The 234th meeting of the State Level Expert Appraisal Committee (SEAC) was held on 21stApril 2015 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting:
1. Shri T. P. Singh, Chairman, SEAC. 2.Shri K.C. Mistry, Secretary, SEAC 3. Dr. Nikhil Desai, Member, SEAC. 4. Shri V. C. Soni, Member, SEAC. 5. Dr. Mayuri Pandya, Member, SEAC 6. Shri Natrajan Pratap,Member, SEAC 7. Shri R.J. Shah, Member, SEAC 8. Shri V.N. Patel, Member, SEAC Following officers from the Geology and Mining Department attended the meeting:
1. Shri S. M.Khopkar, Asst. Geologist, Dist: Navsari and Dist: Valsad 2. Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur. 3. Shri D.K. Patel, Geologist, Dist: Surat. 4. Shri R. K. Modi,I/C Geologist,Dist:Amreli. 5. Shri K. N. ahavadia,Asst. Geologist, Dist: Rajkot, 6. Shri Nirav Barot, Asst. Geologist, Dist: Botad and Bhavnagar. 7. Shri Jatin K Gor, Geological Asst.,Dist:Bharuch
In all 428 proposals of minor minerals which have been received by the Committee through the Office of the Mining Commissioner, Gandhinagar including proposals scheduled on 15th and 16th April 2015 were taken up in the meeting. Considering the scale of individual projects, all the cases were categorized as B2 and appraised individually based on the information furnished in the Form-1 and performa endorsed by the district Geologist / Asst. Geologists
District Sand Mining
Black Trap
Stone Mining
Granite Mining
Building Limestone
Dolerite Total
Navsari 112 44 0 0 0 0 156 Bharuch 2 0 0 0 0 0 2 Valsad 0 16 0 0 0 0 16 Surat 45 17 3 0 0 0 65 Rajkot 20 27 0 0 2 1 50 Amreli 0 25 0 0 4 0 29 Chota Udepur 19 0 0 3 0 0 22 Botad 23 29 0 0 4 0 56 Bhavnagar 14 18 0 0 0 0 32 Total 235 176 3 3 10 1 428
Page 2 of 32
SAND MINING PROJECTS-DISTRICT NAVSARI
Sr. No.
Name of Applicant
Lease Area in Hactare
Address of site
Name of River
Village Taluka Rate of Mining
1 Dharmeshbhai Naranbhai Oad
01-96-79 Ha
Op. S.No. 269,703/2
Purna river
--- ---- 698 MT/M
2 Fakirbhai Gulambhai Motarwala
01-70-00 Ha
B. No. Op. S. No. 384,385,428,430
Ambika river
Kachholi Gandevi 6035 MT/M
3 Kanubhai Lakhubhai Od
01-55-00 Ha
Op. B. No. 132 Ambika river
Ajarai Gandevi 5502 MT/M
4 Manojbhai Mangabhai Oad
03-00-00 Ha
B. No. Op. 646 to 686
Ambika river
Bhatha Gandevi 10650 MT/M
5 Parulben Vijaybhai Naik
00-54-60 Ha
Op. B. No. 439 Ambika river
Kolva Gandevi 1938 MT/M
6 Salim Yusuf Sidat 01-00-00 Ha
B. No. Op. 1551,161
Ambika river
Matwad Gandevi 3550 MT/M
7 Saraswatiben Kanubhai Oad
03-89-26 Ha
S. No. 889 Ambika river
Kalmatha
Gandevi 4000 MT/M
8 Pravinchandra M Patel
00-27-15 Ha
S. No. Opp. 1125
Ambika river
Tadvi Jalalpor 1300 MT/M
9 Bipinbhai Dahyabhai Patel
01-00-00 Ha
Opp. Of B. No. 583,587
Ambika river
Machhad Jalalpor 2600 MT/M
10 Bipinbhai Dahyabhai Patel
02-00-00 Ha
Opp. Of B. No. 590
Ambika river
Machhad Jalalpor 2600 MT/M
11 Pramodbhai P Patel
01-88-00 Ha
Opp. Of B. No. 590/1
Ambika river
Machhad Jalalpor 1300 MT/M
12 Arvindbhai Ravjibhai Patel
01-20-00 Ha
Opp. Of B. No. 590
Ambika river
Machhad Jalalpor 1300 MT/M
13 Umakantbhai J Prajapati
01-00-00 Ha
Opp. Of B. No. 590
Ambika river
Machhad Jalalpor 1170 MT/M
14 Manubhai Chhibabhai Solanki
00-50-00 Ha
S. No. 131 to 193, 195 & 205
Ambika river
Jogvad Chikhali 1775 MT/Year
15 Manojkumar Ashokbhai Gamit
00.90.00 Opp.Block No. 252&261
Ambika river
Bartad Vansda 3195 MT/M
16 Govindbhai V Patel 00-52-65 Ha
Op. S. No. 266,359
Purna river
Supa --- 1870 MT/M
17 Prashant S Nayak 00--69-70 Op. S. No. 106,107
Purna river
Pera --- 1725 MT/M
18 Dharmeshbhai Naranbhai Oad
01-50-00 Ha
Op. S. No. 478,478/1
Purna river
Amadpor Navsari 1242 MT/M
19 Satish Ramanbhai Patel
01-00-00 Ha
B. No. op. S. No. 367,368,1,2,3
Vanganiya river
Desad Gandevi 3550 MT/M
20 Kishorbhai Sumanbhai Patel
0.40.00 Opp Sr. No. 601,602
Purna river
Muldhara Navsari 1180 MT/M
21 Thakorbhai Ambelal Ode
1.33.00 Opp.B. No.10,11,17/1,17/2,18 &19
Ambika river
Dhamdachha
Gandevi 4721 MT/M
Page 3 of 32
22 Alkaben Dalpatbhai Patel
1.00.00 Opp. B. No. 273
Ambika river
Torangam
Gandevi 3550 MT/M
23 Amrutbhai Ranchhodbhai Patel
00.32.00 Opp. Sr. No. 17,18
Ambika river
Boriach Navsari 3550 MT/M
24 Laxmanbhai Mangubhai Od
00.42.00 Opp. Sr. No.117, 118, 120
Ambika river
Sonvadi Gandevi 1491 MT/M
25 Rameshbhai Lalbhai Patel
1.00.00 B. No. 166, 167, 189
Ambika river
Khambhaliya
Vansda 3550 MT/M
26 Sudhaben Rakeshbhai Halpati
0.546 Opp.B. No. 136, 140 & 145
Ambika river
Sonwadi Gandevi 1938 MT/M
27 Chhanabhai JethabhaiHalpati
00.42.32 Opp. B. No. 587 to 591
Ambika river
Khaparia Gandevi 1502 MT/M
28 Ahmadali Adam Ravat
00.60.60 Opp. B. No. 299
Ambika river
Kumbhar Faliya
Navsari 2151 MT/M
29 Shri Kanubhai Lakhubhai Od
04.00.00 Ambika river
Ajarai Gandevi 14200 MT/M
30 Dilipbhai Dayabhai Patel
2.00.00 Opp. B. No. 117, 47,
Ambika river
Kharjai Vansda 7100 MT/M
31 Ratnasinh Amarsinh Od
00.25.42 Opp. Sr. No. 599,598, 590
Ambika river
Muldhara Navsari 750 MT/M
32 Laljibhai Chhaganbhai Gamit
1.00.00 Opp. B. No. 223
Ambika river
Bartad Vansda 3550 MT/M
33 Karshanbhai Gemalbhai Od
00.39.60 Opp.Sr. No. 111, 112
Purna river
Tarsadi Navsari 470 MT/M
34 President/Secrerary, Vikas Mandal
01.68.60 Opp. Sr. No. 70,50 to 55
Purna river
Supa Navsari 4000 MT/M
35 Ranchhodbhai D. Patel
04.00.00 Opp.Sr. No. 58,58,59
Purna river
Kurel Navsari 220 MT/M
36 Karshanbhai Gemalbhai Od
00.48.00 Opp.Sr. No. 98,99,100,136
Purna river
Kurel Navsari 1704 MT/M
37 Shri Chandubhai Chhanabhai
01.84.00 --- Ambika river
Ajarai Gandevi 6532 MT/M
38 Amrutbhai Ranchhodbhai Patel
01.30.00 Opp.Sr. No. 199
Ambika river
Boriach Navsari 4615 MT/M
39 Sadik Ismail Sidat 1.00.00 Opp.B.No. 299 Ambika river
Kumbhar Faliya
Navsari 3550 MT/M
40 Mohmadhanif Ismail Isat
1.13.00 Opp. B. No. 913, 914
Ambika river
Nogama Chikhli 4011 MT/M
