Page 1 of 32 MINUTES OF THE 234 th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE ROOM, GUJARAT POLLUTION CONTROL BOARD, GANDHINAGAR. ------------------------------------------------------------------------------------------------ The 234 th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 21 st April 2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting: 1. Shri T. P. Singh, Chairman, SEAC. 2.Shri K.C. Mistry, Secretary, SEAC 3. Dr. Nikhil Desai, Member, SEAC. 4. Shri V. C. Soni, Member, SEAC. 5. Dr. Mayuri Pandya, Member, SEAC 6. Shri Natrajan Pratap,Member, SEAC 7. Shri R.J. Shah, Member, SEAC 8. Shri V.N. Patel, Member, SEAC Following officers from the Geology and Mining Department attended the meeting: 1. Shri S. M.Khopkar, Asst. Geologist, Dist: Navsari and Dist: Valsad 2. Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur. 3. Shri D.K. Patel, Geologist, Dist: Surat. 4. Shri R. K. Modi,I/C Geologist,Dist:Amreli. 5. Shri K. N. ahavadia,Asst. Geologist, Dist: Rajkot, 6. Shri Nirav Barot, Asst. Geologist, Dist: Botad and Bhavnagar. 7. Shri Jatin K Gor, Geological Asst.,Dist:Bharuch In all 428 proposals of minor minerals which have been received by the Committee through the Office of the Mining Commissioner, Gandhinagar including proposals scheduled on 15 th and 16 th April 2015 were taken up in the meeting. Considering the scale of individual projects, all the cases were categorized as B2 and appraised individually based on the information furnished in the Form-1 and performa endorsed by the district Geologist / Asst. Geologists District Sand Mining Black Trap Stone Mining Granite Mining Building Lime stone Dolerite Total Navsari 112 44 0 0 0 0 156 Bharuch 2 0 0 0 0 0 2 Valsad 0 16 0 0 0 0 16 Surat 45 17 3 0 0 0 65 Rajkot 20 27 0 0 2 1 50 Amreli 0 25 0 0 4 0 29 Chota Udepur 19 0 0 3 0 0 22 Botad 23 29 0 0 4 0 56 Bhavnagar 14 18 0 0 0 0 32 Total 235 176 3 3 10 1 428
Transcript
Page 1: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 1 of 32  

MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE ROOM, GUJARAT POLLUTION CONTROL BOARD, GANDHINAGAR.

------------------------------------------------------------------------------------------------

The 234th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 21stApril 2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting:

1. Shri T. P. Singh, Chairman, SEAC. 2.Shri K.C. Mistry, Secretary, SEAC 3. Dr. Nikhil Desai, Member, SEAC. 4. Shri V. C. Soni, Member, SEAC. 5. Dr. Mayuri Pandya, Member, SEAC 6. Shri Natrajan Pratap,Member, SEAC 7. Shri R.J. Shah, Member, SEAC 8. Shri V.N. Patel, Member, SEAC Following officers from the Geology and Mining Department attended the meeting:

1. Shri S. M.Khopkar, Asst. Geologist, Dist: Navsari and Dist: Valsad 2. Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur. 3. Shri D.K. Patel, Geologist, Dist: Surat. 4. Shri R. K. Modi,I/C Geologist,Dist:Amreli. 5. Shri K. N. ahavadia,Asst. Geologist, Dist: Rajkot, 6. Shri Nirav Barot, Asst. Geologist, Dist: Botad and Bhavnagar. 7. Shri Jatin K Gor, Geological Asst.,Dist:Bharuch

In all 428 proposals of minor minerals which have been received by the Committee through the Office of the Mining Commissioner, Gandhinagar including proposals scheduled on 15th and 16th April 2015 were taken up in the meeting. Considering the scale of individual projects, all the cases were categorized as B2 and appraised individually based on the information furnished in the Form-1 and performa endorsed by the district Geologist / Asst. Geologists

District Sand Mining

Black Trap

Stone Mining

Granite Mining

Building Limestone

Dolerite Total

Navsari 112 44 0 0 0 0 156 Bharuch 2 0 0 0 0 0 2 Valsad 0 16 0 0 0 0 16 Surat 45 17 3 0 0 0 65 Rajkot 20 27 0 0 2 1 50 Amreli 0 25 0 0 4 0 29 Chota Udepur 19 0 0 3 0 0 22 Botad 23 29 0 0 4 0 56 Bhavnagar 14 18 0 0 0 0 32 Total 235 176 3 3 10 1 428

Page 2: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 2 of 32  

SAND MINING PROJECTS-DISTRICT NAVSARI

Sr. No.

