A Campus Evaluation of A Campus Evaluation of TechnologyTechnology
http://starchart.esc12.net/http://starchart.esc12.net/
What does What does STaRSTaR stand for? stand for?
SS – School – School
TT – Technology – Technology
AA – And – And
RR – Readiness – Readiness
The School Technology and The School Technology and Readiness Chart is designed to:Readiness Chart is designed to:
1.1. Determine the progress towards Determine the progress towards meeting the goals of the Long-Range meeting the goals of the Long-Range plan for Technology.plan for Technology.
2.2. Determine the progress towards Determine the progress towards meeting goals of the school district.meeting goals of the school district.
3.3. Annually gauges the progress in Annually gauges the progress in integrating technology into schools.integrating technology into schools.
Texas Campus STAR ChartTexas Campus STAR Chart
This is a tool designed for use in:This is a tool designed for use in:
1.1. Technology planning.Technology planning.
2.2. Budgeting for resources.Budgeting for resources.
3.3. Evaluation of progress in local Evaluation of progress in local technology project.technology project.
1.1. Evaluate campus technologyEvaluate campus technology
2.2. Identify Strengths and WeaknessesIdentify Strengths and Weaknesses
3.3. Compare StatewideCompare Statewide
4.4. Meet goals of Long-Range Plan 2006-2020Meet goals of Long-Range Plan 2006-2020
5.5. Based on 4 point systemBased on 4 point system
1.1. Teaching and LearningTeaching and Learning
2.2. Educator Preparation and DevelopmentEducator Preparation and Development
3.3. Administration & SupportAdministration & Support
4.4. InfrastructureInfrastructure
1.1. EarlyEarly
2.2. DevelopingDeveloping
3.3. Advanced Advanced
4.4. TargetTarget
North Garland
High School STaR Chart 2008-2009
0
2
4
6
8
10
12
14
16
18
20
T. & L. E. P. & D. L. A. & IS. Inf. for Tech.
2007
2008
2009
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
Patterns Freq/Design Content Area TEKS StudentMastery
OnlineLearning
2007
2008
2009
0
0.5
1
1.5
2
2.5
3
3.5
Prof. Dev.Exp.
Models Capabilities Access toP.D.
Levels OnlineLearning
2007
2008
2009
0
0.5
1
1.5
2
2.5
3
3.5
Leader andVision
Planning Instr. Support Comm &Collab
Budget Sup forOnline
2007
2008
2009
0
0.5
1
1.5
2
2.5
3
3.5
Stu perComputer
ConnectSpeed
Other Tech Tech Support LAN WAN Dist LearningCap
2007
2008
2009
Meet all Technology Application TEKSMeet all Technology Application TEKS
Increase Resources and Re-allocate BudgetIncrease Resources and Re-allocate Budget
Focus on Students & Increase CIS StaffFocus on Students & Increase CIS Staff
On-demand Access for all Students in all On-demand Access for all Students in all ClassroomsClassrooms