41 Laxmanbhai Mangubhai Od
00.55.00 Opp. Sr. No. 83,84,85
Ambika river
Sonvadi Gandevi 1952 MT/M
42 Ashokbhai Chhitubhai Nayak
0.48.00 Opp.B. No. 180 & 181
Ambika river
Jogvad Chikhli 3550 MT/M
43 Ashokbhai Chhitubhai Nayak
1.00.00 Opp. B. No. 239 to 244
Ambika river
Jogvad Chikhli 3550 MT/M
44 Ahmadali Adam Ravat
00.92.80 Opp. B. No.368, 370
Ambika river
Nagdhara
Navsari 3294 MT/M
45 Laxmanbhai Mangubhai Od
2.00.00 Opp.Sr. No. 105,105,107,110,113
Ambika river
Sonvadi Gandevi 7100 MT/M
Page 4 of 32
46 Kanubhai Lakhubhai Oad
04.00.00 Sr. No. 837 Ambika river
Morali Gandevi 14200 MT/M
47 Devangkumar Balubhai Patel
1.00.00 B. No. 170,173,174
Ambika river
Sindhai Vansda 7100 MT/M
48 Manojbhai Naranbhai Oad
01.75.00 Opp.Sr. No.703, 714, 716 715, 660
Ambika river
Amadpor Navsari 62012 MT/M
49 Amrutbhai Ranchhodbhai Patel
01.00.00 Opp.Sr. No.199, 211
Ambika river
Boriach Navsari 3550 MT/M
50 Shri Hareshbhai Chandubhai Od
02.00.00 ==== Ambika river
Ajarai Gandevi 7100 MT/M
51 Govindbhai Vanmalibhai Patel
00.63.82 Opp. Sr. No. 359
Purna river
Supa Navsari 2270 MT/M
52 Govindbhai Vanmalibhai Patel
01.00.00 Opp.Sr. No. 266
Purna river
Supa Navsari 3550 MT/M
53 Govindbhai Vanmalibhai Patel
00.25.00 Opp.Sr. No. 266, 359
Purna river
Supa Navsari 8875 MT/M
54 Arpan Ashokbhai Patel
03.00.00 Opp.Sr. No. 2,11,12,13,
Purna river
Muldhara Navsari 5325 MT/M
55 Govindbhai Vanmalibhai Patel
01.00.00 Opp. Sr. No. 364
Purna river
Supa Navsari 3550 MT/M
56 Govindbhai Vanmalibhai Patel
00.45.00 Opp.Sr. No. 364
Purna river
Supa Navsari 1600 MT/M
57 Arpan Ashokbhai Patel
02.24.50 Opp. Sr. No. 411,404,403
Purna river
Amari Navsari 7950 MT/M
58 Arpan Ashokbhai Patel
01.44.00 Opp. Sr. No. 41, 39, 44, 45, 46, 47, 50
Purna river
Supa Navsari 5112 MT/M
59 Arpan Ashokbhai Patel
02.00.00 Opp. Sr. No. 1784, 185, 186
Purna river
Muldhara Navsari 3550 MT/M
60 Pravinbhai V. Patel 02.00.00 Opp. Sr. No. 43,44,46,48,49
Purna river
Kasbapar
Navsari 7100 MT/M
61 Pravinbhai V. Patel 0.54.00 Opp.Sr. No. 82, 100
Purna river
Supa Navsari 1920 MT/M
62 Pravinbhai V. Patel 1.10.00 Opp.Sr. No. 82 77
Purna river
Supa Navsari 1936 MT/M
63 Pravinbhai V. Patel 1.48.00 Opp. Sr. No. 142, 143
Purna river
Supa Navsari 5250 MT/M
64 Pravinbhai V. Patel 00.30.00 Opp.Sr. No. 235, 237, 238
Purna river
Tarsadi Navsari 530 MT/M
65 Pravinbhai V. Patel 0.64.00 Opp. Sr. No. 173, 174
Purna river
Khergam Navsari 760 MT/M
66 Pravinbhai V. Patel 02.30.00 Opp. Sr. No. 2,8,11 to 14
Purna river
Muldhara Navsari 4080 MT/M
67 Pravinbhai V. Patel 02.00.00 Opp.Sr. No. 48,51,53,56,57, 60,61
Purna river
Kasbapar
Navsari 7100 MT/M
68 Harishbhai Gemalbhai Od
00.62.00 Opp. Sr. No. 74
Purna river
Kurel Navsari 1470 MT/M
69 Purna Vibhag Int Utpadak Sahakari Mandali Ltd-Dharagiri
00.46.00 Opp. Sr. No. 74,75
Purna river
Kurel Navsari 1100 MT/M
Page 5 of 32
70 Rajubhai Naginbhai Od
00.28.00 Opp. Sr. No. 84,86
Purna river
Kurel Navsari 6600 MT/M
71 Pravinbhai V. Patel 01.63.52 s.n- 273/1 Purna river
Kabilpor Navasari 5804 mt/m
72 Pravinbhai V. Patel 01.80.88 s.n- 574 to 577 Purna river
Pinsad Navasari 6421 mt/m
73 Pravinbhai V. Patel 02.20.88 s.n- 356,355,344,341
Purna river
Supa Navasari 7841 mt/m
74 Arpan Ashokbhai Patel
02.43.00 s.n- 62 to 67 Purna river
Pinsad Navasari 8626 mt/m
75 Arpan Ashokbhai Patel
04.94.00 s.n- 49 to 62 Purna river
Pinsad Navasari 17537 TPA
76 Pravinbhai V. Patel 01.50.00 s.n- 616,619,620
Purna river
Muldhara Navasari 5325 mt/m
77 Pravinbhai V. Patel 00.90.24 s.n- 235,236,238
Purna river
Tarsadi Navasari 3203 mt/m
78 Arpan Ashokbhai Patel
01.10.40 s.n- 432 to 435 Purna river
Amari Navasari 3919 mt/m
79 Pravinbhai V. Patel 00.81.25 s.n- 574 to 577 Purna river
Pinsad Navasari 2884 mt/m
80 Pravinbhai V. Patel 01.34.00 s.n- 465,345/2 Purna river
Kasbapar
Navasari 4757 mt/m
81 Pravinbhai V. Patel 00.64.40 s.n- 223,224,225
Purna river
Tarsadi Navasari 2286 mt/m
82 Parvatiben Ishwarlal Dhimar
01.00.00 s.n- 103 Purna river
Dharagiri Navasari 3550 mt/m
83 Gram Vikas Mandal
00.70.00 s.n- 71 to 76 Purna river
Supa Navasari 2485 mt/m
84 Pravinbhai V. Patel 03.00.00 s.n- 180 to 184 Purna river
Muldhara Navasari 10650 MT/M
85 Pravinbhai V. Patel 04.80.00 s.n- 12 to 18 Purna river
Pinsad Navasari 17040 TPA
86 Nagjibhai Gemalbhai Oad
01.50.00 s.n- 478 Ambika river
Amadpor Navsari 5325 TPA
87 Najmabanu Hanifbhai Motorwala
00.76.00 s.n- 361 Ambika river
Khakhwada
Gandevi 2500 TPA
88 Parulbhai Vijaybhai Naik
00.86.40 s.n- 51 Ambika river
Kolva Gandevi 3067 TPA
89 Prashant S.Naik 01.60.00 s.n- 62,72 Purna river
Kurel Navasari 5680 TPA
90 Govindbhai Vanmalibhai Patel
00.20.88 s.n- 234,235 Purna river
Tarsadi Navasari 800 TPA
91 Dipakbhai Ranchodbhai Oad
00.37.50 s.n- 264,263 Purna river
Kurel Navasari 1331 TPA
92 Dipakbhai Jayntilal Prajapati
04.80.00 s.n- 590 Purna river
Machhad Jalapor 17040 TPA
93 Dilipbhai Dahyabhai Patel
01.60.00 s.n- 71 Khapri river
Vati Vansda 5680 TPA
94 Dilipbhai Dahyabhai Patel &Kishorbhai Patel
01.20.00 s.n- 48 to 50 Khapri river
Vati Vansda 4260 TPA
Page 6 of 32
95 Dharmeshbhai Naranbhai Oad
00.35.00 s.n- 110,111,112
Ambika river
Jalapor Jalapor 1242 TPA
96 Chetanbhai N.Patel 00.42.52 s.n- 321 Purna river
Veraval Jalapor 1509 TPA
97 Sardaben Naginbhai Oad
1.76.16 s.n- 192,194,197
Ambika river
Ajrai Gandevi 6253 TPA
98 Varshaben Jayesbhai Patel
01.00.00 s.n- 273 Ambika river
Torangam
Gandevi 3067 TPA
99 Parulben Vijaybhai Naik
00.81.00 s.n- 01,51,52,53
Ambika river
Kolva Gandevi 2875 TPA
100 Parulbhai Vijaybhai Naik
01.00.00 s.n- 53,54,55 Ambika river
Kolva Gandevi 3550 TPA
101 Yusuf Ibrahim Sidat
01.00.00 s.n- 163 to 165 Ambika river
Matwad Gandevi 3550 TPA
102 Lilaben Ranchodbhai Oad
01.56.00 s.n- 504,505,508
Purna river
Supa Navasari 5538 TPA
103 Kamuben Sonubhai Oad