Name of Applicant

Lease Area in Hactare

Address of site

Name of River

Village Taluka Rate of Mining

1 Dharmeshbhai Naranbhai Oad

01-96-79 Ha

Op. S.No. 269,703/2

Purna river

--- ---- 698 MT/M

2 Fakirbhai Gulambhai Motarwala

01-70-00 Ha

B. No. Op. S. No. 384,385,428,430

Ambika river

Kachholi Gandevi 6035 MT/M

3 Kanubhai Lakhubhai Od

01-55-00 Ha

Op. B. No. 132 Ambika river

Ajarai Gandevi 5502 MT/M

4 Manojbhai Mangabhai Oad

03-00-00 Ha

B. No. Op. 646 to 686

Ambika river

Bhatha Gandevi 10650 MT/M

5 Parulben Vijaybhai Naik

00-54-60 Ha

Op. B. No. 439 Ambika river

Kolva Gandevi 1938 MT/M

6 Salim Yusuf Sidat 01-00-00 Ha

B. No. Op. 1551,161

Ambika river

Matwad Gandevi 3550 MT/M

7 Saraswatiben Kanubhai Oad

03-89-26 Ha

S. No. 889 Ambika river

Kalmatha

Gandevi 4000 MT/M

8 Pravinchandra M Patel

00-27-15 Ha

S. No. Opp. 1125

Ambika river

Tadvi Jalalpor 1300 MT/M

9 Bipinbhai Dahyabhai Patel

01-00-00 Ha

Opp. Of B. No. 583,587

Ambika river

Machhad Jalalpor 2600 MT/M

10 Bipinbhai Dahyabhai Patel

02-00-00 Ha

Opp. Of B. No. 590

Ambika river

Machhad Jalalpor 2600 MT/M

11 Pramodbhai P Patel

01-88-00 Ha

Opp. Of B. No. 590/1

Ambika river

Machhad Jalalpor 1300 MT/M

12 Arvindbhai Ravjibhai Patel

01-20-00 Ha

Opp. Of B. No. 590

Ambika river

Machhad Jalalpor 1300 MT/M

13 Umakantbhai J Prajapati

01-00-00 Ha

Opp. Of B. No. 590

Ambika river

Machhad Jalalpor 1170 MT/M

14 Manubhai Chhibabhai Solanki

00-50-00 Ha

S. No. 131 to 193, 195 & 205

Ambika river

Jogvad Chikhali 1775 MT/Year

15 Manojkumar Ashokbhai Gamit

00.90.00 Opp.Block No. 252&261

Ambika river

Bartad Vansda 3195 MT/M

16 Govindbhai V Patel 00-52-65 Ha

Op. S. No. 266,359

Purna river

Supa --- 1870 MT/M

17 Prashant S Nayak 00--69-70 Op. S. No. 106,107

Purna river

Pera --- 1725 MT/M

18 Dharmeshbhai Naranbhai Oad

01-50-00 Ha

Op. S. No. 478,478/1

Purna river

Amadpor Navsari 1242 MT/M

19 Satish Ramanbhai Patel

01-00-00 Ha

B. No. op. S. No. 367,368,1,2,3

Vanganiya river

Desad Gandevi 3550 MT/M

20 Kishorbhai Sumanbhai Patel

0.40.00 Opp Sr. No. 601,602

Purna river

Muldhara Navsari 1180 MT/M

21 Thakorbhai Ambelal Ode

1.33.00 Opp.B. No.10,11,17/1,17/2,18 &19

Ambika river

Dhamdachha

Gandevi 4721 MT/M

Page 3: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 3 of 32  

22 Alkaben Dalpatbhai Patel

1.00.00 Opp. B. No. 273

Ambika river

Torangam

Gandevi 3550 MT/M

23 Amrutbhai Ranchhodbhai Patel

00.32.00 Opp. Sr. No. 17,18

Ambika river

Boriach Navsari 3550 MT/M

24 Laxmanbhai Mangubhai Od

00.42.00 Opp. Sr. No.117, 118, 120

Ambika river

Sonvadi Gandevi 1491 MT/M

25 Rameshbhai Lalbhai Patel

1.00.00 B. No. 166, 167, 189

Ambika river

Khambhaliya

Vansda 3550 MT/M

26 Sudhaben Rakeshbhai Halpati

0.546 Opp.B. No. 136, 140 & 145

Ambika river

Sonwadi Gandevi 1938 MT/M

27 Chhanabhai JethabhaiHalpati

00.42.32 Opp. B. No. 587 to 591

Ambika river

Khaparia Gandevi 1502 MT/M

28 Ahmadali Adam Ravat

00.60.60 Opp. B. No. 299

Ambika river

Kumbhar Faliya

Navsari 2151 MT/M

29 Shri Kanubhai Lakhubhai Od

04.00.00 Ambika river

Ajarai Gandevi 14200 MT/M

30 Dilipbhai Dayabhai Patel

2.00.00 Opp. B. No. 117, 47,

Ambika river

Kharjai Vansda 7100 MT/M

31 Ratnasinh Amarsinh Od

00.25.42 Opp. Sr. No. 599,598, 590

Ambika river

Muldhara Navsari 750 MT/M

32 Laljibhai Chhaganbhai Gamit

1.00.00 Opp. B. No. 223

Ambika river

Bartad Vansda 3550 MT/M

33 Karshanbhai Gemalbhai Od

00.39.60 Opp.Sr. No. 111, 112

Purna river

Tarsadi Navsari 470 MT/M

34 President/Secrerary, Vikas Mandal

01.68.60 Opp. Sr. No. 70,50 to 55

Purna river

Supa Navsari 4000 MT/M

35 Ranchhodbhai D. Patel

04.00.00 Opp.Sr. No. 58,58,59

Purna river

Kurel Navsari 220 MT/M

36 Karshanbhai Gemalbhai Od

00.48.00 Opp.Sr. No. 98,99,100,136

Purna river

Kurel Navsari 1704 MT/M

37 Shri Chandubhai Chhanabhai

01.84.00 --- Ambika river

Ajarai Gandevi 6532 MT/M

38 Amrutbhai Ranchhodbhai Patel

01.30.00 Opp.Sr. No. 199

Ambika river

Boriach Navsari 4615 MT/M

39 Sadik Ismail Sidat 1.00.00 Opp.B.No. 299 Ambika river

Kumbhar Faliya

Navsari 3550 MT/M

40 Mohmadhanif Ismail Isat

1.13.00 Opp. B. No. 913, 914

Ambika river

Nogama Chikhli 4011 MT/M

41 Laxmanbhai Mangubhai Od

00.55.00 Opp. Sr. No. 83,84,85

Ambika river

Sonvadi Gandevi 1952 MT/M

42 Ashokbhai Chhitubhai Nayak

0.48.00 Opp.B. No. 180 & 181

Ambika river

Jogvad Chikhli 3550 MT/M

43 Ashokbhai Chhitubhai Nayak

1.00.00 Opp. B. No. 239 to 244

Ambika river

Jogvad Chikhli 3550 MT/M

44 Ahmadali Adam Ravat

00.92.80 Opp. B. No.368, 370

Ambika river

Nagdhara

Navsari 3294 MT/M

45 Laxmanbhai Mangubhai Od

2.00.00 Opp.Sr. No. 105,105,107,110,113

Ambika river

Sonvadi Gandevi 7100 MT/M

Page 4: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 4 of 32  

46 Kanubhai Lakhubhai Oad

04.00.00 Sr. No. 837 Ambika river

Morali Gandevi 14200 MT/M

47 Devangkumar Balubhai Patel

1.00.00 B. No. 170,173,174

Ambika river

Sindhai Vansda 7100 MT/M

48 Manojbhai Naranbhai Oad

01.75.00 Opp.Sr. No.703, 714, 716 715, 660

Ambika river

Amadpor Navsari 62012 MT/M

49 Amrutbhai Ranchhodbhai Patel

01.00.00 Opp.Sr. No.199, 211

Ambika river

Boriach Navsari 3550 MT/M

50 Shri Hareshbhai Chandubhai Od

02.00.00 ==== Ambika river

Ajarai Gandevi 7100 MT/M

51 Govindbhai Vanmalibhai Patel

00.63.82 Opp. Sr. No. 359

Purna river

Supa Navsari 2270 MT/M

52 Govindbhai Vanmalibhai Patel

01.00.00 Opp.Sr. No. 266

Purna river

Supa Navsari 3550 MT/M

53 Govindbhai Vanmalibhai Patel

00.25.00 Opp.Sr. No. 266, 359

Purna river

Supa Navsari 8875 MT/M

54 Arpan Ashokbhai Patel

03.00.00 Opp.Sr. No. 2,11,12,13,

Purna river

Muldhara Navsari 5325 MT/M

55 Govindbhai Vanmalibhai Patel

01.00.00 Opp. Sr. No. 364

Purna river

Supa Navsari 3550 MT/M

56 Govindbhai Vanmalibhai Patel

00.45.00 Opp.Sr. No. 364

Purna river

Supa Navsari 1600 MT/M

57 Arpan Ashokbhai Patel

02.24.50 Opp. Sr. No. 411,404,403

Purna river

Amari Navsari 7950 MT/M

58 Arpan Ashokbhai Patel

01.44.00 Opp. Sr. No. 41, 39, 44, 45, 46, 47, 50

Purna river

Supa Navsari 5112 MT/M

59 Arpan Ashokbhai Patel

02.00.00 Opp. Sr. No. 1784, 185, 186

Purna river

Muldhara Navsari 3550 MT/M

60 Pravinbhai V. Patel 02.00.00 Opp. Sr. No. 43,44,46,48,49

Purna river

Kasbapar

Navsari 7100 MT/M

61 Pravinbhai V. Patel 0.54.00 Opp.Sr. No. 82, 100

Purna river

Supa Navsari 1920 MT/M

62 Pravinbhai V. Patel 1.10.00 Opp.Sr. No. 82 77

Purna river

Supa Navsari 1936 MT/M

63 Pravinbhai V. Patel 1.48.00 Opp. Sr. No. 142, 143

Purna river

Supa Navsari 5250 MT/M

64 Pravinbhai V. Patel 00.30.00 Opp.Sr. No. 235, 237, 238

Purna river

Tarsadi Navsari 530 MT/M

65 Pravinbhai V. Patel 0.64.00 Opp. Sr. No. 173, 174

Purna river

Khergam Navsari 760 MT/M

66 Pravinbhai V. Patel 02.30.00 Opp. Sr. No. 2,8,11 to 14

Purna river

Muldhara Navsari 4080 MT/M

67 Pravinbhai V. Patel 02.00.00 Opp.Sr. No. 48,51,53,56,57, 60,61

Purna river

Kasbapar

Navsari 7100 MT/M

68 Harishbhai Gemalbhai Od

00.62.00 Opp. Sr. No. 74

Purna river

Kurel Navsari 1470 MT/M

69 Purna Vibhag Int Utpadak Sahakari Mandali Ltd-Dharagiri

00.46.00 Opp. Sr. No. 74,75

Purna river

Kurel Navsari 1100 MT/M

Page 5: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 5 of 32  

70 Rajubhai Naginbhai Od

00.28.00 Opp. Sr. No. 84,86

Purna river

Kurel Navsari 6600 MT/M

71 Pravinbhai V. Patel 01.63.52 s.n- 273/1 Purna river

Kabilpor Navasari 5804 mt/m

72 Pravinbhai V. Patel 01.80.88 s.n- 574 to 577 Purna river

Pinsad Navasari 6421 mt/m

73 Pravinbhai V. Patel 02.20.88 s.n- 356,355,344,341

Purna river

Supa Navasari 7841 mt/m

74 Arpan Ashokbhai Patel

02.43.00 s.n- 62 to 67 Purna river

Pinsad Navasari 8626 mt/m

75 Arpan Ashokbhai Patel

04.94.00 s.n- 49 to 62 Purna river

Pinsad Navasari 17537 TPA

76 Pravinbhai V. Patel 01.50.00 s.n- 616,619,620

Purna river

Muldhara Navasari 5325 mt/m

77 Pravinbhai V. Patel 00.90.24 s.n- 235,236,238

Purna river

Tarsadi Navasari 3203 mt/m

78 Arpan Ashokbhai Patel

01.10.40 s.n- 432 to 435 Purna river

Amari Navasari 3919 mt/m

79 Pravinbhai V. Patel 00.81.25 s.n- 574 to 577 Purna river

Pinsad Navasari 2884 mt/m

80 Pravinbhai V. Patel 01.34.00 s.n- 465,345/2 Purna river

