Slide 1 © PharmOut 2018
TGA GMP cannabis facility – considerations
Trevor Schoerie - Managing DirectorAugust 2018
Typical Engineering Project
Presented by Trevor Schoerie8 August, 2018
XXYYZZ_XXX
Slide 3 © PharmOut 2018
Architectural and Engineering
Slide 4 © PharmOut 2018
Six Project Steps
Slide 5 © PharmOut 2018
STEP 01 – FEASIBILITY
• Project charter• Business idea and requirements• Pre-design hazard analysis• Order of magnitude estimate• Project brief
5%3 MONTHS
Slide 6 © PharmOut 2018
STEP 02 – Conceptual Development
• Project definition• Quality by design• User requirements specifications• Conceptual development / Option analysis• Project delivery strategy• Preliminary hazard analysis• Conceptual estimate (±30%)
5%1 MONTH
Slide 7 © PharmOut 2018
STEP 03 – Preliminary Design
• Project delivery plan• Testing strategy• Functional design• Preliminary design documentation• Design qualification• Preliminary hazard analysis• Basis of design
10%2 MONTHS
Slide 8 © PharmOut 2018
STEP 04 – Detailed Design
• Design management• Detailed design documentation
• Process• Architectural• Mechanical• Electrical• Automation
• Design qualification• Safe design• Value engineering• Pre-tender cost estimate
15%2 MONTHS
Slide 9 © PharmOut 2018
STEP 05a – Implementation
• Procurement Assistance and Management• Supplier pre-qualification• Procurement packages• Tender evaluation• FAT / SAT• ODC Cultivation / Production / Manufacture Licence• State Licence and related SOPs• OCD Import licence
10%3 MONTHS
Slide 10 © PharmOut 2018
STEP 05b – Implementation
• Construction Assistance and Management• Construction documentation• Contractor submittals• Construction assistance
15%12 MONTHS
Slide 11 © PharmOut 2018
STEP 05b – Implementation
• Testing and Licence• Commissioning• IQ/OQ/PQ• Process Validation• Training• State Licence and related SOPs• PQS and Qualification for TGA
licence
40%3 MONTHS
Slide 12 © PharmOut 2018
STEP 06 – Close-Out
• Documentation handover• Contractual close out• Post project review
GMP considerations
Presented by Trevor Schoerie8 August, 2018
XXYYZZ_XXX
Slide 14 © PharmOut 2018
52 PIC/S member authorities (1 January 2018)
4 Partners
EDQMEMA
UNICEFWHO
New Zealand
Iceland
Canada
USA
Argentina
South Africa
Australia
Malaysia
Taiwan
Switzerland
Norway
Indonesia
Ukraine
Singapore
Israel
Liechtenstein
EUROPEAN UNION Member States Agencies (29)
Japan
South Korea
Hong Kong
Thailand
Mexico
Iran
Turkey
Newest members 1 Jan 2018
Slide 15 © PharmOut 2018
Software “Six GMP Requirements”
1.PQSHow will you run your facility2. Validation –Documentary evidence the process / test method works
Slide 16 © PharmOut 2018
Good Documentation Practice GDP
Initials but no date.
Missing entry
Unit not specified
Date and initials but
original text not readable
Doc is still in draft. Use the approved test
sheet
Ditto marks not allowed
Incorrect entry
No explanation
why N/A
Empty space. Cross out + initials and
date
What us the company policy on rounding?
Slide 17 © PharmOut 2018
Designing DI into systems (ALCOA)
Attributable Legible/Permanent
Contemporaneous Original Accurate
Initials & Signature registers
Active directory, e-sig, audit trails, metadata
Control of blank forms, pen policy/white out
Documents available in right place at right time, +/-time limits
Verified ‘true copy’, scans
Reflective of the observation data checking
Data annotation tools, audit
trail
System clock, sync., transaction window
Metadata, data about the data that permits reconstruction
Data capture, manual data entry
Paper-based
Electronic
Slide 18 © PharmOut 2018
Product types -Edibles
Slide 19 © PharmOut 2018
US FDA
Sativex (EU/AU) - MS Epidiolex (FDA) - Dravetsyndrome (epilepsy)
Marinol (US FDA EU) Nausea
Construction considerations
Presented by Trevor Schoerie8 August, 2018
XXYYZZ_XXX
Slide 21 © PharmOut 2018
Hardware - Where do we start?
Feasibility / Concept design1. User brief product mix, initial & eventual volumes and jurisdictions2. Working backwards focussing on the process3. Consider WCM / Lean drives design4. Consider Economic Batch Quantities (EBQ)5. Shadow equipment in processing areas, 6. Then wrap the room around the process7. Consider the entire flow8. Even is you have BIM, consider marking out (tape) the floor9. Close your eyes, visualise each activity
Slide 22 © PharmOut 2018
Actions and decision register is keep up to date to ensure speed of delivery
Slide 23 © PharmOut 2018
Greenhouse vs indoors vs broadacre?
How do you choose your growing method?
Climatic factors will determine best options
• Canada vs Australia
• Sub-arctic vs temperate
Slide 24 © PharmOut 2018
TGA code – PIC/S version 13
§3.9. Where starting and primary packaging materials, intermediate or bulk products are exposed to the environment, interior surfaces (walls, floors and ceilings) should be smooth, free from cracks and open joints, and should not shed particulate matter and should permit easy and effective cleaning and, if necessary, disinfection.