01.00.00 s.n- 583,590 Purna river
Mchhad Jalapor 3550 TPA
104 Parimal S Naik 02.50.00 s.n- 9,10,515 Purna river
Supa Navasari 8875 TPA
105 Yusuf Ibrahim Sidat
00.73.44 s.n- 18,22 Ambika river
Boriach Navasari 2607 TPA
106 Pravinaben Dineshbhai Patel
00.50.00 s.n- 250,251 Ambika river
Torangam
Gandevi 1775 TPA
107 Yusuf Ibrahim Sidat
01.00.00 s.n- 163 to 165 Ambika river
Matwad Gandevi 3550 TPA
108 Fakirbhai Mohmad Motala
03.15.00 s.n- 299,348 to 350
Ambika river
Kumbhar Faliya
Navasari 11182 TPA
109 Jagdishbhai Babubhai Patel
04.80.00 s.n- 55,56,57,58,59
Ambika river
Devdha Gandevi 17040 TPA
110 Harshbhai Thakorbhai Patel
04.80.00 s.n- 40,41,42 Ambika river
Devdha Gandevi 17040 mt/m
111 Lallubhai Bhikhabhai Patel
03.84.00 s.n- 141 to 144 157 to0159
Ambika river
Ajrai Gandevi 13632 mt/m
112 Hiraben Fulabhai Od
00-70-00 S.No.264 Purna river
Kurel Navsari 2485 TPA
Shri S.M.Khopkar, Asst.Geologist, Dist:Navsari represented the above proposals.He also informed that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. After detailed deliberation, committee asked Shri S.M.Khopkar, Asst. Geologist, Dist: Navsari to submit written confirmation regarding which of the above proposals include instream minng and which of the proposals are in dry river bed. It was decided by the committee that after submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting. BLACKTRAP MINING PROJECTS-DISTRICT NAVSARI
Sr.No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Raj Quarry Works (Chandubhai Somabhai Patel)
01-75-00 Ha S. No. 602 A/B, B.No. 1754 paiki
Alipore Chikhali 10000 MT/M
Page 7 of 32
2 Bajrang Stone Quarry Works (Pareshbhai J Patel)
02-00-00 Ha B. No. 480, 481
Rethavaniya
Chikhali 4166 MT/M
3 Gulambhai Ahmedbhai hajat 01-52-90 ha B. No. 289 p1 & 289 P2
Rethavaniya
Chikhali 2500 MT/M
4 Amrutlal Patel (Vikaram Quarry Works)
01-94-53 Ha B. No. 1888
Degam Chikhali 4166 MT/M
5 Ravi Stone Quarry Works (Rajeshbhai Hargovindbhai Itwala)
00-60-00 Ha B. No. 353 paiki 2
Khundh Chikhali 6250 MT/M
6 Shri Ram Stone Quarry (Jitendrabhai Ishverbhai Patel)
04-22-63 Ha B. No. 110/2/2
Duvada Chikhali 16500 MT/M
7 Rameshbhai K Patel (Amardeep Metal Works)
01-04-28 Ha S. No. 1884
Degam Chikhali 8690 MT/M
8 Black Diamond Stone Enterprise
00-96-10 Ha B. No. 1754
Degam Chikhali 14500 MT/M
9 Nareshbhai A Patel (Rajhans Metal)
01-41-32 Ha B. No. 2021 to 2026
Alipore Chikhali 18750 MT/M
10 Black Diamond Stone Enterprise
01-41-63 Ha B. No. 1690
Degam Chikhali 33500 MT/M
11 Om Sai Metal 00-73-04 Ha S. No./B. No. 1833
Alipore Chikhali 10000 MT/M
12 Omkar Quarry Works (Hitendrabhai Bhimjibhai Patel)
00-43-23 Ha B. No. 1991 paiki
Alipore Chikhali 3000 MT/M
13 Raj Stone Supplying Company (Chandubhai Somabhai Patel)
01-00-00 Ha S. No. 602 A/B, B.No. 1750 paiki
Alipore Chikhali 6200 MT/M
14 Duvada Stone Supplying Company (Dineshbhai Nanubhai Itwala
00-85-50 Ha S. No. 269, B. No. 353 paiki
Khundh Chikhali 6250 MT/M
15 Jay Ambe Quarry (Hargovinddas Bhikhubhai Mistry)
01-45-69 Ha B. No. 1983
Alipore Chikhali 14160 MT/M
16 Kantaben Maganbhai Patel 01-27-36 Ha B. No. 234
Jamanpada
Chikhali 1666 MT/M
17 Gautamkumar K Patel 01-74-35 Ha B. No. 1874 B
Alipore Chikhali 14583 MT/M
18 Mueshbhai Rajendraprasad Thakur (Vishal Metal)
00-63-29- Ha B. No. 2049
Degam Chikhali 37500 MT/M
19 Bajrang Stone Quarry Works (Pareshbhai J Patel)
00-90-00 Ha B. No. 735
Chasa Chikhali 4166 MT/M
20 Satish M Patel (Tirupati Stone Metal)
01-61-26 ha B. No. 1895
Degam Chikhali 25000 MT/M
21 Kishorbhai haribhai Patel (Shree Umiya Stone Quarry Works )
01-92-67 Ha B. No. 1768
Degam Chikhali 12500 MT/M
22 Shivabhai A Patel (Gayatri Quarry Works)
01-00-00 Ha B. No. 483
Rethavaniya
Chikhali 4166 MT/M
Page 8 of 32
23 Manubhai Pursotambhai Patel (Bhavin Quarry Works)
01-72-55 Ha B. No. 1752, 1754 p1
Alipore Chikhali 8333 MT/M
24 Rameshbhai K Patel (Somnath Stone Ind)
00-29-54 Ha B. No. 1885
Degam Chikhali 11500 MT/M
25 Gautamkumar K Patel (Urvi Stone Pro)
01-00-00 Ha B. No. 1873
Degam Chikhali 4166 MT/M
26 Rameshbhai K Patel (Amardeep Metal)
01-58-46 Ha B. No. 874-A
Degam Chikhali 12500 MT/M
27 Bhimjibhai L Gondaliya (Jay Khodiyar Metal)
02-22-82 Ha B. No. 1989 paiky 2 &3
Alipore Chikhali 37500 MT/M
28 Hitendrabhai Bhimajibhai Patel
00-99-22 Ha B. No. 1976,1977 paiki
Alipore Chikhali 6000 MT/M
29 Shri Ram Stone Quarry 4.22.63 ha Block No. 110/2/2
Duvada Gandevi 16666 MT/M
30 Shiv Quarry Works 02.79.45 Ha Sr. No. 100-A&100 B
Debarpada
Chikhli 195615 MT/M
31 Shree Vinayak Stone 01.20.83 Ha B. No 1852
Degam Chikhli 155065 MT/M
32 Patel Metals 01.00.00 Ha B.No. 1800
Degam Chikhli 102666 MT/M
33 Bharat Kumar Gopalbhai Patel
1.99.37 Ha Block No. 150(P), Sr. No. 134
Duvada Gandevi 4166 MT/M
34 Mr. Amitkumar Mathurbhai Kaneriya
01.20.58 Ha B. No.1894
Degam Chikhli 2,00,000 MT/Y
35 Shri Dilipbhai Bhagubhai Patel
00.60.00 Ha B. No. 150(P)
Duvada Gandevi 10000 MT/M
36 Damyantiben D. Patel 00.76.00 Ha B. No. 131 (P)
Duvada Gandevi 8333 MT/M
37 Krishna Metals 00-50-66 Ha B. No. 1742/paiki
Chasa Chiikhali 5000 MT/M
38 Bilal Ahmad Salim Divan 01.00.00 Ha s.n- 724p Alipor Chikhali 6666 mt/m
39 Kalyan Quarry Works 03.40.95 Ha s.n- 197 Duvada Gandevi 17000 mt/m
40 Devjibhai L. Gondaliya 01.36.12 Ha s.n- 1989/p-1
Alipor Chikhali 25000 mt/m
41 Bhimjibhai L.Gondaliya 00.92.40 Ha s.n- 1989/p-4
Alipor Chikhali 18750 mt/m
42 Vinodkumar Govindbhai Viradiya
00.69.81 Ha s.n- 150 P Duvada Gandevi 11500 TPA
43 Shri Yusuf Ismail Jasat 00.56.72 Ha B. No. 2174
Aalipor Chikhli 10000 MT/M
44 Laxmi Metal Quarry Works
3.00.00 Ha Block No. 1848, 1848 / p1, 1847 & 1844
Degam Chikhli 123200MT/M
Page 9 of 32
Shri S.M.Khopkar, Asst. Geologist, Dist: Navsari mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
SAND MINING PROJECTS-DISTRICT BHARUCH
Sr. No.