Kasbapar

Navasari 4757 mt/m

81 Pravinbhai V. Patel 00.64.40 s.n- 223,224,225

Purna river

Tarsadi Navasari 2286 mt/m

82 Parvatiben Ishwarlal Dhimar

01.00.00 s.n- 103 Purna river

Dharagiri Navasari 3550 mt/m

83 Gram Vikas Mandal

00.70.00 s.n- 71 to 76 Purna river

Supa Navasari 2485 mt/m

84 Pravinbhai V. Patel 03.00.00 s.n- 180 to 184 Purna river

Muldhara Navasari 10650 MT/M

85 Pravinbhai V. Patel 04.80.00 s.n- 12 to 18 Purna river

Pinsad Navasari 17040 TPA

86 Nagjibhai Gemalbhai Oad

01.50.00 s.n- 478 Ambika river

Amadpor Navsari 5325 TPA

87 Najmabanu Hanifbhai Motorwala

00.76.00 s.n- 361 Ambika river

Khakhwada

Gandevi 2500 TPA

88 Parulbhai Vijaybhai Naik

00.86.40 s.n- 51 Ambika river

Kolva Gandevi 3067 TPA

89 Prashant S.Naik 01.60.00 s.n- 62,72 Purna river

Kurel Navasari 5680 TPA

90 Govindbhai Vanmalibhai Patel

00.20.88 s.n- 234,235 Purna river

Tarsadi Navasari 800 TPA

91 Dipakbhai Ranchodbhai Oad

00.37.50 s.n- 264,263 Purna river

Kurel Navasari 1331 TPA

92 Dipakbhai Jayntilal Prajapati

04.80.00 s.n- 590 Purna river

Machhad Jalapor 17040 TPA

93 Dilipbhai Dahyabhai Patel

01.60.00 s.n- 71 Khapri river

Vati Vansda 5680 TPA

94 Dilipbhai Dahyabhai Patel &Kishorbhai Patel

01.20.00 s.n- 48 to 50 Khapri river

Vati Vansda 4260 TPA

Page 6: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 6 of 32  

95 Dharmeshbhai Naranbhai Oad

00.35.00 s.n- 110,111,112

Ambika river

Jalapor Jalapor 1242 TPA

96 Chetanbhai N.Patel 00.42.52 s.n- 321 Purna river

Veraval Jalapor 1509 TPA

97 Sardaben Naginbhai Oad

1.76.16 s.n- 192,194,197

Ambika river

Ajrai Gandevi 6253 TPA

98 Varshaben Jayesbhai Patel

01.00.00 s.n- 273 Ambika river

Torangam

Gandevi 3067 TPA

99 Parulben Vijaybhai Naik

00.81.00 s.n- 01,51,52,53

Ambika river

Kolva Gandevi 2875 TPA

100 Parulbhai Vijaybhai Naik

01.00.00 s.n- 53,54,55 Ambika river

Kolva Gandevi 3550 TPA

101 Yusuf Ibrahim Sidat

01.00.00 s.n- 163 to 165 Ambika river

Matwad Gandevi 3550 TPA

102 Lilaben Ranchodbhai Oad

01.56.00 s.n- 504,505,508

Purna river

Supa Navasari 5538 TPA

103 Kamuben Sonubhai Oad

01.00.00 s.n- 583,590 Purna river

Mchhad Jalapor 3550 TPA

104 Parimal S Naik 02.50.00 s.n- 9,10,515 Purna river

Supa Navasari 8875 TPA

105 Yusuf Ibrahim Sidat

00.73.44 s.n- 18,22 Ambika river

Boriach Navasari 2607 TPA

106 Pravinaben Dineshbhai Patel

00.50.00 s.n- 250,251 Ambika river

Torangam

Gandevi 1775 TPA

107 Yusuf Ibrahim Sidat

01.00.00 s.n- 163 to 165 Ambika river

Matwad Gandevi 3550 TPA

108 Fakirbhai Mohmad Motala

03.15.00 s.n- 299,348 to 350

Ambika river

Kumbhar Faliya

Navasari 11182 TPA

109 Jagdishbhai Babubhai Patel

04.80.00 s.n- 55,56,57,58,59

Ambika river

Devdha Gandevi 17040 TPA

110 Harshbhai Thakorbhai Patel

04.80.00 s.n- 40,41,42 Ambika river

Devdha Gandevi 17040 mt/m

111 Lallubhai Bhikhabhai Patel

03.84.00 s.n- 141 to 144 157 to0159

Ambika river

Ajrai Gandevi 13632 mt/m

112 Hiraben Fulabhai Od

00-70-00 S.No.264 Purna river

Kurel Navsari 2485 TPA

Shri S.M.Khopkar, Asst.Geologist, Dist:Navsari represented the above proposals.He also informed that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. After detailed deliberation, committee asked Shri S.M.Khopkar, Asst. Geologist, Dist: Navsari to submit written confirmation regarding which of the above proposals include instream minng and which of the proposals are in dry river bed. It was decided by the committee that after submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting. BLACKTRAP MINING PROJECTS-DISTRICT NAVSARI

Sr.No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Raj Quarry Works (Chandubhai Somabhai Patel)

01-75-00 Ha S. No. 602 A/B, B.No. 1754 paiki

Alipore Chikhali 10000 MT/M

Page 7: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 7 of 32  

2 Bajrang Stone Quarry Works (Pareshbhai J Patel)

02-00-00 Ha B. No. 480, 481

Rethavaniya

Chikhali 4166 MT/M

3 Gulambhai Ahmedbhai hajat 01-52-90 ha B. No. 289 p1 & 289 P2

Rethavaniya

Chikhali 2500 MT/M

4 Amrutlal Patel (Vikaram Quarry Works)

01-94-53 Ha B. No. 1888

Degam Chikhali 4166 MT/M

5 Ravi Stone Quarry Works (Rajeshbhai Hargovindbhai Itwala)

00-60-00 Ha B. No. 353 paiki 2

Khundh Chikhali 6250 MT/M

6 Shri Ram Stone Quarry (Jitendrabhai Ishverbhai Patel)

04-22-63 Ha B. No. 110/2/2

Duvada Chikhali 16500 MT/M

7 Rameshbhai K Patel (Amardeep Metal Works)

01-04-28 Ha S. No. 1884

Degam Chikhali 8690 MT/M

8 Black Diamond Stone Enterprise

00-96-10 Ha B. No. 1754

Degam Chikhali 14500 MT/M

9 Nareshbhai A Patel (Rajhans Metal)

01-41-32 Ha B. No. 2021 to 2026

Alipore Chikhali 18750 MT/M

10 Black Diamond Stone Enterprise

01-41-63 Ha B. No. 1690

Degam Chikhali 33500 MT/M

11 Om Sai Metal 00-73-04 Ha S. No./B. No. 1833

Alipore Chikhali 10000 MT/M

12 Omkar Quarry Works (Hitendrabhai Bhimjibhai Patel)

00-43-23 Ha B. No. 1991 paiki

Alipore Chikhali 3000 MT/M

13 Raj Stone Supplying Company (Chandubhai Somabhai Patel)

01-00-00 Ha S. No. 602 A/B, B.No. 1750 paiki

Alipore Chikhali 6200 MT/M

14 Duvada Stone Supplying Company (Dineshbhai Nanubhai Itwala

00-85-50 Ha S. No. 269, B. No. 353 paiki

Khundh Chikhali 6250 MT/M

15 Jay Ambe Quarry (Hargovinddas Bhikhubhai Mistry)

01-45-69 Ha B. No. 1983

Alipore Chikhali 14160 MT/M

16 Kantaben Maganbhai Patel 01-27-36 Ha B. No. 234

Jamanpada

Chikhali 1666 MT/M

17 Gautamkumar K Patel 01-74-35 Ha B. No. 1874 B

Alipore Chikhali 14583 MT/M

18 Mueshbhai Rajendraprasad Thakur (Vishal Metal)

00-63-29- Ha B. No. 2049

Degam Chikhali 37500 MT/M

19 Bajrang Stone Quarry Works (Pareshbhai J Patel)

00-90-00 Ha B. No. 735

Chasa Chikhali 4166 MT/M

20 Satish M Patel (Tirupati Stone Metal)

01-61-26 ha B. No. 1895

Degam Chikhali 25000 MT/M

21 Kishorbhai haribhai Patel (Shree Umiya Stone Quarry Works )

01-92-67 Ha B. No. 1768

Degam Chikhali 12500 MT/M

22 Shivabhai A Patel (Gayatri Quarry Works)

01-00-00 Ha B. No. 483

Rethavaniya

Chikhali 4166 MT/M

Page 8: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 8 of 32  

23 Manubhai Pursotambhai Patel (Bhavin Quarry Works)

01-72-55 Ha B. No. 1752, 1754 p1

Alipore Chikhali 8333 MT/M

24 Rameshbhai K Patel (Somnath Stone Ind)

00-29-54 Ha B. No. 1885

Degam Chikhali 11500 MT/M

25 Gautamkumar K Patel (Urvi Stone Pro)

01-00-00 Ha B. No. 1873

Degam Chikhali 4166 MT/M

26 Rameshbhai K Patel (Amardeep Metal)

01-58-46 Ha B. No. 874-A

Degam Chikhali 12500 MT/M

27 Bhimjibhai L Gondaliya (Jay Khodiyar Metal)

02-22-82 Ha B. No. 1989 paiky 2 &3

Alipore Chikhali 37500 MT/M

28 Hitendrabhai Bhimajibhai Patel

00-99-22 Ha B. No. 1976,1977 paiki

Alipore Chikhali 6000 MT/M

29 Shri Ram Stone Quarry 4.22.63 ha Block No. 110/2/2

Duvada Gandevi 16666 MT/M

30 Shiv Quarry Works 02.79.45 Ha Sr. No. 100-A&100 B

Debarpada

Chikhli 195615 MT/M

31 Shree Vinayak Stone 01.20.83 Ha B. No 1852

Degam Chikhli 155065 MT/M

32 Patel Metals 01.00.00 Ha B.No. 1800

Degam Chikhli 102666 MT/M

33 Bharat Kumar Gopalbhai Patel

1.99.37 Ha Block No. 150(P), Sr. No. 134

Duvada Gandevi 4166 MT/M

34 Mr. Amitkumar Mathurbhai Kaneriya

01.20.58 Ha B. No.1894

Degam Chikhli 2,00,000 MT/Y

35 Shri Dilipbhai Bhagubhai Patel

00.60.00 Ha B. No. 150(P)

Duvada Gandevi 10000 MT/M

36 Damyantiben D. Patel 00.76.00 Ha B. No. 131 (P)

Duvada Gandevi 8333 MT/M

37 Krishna Metals 00-50-66 Ha B. No. 1742/paiki

Chasa Chiikhali 5000 MT/M

38 Bilal Ahmad Salim Divan 01.00.00 Ha s.n- 724p Alipor Chikhali 6666 mt/m

39 Kalyan Quarry Works 03.40.95 Ha s.n- 197 Duvada Gandevi 17000 mt/m

40 Devjibhai L. Gondaliya 01.36.12 Ha s.n- 1989/p-1

Alipor Chikhali 25000 mt/m

41 Bhimjibhai L.Gondaliya 00.92.40 Ha s.n- 1989/p-4

Alipor Chikhali 18750 mt/m

42 Vinodkumar Govindbhai Viradiya

00.69.81 Ha s.n- 150 P Duvada Gandevi 11500 TPA

43 Shri Yusuf Ismail Jasat 00.56.72 Ha B. No. 2174

Aalipor Chikhli 10000 MT/M

44 Laxmi Metal Quarry Works

3.00.00 Ha Block No. 1848, 1848 / p1, 1847 & 1844

Degam Chikhli 123200MT/M

Page 9: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 9 of 32  

Shri S.M.Khopkar, Asst. Geologist, Dist: Navsari mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

SAND MINING PROJECTS-DISTRICT BHARUCH

Sr. No.

