Target Energy Ltd OGIS New York April 2013 1
Transcript
Page 1: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

Target Energy Ltd

OGIS New York

April 2013

1

Page 2: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

This Presentation is provided on the basis that none of the Company nor its respective officers, shareholders,related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation orwarranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained inthe Presentation and nothing contained in the Presentation is, or may be relied upon as, a promise, representationor warranty, whether as to the past or the future. The Company hereby excludes all warranties that can beexcluded by law.

The Presentation contains prospective financial material which is predictive in nature and may be affected byinaccurate assumptions or by known or unknown risks and uncertainties, and may differ materially from resultsultimately achieved.

All persons should consider seeking appropriate professional advice in reviewing the Presentation and all otherinformation with respect to the Company and evaluating the business, financial performance and operations of theCompany. Neither the provision of the Presentation nor any information contained in the Presentation orsubsequently communicated to any person in connection with the Presentation is, or should be taken as,constituting the giving of investment advice to any person.

NOTE: In accordance with ASX Listing Rules, any hydrocarbon reserves and/or drilling update information in this report has been reviewed and signed off by MrLaurence Roe, B Sc, Managing Director of Target Energy, who is a member of the Society of Exploration Geophysicists and has over 30 years experience in thesector. He consents to that information in the form and context in which it appears.

Target reports Barrels of Oil Equivalent (BoE), using a gas to oil conversion rate based on equivalent thermal energy , i.e. 6000 cubic feet of gas = 1 Barrel of Oil).

Disclaimer

2

Page 3: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

3

• Target Energy Limited is an exploration and production company listed on the Australian Securities Exchange (ASX), stock code “TEX”, with offices in Houston, Texas and Perth, Western Australia.  

• The Company is in the process of providing access to its stock to US‐based investors via the OTCQX platform. This is expected to be in place in May 2013.  

• Target’s business strategy is to acquire meaningful acreage leaseholds in U.S. on‐shore hydrocarbon basins that have significant infrastructure, access to oilfield services and supply companies and, most importantly, significant un‐tapped hydrocarbon reserves. 

• Our objective is to grow production, reserves and cash flow “through the drill‐bit” by applying current oilfield technology to known hydrocarbon producing formations that will yield meaningful production, proved reserves, cash flow and shareholder value.

Business Strategy 

Page 4: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

4

• Producing assets in Permian Basin and in Texas & Louisiana Gulf Coast.

• Expanding Permian Basin assets.

• Growing oil production, reserves and cash flow through the drill bit.

• Company’s production increased by 320% in 2013 following successful Permian Basin drilling campaign.

• Ongoing 2013 drilling programs in Permian Basin and Louisiana likely to add significantly to Target’s production and reserves.

In Summary

Page 5: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

5

Corporate Snapshot 

Directors & Management

Chris Rowe ChairmanLaurence Roe Managing DirectorStephen Mann Non Executive DirectorRowan Caren Company Secretary

Ralph Kehle Chairman, TELA (USA)**Don Sytsma VP Finance, TELA (USA)Gregg Bonagurio Reservoir & Production EngineerBradley Holmes Investor Relations

*Subject to confirmation. **TELA (USA), Inc. is a wholly‐owned subsidiary of Target Energy.  

Shares on issue (ASX: TEX) 452.1m

Options (Warrants):  $0.10 exp 31 Mar 2014 40.5m$0.12 exp 24 Oct  2014 0.8m

Market cap A$36.2m (US$37.2m)

Company in process of providing access to stock for US‐investors via OTCQX platform. Expect trading on OTCQX (stock code “TEXQY”*) to commence in May 2013.

Page 6: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

IMGP4382

6

Page 7: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

7

Target Energy Projects

Page 8: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

8

Production, Appraisal & Development

Sand SML #A1 SML #A3 SML #A2

Marg Howie Yet to be produced Not Intersected Yet to be produced

1st Camerina Yet to be produced Yet to be produced In Production**

3rd Marg Tex Produced Yet to be produced* Produced

Lower 3rd Marg Tex Yet to be produced In Production Not Intersected

4th Marg Tex Produced Tight Produced

Hackberry A1 Not Reached Not Intersected Produced

Hackberry A4 Not Reached Produced Produced

Section 28 Project – St Martin Parish, Louisiana 

SML A1 presently shut‐in awaiting recompletion*May be partially depleted due to prior A1 production

**SML A2 recompleted in 1st Camerina in Feb 2013;Initial flow at 1500 mcfgd + 20 BCPD

• Target Energy Working Interest 25%• Attic production at Section 28 salt dome. Wells drilled 2007‐2009.