Name of Applicant Lease Area in Hactare
Address of site
Name of River
Village Taluka Rate of Mining
1 Jayntibhai RamjibhaiVamja
1.77.00 s.n- 260 Narmada Indor Zagadiya 15000 MTPA
2 Vipulbhai Harendrabhai Patel
1.21.00
s.n- 253 Narmada Indor Zagadiya 10000 MTPA
Shri Jatin K Gor, Geological Asst. represented that sand excavation will be done only from dry river bed. It was also represented that none of the above lease areas is situated in coastal regulation zone. No any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. Sand is proposed to be excavated up to 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of each of the cases, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015. BLACKTRAP MINING PROJECTS-DISTRICT VALSAD
Sr.No. Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 R.R Mishra Stone Qqarry
1.00.00 s.n- 64/A Orwad Killa Pardi 7500 mt/m
2 Shree Laxmi Stone Suppliers
00.81.00 s.n- 64/A/2
Orwad Pardi 30,000 TPA
3 Harjibhai Putiyabhai Thorat
00.51.00 s.n- 316 Kakadkopar Kaprada 16,000 TPA
Page 10 of 32
4 Shree Ghanshyam Stone Quarry
01.21.41 s.n- 365/p Khadki Pardi 35000 TPA
5 Padma Stone 00.92.75 s.n- 826/p Mota Pondha
Kaprada 28,000 TPA
6 Patel Stone Industries 00.26.52 s.n- 437/p Ozar Kaprada 8.000 TPA
7 Shree Manjulaben Mukeshbhai Rajput
01.46.71 s.n- 63/2 Morai Pardi 40.000 TPA
8 Mukesh Rajendraprasad Thakur
00.57.00 s.n- 63 Morai Pardi 18.000 TPA
9 Shiv Stone Quarry 1.00.00 s.n- 657/1/2
Vatar Pardi 30.000 TPA
10 Kirankumar Mohanlal Desai
2.00.00 s.n- 407/p Karajgam Umbergaun 60.000 TPA
11 Amrutlal nanjibhai Patel 1.00.00 s.n- 68/2 Sarigam Umbergaun 32.000 TPA
12 R. Desai & Co 04.85.11 s.n- 64/A/1
Orwad Pardi 80.000 TPA
13 Pratik Kirankumar Desai
1.00.00 s.n- 406/2/p
Karajgam Umbergaun 30.000 TPA
14 Rameshwar Stone Supplier
00.71.60 s.n- 81/p Punet Umbergaun 24.000 TPA
15 Jalaram Stone Quarry 01.41.18 s.n- 56/1/2
Motiwada Pardi 30.000 TPA
16 Janaksinh U. Chauhan 01.10.20 s.n- 112/2 Maroli Umbergaun 10.000 TPA
Shri S.M.Khopkar, Asst. Geologist, Dist:Valsad presented the above proposals and mentioned lease areas are situated beyond 500 m distance from the nearest villages except proposal at Sr. NO: 11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam.Committee asked Shri S.M.Khopkar to submit the details of the nearest resident from the periphery of the lease at sr.no: 11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 except proposal at Sr. NO:11 of Shri Amrutlal Nanjibhai Patel,SNO: 68/2,Sarigam.
Page 11 of 32
SAND MINING PROJECTS-DISTRICT SURAT
Sr. No.
Name of Applicant
Lease Area in Hactare
Address of site
Name of River
Village Taluka Rate of Mining
1 Shree Mahalaxmi Minerals
04-00-00 Ha S. No. 180 Tapi Kadod Bardoli 10000 MT/Year
2 Ashwinbhai Sitarambhai Prajapati
02-65-00 Ha S. No. 816 Tapi Ghala Kamrej 15000 TPA
3 Baldevsinh A Rathod
01-65-00 Ha Opp. B. No. 12
Tapi Jior Kamrej 26000 TPA
4 Mohammad Aslam Hasim Patel
00-40-00 Ha Opp. S. No. 861,862
Tapi Ghala Kamrej 23400 TPA
5 Chanchalben Durlabhbhai Parmar
02-00-00 Ha Opp. S. No. 178
Tapi Machhi Kamrej 21000 MT/Year
6 Rajubhai Sitarambhai Prajapati
02-20-00 Ha Opp. S. No. 17 to 18
Tapi Machhi Kamrej 15000 TPA
7 Champakbhai Bhulabhai Prajapati
02-25-00 Ha Opp. S. No. 10,16 &17
Tapi Machhi Kamrej 15000 TPA
8 Ashwinbhai Sitarambhai Prajapati
02-00-00 Ha S. No. 18 to 21
Tapi Machhi Kamrej 10000 TPA
9 Ajaybhai V Solanki 01-00-00 Ha Opp. B. No. 712
Tapi Karjan Kamrej 30000 MT/year
10 Dhanuben K Oad 02-00-00 Ha Opp. B. No. 65
Tapi Ghala Kamrej 20000 MT/year
11 Navinbhai P Parmar
01-66-00 Ha Opp. B. No. 2 to5
Tapi Karjan Kamrej 30000 MT/year
12 Ajaybhai V Solanki 02-80-00 Ha Opp. B. No.455 to 469
Tapi Sampura Kamrej 30000 MT/year
13 Girishbhai Dahyabhai Oad
00-75-00 Ha Opp. S. No.65
Tapi Ghala Kamrej 26000 TPA
14 Padmaben Jayantibhai Oad
04-00-00 Ha Opp. S. No. 65,41,29 to 32
Tapi Ghala Kamrej 23400 MT/Month
15 Dahyabhai Naranbhai Rathod
00-60-00 Ha Opp. S. No. 165,166
Tapi Machhi Kamrej 12000 MT/Year
16 Bhikhiben Dahyabhai Rathod
01-70-00 Ha Opp. S. No. 165,166
Tapi Machhi Kamrej 20000 MT/year
17 Rameshbhai Chandubhai Od
01-88-00 Ha Opp. S. No. 2,3
Tapi Machhi Kamrej 23000 MT/year
18 Saomabhai Navajibhai Gamit
00-51-61 Ha Opp. S. No. 175,176
Tapi Machhi Kamrej 10000 MT/year
19 Badan Traders (Memunaben Dawood Dhalech)
01-10-00 Ha S. No. 61 & 62
Tapi Bodhan Mandvi 8300 MT/Month
20 Dipakkumar Pravinchandra Vyas
00-35-00 Ha B. No. 192 Tapi Timba Kamrej 5000 MT/Year
Page 12 of 32
21 Dhansukhbhai Sukhabhai Monya
02-00-00 Ha B. No./ S. No. 175,169
Tapi Miyawadi Kadod
Bardoli 25000 MT/Year
22 Rajubhai Ranchhodbhai Patel
01-96-00 Ha S. No. 361 & 367
Tapi Kosadi Mandvi 10000 MT/Year
23 Shaileshbhai Rameshbhai od
02-60-00 Ha Opp. S. No. 817,818,819
Tapi Ghala Kamrej 22000 MT/Year
24 Gokulbhai Mesurbhai Rathod
04-00-00 Ha Opp. S. No. 170,175
Tapi Machhi Kamrej 26000 MT/Year
25 Lalitaben Somabhai Rathod
04-00-00 Ha Opp. S. No.6,8
Tapi Machhi Kamrej 29000 MT/Year
26 Naranbhai Melabhai Oad
03-15-00 ha Opp. B. No. 57 to 26
Tapi Baudhan Mandvi 425 MT/Month
27 Naranbhai Melabhai Oad
00-25-00 Ha Opp. S. No.54,55
Tapi Baudhan Mandvi 425 MT/Month
28 Rameshbhai Thakorbhai patel
03-00-00 Ha Opp. S. No.828.833
Tapi Ghala Kamrej 425 MT/Month
29 Thakorbhai Vanmalibhai Patel
00-80-00 Ha Opp. S. No.808.807
Tapi Ghala Kamrej 425 MT/Month
30 Rasikbhai Thakorbhai Patel
00-80-00 Ha Opp. S. No.808.
Tapi Ghala Kamrej 425 MT/Month
31 Ushaben Ranchhodbhai Patel
02-20-00 Ha S. No. 358,360,368,369
Tapi Kosadi Mandvi 25000 MT/Year
32 Mahmadbhai Bajibhai Mahida
00-95-00 Ha Opp. S. No. 24
Tapi Baudhan Mandvi 10000 MT/Year
33 Vinaysinh B Rathod
00-69-60 Ha Opp. S. No. 19,20
Tapi Machhi Kamrej 8000 MT/Year
34 Dayalbhai Somabhai Ahir
01-68-86 Ha Opp. S. No. 178,180
Tapi Machhi Kamrej 20000 MT/year
35 Rasidbhai G Sindha
03-20-00 Ha Opp. S. No. 13,14,15
Tapi Baudhan Mandvi 13000 MT/Year
36 Rasidbhai G Sindha
04-00-00 Ha Opp. S. No. 30,28, 55 to 58
Tapi Baudhan Mandvi 20000 MT/year
37 The Kamrej Taluka Reti-Gravel Kadhnari Sahkari Mandli Ltd.
05-00-00 Ha S. No. 421 to 427,467
Tapi Dungra Kamrej 30000 MT/year
38 Arvindbhai Vallabhabhai Solanki
04-90-00 Ha B. No./ S. No. 33,34,35,48
Tapi Kakrapar Mandvi 10000 MT/Year
39 Ajaybhai Vallabhbhai Solanki
04-90-00 Ha B. No./ S. No. 30,31,33
Tapi Kakrapar Mandvi 10000 MT/Year
40 Prashantkumar Rameshabhai Vasava
06.35.11 opp.s.n.7,8,10 nadi pat
Tapi Magatra Mandvi 1250 mt/m
41 Kasim Ibrahim Badan
01.10.78 Opp.on river bed
Tapi Bodhan Mandvi 10000 mt/y
42 Nareshbhai Ganpatbhai Oad
00.79.95 Opp. S.n.41,30 on river bed
Tapi Ghala Kamrej 750 mt/m
Page 13 of 32
43 Nilaben J Chavd 00.35.00 Opp b.n.859,860 river bed
Tapi Ghala Kamrej 1300 mt/m
44 Mohit Agarwal (Baba Trading)
10-07-55 Ha B. No. L-2, Tapi Kholvad Kamrej 30000 MT/Month
45 Vahidaben Nazirahmed Shikari
01.00.00 Opp.b.n.134,138&140
Purna Shekhpur Mahuva 10000 mt/m
Shri D.K. Patel, Geologist, Dist: Surat presented the above proposals. He mentioned that no bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. After detailed deliberation during presentation, committee asked Shri D.K.Patel, Geologist, Dist:Surat to submit details regarding which of the above proposals include instream mining and which of the proposals are in dry river bed. After submission of the aforesaid details, the above proposals will be taken up in one of the upcoming SEAC meeting.