Name of Applicant Lease Area in Hactare

Address of site

Name of River

Village Taluka Rate of Mining

1 Jayntibhai RamjibhaiVamja

1.77.00 s.n- 260 Narmada Indor Zagadiya 15000 MTPA

2 Vipulbhai Harendrabhai Patel

1.21.00

s.n- 253 Narmada Indor Zagadiya 10000 MTPA

Shri Jatin K Gor, Geological Asst. represented that sand excavation will be done only from dry river bed. It was also represented that none of the above lease areas is situated in coastal regulation zone. No any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. Sand is proposed to be excavated up to 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of each of the cases, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015. BLACKTRAP MINING PROJECTS-DISTRICT VALSAD

Sr.No. Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 R.R Mishra Stone Qqarry

1.00.00 s.n- 64/A Orwad Killa Pardi 7500 mt/m

2 Shree Laxmi Stone Suppliers

00.81.00 s.n- 64/A/2

Orwad Pardi 30,000 TPA

3 Harjibhai Putiyabhai Thorat

00.51.00 s.n- 316 Kakadkopar Kaprada 16,000 TPA

Page 10: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 10 of 32  

4 Shree Ghanshyam Stone Quarry

01.21.41 s.n- 365/p Khadki Pardi 35000 TPA

5 Padma Stone 00.92.75 s.n- 826/p Mota Pondha

Kaprada 28,000 TPA

6 Patel Stone Industries 00.26.52 s.n- 437/p Ozar Kaprada 8.000 TPA

7 Shree Manjulaben Mukeshbhai Rajput

01.46.71 s.n- 63/2 Morai Pardi 40.000 TPA

8 Mukesh Rajendraprasad Thakur

00.57.00 s.n- 63 Morai Pardi 18.000 TPA

9 Shiv Stone Quarry 1.00.00 s.n- 657/1/2

Vatar Pardi 30.000 TPA

10 Kirankumar Mohanlal Desai

2.00.00 s.n- 407/p Karajgam Umbergaun 60.000 TPA

11 Amrutlal nanjibhai Patel 1.00.00 s.n- 68/2 Sarigam Umbergaun 32.000 TPA

12 R. Desai & Co 04.85.11 s.n- 64/A/1

Orwad Pardi 80.000 TPA

13 Pratik Kirankumar Desai

1.00.00 s.n- 406/2/p

Karajgam Umbergaun 30.000 TPA

14 Rameshwar Stone Supplier

00.71.60 s.n- 81/p Punet Umbergaun 24.000 TPA

15 Jalaram Stone Quarry 01.41.18 s.n- 56/1/2

Motiwada Pardi 30.000 TPA

16 Janaksinh U. Chauhan 01.10.20 s.n- 112/2 Maroli Umbergaun 10.000 TPA

Shri S.M.Khopkar, Asst. Geologist, Dist:Valsad presented the above proposals and mentioned lease areas are situated beyond 500 m distance from the nearest villages except proposal at Sr. NO: 11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam.Committee asked Shri S.M.Khopkar to submit the details of the nearest resident from the periphery of the lease at sr.no: 11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 except proposal at Sr. NO:11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam.

Page 11: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 11 of 32  

SAND MINING PROJECTS-DISTRICT SURAT

Sr. No.

Name of Applicant

Lease Area in Hactare

Address of site

Name of River

Village Taluka Rate of Mining

1 Shree Mahalaxmi Minerals

04-00-00 Ha S. No. 180 Tapi Kadod Bardoli 10000 MT/Year

2 Ashwinbhai Sitarambhai Prajapati

02-65-00 Ha S. No. 816 Tapi Ghala Kamrej 15000 TPA

3 Baldevsinh A Rathod

01-65-00 Ha Opp. B. No. 12

Tapi Jior Kamrej 26000 TPA

4 Mohammad Aslam Hasim Patel

00-40-00 Ha Opp. S. No. 861,862

Tapi Ghala Kamrej 23400 TPA

5 Chanchalben Durlabhbhai Parmar

02-00-00 Ha Opp. S. No. 178

Tapi Machhi Kamrej 21000 MT/Year

6 Rajubhai Sitarambhai Prajapati

02-20-00 Ha Opp. S. No. 17 to 18

Tapi Machhi Kamrej 15000 TPA

7 Champakbhai Bhulabhai Prajapati

02-25-00 Ha Opp. S. No. 10,16 &17

Tapi Machhi Kamrej 15000 TPA

8 Ashwinbhai Sitarambhai Prajapati

02-00-00 Ha S. No. 18 to 21

Tapi Machhi Kamrej 10000 TPA

9 Ajaybhai V Solanki 01-00-00 Ha Opp. B. No. 712

Tapi Karjan Kamrej 30000 MT/year

10 Dhanuben K Oad 02-00-00 Ha Opp. B. No. 65

Tapi Ghala Kamrej 20000 MT/year

11 Navinbhai P Parmar

01-66-00 Ha Opp. B. No. 2 to5

Tapi Karjan Kamrej 30000 MT/year

12 Ajaybhai V Solanki 02-80-00 Ha Opp. B. No.455 to 469

Tapi Sampura Kamrej 30000 MT/year

13 Girishbhai Dahyabhai Oad

00-75-00 Ha Opp. S. No.65

Tapi Ghala Kamrej 26000 TPA

14 Padmaben Jayantibhai Oad

04-00-00 Ha Opp. S. No. 65,41,29 to 32

Tapi Ghala Kamrej 23400 MT/Month

15 Dahyabhai Naranbhai Rathod

00-60-00 Ha Opp. S. No. 165,166

Tapi Machhi Kamrej 12000 MT/Year

16 Bhikhiben Dahyabhai Rathod

01-70-00 Ha Opp. S. No. 165,166

Tapi Machhi Kamrej 20000 MT/year

17 Rameshbhai Chandubhai Od

01-88-00 Ha Opp. S. No. 2,3

Tapi Machhi Kamrej 23000 MT/year

18 Saomabhai Navajibhai Gamit

00-51-61 Ha Opp. S. No. 175,176

Tapi Machhi Kamrej 10000 MT/year

19 Badan Traders (Memunaben Dawood Dhalech)

01-10-00 Ha S. No. 61 & 62

Tapi Bodhan Mandvi 8300 MT/Month

20 Dipakkumar Pravinchandra Vyas

00-35-00 Ha B. No. 192 Tapi Timba Kamrej 5000 MT/Year

Page 12: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 12 of 32  

21 Dhansukhbhai Sukhabhai Monya

02-00-00 Ha B. No./ S. No. 175,169

Tapi Miyawadi Kadod

Bardoli 25000 MT/Year

22 Rajubhai Ranchhodbhai Patel

01-96-00 Ha S. No. 361 & 367

Tapi Kosadi Mandvi 10000 MT/Year

23 Shaileshbhai Rameshbhai od

02-60-00 Ha Opp. S. No. 817,818,819

Tapi Ghala Kamrej 22000 MT/Year

24 Gokulbhai Mesurbhai Rathod

04-00-00 Ha Opp. S. No. 170,175

Tapi Machhi Kamrej 26000 MT/Year

25 Lalitaben Somabhai Rathod

04-00-00 Ha Opp. S. No.6,8

Tapi Machhi Kamrej 29000 MT/Year

26 Naranbhai Melabhai Oad

03-15-00 ha Opp. B. No. 57 to 26

Tapi Baudhan Mandvi 425 MT/Month

27 Naranbhai Melabhai Oad

00-25-00 Ha Opp. S. No.54,55

Tapi Baudhan Mandvi 425 MT/Month

28 Rameshbhai Thakorbhai patel

03-00-00 Ha Opp. S. No.828.833

Tapi Ghala Kamrej 425 MT/Month

29 Thakorbhai Vanmalibhai Patel

00-80-00 Ha Opp. S. No.808.807

Tapi Ghala Kamrej 425 MT/Month

30 Rasikbhai Thakorbhai Patel

00-80-00 Ha Opp. S. No.808.