Page 9: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

9

East Chalkley Field, Cameron Parish, Louisiana

• Target Energy Working Interest 35%

• 2012 Independent Technical Specialist (RISC Pty Ltd) report on East Chalkley confirmed most likely technically recoverable reserves and resources (“2P/2C”) of 1.7 MMBO with an upside (“3P/3C”) estimate of 4 MMBO.

• Field producing  40‐50 BOPD from Pine Pasture #2 well.

• Updip oil development well (Pine Pasture #3) to be drilled in later April / May 2013  – potential Initial Production of 200‐300 BOPD. Downdip injection well planned for Q2/Q3.

• Potential for additional appraisal/development wells +  injectors to develop down dip sector plus additional development well + injector updip from existing production.

• Based on reserves from RISC report, Target estimates East Chalkley’s (“most likely”) NPV10 value at US$12.1 million net to Target with a (“upside”) PV10 value of US$31.8 million net to Target. 

Production, Appraisal & Development

Page 10: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

10Depth Alliance W2 (feet)/Google Earth Image1 mile

East Chalkley Field, Cameron Parish, Louisiana

Production, Appraisal & Development

Pine Pasture #3  Proposed LocationApril/May 2013

Page 11: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

11

Production, Appraisal & Development

East Chalkley Field, Cameron Parish, Louisiana

Page 12: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

IMGP4382

12

Page 13: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

13

• Howard & Glasscock Counties, West Texas

• Target Energy Lease‐hold (gross acres): 3,492

• Target Energy Working Interest:  60%

• Net Revenue Interest: 75%

• Estimated number of vertical development locations in 3,492 ac leasehold:

At 40 acre spacing 87

At 20 acre spacing 174

Howard & Glasscock Counties

Fairway ‐ Permian Basin Tight Oil Resource Play

Page 14: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

14

Fairway ‐ Permian Basin Tight Oil Resource Play

Source: Tudor Holt Pickering @ Executive Oil Conference 3 April 2012

Midland, Tx

Target Energy Fairway Project

Page 15: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

15

Fairway ‐ Permian Basin Tight Oil Resource Play

Howard Glasscock Field (1925)

1 mile

1.6 km

Howard CountyGlasscock County

Target Energy leaseholdings

IP = Initial Production

ProducerProposed Well Location

Darwin #1 (Sep 2012), #2 (Dec 2013) Combined 170 BOPD + 210 mcfgd

BOA 12 #125 BOPD

Darwin #3 proposed location 

Sydney #1 (Feb 2013) –Fusselman IP 150 BOPD + 200 mcfgd

Page 16: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

16

BOA  12 #1 Production Interval 

Equivalent prospective section in Darwin #1  

Equivalent producing zone in Darwin / Sydney (Fuss)  

Fairway ‐ Permian Basin Tight Oil Resource Play

Page 17: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

17

• Darwin #12012 Wolfberry/Fusselman well. Initial Fusselman reserves estimated at 200,000 BO. Well commenced production on 18 January. Currently producing at  110 BOPD with 155 mcfgd.

• Darwin #2Offset to Darwin #1. Well successfully re‐entered in December 2012. Well on pump 60 BOPD + 106 mcfgd.

• Sydney #1Drilling concluded in Feb 2013. Commence production from Fusselman IP at 150 BOPD + 180 mcfgd. 

• BOA 12#1Wolfberry well ‐ drilled late 2011. Currently producing app 25 BOPD + 100 mcfgd.

• Darwin #3800m east of Darwin #1. Permitting underway. Well will test Fusselman and Wolfberry. 

• Fairway gas is liquids rich (~1400 BTU), attracting premium pricing. 

• Partners are planning further drilling in Q3 2013.

Fairway ‐ Permian Basin Tight Oil Resource Play

Page 18: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

0

50

100

150

200

250

300

350

400

450

500BO

EPD

Fairway Project 2013 Gross Weekly Production (avg BOEPD)

18

Fairway ‐ Permian Basin Tight Oil Resource Play

Sydney 1 online

Darwin 2 online

Darwin 1 online

Darwin 1 10 day shut in 

awaiting equipment

Page 19: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

IMGP4382

19

Page 20: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

20

Sources:  Laredo Petroleum @ Executive Oil Conference 3 April 2012

Most operators still drilling vertical wells with stacked pays, but we are seeing a rapid acceleration in horizontal drilling. 

