the different

directorates, services and representations, and to harmonize processes and instruments.

These changes have consequences and require adaptations from all humanitarian actors, including

the SDC/HA. It is against this background that the SDC/HA has launched a process on the future of

the Swiss Humanitarian Aid Unit. The overall goal of the process is to strengthen the Swiss

Humanitarian Aid Unit as the operational arm of the SDC/HA taking into account the changing

environment and parameters. In order to pursue this goal, the SDC/HA defined a series of short and

long-term measures. The measures have been elaborated along the four tasks of the Swiss

Humanitarian Aid Unit (see above). The scope and concrete objectives of this review are outlined in

chapter 2.3.

Page 7: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

7/15

2.3 Purpose, objectives and scope of the review

2.3.1 Purpose

The purpose of this review is mainly prospective (future-oriented) and formative (learning-oriented). The review shall hence allow SDC to learn from the review’s findings and provide information useful for decision making about the future orientation of Swiss Humanitarian Aid Unit.

2.3.2 Objectives

Considering the evolving global environment, the main objective of the review is to determine the relevance and added value of the Swiss Humanitarian Aid Unit’s contribution to the core mandate of SDC/HA which is saving lives and alleviating suffering. Based on these findings, the review shall draw conclusions and formulate recommendations on how to strengthen the SHA as operational arm of the SDC/HA in light of the future orientation of Switzerland’s international cooperation as foreseen in the federal dispatch 2021-243 and beyond. Accordingly, the review considers (i) the global environment and humanitarian needs, (ii) the Swiss added value as well as (iii) the Swiss interests in maintaining its Humanitarian tradition.

2.3.3 Scope

The scope of this review is limited to the Swiss Humanitarian Aid Unit. The conclusions and recommendations of the present review may however have implications on the SHA’s framework conditions. The analysis of these implications shall form an integral part of the present review. The recommendations may also comprise changes in role, size and structure of the Swiss Humanitarian Aid Unit. The management response to the review and its findings will be assured by the Head of the Swiss Humanitarian Aid Department and Swiss Humanitarian Aid Unit. The review will be published. A separate external review was conducted targeting “Swiss Rescue”, Switzerland’s INSARAG certified heavy USAR Team, which is one of Switzerland’s rapid response instruments. The results and recommendations of this review shall be incorporated into the present mandate.

2.4 Indicative review questions

The preliminary review questions are:

A) Relevance i. What are the most important developments relevant for humanitarian aid (global

humanitarian needs, political and institutional requirements and frame conditions)? ii. What is the SHA’s contribution to the mandate of Switzerland’s humanitarian aid and its

positioning? iii. What is the value added of the SHA compared to other instruments of the Humanitarian

Aid and in combination with them? iv. What is the contribution and value added of the SHA in light of the identified expected

developments in humanitarian needs and frame conditions?

B) Appropriateness of the SHA’s strategic orientation: i. Are the four tasks of the SHA (rapid response, direct implementation, secondments and

support to HQ and representations) appropriate in light of the humanitarian needs and the mandate of the SDC/HA?

3 https://www.eda.admin.ch/deza/en/home/news/dossiers/alle-dossiers/iza-2021-2024.html

Page 8: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

8/15

ii. Which scope of duties and specialisations will become more/less relevant in future? iii. Which competencies should be fostered / reduced within the SHA in future and which

expert group set up appears to be most effective to adapt to changing needs in the humanitarian sector?

C) Appropriateness of the SHA’s organisation:

i. Which institutional, organisational and managerial aspects are currently conducive/obstructive for the functioning of the SHA?

ii. Which options for institutional, organisational and managerial changes should be envisaged in order to enable the best possible frame conditions for the SHA to fulfil its mandate?