Tapi Ghala Kamrej 425 MT/Month

31 Ushaben Ranchhodbhai Patel

02-20-00 Ha S. No. 358,360,368,369

Tapi Kosadi Mandvi 25000 MT/Year

32 Mahmadbhai Bajibhai Mahida

00-95-00 Ha Opp. S. No. 24

Tapi Baudhan Mandvi 10000 MT/Year

33 Vinaysinh B Rathod

00-69-60 Ha Opp. S. No. 19,20

Tapi Machhi Kamrej 8000 MT/Year

34 Dayalbhai Somabhai Ahir

01-68-86 Ha Opp. S. No. 178,180

Tapi Machhi Kamrej 20000 MT/year

35 Rasidbhai G Sindha

03-20-00 Ha Opp. S. No. 13,14,15

Tapi Baudhan Mandvi 13000 MT/Year

36 Rasidbhai G Sindha

04-00-00 Ha Opp. S. No. 30,28, 55 to 58

Tapi Baudhan Mandvi 20000 MT/year

37 The Kamrej Taluka Reti-Gravel Kadhnari Sahkari Mandli Ltd.

05-00-00 Ha S. No. 421 to 427,467

Tapi Dungra Kamrej 30000 MT/year

38 Arvindbhai Vallabhabhai Solanki

04-90-00 Ha B. No./ S. No. 33,34,35,48

Tapi Kakrapar Mandvi 10000 MT/Year

39 Ajaybhai Vallabhbhai Solanki

04-90-00 Ha B. No./ S. No. 30,31,33

Tapi Kakrapar Mandvi 10000 MT/Year

40 Prashantkumar Rameshabhai Vasava

06.35.11 opp.s.n.7,8,10 nadi pat

Tapi Magatra Mandvi 1250 mt/m

41 Kasim Ibrahim Badan

01.10.78 Opp.on river bed

Tapi Bodhan Mandvi 10000 mt/y

42 Nareshbhai Ganpatbhai Oad

00.79.95 Opp. S.n.41,30 on river bed

Tapi Ghala Kamrej 750 mt/m

Page 13: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 13 of 32  

43 Nilaben J Chavd 00.35.00 Opp b.n.859,860 river bed

Tapi Ghala Kamrej 1300 mt/m

44 Mohit Agarwal (Baba Trading)

10-07-55 Ha B. No. L-2, Tapi Kholvad Kamrej 30000 MT/Month

45 Vahidaben Nazirahmed Shikari

01.00.00 Opp.b.n.134,138&140

Purna Shekhpur Mahuva 10000 mt/m

Shri D.K. Patel, Geologist, Dist: Surat presented the above proposals. He mentioned that no bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. After detailed deliberation during presentation, committee asked Shri D.K.Patel, Geologist, Dist:Surat to submit details regarding which of the above proposals include instream mining and which of the proposals are in dry river bed. After submission of the aforesaid details, the above proposals will be taken up in one of the upcoming SEAC meeting.

BLACKTRAP MINING PROJECTS-DISTRICT SURAT

Sr. No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Induben Kanjibhai Gamit

03-27-00 Ha

S. No. 240, B. No. 281

Zab Mandvi 20000 MT/Month

2 Jagdishbhai Bhagvanjibhai Kathiriya (New Madhav Stone Quarry)

1.7909 Ha

B. No. 157 Wadi Umarpada 1,20,000 MT/Year

3 National Quarry Works

04-69-15 Ha

B. No. 1,2,77-B & 501

Tuked Mandvi 75000 MT/Year

4 Khodiyar Stone Quarry

00-59-46 Ha

B. No. 360 Verakui Mangrol 2500 MT/Month

5 Harihar Quarry (Rajeshbhai Pithabhai Varu)

3.2982 HA

B. No. 301 paikee

Areth Mandvi 54000 MT/Year

6 Merambhai Hamirbhai Bandhiya

2 Ha S. No. 100,101

Kamlapore

Mandvi 30000 MT/year

7 Rajeshbhai Pithabhai Varu

4 Ha Opp. S. No. 101,102

Kamlapore

Mandvi 60000 MT/Year

8 Budhiyabhai Chhotiyabhai Vasava

01-69-93 Ha

B. No./S. No. 52

Amarkui Mangrol 75000 MT/Year

9 Teljibhai Khalapbhai Chaudhari

2.1999 Ha

B. No. 123, S. No. 60/17

Selarpur Mangrol 30000 MT/year

10 Ramanbhai Treshmabhai Vasava

1 Ha P. No. 57/1 Umbhariya

Umarpada 3000 MT/Year

11 Hiteshbhai Mahendrabhai Sarkhedi (Padma Stone Quarry)

03.64.00 B.n.94 Uteva Amndvi 20000 mt/m

Page 14: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 14 of 32  

12 Mansukhbhai Khimjibhai Bhalala (Khodiyar Stone Quarry)

02.36.64 b.n.358 Verakul Mangrol 6700 mt/m

13 Nashilbhai M Kanani (Vrundavan Stone Crusher)

00.96.00 b.n.36 Kantvav Mangrol 500 mt/m

14 Larson And Toubro Ltd.

4.90.00 Vareth Mandvi 54000 mt/m

15 Larson And Toubro Ltd.

01.72.25 Vankla Mandvi 15000 mt/m

16 Janakbhai Patel 03.90.27 b.n.59,60,61

Kantvav Mangrol 10000 mt/y

17 Raj Stone Quarry 04.00.00 b.n.83 Naren Mandvi 23000 mt/m

The above mentioned lease areas are situated beyond 500 m distance from the nearest villages except proposal at Sr.NO: 3 of National Quarry Works.Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs.After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 except for the proposal at serial No: 3.

For the proposal at sr.No.:3, National Quarry Works, Committee asked Shri D K Patel, Geologist to submit the nearest distance of village Tuked from proposed lease at Sr.NO: 3. After receipt of the details, committee decided to appraise the proposal in one of the upcoming SEAC meeting.

STONE MINING PROJECTS-DISTRICT SURAT

Sr.No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Parshottambhai Chaudhary 01-00-00 Ha

B. No. 106

Kantvav Mangrol 1600 MT/Month

2 Bhurabhai Kalubhai Kuvadia (Nilkanth Stone Quarry)

00-52-50 ha

B. No. 131

Selarpur Mangrol 1600 MT/Month

3 Shiv Shakti Stone Quarry (Vijay Mahendrasingh Bambadiya)

01-66-55 Ha

B. No. 41,43

Umbhariya Mangrol 2100 MT/Month

Page 15: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 15 of 32  

Shri D.K. Patel, Geologist, Dist: Surat presented the above proposals. During the meeting, the committee noticed that all the above lease areas are situated beyond 500 m from the nearest habitation. Blasting is not required and sand stone will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

BLACKTRAP MINING PROJECTS-DISTRICT RAJKOT

Sr.No. Name of Applicant

Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Hirenkumar Jagdishbhai Adhaduk

01-00-00 s.n.384paiki Moti Marad

Dhoraji 2083 mt/Month

2 Shri Rajhans Stone Quarry Crushing.co

03-00-00 s.n. 93/1paiki

Lapasari Rajkot 4000 mt/month

3 Rajeshkumar Naranbhai Ram

00-80-94 s.n. 328paiki 1/1

Sankali Jetpur 900 mt/month

4 Dhirubhai Khodabhai Makwana

1-00-00 s.n. 27/1paiki

Chordi Gondal 1000 mt/month

5 Rupsinh Juvansinh Zala

01-00-00 s.n. 34paiki Chordi Gondal 800 mt/month

6 Jagdishbhai H. Dafda

00-75-00 Nadi Paiki Anandpar

K.Sangani 800 mt/month

7 Dilipbhai Rajeshbhai Mavani

01-00-00 s.n. 128paiki Gundala Gondal 1000 mt/month

8 Silver Stone Crusher

02-00-00 s.n. 412paiki Khirasara

Lodhika 3000 mt/month

9 Babulal Premjibhai Rathod

01-00-00 s.n. vokla paiki

Moti paneli

Upleta 800 mt/month

10 Nagajanbhai Dvayat Chandera

02-00-00 s.n. 223paiki 1

Nagalpar Rajkot 1500 mt/month

11 Mukeshkumar Trikambhai Adhduk

01-00-00 s.n. 273paiki Bhankh Upleta 1200 mt/month

12 Paras Stone Crusher

02-00-00 s.n. 144paiki Thorata Jetpur 2000 mt/month

13 Niteshbhai R. Jalu

01-00-00 s.n. 109paiki 1

Anandpar

K.Sangani 800 mt/month

14 Ranabhai Vejabhai Kuchhdiya

01-00-00 s.n. Machchhu Rivar Bed Paiki

Satda Rajkot 800 mt/month

Page 16: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 16 of 32  

15 Masharibhai Bhimshibhai Kandoriya

01-00-00 s.n. 3355paiki 1

k.sangani

K.Sangani 800 mt/month

16 Patel Stone 01-00-00 s.n. Gandali Vokla p

Chordi Gondal 1200 mt/month

17 Raj Stone Crusher (Hardasbhai Ranabhai Ram)

01.00.00 s.n.184 Vorakotda

Gondal 3000 mt/month

18 Kishorbhai Rajeshbhi Mavani

01.00.00 s.n.Gondli p Vorakotda

Gondal 3000 mt/month

19 Govindbhai Jivabhai Bhetariya

01.00.00 Kothariya

Rajkot 1250 mt/m

20 Menshibhai Naranbhai Jogal

01.00.00 s.n.23p Jamvadi Gondal 3000 mt/month

21 Shre Raj Stone Crusher

01.00.00 s.n.184p Vorakotda

Gondal 3000 mt/month

22 Pintubhai Menshibhai jogal

02.00.00 S.n.633p Khajurda Jamkandorana

2000 mt/month

23 Bhikhubhai Naranbhai Ram

02.00.00 S.n.633p Khajurda Jamkandorana

2000 mt/month

24 Amitbhai Hardasbhai Solanki& other

01.00.00 s.n.199p1 Virpur Jetpur 3000 mt/month

25 Parbatbhai Khimandbhai Solanki

01.00.00 Belt of River p

Vorakotda

Gondal 2000 mt/month

26 Mensibhai Naranbhai Jogal

01.00.00 s.n.23p Jamvadi Gondal 3000 mt/month

27 Parulben KUNVARJIBHAI Bavliya

02.00.00 s.n.54 Kotda Jasdan 1000 mt/month

The above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

Page 17: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 17 of 32  

SAND MINING PROJECTS-DISTRICT RAJKOT

Sr. No.