Fairway is also in the heart of the Cline Shale play trend

Fairway ‐ Permian Basin Tight Oil Resource Play

Page 21: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

21

Fairway ‐ Permian Basin Tight Oil Resource Play

Target Energy Fairway Project

Activity around Target leases: Laredo

Source: Laredo Petroleum, ADAM Dallas Luncheon 6 Dec 2012

Page 22: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

22

Fairway ‐ Permian Basin Tight Oil Resource Play

Target Energy Fairway Project

Source: Apache Energy, Bank of America Conference, 14 Nov 2012

Activity around Target leases: Apache

Page 23: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

23Source:  Apache Energy: Howard Weil 41st Annual Energy Conference 18 March 2012

Fairway ‐ Permian Basin Tight Oil Resource Play

Target EnergyLeases

Activity around Target leases: Apache

Page 24: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

24

Fairway ‐ Permian Basin Tight Oil Resource Play

• Permian Basin has multiple (expanding) proven vertical and horizontal plays.

• Wolfcamp / Cline / Strawn / Miss / Dev / Fusselman all present at Fairway.

• In Fairway project area, Target now producing over 230 BOEPD (net to our WI) from one Wolfberry and three Fusselman wells. Wolfberry yet to be tested in the Fusselman wells. 

• Further Wolfberry/Fusselman drilling at Fairway planned for late Q2/Q3 this year. 

• Reliable economics in vertical drilling: Wolfberry wells typically recover 120 – 130 mBOe. Fusselman wells such as Darwin #1 can recover 200 mBOe.

• Fairway leases also well placed in Cline Shale Fairway in Howard / Glasscock Counties. Additional Deadwood potential.

• Horizontal drilling activity already increasing in and around Fairway area – will add substantial value. Local (Apache) Cline Shale wells have EUR’s ranging up to 528 mBOE.  

Page 25: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

IMGP4382

25

Page 26: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

26

Fairway Project – Howard & Glasscock Counties, Tx TEX WI: 60%Production: Wolfberry/Fusselman

BOA 12 #1 (2011)  Darwin #1 (2012)      approx 320 BOPD + 400 mcfgdDarwin #2 (2012)     Sydney #1 (2013) 

East Chalkley Oil Field – Cameron Ph, La TEX WI: 35%Production: Alliance W2 sands – approx 40 ‐ 50 BOPD

Pine Pasture #1 shut‐inPine Pasture #2 (2008) 

Section 28 Project – St Martin Ph, La   TEX WI: 25%Production: MgTex/Hackberry – app 900 mcfgd + 25 BOPD 

Snapper #A‐1 (2007) shut‐in awaiting workoverSnapper #A‐2 (2008) Snapper #A‐3 (2009) 

Multiple pay zones in all wells. 

Merta Gas Field‐Wharton Co, Tx TEX WI: 25%Production: Cook Mountain – approx 350 mcfgd + 3 BOPD

Merta #1 (2009)

Projects – Gross Production

Page 27: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

27

Reserves

30/6/12 Audited Reserves & Exploration Potential (net to WI/NRI)

Fairway reserves not included 

Audited Reserves(000 BOE)

Proved & Probable

Possible Contingent (Best 

Estimate)

Contingent (High Estimate Increment)

Total

30 June 2012 132.9 88.9 315.5 490.8 1028.1

Subsequent to the Reserves Audit, the recent drilling at Fairway has added the following volumes (internal preliminary estimates ‐ unaudited):

PDP (Proved Developed Producing)*BOA 12 #1  Wolfberry 80 mBOe gross / 36 mBOe net TargetDarwin #1  Fusselman 200 mBOe gross / 90 mBOe net TargetDarwin #2  TBASydney #1  Fusselman 200 mBOe gross / 90 mBOe net Target

Additional PDNP (Proved Developed Non Producing) reserves exist at Darwin and Sydney but are yet to be quantified.

*Assumes current economic and operating conditions going forward. 

Page 28: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

IMGP4382

28

Resource Plays: Fairway• Building production profile:

o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013• Continuing drilling program in 2013.• Monitor expanding horizontal plays.

East Chalkley Oil Field Development: Pine Pasture #3 Well ( April/May 2013)Further Appraisal/Development Drilling

Ongoing Production:FairwaySection 28 Project AreaEast Chalkley Oil FieldMerta Gas Field

Continue evaluation of new opportunities:CorporateTechnical

What’s in the pipeline…

Page 29: TEX OGIS NY April 2013 - Target Energy Energy OGIS NY April 2013... · BOA 12 #1 25 BOPD Darwin #3 ... o Gross production increased from 25 BOPD to 320 BOPD in Q1 2013 • Continuing

29

1900 St James Place, #425Houston TX 77056 USA

Ph: +1 713 275 9800

Suite 5, 6 Richardson St,West Perth WA 6005 Australia

Ph: +61 8 9476 9000 

E: [email protected]

W: www.targetenergy.com.au


Recommended