§3.10 Pipework, light fittings, ventilation points and other services should be designed and sited to avoid the creation of recesses which are difficult to clean. As far as possible, for maintenance purposes, they should be accessible from outside the manufacturing areas.
should = must
Slide 25 © PharmOut 2018
Example of Indoor Growhttps://www.businessinsider.com.au/photos-canopy-growth-tweed-marijuana-grow-site-2017-3?r=US&IR=T
Slide 26 © PharmOut 2018
Heating Ventilation And Cooling (HVAC)
• Temperature • Humidity • Ventilation• Carbon Dioxide • Lighting• Turn down• Extreme weather event • Airflow / mixing• FMEA?• In room vs external• DX vs centralised
Slide 27 © PharmOut 2018
The main source of contamination is?
Did you know 50% of house dust is skin?
Slide 28 © PharmOut 2018
Central AHUParticlesMoistureCooling
ZC
ZC = Zone controlAir volume & reheat
ZC
ZC
ZC
ZC
ZC
Systems Configuration – Single Plant
Slide 29 © PharmOut 2018
Prevention of cross-contamination
Consider • Air locks and air extraction/ventilation and air filtration• Risk assess• Insects• Batch to batch • Pressure change when changing grades• Dedicated clothing• Within reason safety takes precedence over GMP
• Standard for most MC facilities will be ISO8 (at rest)• ISO 14664
Slide 30 © PharmOut 2018
Pressure cascade for ‘LIQUIDS’
++
+
o
Direction of air flow
Airlock
Operational Zone
Corridor
Supporting Zone
Door to open against the direction of the air flow. (closing with the air flow)
o – zero pressure+ - increase of (min.) 10 Pa ++ - additional increase of (min.) 10 Pa
Slide 31 © PharmOut 2018
Pressure cascade for ‘POWDERS’
o
+
++
Direction of air flow
Airlock
Operational Zone
Corridor
Supporting Zone
Door to open against the direction of the air flow. (closing with the air flow)
o – zero pressure+ - increase of (min.) 10 Pa ++ - additional increase of (min.) 10 Pa
Slide 32 © PharmOut 2018
Pressure cascade for ‘BUBBLE’
+
++
+
Direction of air flow
Airlock
Operational Zone
Corridor
Supporting Zone
Door to open against the direction of the air flow. (closing with the air flow)
o – zero pressure+ - increase of (min.) 10 Pa ++ - additional increase of (min.) 10 Pa
Slide 33 © PharmOut 2018
Pressure cascade for ‘SINK’
++
+
++
Direction of air flow
Airlock
Operational Zone
Corridor
Supporting Zone
Door to open against the direction of the air flow. (closing with the air flow)
o – zero pressure+ - increase of (min.) 10 Pa ++ - additional increase of (min.) 10 Pa
Slide 34 © PharmOut 2018
Differential Pressure Requirements
• GMPs require Cascading Air Flows using differential pressure from cleanest to least clean. Pressure difference between areas of different class:
• 0.05” wg = 12.5 Pascals• PIC/S Annex 1: 10 – 15 Pa (guidance value)
Slide 35 © PharmOut 2018
Preferred option for clean rooms
Cost• Shouldn’t always be
at the top of the list.• Remember you should
be considering >20 years life.
Local sourcing• Materials• Labour to install• Technical support
Construction environment• Clean/dirty• Dry/wet
Project lead times and decision making• Have to make
decisions early for pre-fabricated
• Have longer to cogitate for stick-built
Modification and relocation requirements• Is the systems
compatible with development and evolution of the business operations?
Repair• In house • Local resources• Vendor dependent
Slide 36 © PharmOut 2018
Other attributes of the construction system
Ceiling
Suspended
Bridging on walls
Walk-on
Low level return air ducts
In wall construction
Double wall required
Plant on surface
Services in walls
In wall thickness
In a service pod on wall
In a service chase
Slide 37 © PharmOut 2018
Masonry construction
Slide 38 © PharmOut 2018
Masonry construction
• Masonry walls• Concrete ceiling• Hard plaster (gypsum)• Door frames set into the wall structure• Applied epoxy paint to walls• Thin epoxy floor finish or vinyl
Slide 39 © PharmOut 2018
Gypsum or Calcium Silicate board and frame
• Metal frame• Calcium silicate or Gypsum board
attached• Joints taped• Finish applied – this case a glass
reinforced polyester resin.
Slide 40 © PharmOut 2018
Glass Reinforced Polyester (GRP) clean room system
Slide 41 © PharmOut 2018
Metal panel construction system
Slide 42 © PharmOut 2018
FloorChannels...
Metal panel construction system
42
Slide 43 © PharmOut 2018
. . Ceiling Channels...
Metal panel construction system
Slide 44 © PharmOut 2018
...Glazing...
…Single
Or
double
Window details
Slide 45 © PharmOut 2018
….Doors….SwingSlide
PoweredRoller
Doors
Slide 46 © PharmOut 2018
Door attributes
• Swing doors should close with air pressure.• Often need to work with electromechanical interlock systems• Doors should be self closing (soft close to avoid pressure shocks).• Hygienic design. Avoid cavities and ledges.• Powered doors
• Becoming more common• Ensures optimum open/close rate• Can help avoid hand contact
• Sliding doors• Ensure cleanroom style• Avoid floor tracks• Ensure top track cleanable
Slide 47 © PharmOut 2018
FLUSH with the Panel…
Slide 48 © PharmOut 2018
Walk-on ceiling
Slide 49 © PharmOut 2018
Equipment Integration
Slide 50 © PharmOut 2018
Slide 51 © PharmOut 2018
Thank you
Trevor Schoerie
Executive Consultant
www.pharmout.net