The indicative review questions are only suggestions and shall be reviewed by the review team during the inception phase. The review team will be tasked to propose a detailed catalogue of review questions in its inception report. The review team will be asked to propose tasks suitable to answer above review questions. Amongst others, the tasks shall include: - Short analysis of most important developments relevant for humanitarian aid (global humanitarian

needs, political and institutional requirements and frame conditions) - Analysis of organizational structure of SHA - Analysis of the staff structure (age, gender, experience, core competencies) of SHA according to

different expert groups - Analysis of organizational environment in which SHA operates (SDC, FDFA, employers of SHA

members) - Analysis of recruitment, training, development and deployment processes and instruments - Analysis of results along the four tasks of the SHA (rapid response, direct implementation,

secondments and support HQ and representations)

2.5 Methodology and process

2.5.1 Methodology

The independent review team will assess the review objectives and questions in a neutral and objective way. The review team shall review and assess existing facts, processes, tools and instruments (summative part). Their findings, conclusions and recommendation shall be evidence based and formulated in an open, constructive and non-judging manner. The review team shall use or develop adequate rubrics and instruments for assessing all collected information within the review. The review team will develop a rigorous and appropriate methodology during the inception phase, together with a Theory of Change which will set the framework for the review. It is expected to make use of a series of different methodological instruments, such as:

Review of relevant documents from SDC, partners and other donors, as well as international research.

Interviews and focus group discussions with SDC staff in Berne and abroad and with members of the SHA.

Interviews with relevant persons representing partner organisations (multilateral agencies,

Page 9: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

9/15

donors, NGOs etc.).

Interviews with other stakeholders in Switzerland and abroad.

Two field missions to locations where SHA is or has been active.

The Advisory Group (AG, see section 2.7.2) shall be involved in reviewing and refining the recommendations to the SDC/HA senior management – while the responsibility remains within the review team.

Page 10: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

10/15

2.5.2 Process

The following work plan suggests the dates and responsibilities for the different activities of the review

process. This work plan will eventually be adapted by the review team during the inception phase.

Activity Date (tentative) Responsibilities

1st AG meeting: Kick-off in Bern (with review team) + first round

of interviews for inception phase (in Bern and by phone)

May 2020 AG / Review team

Elaboration of the Inception Report: review of objectives,

questions, design and methodology

May 2020 Review team

2nd AG meeting: Feedback to Inception Report (with review

team)

May 2020 AG / Review team

Finalization of the Inception Report (incl. AG comments) May 2020 Review team

Desk study, interviews with stakeholders, partners, focus

groups, workshops, field missions, e-discussions if relevant,

data analysis

June-July 2020 Review team

Draft report August 2020 Review team

3rd AG meeting: Feedback on draft report. Review of

conclusions and recommendations (with review team)

August 2020 AG / Review team

Final Report September 2020 Review team

Presentation to SDC/HA Senior Management September 2020 Review team

Presentation to SDC Directorate October 2020 Review team

SDC/HA Management Response October 2020 SDC/HA Senior

Management

2.6 Deliverables

The following deliverables are required:

2.6.1 Inception Report

The review team prepares an Inception Report - after an initial review of relevant documentation and

some initial interviews. It shall present:

the results of the first round of interviews and desk review

conceptual framework(s) to be used in the review (including a draft Theory of Change which

presents SDC/HA’s logic regarding the subject matter of this review)

the key review questions and methodology

analytical framework for answering the review questions with rubrics or assessment scales that

will be used for assessing the information, data sources and collection, sampling and key

indicators

first list of interviewees, proposal for participants of focus groups/workshops

Page 11: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

11/15

The Inception Report also includes a timeline for the review process. It shall explain the strengths,

weaknesses and limitations of the review approach and the means used to address these limitations.

The review team should suggest a tentative structure of the final report.

The Inception Report shall be written in English and should not exceed 15 pages (excluding annexes).

It will be addressed to the SDC/HA Senior Management, but will be discussed with the Advisory Group

in Bern.

2.6.2 Review Report

A fit-to-print Review Report4 in English containing findings, conclusions and recommendations,

whereby the conclusions must be clearly derived from the findings and the recommendations be clearly

based on the conclusions.

The review report should not exceed 40 pages (including an executive summary; excluding annexes).

The report should contain clear references of the important information / data available in the annexes.

The executive summary (abstract) should correspond to the DAC-Standards and should not exceed 3

pages.

Additionally, a concise presentation (PowerPoint) shall be prepared by the review team for SDCs

use.

2.7 Roles and responsibilities during the review

2.7.1 SDC/HA Senior Management

SDC/HA Senior Management (i) approves the Terms of Reference, (ii) expresses their stand on the

review recommendations through the management response and (iii) ensures appropriate information

of the review results to the SDC Directorate and other stakeholders.

