40
Test Presentation 01 Subtitle Esh Group T: 0191 377 4570 E: [email protected] Lifting Operations Lifting with Excavators Esh Construction Esh Group T: 0191 377 4570 E: [email protected]
Transcript
Page 1: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

Test Presentation 01Subtitle

Esh GroupT: 0191 377 4570E: [email protected]

Lifting Operations

Lifting with ExcavatorsEsh Construction

Esh GroupT: 0191 377 4570E: [email protected]

Page 2: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

BackgroundNovember 2016

Operator failed to follow method statement

Criticised by EA and HSE for not having specific lifting plan

It has taken nearly 2 years and plenty of trial and error to get to where we are now

Page 3: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Background

Loads of information on use of cranes for lifting operations

Very little on using excavators to lift. CPA revision 3, 2017 Lifting Operations With Excavators.

Appointed person / lift supervisor training for cranes, nothing for supervising lifting with excavators

Excavators are not cranes, they move differently, they turn quicker and they travel!

They are designed primarily to dig.

Page 4: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting Operations

Free Guidance document issued by the Construction Plant Association

Page 5: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Identifying Lift Type

Page 6: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Identifying Lift Type

Page 7: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Influencing Factors

Planning and Supervision: Site Managers with suitable experience and support from appointed persons and H&S as required.

Selection of Excavators: lift capacity, physical size, obstructions

Competence of operators: CPCS with Lifting Operations endorsement A58C and A59C.

Maintenance and thorough examinations of machines and lifting equipment

Page 8: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Background

Extract from CPA Guidance on Lifting with Excavators’

Page 9: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Influencing Factors

Fast articulation and slew movements, cranes are designed for slower movement.

The operation of Boom, Dipper arm simultaneously to maintain position, whilst lifting or lowering.

Lift Capacity Indicator only warns of approach to overload.

Rated at least stable condition (cross track) so it alarms well short of overload, causing operators to switch it off.

Page 10: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting OperationsFork attachment?

Thorough examination required / SWL Quite heavy in itself, uneven distribution of stress

Page 11: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting Operations

In line / Cross track, the machines lift capability changes, not an issue with crane, height + or - ground level, all factors which affect the machines capability

Page 12: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting Operations

Same machine, same lifting equipment, same load, so what has changed?

Page 13: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting OperationsWeight of quick hitch, lifting equipment and pump, should not be an issue for the machine.

Assuming the hydraulic hoses and extraction pipe are secured and supported at entry to the shaft, who would consider the head of water as part of the overall weight?

In this case, assuming a head of 8 m the water could add 1.25 metric tonnes to the load.

Page 14: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting Operations

What’s wrong with this picture?Undue stress placed on the chain, must be vertical from lifting pint.

Page 15: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Lifting Operations

Standard operation which we see everyday on site.

At what point does this become a lifting operation, at commencement of pull or when sheet clears the ground?

Page 16: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Legislation

LOLER 1998, applies to excavators when used in lifting operations.

Regulation 2 states: “An excavator (or other earth moving equipment), adapted to be used for lifting, using lifting attachments (e.g. forks, grabs, magnets), but not when used for normal earth moving operations.

In other words when not used for its primary designed function

HSAWA 1974: Requires that the company provide safe plant and equipment, arrangements to ensure practices are safe, suitable supervision, a safe working place and training.

PUWER 1998: Requires regular thorough inspection of all plant and equipment used in lifting operations.

Lets not forget the influence of insurance companies in driving change

Page 17: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

OH&SF039 Lifting Plan

The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on site, this would include manhole rings, pipes, trench box etc. The weights of these items are known and the rated capacity of the machine required to safely lift these items is calculated.

Page 18: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Completion

The Lift Supervisor will complete the lifting operations details including the description of the lifting operations to be carried out under the plan.

This will generally be the Site Manager.

They will consult the Excavator Lifting Capacity Charts and Identify whether the excavator selected is capable of lifting the required weight from the tables.

Page 19: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Completion

When we started to consider this operation our original thought was to use the capacity at the machines least stable position, to take the decision away from site managers

Soon became obvious that this was impractical as nothing less than a 32 tonne excavator would be able to carry out lifting operations on site!

Page 20: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Excavator Lifting Capacity Charts

Page 21: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Completing the lift plan• The lift Supervisor will then make necessary deductions from the

identified lift capacity as indicated on the form. These shall be deducted from the rated capacity to give the lifting capacity.