Name of Applicant

Lease Area in Hactare

Address of site

Name of River

Village Taluka Rate of Mining

1 Bharatbhai Kalabhai Humble

00-82-60

River Bed Bhadar Nilakha Upleta 820 mt/month

2 VikrambhI Kalabhai Humble

05-00-00

River Bed Venu Nilakha Upleta 5000 mt/Year

3 Mansukhbhai Punajabhai Der

02-00-00

River Bed Bhadar Gadha Upleta 2000 mt/month

4 Varshaben Vikrambhai Humbie

04-75-00

River Bed Venu Nilakha Upleta 4750 mt/month

5 Vajubhai Karsanbhai Dav

01-99-15

River Bed Bhadar Dolatpar Jasdan 1990 mt/month

6 Naranbhai R. Chanravadiya

02-00-00

River Bed Bhadar Hadfodi Upleta 2000 mt/month

7 Karmanbhai Ukabbhai Chavda

01-00-00

River Bed Bhadar Majethi Upleta 1000 mt/month

8 Varshaben V. Humble (Bhagyoday Reti Supplirrs)

02-71-65

River Bed Bhadar Majethi Upleta 2670 mt/month

9 Khimjibhai Rajabhai Ahir

02-00-00

River Bed Bhadar Hadfodi Upleta 2000 mt/month

10 Bhupatbhai Arjanbhai Humble

04-75-00

River Bed Venu Nilakha Upleta 4750 mt/month

11 Sanjaybhai Lilabhai Daki

03-00-00

River Bed Venu kharchia Upleta 1000 mt/month

12 Naranbhai kanabhai Vadhira

03-97-04

River Bed Venu maekhatimbi Upleta 1500 mt/month

13 Dineshbhai Punjabhai Der

01-00-00

River Bed Bhadar Bhadar Upleta 1000 mt/month

14 Babubhai Ukabhai Chavda

01-00-00

River Bed Bhadar Majethi Upleta 1000 mt/month

15 Dharmendrasinh N. Vala

04-86-00

River Bed Bhadar Gadha Upleta 3000 mt/month

16 Ramnikbhai Nathabhai Kantariya

01-00-00

River Bed Bhadar Supedi Dhoraji 1000 mt/month

17 Dineshbhai Punjabhai Der

01-00-00

River Bed Bhadar Upleta Upleta 1000 mt/month

18 Naranbhai R. Chanravadiya

01-00-00

River Bed Bhadar Upleta Upleta 1000 mt/month

19 Ashishbhai Vikarambhai Chavda

02-00-00

River Bed Bhadar Majethi Upleta 2000 mt/month

20 Shyamkhantu Education and Charitable Trust (Dharmendrasinh N. Vala)

02-78-00

River Bed Venu Varjangjalia Upleta 2000 mt/month

Page 18: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 18 of 32  

Shri K. N. Mahavadia, Asst. Geologist, Dist: Rajkot, represented that Bhadar and Venu Rivers are seasonal rivers and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease areas. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

BULDING LIME STONE MINING PROJECTS-DISTRICT RAJKOT

Sr.No. Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Dudabhai Rajeshbhai Parmar

01-015-034 s.n. 489paiki 6

Dhank Upleta 666 mt/month

2 Kanjibhai Nathabhai Maheta

01-025-045 s.n. 489paiki 1/2

Dhank Upleta 850 mt/month

Shri K. N. Mahavadia, Assistant Geologist, District Rajkot, informed the committee that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

DOLERITE MINING PROJECTS-DISTRICT RAJKOT

Sr.No. Name of Applicant

Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Rajeshbhai Mohanbhai Makadiya

01-51-76

s.n. 49/2 p1p1

Sajadiyari Upleta 833 mt/month

Shri K. N. Mahavadia, Assistant Geologist, District Rajkot, informed the committee that above project does not involve blasting and mineral will be removed only with help of cutter machine. It was also mentioned that the above project does not involve

Page 19: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 19 of 32  

intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

Proposals for mining of minor minerals of Amreli and Chota Udepur districts scheduled on 15th April 2015 and Proposals of minor minerals of Bhavnagar and Botad distrcts scheduled on 16th April 2014 could not be appraised in respective meeting due to absence of Asst. Geologist of respective districts. These proposals of Amreli, Chota Udepur, Botad and Bhavnagar are taken up on 21st April 2015 in 234th SEAC meeting as Asst. Geologist of respective districts remained present and SEAC appraised the proposals as under.

BLACKTRAP MINING PROJECTS - DISTRICT AMRELI

Sr. No

Name of Applicant Lease Area in Hactare

Location Address

Village Taluka Rate of Mining

1 Maheshbhai Jethabhai Bhayani

4-1-98 S.No.394 P 22

Utvad Babra 20000 MTPA

2 Uma Quarry Works 01-28-27 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

3 Harbhole Stone Quarry (Ramnikbhai Dhanabhai Gol)

02-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

4 Nilkanthvani Stone Crusher

02-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

5 Nilkanthvani Stone Crusher

01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

6 Nilkanthvani Stone Crusher

01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

7 Nilkanthvani Stone Crusher

03-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

8 Sabbirbhai Baddrudin Travadi

01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

9 Jujar Naruddin Travadi 01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

10 Classic Network Pvt. Ltd. 03-02-40 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

Page 20: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 20 of 32  

Sr. No

Name of Applicant Lease Area in Hactare

Location Address

Village Taluka Rate of Mining

11 Rameshbhai P Kaneriya 01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

12 Laxmi Stone Quarry 00-80-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

13 R K Raiyani 01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

14 J B Construction Co. 01-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

15 J B Construction Co. 02-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

16 Hargovindbhai Zaverbhai Hirpara

01-50-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

17 Hargovindbhai Zaverbhai Hirpara

01-04-43 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

18 Hargovindbhai Zaverbhai Hirpara

01-70-98 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

19 Laxmanbhai L Makashana 01-45-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

20 Jay Bharat Quarry Works 01-74-34 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

21 Rameshbhai Laxmanbhai Mayatra

02-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

22 K M Satani 03-80-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

23 Laxmi Stone Quarry 02-00-00 S. No. 394/1 P 22

Utvad Babra 16000 MTPA

24 Anil Metal Industries 00-7-35 S. No. 174 Manekwada Bagasara 2000 MT/M

25 Bharat Quarry Works 01-00-00 S. No. 4 P Manekwada Bagasara 2000 MT/M

The above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of

Page 21: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 21 of 32  

mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits for use of agriculture and plantation as well as reclamation work. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

BUILDING LIME STONE MINING PROJECTS DISTRICT AMRELI

Sr No

Name of Applicant Lease Area in Hactare

Address of site Village Taluka Rate of Mining

1 Keshvala Bhayabhai Vinjabhai

01-00-00 Govt. S.No.161 Vankiya Babra 8000 TPA

2 Shree Bhagwati Krupa Stone Quarry

04-90-00 Govt.Sr.No.96/1 P

Ishwariya Babra 20000 TPA

3 Bharatbhai Bijalbhai Bavaliya

01-00-00 Govt. Sr. No.96/1 P

Ishwariya Babra 8000 TPA

4 Shantibhai Gigabhai Khachar

00-80-94 S.No.163 P 4 Lalka Babra 4000 TPA

To represent the above proposals for Amreli district, Shri R. K. Modi,I/C Geologist,Dist:Amreli remained present. He informed the committee that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