2.7.2 Advisory group (AG)

The Advisory Group (AG) accompanies the review process. The AG comments on (i) the review

design (Terms of Reference), (ii) the draft Inception Report and (iii) the draft Review Report. At the 3rd

AG meeting (see 2.5.2), the AG validates the review findings, conclusions and recommendations.

The review process will include periodic engagement of the AG members and/or other relevant SDC

staff for following activities:

Provide support to the review team in better understanding SDC’s approaches, structures and

working processes.

Comment the Terms of Reference and the draft Inception Report and provide feedbacks to the

draft Review Report.

The AG is composed of representatives of the relevant divisions/sections of the SDC/HA (Human

resources, Logistics, SHA expert groups, operational divisions, staff unit) as well as representatives of

other relevant FDFA services. The AG is chaired by a member of SDC/HA’s management team5.

4 According to the formatting guidelines of the SDC Review and Corporate Controlling Division 5 Namely the SDC/HA Head of Africa division.

Page 12: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

12/15

2.7.3 Review Team

SDC/HA will contract a review team that is independent6 of the FDFA/SDC and has not been involved

in any activities covered by this review.

The review team should offer expertise regarding review and partnership development, innovative

thinking, the ability to combine established methods with new approaches and to critically discuss,

evaluate and share results with stakeholders throughout the review process.

The review team shall consist of a team of at least two experts with complementary expertise and

experience. More particularly, the experts are expected to bring along the following review and subject

matter expertise and experience:

Excellent knowledge of the humanitarian system with its actors, trends and challenges

Strong knowledge of the Swiss political and public administration environment relevant for

SDC/Humanitarian aid

Strong knowledge of the orientation, structure and functioning of Swiss International Cooperation

and the Swiss Humanitarian Aid

Strong expertise in organisational development and/or strategic human resource management

Solid performance record in conducting similar reviews

Established network of contacts with state and non-state actors active in the field of humanitarian

aid

Experience in collaboration with humanitarian state actors

Sensitivity for political implications within Switzerland and on international level

Furthermore, the evaluators are expected to have:

Ability to work and communicate in English, plus excellent writing skills in English. German and

French comprehension is required (good reading skills). Good communication skills in German

and French is an additional asset.

The chair of the Advisory Group (refer to chapter 2.7.2) will act as point of contact to the review team.

2.8 Volume of the mandate

A total number approximately 80-90 working days between May and October 2020 (see chapter

2.5.2) may be allocated to the independent review team. These working days should include field

missions and visits to Switzerland. If applicable, TVA must be offered separately.

All the price details must be indicated in Swiss Francs (CHF) excl. VAT. The price excl. VAT includes

in particular insurance, allowances, social costs, transport, customs etc.

The bidder will not be reimbursed for any costs arising from the preparation or submission of the bid.

6 Independence means that the members of the review team shall not have worked for the FDFA, especially the

SDC, in the past five years (except having conducted other external review mandates) or have any other strong linkages or dependencies with the FDFA or the Swiss Humanitarian Aid Unit.

Page 13: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

13/15

2.9 Time frame of the selection process

Deadline Activity

02.03.2020 Invitation of at least 3 bidders

23.03.2020 Deadline for submitting offer

06.04.2020 Awarding of mandate and notice to unsuccessful bidders

20.04.2020 Signing of contract

01.05.2020 Start of the Mandate

3 Formal aspects of the invitation to tender

3.1 Contracting authority

The staff unit of the Humanitarian Aid and SHA manages the award procedure and is the direct

mandating party for the bidder.

3.2 Type of procedure

Direct-award procedure

4 Composition and content of the offer

Chapter Contents Max. No.

pages

0 Cover letter with signature(s) 1

1 Technical proposal:

1. Motivation 2. Understanding of the mandate 3. Description of proposed approach/concept 4. Qualifications and experience of the review team (incl. CVs

as annex), covering at least aspects listed in chapter 2.7.3 above.

5

2 Financial proposal:

Submit the financial proposal in accordance with Annex 4 Budget

form in CHF currency.