• The lift supervisor should identify the limits of the lifting operation, the maximum radius of the lift, the maximum height and or drop of the lift, and whether the lift is to be carried out inline or across the tracks.

• Carriage of loads must wherever possible be carried out in line with tracks at shortest radius possible.

Page 22: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Completing the lift plan• The Lift Supervisor must also establish that the

operation does not exceed 80% of the hydraulic capacity (Available lifting Capacity) of the machine. If this is the case the lift must be referred to the Appointed Person.

Weight of load(including Lifting equipment) = %

Available Excavator Capacity

• If the final lifting capacity is less than the load weight, the lift supervisor must refer the lift to the Appointed Person.

Page 23: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Excavator

The specific details of the excavator

you plan to use should be entered.

The information is available in the vehicle

handbook and should be displayed as a

sticker on the inside window of the

machine.

Page 24: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Excavator

Page 25: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Excavator

The lift radius should be the maximum distance that the excavator has to reach to complete the operation. It is measured from the centre of the machine to the tip of the boom.

The lift height / drop is the height that the lifting point will be at during the operation. Not the load!

Page 26: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Excavator

Inline /cross track is straight forward, will the load be lifted within 45° of being inline with the tracks. If greater than 45°the lift is cross track and deductions must be made.

Where the load will be initially lifted cross track and then brought in line prior to tracking, the cross track value should be used.

Where multiple lifts are planned, all lifts should be classed as cross track.

Page 27: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Lift

The maximum capacity of the excavator in the configuration previously identified must be entered.

Buckets should where possible be removed for lifting operations. If this is not possible then the weight must be deducted.

The weight of the quick hitch must also be deducted.

The weight of lifting equipment must then be deducted. In this case 55kg for the chains and 3 kg for the lifting keys.

Page 28: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

WeightsInformation on weights is available.

Page 29: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Lift

Once all the deductions have been made the final capacity figure should be entered. This figure is the safe working load (SWL) of the machine in this configuration.

Consult the document ‘Use and maintenance of Lifting Equipment’ prior to selecting lifting equipment.

Page 30: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Load

Lift Supervisor can plan and implement basic lifts only. They can supervise other lifts with plan in place.

An Appointed Person is required to be consulted for intermediate lifts and must plan complex lifts.

Page 31: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

The Load

This form and procedure only applies to basic repetitive lifts carried out on sites. Outside of these criteria the lift must be assessed by an Appointed Person.

As long as the item to be lifted is less than 80% of the excavator capacity (as calculated) then the lift can proceed.

If the lift is over 80% of capacity an Appointed Person must be consulted.

Page 32: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Movement & Location

Where the load weight exceeds 80% of the final capacity the AP must be consulted.Where the load is to be carried down a slope equal to or greater than 10° the AP must be consulted. This is due to the increase in radius due to the pendulum factor

In this case 4003 = 63% 6350

Weight of load & lifting Equipment =%Adjusted SWL

Page 33: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Movement & Location

Page 34: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Specific Risks

Hazards would include, choke points, scaffolds next to route, buildings, excavations, potential contact with pedestrians, underground services tracked over, overhead cables tracked under.If any of these are present the operator and lift supervisor should walk the route and identify control measures.All persons involved in the operation must sign the lift plan.

Page 35: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Wheeled Excavators

As can be seen the side tipping lines vary greatly depending on the locking of the oscillating axle and deployment of the blade and or stabilisers. It also as a significant impact on the lifting capacity.

The position of the front tipping line also depends upon the deployment of stabilisers and/or blade. As a rule, they are much more stale with stabilisers deployed.

Page 36: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Wheeled ExcavatorsEffect of Tyres on StabilityStability and load carrying capabilities can be adversely affected by issues such as:

• Incorrect tyre pressures• Differences in diameter of tyres on the

same axel due to deferential wear.• Difference of diameter in tyres on same

hub.• Incorrect ply rating• Use of poor spec tyres• Poor Tyre Repairs

Page 37: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

When things go wrong

Page 38: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

General

Based upon the CPA guidance we have created two procedures, one for 360 and one for 180 backhoe loaders.

Page 39: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Questions

?

Page 40: Test Lifting Operations Presentation 01 - ncsg.org.uk · OH&SF039 Lifting Plan The basic excavator lifting plan is intended to cover standard and repetitive lifting operations on

www.eshgroup.co.uk

Thank you for your time – any questions?