BLACKTRAP MINING PROJECTS-DISTRICT SURAT
Sr. No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Induben Kanjibhai Gamit
03-27-00 Ha
S. No. 240, B. No. 281
Zab Mandvi 20000 MT/Month
2 Jagdishbhai Bhagvanjibhai Kathiriya (New Madhav Stone Quarry)
1.7909 Ha
B. No. 157 Wadi Umarpada 1,20,000 MT/Year
3 National Quarry Works
04-69-15 Ha
B. No. 1,2,77-B & 501
Tuked Mandvi 75000 MT/Year
4 Khodiyar Stone Quarry
00-59-46 Ha
B. No. 360 Verakui Mangrol 2500 MT/Month
5 Harihar Quarry (Rajeshbhai Pithabhai Varu)
3.2982 HA
B. No. 301 paikee
Areth Mandvi 54000 MT/Year
6 Merambhai Hamirbhai Bandhiya
2 Ha S. No. 100,101
Kamlapore
Mandvi 30000 MT/year
7 Rajeshbhai Pithabhai Varu
4 Ha Opp. S. No. 101,102
Kamlapore
Mandvi 60000 MT/Year
8 Budhiyabhai Chhotiyabhai Vasava
01-69-93 Ha
B. No./S. No. 52
Amarkui Mangrol 75000 MT/Year
9 Teljibhai Khalapbhai Chaudhari
2.1999 Ha
B. No. 123, S. No. 60/17
Selarpur Mangrol 30000 MT/year
10 Ramanbhai Treshmabhai Vasava
1 Ha P. No. 57/1 Umbhariya
Umarpada 3000 MT/Year
11 Hiteshbhai Mahendrabhai Sarkhedi (Padma Stone Quarry)
03.64.00 B.n.94 Uteva Amndvi 20000 mt/m
Page 14 of 32
12 Mansukhbhai Khimjibhai Bhalala (Khodiyar Stone Quarry)
02.36.64 b.n.358 Verakul Mangrol 6700 mt/m
13 Nashilbhai M Kanani (Vrundavan Stone Crusher)
00.96.00 b.n.36 Kantvav Mangrol 500 mt/m
14 Larson And Toubro Ltd.
4.90.00 Vareth Mandvi 54000 mt/m
15 Larson And Toubro Ltd.
01.72.25 Vankla Mandvi 15000 mt/m
16 Janakbhai Patel 03.90.27 b.n.59,60,61
Kantvav Mangrol 10000 mt/y
17 Raj Stone Quarry 04.00.00 b.n.83 Naren Mandvi 23000 mt/m
The above mentioned lease areas are situated beyond 500 m distance from the nearest villages except proposal at Sr.NO: 3 of National Quarry Works.Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs.After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 except for the proposal at serial No: 3.
For the proposal at sr.No.:3, National Quarry Works, Committee asked Shri D K Patel, Geologist to submit the nearest distance of village Tuked from proposed lease at Sr.NO: 3. After receipt of the details, committee decided to appraise the proposal in one of the upcoming SEAC meeting.
STONE MINING PROJECTS-DISTRICT SURAT
Sr.No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Parshottambhai Chaudhary 01-00-00 Ha
B. No. 106
Kantvav Mangrol 1600 MT/Month
2 Bhurabhai Kalubhai Kuvadia (Nilkanth Stone Quarry)
00-52-50 ha
B. No. 131
Selarpur Mangrol 1600 MT/Month
3 Shiv Shakti Stone Quarry (Vijay Mahendrasingh Bambadiya)
01-66-55 Ha
B. No. 41,43
Umbhariya Mangrol 2100 MT/Month
Page 15 of 32
Shri D.K. Patel, Geologist, Dist: Surat presented the above proposals. During the meeting, the committee noticed that all the above lease areas are situated beyond 500 m from the nearest habitation. Blasting is not required and sand stone will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
BLACKTRAP MINING PROJECTS-DISTRICT RAJKOT
Sr.No. Name of Applicant
Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Hirenkumar Jagdishbhai Adhaduk
01-00-00 s.n.384paiki Moti Marad
Dhoraji 2083 mt/Month
2 Shri Rajhans Stone Quarry Crushing.co
03-00-00 s.n. 93/1paiki
Lapasari Rajkot 4000 mt/month
3 Rajeshkumar Naranbhai Ram
00-80-94 s.n. 328paiki 1/1
Sankali Jetpur 900 mt/month
4 Dhirubhai Khodabhai Makwana
1-00-00 s.n. 27/1paiki
Chordi Gondal 1000 mt/month
5 Rupsinh Juvansinh Zala
01-00-00 s.n. 34paiki Chordi Gondal 800 mt/month
6 Jagdishbhai H. Dafda
00-75-00 Nadi Paiki Anandpar
K.Sangani 800 mt/month
7 Dilipbhai Rajeshbhai Mavani
01-00-00 s.n. 128paiki Gundala Gondal 1000 mt/month
8 Silver Stone Crusher
02-00-00 s.n. 412paiki Khirasara
Lodhika 3000 mt/month
9 Babulal Premjibhai Rathod
01-00-00 s.n. vokla paiki
Moti paneli
Upleta 800 mt/month
10 Nagajanbhai Dvayat Chandera
02-00-00 s.n. 223paiki 1
Nagalpar Rajkot 1500 mt/month
11 Mukeshkumar Trikambhai Adhduk
01-00-00 s.n. 273paiki Bhankh Upleta 1200 mt/month
12 Paras Stone Crusher
02-00-00 s.n. 144paiki Thorata Jetpur 2000 mt/month
13 Niteshbhai R. Jalu
01-00-00 s.n. 109paiki 1
Anandpar
K.Sangani 800 mt/month
14 Ranabhai Vejabhai Kuchhdiya
01-00-00 s.n. Machchhu Rivar Bed Paiki
Satda Rajkot 800 mt/month
Page 16 of 32
15 Masharibhai Bhimshibhai Kandoriya
01-00-00 s.n. 3355paiki 1
k.sangani
K.Sangani 800 mt/month
16 Patel Stone 01-00-00 s.n. Gandali Vokla p
Chordi Gondal 1200 mt/month
17 Raj Stone Crusher (Hardasbhai Ranabhai Ram)
01.00.00 s.n.184 Vorakotda
Gondal 3000 mt/month
18 Kishorbhai Rajeshbhi Mavani
01.00.00 s.n.Gondli p Vorakotda
Gondal 3000 mt/month
19 Govindbhai Jivabhai Bhetariya
01.00.00 Kothariya
Rajkot 1250 mt/m
20 Menshibhai Naranbhai Jogal
01.00.00 s.n.23p Jamvadi Gondal 3000 mt/month
21 Shre Raj Stone Crusher
01.00.00 s.n.184p Vorakotda
Gondal 3000 mt/month
22 Pintubhai Menshibhai jogal
02.00.00 S.n.633p Khajurda Jamkandorana
2000 mt/month
23 Bhikhubhai Naranbhai Ram
02.00.00 S.n.633p Khajurda Jamkandorana
2000 mt/month
24 Amitbhai Hardasbhai Solanki& other
01.00.00 s.n.199p1 Virpur Jetpur 3000 mt/month
25 Parbatbhai Khimandbhai Solanki
01.00.00 Belt of River p
Vorakotda
Gondal 2000 mt/month
26 Mensibhai Naranbhai Jogal
01.00.00 s.n.23p Jamvadi Gondal 3000 mt/month
27 Parulben KUNVARJIBHAI Bavliya
02.00.00 s.n.54 Kotda Jasdan 1000 mt/month
The above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
Page 17 of 32
SAND MINING PROJECTS-DISTRICT RAJKOT
Sr. No.