Page 22: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 22 of 32  

SAND MINING PROJECTS- DISTRICT: CHHOTAUDEPUR

Sr. No

Name of Applicant

Lease Area in Hactare

Opp. to: Name of River

Village Taluka Rate of Mining

1 Jagadishbhai Vajubhai Desai

02-94-14 S. No. 1370, 1371,1373

Orsang Mankani Bodeli 2500 MT/Month

2 Ashokji Gopiji Vanjara

03-32-55 S. No. 1438, 1439

Orsang Mankani Bodeli 2500 MT/Month

3 Becharji Sanaji Thakor

04-90-00 S. No. 1411, 1412,1420

Orsang Mankani Bodeli 2500 MT/Month

4 Natvarji Punjaji Thakor

02-18-97 S. No. 1409,1410

Orsang Mankani Bodeli 2500 MT/Month

5 Kanuji Gopiji Vanjara

01-42-38 S. No. 1428 to 1430

Orsang Mankani Bodeli 2500 MT/Month

6 Dhanaji Gopiji Vanjara

04-50-00 S. No. 63,65

Orsang Bamroli Bodeli 2500 MT/Month

7 Dhanaji Gopiji Vanjara

01-66-10 S. No. 1373 to 1376

Orsang Mankani Bodeli 2500 MT/Month

8 Sureshbhai Vechatbhai Baria

03-56-12 S. No. 48 Orsang Pitha Bodeli 2500 MT/Month

9 Bhairavbhai Bhagavatibhai Chobisa

10-00-00 S. No. 45,103,104

Orsang Pinchuvada

Bodeli 2500 MT/Month

10 Shiv Mining (Bhairavbhai Bhagavatibhai Chobisa)

04-52-08 S. No. 45,103,104

Orsang Pinchuvada

Bodeli 2500 MT/Month

11 Rameshchandra Bhailabhai Patel

09-63-96 S. No. 20,21,22

Orsang Suskal Jetpurpavi

2500 MT/Month

12 Jayesh Manubhai Patel

10-00-00 S. No. 20 Orsang Suskal Jetpurpavi

2500 MT/Month

Page 23: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 23 of 32  

Sr. No

Name of Applicant

Lease Area in Hactare

Opp. to: Name of River

Village Taluka Rate of Mining

13 Tarun Manubhai Patel

10-00-00 S. No. 20 Orsang Suskal Jetpurpavi

2500 MT/Month

14 Ruchit Rameshchandra Patel

08-24-76 S. No. 21,22

Orsang Suskal Jetpurpavi

2500 MT/Month

15 Sureshbhai Vechatbhai Baria

10-00-00 S. No. 40,45,47

Orsang Pitha Bodeli 2500 MT/Month

16 Harehbhai Kalidas Patel

10-00-00 S. No. 16,20,21

Orsang Tadkachala

Jetpurpavi

2500 MT/Month

17 Maheshbhai Vechatbhai Baria

10-00-00 S. No. 22,23, 26,38,40

Orsang Pitha Bodeli 2500 MT/Month

18 Charuben Deveshbhai Sahai

04-78-04 S. No. 359 Orsang Modasar Bodeli 2500 MT/Month

19 Prabhavati J. Chavda

02-00-00 --- Orsang River

Jabugam 12000 MT/M

Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur represented the aforesaid proposals. He informed that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. Maximum depth of the mining will be 2 meter or water level, whichever is less. Type of mining will manual.After detailed deliberation during presentation, committee asked Shri C.H. Dave, Mining supervisor to submit details regarding which of the above proposals include instream minng and which of the proposals are in dry river bed. After submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting.

GRANITE MINING PROJECTS DISTRICT CHHOTAUDEPUR

Sr. No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Ranjitsinh Mohansinh Rathwa

01-60-89 S. No. 101 paiki

Ghuntanvad Jetpurpavi 1,00,000 TPA

Page 24: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 24 of 32  

Sr. No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

2 Mihir Hariprasad Pandya

03-25-28 S. No. 188 paiki

Raipur Jetpurpavi 125000 TPA

3 Mihir Hariprasad Pandya

04-00-00 S. No. 188 paiki

Raipur Jetpurpavi 12,000 TPA

Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur informed that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During meeting, considering the proposed mitigation measures, the committee asked Shri C.H.Dave, Mining Supervisor to submit documents of 7/12 abstract.After submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting. BLACKTRAP MINING PROJECTS DISTRICT BOTAD Sr. No

Name of Applicant Lease Area in Hactare

Opp. to: Village Taluka Rate of Mining

1 Vajubhai Ramabhai Kher

02-00-00 Ha

S. No. 243 Gundala Gadhada

1250 MT/M

2 Jivanbhai L Chauhan 01-00-00 Ha

S. No. 255 paiki

Hadad 1500 MT/M

3 Ramdevsinh Vikramsinh Gohil

00-74-88 Ha

S. No. 112 paiki

Chiroda Gadhada

75,000 TPA

4 Digvijay Construction Pvt. Ltd.

01-00-00 Ha

Govt. S. No. 233 paiky

Kinara Ranpur 1666 MT/M

5 Jayeshbhai L Chauhan 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

6 Amulakhbhai C Virani 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

7 Bhikhubhai G Vaghela 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

8 Pratapbhai K Vadher 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 5000 MT/M

9 Fatesinh Vallbhbhai Kher

01-00-00 Ha

S. No. 243 Gundala Gadhada

1130 MT/M

10 Shree Ram Quarry Works

01-00-00 Ha

S. No. 252/1 paiki

Gundala Gadhada

600 MT/M

11 Raghavbhai Rambhai Kher

00-89-03 Ha

S. No. 252/1 paiki

Gundala Gadhada

1200 MT/M

12 Pratapbhai K Vadher 02-00-00 Ha

S. No. 75 paiki

Dhankaniya 833 MT/M

13 Sureshbhai S Godhani 01-00-00 Ha

S. No. 255 paiki

Hadad 833 MT/M

Page 25: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 25 of 32  

Sr. No

Name of Applicant Lease Area in Hactare

Opp. to: Village Taluka Rate of Mining

14 Arjun Stone Crusher 01-75-

00 Ha S. No. 75 paiki

Dhankaniya 5000 MT/M

15 Maruti Enterprise 02-00-73 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

16 Maruti Enterprise 02-99-18 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

17 Chamunda Quarry Works

01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

18 Ramnikbhai B Darediya 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

19 Maheshbhai K Gamara 01-00-00 Ha

Ghelo river Rampara Gadhada

1000 MT/M

20 Hargovindbhai Z Haripara

02-00-00 Ha

S. No. 75 paiki

Dhankaniya 8333 MT/M

21 Rasikbhai B Darediya 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

22 Ramjibhai N Meghani 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

23 Rasikbhai R Meghani 01-00-00 Ha

S. No. 75 paiki

Dhankaniya 1500 MT/M

24 Ishverbhai Bhagvanbhai Patel

01-27-48 Ha

S. No. 223/4 Kinara

Kinara Ranpur 1000 MT/M

25 Upendra Quarry Works 05-00-00 Ha

S. No. 139/5 paiki

Ranpur Ranpur 2500 MT/M

26 Nirubha Harisinh Gohil 1.00.00 s.n- 255/p Hadad Botad 6,250 mt/m

27 Pathabhai Dharamshibhai

00.83.20 s.n- 139p81 Bhadala Botad 1000 mt/m

28 Jagodana Rajeshbhai

Laljibhai 1.00.00 s.n- 75p2/2 Vavadi Gadha

da 5000 mt/m

29 GVK Project & Technical Service LTD

04.34.02 s.n- 465,466,463p

Bodiya Ranpur 2000 mt/m

Shri Nirav Barot, Asst. Geologist, Dist: Botad represented all the above projects.He mentioned that the above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the

Page 26: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 26 of 32  

committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015. RIVER BED SAND MINING PROJECTS DISTRICT :BOTAD Sr. No.

Name of Applicant Lease Area in Hactare

Name of River

Village Taluka Rate of Mining

1 Mangalsangbhai Labhubhai Tank

00-75-00 Ha

Keri Keriya 333 MT/M

2 Pratapbhai Ransingbhai Khachar

02-00-00 Ha

Keri Keriya 333 MT/M

3 Bhanubhai Nathubhai Mer

00-99-20 Ha

Keri Salangparda

Gadhada 1660 MT/M

4 Hamirbhai Harsurbhai Lavadiya

03-51-10 Ha

Kalubhar Rajpipala Gadhada 1000 MT/M

5 Kanjibhai Sambhubhai Godhani

04-00-00 Ha

Kalubhar Rajpipala Gadhada 1000 MT/M

6 Harpalsinh Raghuvirsinh Gohil

01-00-00 Ha

Ghelo Ishveriya Gadhada 333 MT/M

7 Hitendrasinh G Vala 01-21-22 Ha

Keri Ningala Gadhada 333 MT/M

8 Ravjibhai Dayabhai Parmar

3.00.00 Keri Meghavadiya

Gadhada 1000 mt/m

9 Mahavirsinh Bhavubha Vala

2.00.00 Ghelo Pipal Gadhada 375 mt/m

10 Kalyanbhai Megajibhai Galathara

00.96.00 Keri Meghavadiya

Gadhada 1000 mt/m

11 Dhirubhai Hakubhai Kuvadiya

1.00.00 Kalubhar Rajpipala Gadhada 1000 mt/m

12 Pradipsinh B.Vala 2.51.84 Keri Ningala Gadhada 375 mt/m 13 Kisan Infrastructure

PVT.LTD 00.98.05 Keri Ningala Gadhada 900 mt/m

14 Ganshyamsinh. H. Gohil

0.98.05 Keri Ningala Gadhada 333 mt/m

15 Maheshbhai Dayabhai Sindhav

01-19-00 Ha

Ghelo Lakhanka Gadhada

16 Naranbhai Gandabhai Zala

01-00-00 Ha

Kalubhar Chosala Gadhada 416 MT/M

17 Kakubhai Sardulbhai 1.00.00 Keri Nana Salangpur

Gadhada 1000 mt/m

18 Shree Dharmendrasinh p. Gohil

2.78.10 Ghelo Adatala Gadhada 1000 mt/m

19 Shree Ravirajsinh M. Gohil

00.79.66 Ghelo Adatala Gadhada 1000 mt/m

20 Haribhai Dansangbhai

00.98.05 Keri Ningala Gadhada 1000 mt/m

21 Ashokbhai Chaturbhai Dabasara

00.50.51 Keri Shiyanagar Gadhada 375 mt/m

Page 27: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 27 of 32  

22 Rameshbhai m. Vaghani

1.00.00 Keri Keriya Gadhada 416 mt/m

23 Pareshbhai Manharbhai Jakhaniya

02-25-40 Ha

Keri Keriya 1000 MT/M

Shri Nirav Barot, Asst. Geologist, Dist: Botad represented that Keri, Kalubhar, Ghelo rivers are seasonal rivers and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease area. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above project for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

BUILDING LIME STONE MINING PROJECTS DISTRICT BOTAD Sr. No.