1 narrative, +

budget form

3 Experience - Proof of references

The bidder has enough experience in projects comparable with the present mandate

in terms of scope, financial extent and complexity. The bidder proves this experience

with at least two references in the last five years.

n/a

4 Form «Bidder declaration» n/a

5 Information contact person n/a

6 Acceptance of GTC

The bidder shall explicitly confirm, without limitation or modification, the acceptance of

the FDFA’s General Conditions of Business (GTC) as per annex 2 of the present

Terms of Reference

n/a

7 Acceptance e-billing

Contractors are obliged to submit an electronic bill to the FDFA if the contract value is

above CHF 5’000 (excl. VAT). For Information on the electronic billing see annex 3.

n/a

Page 14: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

14/15

5 Additional points to be noted by the bidder

5.1 Address for submission of offers

Offers must be submitted to all the following E-Mail addresses:

[email protected]

[email protected]

[email protected]

5.2 Language of documents, language of bids

The bid can be submitted in English, French or German. The documents are available in English,

German or French.

5.3 Deadline for submitting a bid and validity

The bid must be sent by email to the contacts named under chapter 5.1 by 23.03.2020 17:00 UTC at

the latest with the following note: Offer for Review Swiss Humanitarian Aid Unit.

The bid is valid for up to 60 days after the aforementioned date for submission.

5.4 General Terms and Conditions of Business (GTC)

GENERAL TERMS AND CONDITIONS OF BUSINESS (GTC) OF THE SWISS FEDERAL

DEPARTMENT OF FOREIGN AFFAIRS (FDFA) FOR MANDATES (TYPE A for employed persons

AND TYPE B for legal persons and institutions).

These General Conditions of Business (GTC) shall be deemed accepted by the contractor on

submission of the offer.

5.5 Conclusion of contract

The contract is concluded subject to the prior approval of credits by FDFA.

5.6 Bidding consortia

Bidding consortia are permitted.

5.7 Subcontractors

Subcontractors are permitted, subject to the prior approval of the awarding entity. Subcontractors are

allowed to participate in several bids. If the bidder engages subcontractors in order to carry out the work,

the bidder will assume overall responsibility. It will list all the subcontractors involved, together with the

roles allocated to them, in annex 1 "Bidder information".

Any contractual delegation by the contractor of performance of all or part of the present contract to

subcontractors shall be subject to the prior written consent of the contracting authority. Subcontractors

and their personnel must satisfy all conditions stipulated in the present contract and the appendices

thereto. In the event that the contractor delegates performance of all or part of the contract, the

contractor shall bear sole liability for the acts of any subcontractors.

Page 15: Terms of Reference External review of the SWISS … · 2020. 2. 27. · Federal Department of Foreign Affairs FDFA Swiss Agency for Development and Cooperation SDC Humanitarian Aid

15/15

5.8 Confidentiality

All information of any kind that comes to the attention of the bidder in connection with the tendered

mandate of the awarding authority is to be treated as confidential. The content of the present tender

may only be made available to persons taking part in the preparation of the bid.

The tender documentation may not be used for any other purposes than preparation of the bid, even

in extracts.

Bidders treat facts as confidential that are not public knowledge or publicly available. In cases of

doubt, facts are to be treated as confidential. This obligation to secrecy remains valid even after

conclusion of the tender procedure.

The awarding authority undertakes to maintain confidentiality about this bid towards third parties

subject to the reserve of statutory publication requirements.

5.9 Integrity clause

Bidders undertake to take all necessary measures to avoid corruption, especially not to offer or accept

payments or other advantages.

Bidders who violate the integrity clause are required to pay a contractual penalty to the contracting

authority amounting to 10% of the contract sum or at least CHF 3,000 per violation.

The bidder notes that a violation of the integrity clause leads as a rule to the cancellation of the award

or to early termination of the contract by the contracting authority for important reasons.

The Parties shall inform each other in case of any well-founded suspicions of corruption.

5.10 Protected rights

All protected rights that arise from executing the mandate shall be transferred to the contracting

authority.

6 Annexes

No. Annex

1 Form „Bidder declaration“

2 GTC FDFA Mandates (type A and B)

3 Information e-billing

4 Budget-form Type B

5 Fact sheet compensation for fees and expenses


Recommended