Name of Applicant
Lease Area in Hactare
Address of site
Name of River
Village Taluka Rate of Mining
1 Bharatbhai Kalabhai Humble
00-82-60
River Bed Bhadar Nilakha Upleta 820 mt/month
2 VikrambhI Kalabhai Humble
05-00-00
River Bed Venu Nilakha Upleta 5000 mt/Year
3 Mansukhbhai Punajabhai Der
02-00-00
River Bed Bhadar Gadha Upleta 2000 mt/month
4 Varshaben Vikrambhai Humbie
04-75-00
River Bed Venu Nilakha Upleta 4750 mt/month
5 Vajubhai Karsanbhai Dav
01-99-15
River Bed Bhadar Dolatpar Jasdan 1990 mt/month
6 Naranbhai R. Chanravadiya
02-00-00
River Bed Bhadar Hadfodi Upleta 2000 mt/month
7 Karmanbhai Ukabbhai Chavda
01-00-00
River Bed Bhadar Majethi Upleta 1000 mt/month
8 Varshaben V. Humble (Bhagyoday Reti Supplirrs)
02-71-65
River Bed Bhadar Majethi Upleta 2670 mt/month
9 Khimjibhai Rajabhai Ahir
02-00-00
River Bed Bhadar Hadfodi Upleta 2000 mt/month
10 Bhupatbhai Arjanbhai Humble
04-75-00
River Bed Venu Nilakha Upleta 4750 mt/month
11 Sanjaybhai Lilabhai Daki
03-00-00
River Bed Venu kharchia Upleta 1000 mt/month
12 Naranbhai kanabhai Vadhira
03-97-04
River Bed Venu maekhatimbi Upleta 1500 mt/month
13 Dineshbhai Punjabhai Der
01-00-00
River Bed Bhadar Bhadar Upleta 1000 mt/month
14 Babubhai Ukabhai Chavda
01-00-00
River Bed Bhadar Majethi Upleta 1000 mt/month
15 Dharmendrasinh N. Vala
04-86-00
River Bed Bhadar Gadha Upleta 3000 mt/month
16 Ramnikbhai Nathabhai Kantariya
01-00-00
River Bed Bhadar Supedi Dhoraji 1000 mt/month
17 Dineshbhai Punjabhai Der
01-00-00
River Bed Bhadar Upleta Upleta 1000 mt/month
18 Naranbhai R. Chanravadiya
01-00-00
River Bed Bhadar Upleta Upleta 1000 mt/month
19 Ashishbhai Vikarambhai Chavda
02-00-00
River Bed Bhadar Majethi Upleta 2000 mt/month
20 Shyamkhantu Education and Charitable Trust (Dharmendrasinh N. Vala)
02-78-00
River Bed Venu Varjangjalia Upleta 2000 mt/month
Page 18 of 32
Shri K. N. Mahavadia, Asst. Geologist, Dist: Rajkot, represented that Bhadar and Venu Rivers are seasonal rivers and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease areas. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above projects for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
BULDING LIME STONE MINING PROJECTS-DISTRICT RAJKOT
Sr.No. Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Dudabhai Rajeshbhai Parmar
01-015-034 s.n. 489paiki 6
Dhank Upleta 666 mt/month
2 Kanjibhai Nathabhai Maheta
01-025-045 s.n. 489paiki 1/2
Dhank Upleta 850 mt/month
Shri K. N. Mahavadia, Assistant Geologist, District Rajkot, informed the committee that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
DOLERITE MINING PROJECTS-DISTRICT RAJKOT
Sr.No. Name of Applicant
Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Rajeshbhai Mohanbhai Makadiya
01-51-76
s.n. 49/2 p1p1
Sajadiyari Upleta 833 mt/month
Shri K. N. Mahavadia, Assistant Geologist, District Rajkot, informed the committee that above project does not involve blasting and mineral will be removed only with help of cutter machine. It was also mentioned that the above project does not involve
Page 19 of 32
intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
Proposals for mining of minor minerals of Amreli and Chota Udepur districts scheduled on 15th April 2015 and Proposals of minor minerals of Bhavnagar and Botad distrcts scheduled on 16th April 2014 could not be appraised in respective meeting due to absence of Asst. Geologist of respective districts. These proposals of Amreli, Chota Udepur, Botad and Bhavnagar are taken up on 21st April 2015 in 234th SEAC meeting as Asst. Geologist of respective districts remained present and SEAC appraised the proposals as under.
BLACKTRAP MINING PROJECTS - DISTRICT AMRELI
Sr. No
Name of Applicant Lease Area in Hactare
Location Address
Village Taluka Rate of Mining
1 Maheshbhai Jethabhai Bhayani
4-1-98 S.No.394 P 22
Utvad Babra 20000 MTPA
2 Uma Quarry Works 01-28-27 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
3 Harbhole Stone Quarry (Ramnikbhai Dhanabhai Gol)
02-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
4 Nilkanthvani Stone Crusher
02-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
5 Nilkanthvani Stone Crusher
01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
6 Nilkanthvani Stone Crusher
01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
7 Nilkanthvani Stone Crusher
03-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
8 Sabbirbhai Baddrudin Travadi
01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
9 Jujar Naruddin Travadi 01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
10 Classic Network Pvt. Ltd. 03-02-40 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
Page 20 of 32
Sr. No
Name of Applicant Lease Area in Hactare
Location Address
Village Taluka Rate of Mining
11 Rameshbhai P Kaneriya 01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
12 Laxmi Stone Quarry 00-80-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
13 R K Raiyani 01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
14 J B Construction Co. 01-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
15 J B Construction Co. 02-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
16 Hargovindbhai Zaverbhai Hirpara
01-50-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
17 Hargovindbhai Zaverbhai Hirpara
01-04-43 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
18 Hargovindbhai Zaverbhai Hirpara
01-70-98 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
19 Laxmanbhai L Makashana 01-45-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
20 Jay Bharat Quarry Works 01-74-34 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
21 Rameshbhai Laxmanbhai Mayatra
02-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
22 K M Satani 03-80-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
23 Laxmi Stone Quarry 02-00-00 S. No. 394/1 P 22
Utvad Babra 16000 MTPA
24 Anil Metal Industries 00-7-35 S. No. 174 Manekwada Bagasara 2000 MT/M
25 Bharat Quarry Works 01-00-00 S. No. 4 P Manekwada Bagasara 2000 MT/M
The above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of
Page 21 of 32
mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits for use of agriculture and plantation as well as reclamation work. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
BUILDING LIME STONE MINING PROJECTS DISTRICT AMRELI
Sr No
Name of Applicant Lease Area in Hactare
Address of site Village Taluka Rate of Mining
1 Keshvala Bhayabhai Vinjabhai
01-00-00 Govt. S.No.161 Vankiya Babra 8000 TPA
2 Shree Bhagwati Krupa Stone Quarry
04-90-00 Govt.Sr.No.96/1 P
Ishwariya Babra 20000 TPA
3 Bharatbhai Bijalbhai Bavaliya
01-00-00 Govt. Sr. No.96/1 P
Ishwariya Babra 8000 TPA
4 Shantibhai Gigabhai Khachar
00-80-94 S.No.163 P 4 Lalka Babra 4000 TPA
To represent the above proposals for Amreli district, Shri R. K. Modi,I/C Geologist,Dist:Amreli remained present. He informed the committee that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
Page 22 of 32
SAND MINING PROJECTS- DISTRICT: CHHOTAUDEPUR
Sr. No
Name of Applicant
Lease Area in Hactare
Opp. to: Name of River
Village Taluka Rate of Mining
1 Jagadishbhai Vajubhai Desai
02-94-14 S. No. 1370, 1371,1373
Orsang Mankani Bodeli 2500 MT/Month
2 Ashokji Gopiji Vanjara
03-32-55 S. No. 1438, 1439
Orsang Mankani Bodeli 2500 MT/Month
3 Becharji Sanaji Thakor
04-90-00 S. No. 1411, 1412,1420
Orsang Mankani Bodeli 2500 MT/Month
4 Natvarji Punjaji Thakor
02-18-97 S. No. 1409,1410
Orsang Mankani Bodeli 2500 MT/Month
5 Kanuji Gopiji Vanjara
01-42-38 S. No. 1428 to 1430
Orsang Mankani Bodeli 2500 MT/Month
6 Dhanaji Gopiji Vanjara
04-50-00 S. No. 63,65
Orsang Bamroli Bodeli 2500 MT/Month
7 Dhanaji Gopiji Vanjara
01-66-10 S. No. 1373 to 1376
Orsang Mankani Bodeli 2500 MT/Month
8 Sureshbhai Vechatbhai Baria
03-56-12 S. No. 48 Orsang Pitha Bodeli 2500 MT/Month
9 Bhairavbhai Bhagavatibhai Chobisa
10-00-00 S. No. 45,103,104
Orsang Pinchuvada
Bodeli 2500 MT/Month
10 Shiv Mining (Bhairavbhai Bhagavatibhai Chobisa)
04-52-08 S. No. 45,103,104
Orsang Pinchuvada
Bodeli 2500 MT/Month
11 Rameshchandra Bhailabhai Patel
09-63-96 S. No. 20,21,22
Orsang Suskal Jetpurpavi
2500 MT/Month
12 Jayesh Manubhai Patel
10-00-00 S. No. 20 Orsang Suskal Jetpurpavi
2500 MT/Month
Page 23 of 32
Sr. No
Name of Applicant
Lease Area in Hactare
Opp. to: Name of River
Village Taluka Rate of Mining
13 Tarun Manubhai Patel
10-00-00 S. No. 20 Orsang Suskal Jetpurpavi
2500 MT/Month
14 Ruchit Rameshchandra Patel
08-24-76 S. No. 21,22
Orsang Suskal Jetpurpavi
2500 MT/Month
15 Sureshbhai Vechatbhai Baria
10-00-00 S. No. 40,45,47
Orsang Pitha Bodeli 2500 MT/Month
16 Harehbhai Kalidas Patel
10-00-00 S. No. 16,20,21
Orsang Tadkachala
Jetpurpavi
2500 MT/Month
17 Maheshbhai Vechatbhai Baria
10-00-00 S. No. 22,23, 26,38,40
Orsang Pitha Bodeli 2500 MT/Month
18 Charuben Deveshbhai Sahai
04-78-04 S. No. 359 Orsang Modasar Bodeli 2500 MT/Month
19 Prabhavati J. Chavda
02-00-00 --- Orsang River
Jabugam 12000 MT/M
Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur represented the aforesaid proposals. He informed that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. Maximum depth of the mining will be 2 meter or water level, whichever is less. Type of mining will manual.After detailed deliberation during presentation, committee asked Shri C.H. Dave, Mining supervisor to submit details regarding which of the above proposals include instream minng and which of the proposals are in dry river bed. After submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting.