Name of Applicant Lease Area in Hactare

Address of site

Village Taluka Rate of Mining

1 Ravjibhai Karamshibhai Utedia

01-00-00 Ha

S. No. 147/P Itadiya Gadhada 150 MT/M

2 Hareshbhai Ravjibhai Utedia

01-00-00 Ha

S. No. 147/P Itadiya Gadhada 150 MT/M

3 Hasmukhbhai Shambhubhai Utedia

01-00-00 Ha

S. No. 147/P Itadiya Gadhada 150 MT/M

4 Virabhai Manjibhai Dholakiya

1.00.00 s.n- 147p Itariya Gadhada 1000 mt/m

Shri Nirav Barot, Asst. Geologist, Dist: Botad presented the above proposals and mentioned that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

Page 28: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 28 of 32  

SAND MINING PROJECTS DISTRICT BHAVNAGAR Sr. No.

Name of Applicant

Lease Area in Hactare

Name of River

Village Taluka Rate of Mining

1 Bhikhabhai Govindbhai Dangar

02-72-23 Ha Shetrunji Royal Talaja 10,000 TPA

2 Nanubhai Bhalabhai Mevada

01-68-00 Ha Shetrunji Makhania Talaja 10,000 TPA

3 Dharabhai Gigabhai Mewada

04-00-00 Ha Shetrunji Makhania Talaja 10,000 TPA

4 Ramabhai Gigabhai Mewada

04-00-00 Ha Shetrunji Makhania Talaja 10,000 TPA

5 Rajubhai Govindbhai Dhila

01-77-52 Ha Shetrunji Bhengali - Timana

Talaja 10,000 TPA

6 Bhurabhai Kamabhai Mer

01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month

7 Hamirbhai Bhurabhai Mer

01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month

8 Kanubhai Vashrambhai Aal

02-00-00 Ha Kalubhar Chogath Umarala 2000 MT/Month

9 Vashrambhai Ramshibhai Aal

01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month

10 Jayantibhai Ganeshbhai Goyani

01-44-00 Ha Shetrunji Samadhiyala

Gariyadhar

333 MT/Month

11 Dinkarray S Bhatt

01-00-00 Ha Shetrunji Talaja Talaja 333 MT/Month

12 Jethabhai Vashrambhai Aal

01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month

13 Dhamendrasinh S. Vala

00-84-68 Ha Shetrunji Royal Talaja 2600 MT/Month

14 Mahavirsinh R Gohil

01-00-00 Ha Shetrunji Talaja Talaja 2600 MT/Month

Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar represented that Kalubhar river is a seasonal river and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease area. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion.

Page 29: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 29 of 32  

After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend projects (Except at serial numbers: 1,2,3,4,5,10,11,13 &14) for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

For the proposals at serial no: 1,2,3,4,5,10,11,13 &14, committee noticed that proposals for sand mining is from the Shetrunji river bed and as the petition is pending before the Honorable High Court of Gujarat and being a corridor for wild life movement, it was unaniumously decided to keep all the proposals pending at serial no: 1,2,3,4,5,10,11,13 &14 till final order of Honorable High Court of Gujarat. Committee also asked Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar to submit the status report regarding movement of wild life habitate in the proposed lease area in Shterunji river bed.

.BLACKTRAP MINING PROJECTS DISTRICT BHAVNAGAR

Sr. No.

Name of Applicant Lease Area in Hactare

Name of River/Location of proposal

Village Taluka Rate of Mining

1 Raisangbhai Narsangbhai Parmar

01-00-00 Ha

S. No. 69/1

Jambala Sihor 75,000 TPA

2 Raisangbhai Narsangbhai Parmar

01-19-13 Ha

S. No. 69/1

Jambala Sihor 80,000 TPA

3 Ghanshyambhai Meghjibhai Barad

01-00-00 Ha

S. No. 265 paiki

Khodvadari Gariyadhar 75,000 TPA

4 Aai Shree Khodiyar Quarry Works

01-00-00 Ha

S. No. 265 paiki

Khodvadari Gariyadhar 80,000 TPA

5 Pareshkumar Keshavlal Roy

01-00-00 Ha

S. No. 265 paiki

Khodvadari Gariyadhar 75,000 TPA

6 Yogeshbhai Ganeshbhai Parmar

02-00-00 Ha

S. No. 415 Mandvi Gariyadhar 85,000 TPA

7 Patel Meghjibhai Jivarajbhai

01-00-00 Ha

S. No. 415 paiki

Mandvi Gariyadhar 75,000 TPA

8 Chotubha Shivubha Sarvaiya

02-18-49 Ha

S. No. 265 Khodvadari Gariyadhar 600 MT/Month

9 Mahavirsinh Kiritsinh Gohil

02-00-00 Ha

S. No. 17 Trambak Ghogha 580 MT/Month

Page 30: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 30 of 32  

10 New Parth Stone Crusher

01-39-74 Ha

S. No. 123/1/Paiki

Butiya Palitana 1500 MT/Month

11 Sitaram Quarry Works 03-00-00 Ha

Shetrunji River

Nani Rajsthali

Palitana 375 MT/Month

12 Sitaram Quarry Works 03-00-00 Ha

S. No. 254 p

Nani Rajsthali

Palitana 1340 MT/Month

13 Sitaram Quarry Works 02-52-80 Ha

Shetrunji River

Nani Rajsthali

Palitana 300 MT/Month

14 Sitaram Quarry Works 03-13-63 Ha

Shetrunji River

Nani Rajsthali

Palitana 340 MT/Month

15 Madhav Stones 01-61-92 Ha

S. No. 118 Sanjnasar Palitana 340 MT/Month

16 Hardipsinh Raghuvirsinh Chudasma

01-21-41 Ha

S. No. 213/2

Bhadli Sihor 330 MT/Month

17 Pushprajsinh Pradyumansinh Chudasma

01-13-21 Ha

S. No. 212 Bhadli Sihor 330 MT/Month

18 Rajul Stone Crusher 01-00-00 Ha

S. No. 3 paiki

Piparla Sihor 200 MT/Month

Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar represented the above proposals. He mentioned that lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases( Except at serial numbers: 11,13 &14 for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.

Page 31: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 31 of 32  

For the proposals at serial no: 11,13 &14, committee noticed that proposals for Blacktrap Mining mining is from the Shetrunji river and as the petition is pending before the Honorable High Court of Gujarat and being a corridor for wild life movement, it was unanimously decided to keep all the proposals pending at serial no: 11,13 &14 till final order of Honorable High Court of Gujarat. Committee also asked Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar to submit the status report regarding movement of wild life habitate in the proposed lease area in Shterunji river.

Table Agenda

[1] TATA Chemicals Ltd., S NO. 21/P, Village: Aniali, Ta: Ranavav, Porbander (15.99 Ha):

During 227th meeting of the state level expert appraisal committee held on 10/2/2015, proposal of TATA Chemicals Ltd.,S NO. 21/P, Village: Aniali, Ta: Ranavav, Porbander (15.99 Ha) was appraised and committee asked following additional information.

1. Based on contours, details of flow of rainwater runoff meeting to the nearby water bodies showing no resistance to the natural flow pattern due to proposed mining activities.

2. Details of existence of blue bull in study area and project activities impeding/endangering habitation of the said species and proposed action plan to protect its habitation.

3. Letter from department of Geology and mining regarding no other mine exists in the 500 m radial distance from the boundary of the mine lease area.

Project proponent has submitted the reply of aforesaid details on 16-04-2015 which is found satisfactory to the committee and it was unanimously decided by the committee to recommend for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 to SEIAA.

(2). TATA Chemicals Ltd.,S NO. 94/P, Village: Aniali, Ta: Ranavav, Porbander (6.07 Ha)

During 227th meeting of the state level expert appraisal committee held on 10/2/2015, proposal of TATA Chemicals Ltd.,S NO. 94/P, Village: Aniali, Ta: Ranavav, Porbander (6.07 Ha.) was appraised and committee asked following additional information

1. Based on contours, details of flow of rainwater runoff meeting to the nearby water bodies showing no resistance to the natural flow pattern due to proposed mining activities.

Page 32: th MEETING OF THE STATE LEVEL EXPERT … Minutes of the 234th.pdfPage 1 of 32 MINUTES OF THE 234th MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE HELD ON 21/04/2015 AT COMMITTEE

 

Page 32 of 32  

2. Details of existence of blue bull in study area and project activities impeding/endangering habitation of the said species and proposed action plan to protect its habitation.

3. Letter from department of Geology and mining regarding no other mine exists in the 500 m radial distance from the boundary of the mine lease area.

Project proponent has submitted the reply of aforesaid details on 16-04-2015 which is found satisfactory to the committee and it was unanimously decided by the committee to recommend for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 to SEIAA.

Meeting was concluded with thanks to Chair.

Minutes Approved by:

Shri T. P. Singh, Chairman, SEAC.

Shri K.C. Mistry, Secretary, SEAC

Dr. Nikhil Desai, Member, SEAC.

Shri V. C. Soni, Member, SEAC.

Dr. Mayuri Pandya, Member, SEAC

Shri Natrajan Pratap,Member, SEAC

Shri R.J. Shah, Member, SEAC

Shri V.N. Patel, Member, SEAC


Recommended