GRANITE MINING PROJECTS DISTRICT CHHOTAUDEPUR
Sr. No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Ranjitsinh Mohansinh Rathwa
01-60-89 S. No. 101 paiki
Ghuntanvad Jetpurpavi 1,00,000 TPA
Page 24 of 32
Sr. No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
2 Mihir Hariprasad Pandya
03-25-28 S. No. 188 paiki
Raipur Jetpurpavi 125000 TPA
3 Mihir Hariprasad Pandya
04-00-00 S. No. 188 paiki
Raipur Jetpurpavi 12,000 TPA
Shri C.H. Dave, Mining Supervisor, Dist: Chota Udepur informed that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During meeting, considering the proposed mitigation measures, the committee asked Shri C.H.Dave, Mining Supervisor to submit documents of 7/12 abstract.After submission of the details, all the above proposals will be taken up in one of the upcoming SEAC meeting. BLACKTRAP MINING PROJECTS DISTRICT BOTAD Sr. No
Name of Applicant Lease Area in Hactare
Opp. to: Village Taluka Rate of Mining
1 Vajubhai Ramabhai Kher
02-00-00 Ha
S. No. 243 Gundala Gadhada
1250 MT/M
2 Jivanbhai L Chauhan 01-00-00 Ha
S. No. 255 paiki
Hadad 1500 MT/M
3 Ramdevsinh Vikramsinh Gohil
00-74-88 Ha
S. No. 112 paiki
Chiroda Gadhada
75,000 TPA
4 Digvijay Construction Pvt. Ltd.
01-00-00 Ha
Govt. S. No. 233 paiky
Kinara Ranpur 1666 MT/M
5 Jayeshbhai L Chauhan 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
6 Amulakhbhai C Virani 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
7 Bhikhubhai G Vaghela 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
8 Pratapbhai K Vadher 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 5000 MT/M
9 Fatesinh Vallbhbhai Kher
01-00-00 Ha
S. No. 243 Gundala Gadhada
1130 MT/M
10 Shree Ram Quarry Works
01-00-00 Ha
S. No. 252/1 paiki
Gundala Gadhada
600 MT/M
11 Raghavbhai Rambhai Kher
00-89-03 Ha
S. No. 252/1 paiki
Gundala Gadhada
1200 MT/M
12 Pratapbhai K Vadher 02-00-00 Ha
S. No. 75 paiki
Dhankaniya 833 MT/M
13 Sureshbhai S Godhani 01-00-00 Ha
S. No. 255 paiki
Hadad 833 MT/M
Page 25 of 32
Sr. No
Name of Applicant Lease Area in Hactare
Opp. to: Village Taluka Rate of Mining
14 Arjun Stone Crusher 01-75-
00 Ha S. No. 75 paiki
Dhankaniya 5000 MT/M
15 Maruti Enterprise 02-00-73 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
16 Maruti Enterprise 02-99-18 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
17 Chamunda Quarry Works
01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
18 Ramnikbhai B Darediya 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
19 Maheshbhai K Gamara 01-00-00 Ha
Ghelo river Rampara Gadhada
1000 MT/M
20 Hargovindbhai Z Haripara
02-00-00 Ha
S. No. 75 paiki
Dhankaniya 8333 MT/M
21 Rasikbhai B Darediya 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
22 Ramjibhai N Meghani 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
23 Rasikbhai R Meghani 01-00-00 Ha
S. No. 75 paiki
Dhankaniya 1500 MT/M
24 Ishverbhai Bhagvanbhai Patel
01-27-48 Ha
S. No. 223/4 Kinara
Kinara Ranpur 1000 MT/M
25 Upendra Quarry Works 05-00-00 Ha
S. No. 139/5 paiki
Ranpur Ranpur 2500 MT/M
26 Nirubha Harisinh Gohil 1.00.00 s.n- 255/p Hadad Botad 6,250 mt/m
27 Pathabhai Dharamshibhai
00.83.20 s.n- 139p81 Bhadala Botad 1000 mt/m
28 Jagodana Rajeshbhai
Laljibhai 1.00.00 s.n- 75p2/2 Vavadi Gadha
da 5000 mt/m
29 GVK Project & Technical Service LTD
04.34.02 s.n- 465,466,463p
Bodiya Ranpur 2000 mt/m
Shri Nirav Barot, Asst. Geologist, Dist: Botad represented all the above projects.He mentioned that the above mentioned lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the
Page 26 of 32
committee unanimously decided to recommend the above cases for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015. RIVER BED SAND MINING PROJECTS DISTRICT :BOTAD Sr. No.
Name of Applicant Lease Area in Hactare
Name of River
Village Taluka Rate of Mining
1 Mangalsangbhai Labhubhai Tank
00-75-00 Ha
Keri Keriya 333 MT/M
2 Pratapbhai Ransingbhai Khachar
02-00-00 Ha
Keri Keriya 333 MT/M
3 Bhanubhai Nathubhai Mer
00-99-20 Ha
Keri Salangparda
Gadhada 1660 MT/M
4 Hamirbhai Harsurbhai Lavadiya
03-51-10 Ha
Kalubhar Rajpipala Gadhada 1000 MT/M
5 Kanjibhai Sambhubhai Godhani
04-00-00 Ha
Kalubhar Rajpipala Gadhada 1000 MT/M
6 Harpalsinh Raghuvirsinh Gohil
01-00-00 Ha
Ghelo Ishveriya Gadhada 333 MT/M
7 Hitendrasinh G Vala 01-21-22 Ha
Keri Ningala Gadhada 333 MT/M
8 Ravjibhai Dayabhai Parmar
3.00.00 Keri Meghavadiya
Gadhada 1000 mt/m
9 Mahavirsinh Bhavubha Vala
2.00.00 Ghelo Pipal Gadhada 375 mt/m
10 Kalyanbhai Megajibhai Galathara
00.96.00 Keri Meghavadiya
Gadhada 1000 mt/m
11 Dhirubhai Hakubhai Kuvadiya
1.00.00 Kalubhar Rajpipala Gadhada 1000 mt/m
12 Pradipsinh B.Vala 2.51.84 Keri Ningala Gadhada 375 mt/m 13 Kisan Infrastructure
PVT.LTD 00.98.05 Keri Ningala Gadhada 900 mt/m
14 Ganshyamsinh. H. Gohil
0.98.05 Keri Ningala Gadhada 333 mt/m
15 Maheshbhai Dayabhai Sindhav
01-19-00 Ha
Ghelo Lakhanka Gadhada
16 Naranbhai Gandabhai Zala
01-00-00 Ha
Kalubhar Chosala Gadhada 416 MT/M
17 Kakubhai Sardulbhai 1.00.00 Keri Nana Salangpur
Gadhada 1000 mt/m
18 Shree Dharmendrasinh p. Gohil
2.78.10 Ghelo Adatala Gadhada 1000 mt/m
19 Shree Ravirajsinh M. Gohil
00.79.66 Ghelo Adatala Gadhada 1000 mt/m
20 Haribhai Dansangbhai
00.98.05 Keri Ningala Gadhada 1000 mt/m
21 Ashokbhai Chaturbhai Dabasara
00.50.51 Keri Shiyanagar Gadhada 375 mt/m
Page 27 of 32
22 Rameshbhai m. Vaghani
1.00.00 Keri Keriya Gadhada 416 mt/m
23 Pareshbhai Manharbhai Jakhaniya
02-25-40 Ha
Keri Keriya 1000 MT/M
Shri Nirav Barot, Asst. Geologist, Dist: Botad represented that Keri, Kalubhar, Ghelo rivers are seasonal rivers and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease area. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion. After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend above project for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
BUILDING LIME STONE MINING PROJECTS DISTRICT BOTAD Sr. No.
Name of Applicant Lease Area in Hactare
Address of site
Village Taluka Rate of Mining
1 Ravjibhai Karamshibhai Utedia
01-00-00 Ha
S. No. 147/P Itadiya Gadhada 150 MT/M
2 Hareshbhai Ravjibhai Utedia
01-00-00 Ha
S. No. 147/P Itadiya Gadhada 150 MT/M
3 Hasmukhbhai Shambhubhai Utedia
01-00-00 Ha
S. No. 147/P Itadiya Gadhada 150 MT/M
4 Virabhai Manjibhai Dholakiya
1.00.00 s.n- 147p Itariya Gadhada 1000 mt/m
Shri Nirav Barot, Asst. Geologist, Dist: Botad presented the above proposals and mentioned that none of the above projects has proposed to undertake blasting and mineral will be removed only with help of cutter machine. It was also noticed that none of the above projects involves intersection of ground water table. It was presented that arrangement of water sprinkling will be done during cutting for control of fugitive emission. During the meeting, considering the proposed mitigation measures, the committee decided to recommend the above projects for grant environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
Page 28 of 32
SAND MINING PROJECTS DISTRICT BHAVNAGAR Sr. No.
Name of Applicant
Lease Area in Hactare
Name of River
Village Taluka Rate of Mining
1 Bhikhabhai Govindbhai Dangar
02-72-23 Ha Shetrunji Royal Talaja 10,000 TPA
2 Nanubhai Bhalabhai Mevada
01-68-00 Ha Shetrunji Makhania Talaja 10,000 TPA
3 Dharabhai Gigabhai Mewada
04-00-00 Ha Shetrunji Makhania Talaja 10,000 TPA
4 Ramabhai Gigabhai Mewada
04-00-00 Ha Shetrunji Makhania Talaja 10,000 TPA
5 Rajubhai Govindbhai Dhila
01-77-52 Ha Shetrunji Bhengali - Timana
Talaja 10,000 TPA
6 Bhurabhai Kamabhai Mer
01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month
7 Hamirbhai Bhurabhai Mer
01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month
8 Kanubhai Vashrambhai Aal
02-00-00 Ha Kalubhar Chogath Umarala 2000 MT/Month
9 Vashrambhai Ramshibhai Aal
01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month
10 Jayantibhai Ganeshbhai Goyani
01-44-00 Ha Shetrunji Samadhiyala
Gariyadhar
333 MT/Month
11 Dinkarray S Bhatt
01-00-00 Ha Shetrunji Talaja Talaja 333 MT/Month
12 Jethabhai Vashrambhai Aal
01-00-00 Ha Kalubhar Chogath Umarala 1000 MT/Month
13 Dhamendrasinh S. Vala
00-84-68 Ha Shetrunji Royal Talaja 2600 MT/Month
14 Mahavirsinh R Gohil
01-00-00 Ha Shetrunji Talaja Talaja 2600 MT/Month
Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar represented that Kalubhar river is a seasonal river and sand excavation will be done only from dry riverbed. He also informed that instream (flowing water) type of mining is not practiced in the above lease area. It was also represented that no any bridge piers / water intake wells / irrigation structures exist within 500 m distance from boundary of any of above lease areas. He explained that sand excavation will be done up to maximum 3 m depth or water level, whichever is less. The committee observed that the lease holders have proposed to leave adequate setback distance from the river bank so as to avoid chances of river bank erosion.
Page 29 of 32
After discussion and detailed scrutiny of the case, considering the proposed mitigation measures proposed by the lease holders, the committee unanimously decided to recommend projects (Except at serial numbers: 1,2,3,4,5,10,11,13 &14) for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
For the proposals at serial no: 1,2,3,4,5,10,11,13 &14, committee noticed that proposals for sand mining is from the Shetrunji river bed and as the petition is pending before the Honorable High Court of Gujarat and being a corridor for wild life movement, it was unaniumously decided to keep all the proposals pending at serial no: 1,2,3,4,5,10,11,13 &14 till final order of Honorable High Court of Gujarat. Committee also asked Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar to submit the status report regarding movement of wild life habitate in the proposed lease area in Shterunji river bed.
.BLACKTRAP MINING PROJECTS DISTRICT BHAVNAGAR
Sr. No.
Name of Applicant Lease Area in Hactare
Name of River/Location of proposal
Village Taluka Rate of Mining
1 Raisangbhai Narsangbhai Parmar
01-00-00 Ha
S. No. 69/1
Jambala Sihor 75,000 TPA
2 Raisangbhai Narsangbhai Parmar
01-19-13 Ha
S. No. 69/1
Jambala Sihor 80,000 TPA
3 Ghanshyambhai Meghjibhai Barad
01-00-00 Ha
S. No. 265 paiki
Khodvadari Gariyadhar 75,000 TPA
4 Aai Shree Khodiyar Quarry Works
01-00-00 Ha
S. No. 265 paiki
Khodvadari Gariyadhar 80,000 TPA
5 Pareshkumar Keshavlal Roy
01-00-00 Ha
S. No. 265 paiki
Khodvadari Gariyadhar 75,000 TPA
6 Yogeshbhai Ganeshbhai Parmar
02-00-00 Ha
S. No. 415 Mandvi Gariyadhar 85,000 TPA
7 Patel Meghjibhai Jivarajbhai
01-00-00 Ha
S. No. 415 paiki
Mandvi Gariyadhar 75,000 TPA
8 Chotubha Shivubha Sarvaiya
02-18-49 Ha
S. No. 265 Khodvadari Gariyadhar 600 MT/Month
9 Mahavirsinh Kiritsinh Gohil
02-00-00 Ha
S. No. 17 Trambak Ghogha 580 MT/Month
Page 30 of 32
10 New Parth Stone Crusher
01-39-74 Ha
S. No. 123/1/Paiki
Butiya Palitana 1500 MT/Month
11 Sitaram Quarry Works 03-00-00 Ha
Shetrunji River
Nani Rajsthali
Palitana 375 MT/Month
12 Sitaram Quarry Works 03-00-00 Ha
S. No. 254 p
Nani Rajsthali
Palitana 1340 MT/Month
13 Sitaram Quarry Works 02-52-80 Ha
Shetrunji River
Nani Rajsthali
Palitana 300 MT/Month
14 Sitaram Quarry Works 03-13-63 Ha
Shetrunji River
Nani Rajsthali
Palitana 340 MT/Month
15 Madhav Stones 01-61-92 Ha
S. No. 118 Sanjnasar Palitana 340 MT/Month
16 Hardipsinh Raghuvirsinh Chudasma
01-21-41 Ha
S. No. 213/2
Bhadli Sihor 330 MT/Month
17 Pushprajsinh Pradyumansinh Chudasma
01-13-21 Ha
S. No. 212 Bhadli Sihor 330 MT/Month
18 Rajul Stone Crusher 01-00-00 Ha
S. No. 3 paiki
Piparla Sihor 200 MT/Month
Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar represented the above proposals. He mentioned that lease areas are situated beyond 500 m distance from the nearest villages. Method of basalt removal involves drilling, blasting, sizing of mineral, etc. Top soil will be stacked separately for green belt development whereas overburden will be removed, stacked and refilled in mined out pits. None of the proposal involves intersection of ground water table. No wastewater generation is envisaged from mining activities. Domestic wastewater will be disposed off through septic tank – soak pit. Arrangement will be done to prevent contamination of surface runoff. Proposed air pollution control measures include use of only controlled blasting, water sprinkling on haul roads, tree plantation in periphery and road sides, etc. It is proposed to convert mined out pits into water reservoirs. After deliberations on various aspects, considering the proposed mitigation measures, the committee unanimously decided to recommend the above cases( Except at serial numbers: 11,13 &14 for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015.
Page 31 of 32
For the proposals at serial no: 11,13 &14, committee noticed that proposals for Blacktrap Mining mining is from the Shetrunji river and as the petition is pending before the Honorable High Court of Gujarat and being a corridor for wild life movement, it was unanimously decided to keep all the proposals pending at serial no: 11,13 &14 till final order of Honorable High Court of Gujarat. Committee also asked Shri Nirav Barot, Asst. Geologist, Dist: Bhavnagar to submit the status report regarding movement of wild life habitate in the proposed lease area in Shterunji river.
Table Agenda
[1] TATA Chemicals Ltd., S NO. 21/P, Village: Aniali, Ta: Ranavav, Porbander (15.99 Ha):
During 227th meeting of the state level expert appraisal committee held on 10/2/2015, proposal of TATA Chemicals Ltd.,S NO. 21/P, Village: Aniali, Ta: Ranavav, Porbander (15.99 Ha) was appraised and committee asked following additional information.
1. Based on contours, details of flow of rainwater runoff meeting to the nearby water bodies showing no resistance to the natural flow pattern due to proposed mining activities.
2. Details of existence of blue bull in study area and project activities impeding/endangering habitation of the said species and proposed action plan to protect its habitation.
3. Letter from department of Geology and mining regarding no other mine exists in the 500 m radial distance from the boundary of the mine lease area.
Project proponent has submitted the reply of aforesaid details on 16-04-2015 which is found satisfactory to the committee and it was unanimously decided by the committee to recommend for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 to SEIAA.
(2). TATA Chemicals Ltd.,S NO. 94/P, Village: Aniali, Ta: Ranavav, Porbander (6.07 Ha)
During 227th meeting of the state level expert appraisal committee held on 10/2/2015, proposal of TATA Chemicals Ltd.,S NO. 94/P, Village: Aniali, Ta: Ranavav, Porbander (6.07 Ha.) was appraised and committee asked following additional information
1. Based on contours, details of flow of rainwater runoff meeting to the nearby water bodies showing no resistance to the natural flow pattern due to proposed mining activities.
Page 32 of 32
2. Details of existence of blue bull in study area and project activities impeding/endangering habitation of the said species and proposed action plan to protect its habitation.
3. Letter from department of Geology and mining regarding no other mine exists in the 500 m radial distance from the boundary of the mine lease area.
Project proponent has submitted the reply of aforesaid details on 16-04-2015 which is found satisfactory to the committee and it was unanimously decided by the committee to recommend for grant of environmental clearance with stipulation of standard conditions as approved in 232nd SEAC meeting held on 15th April 2015 to SEIAA.
Meeting was concluded with thanks to Chair.
Minutes Approved by:
Shri T. P. Singh, Chairman, SEAC.
Shri K.C. Mistry, Secretary, SEAC
Dr. Nikhil Desai, Member, SEAC.
Shri V. C. Soni, Member, SEAC.
Dr. Mayuri Pandya, Member, SEAC
Shri Natrajan Pratap,Member, SEAC
Shri R.J. Shah, Member, SEAC
Shri V.N. Patel, Member, SEAC