Designed for Performance, Value, Sustainability and Aesthetics 1 The Aesthetic Versatility of Modern Parking Structures NORR Limited & Canadian Precast/Prestressed Concrete Institute
Transcript
Designed for Performance, Value, Sustainability and Aesthetics
1
The Aesthetic Versatility
of Modern Parking Structures
NORR Limited & Canadian Precast/Prestressed Concrete Institute
PARKING STRUCTURES
Designed for Performance, Value, Sustainability and Aesthetics
2
Toronto Pearson International Airport Parking Garage
Case Study - 1
3
Human scale
incorporated
into design
with the use of
form liners.
Toronto Pearson International Airport Parking Garage
Case Study - 1
Toronto Pearson International Airport Parking Garage
Case Study - 1
5
Detailed
custom
architectural
form liner.
Toronto Pearson International Airport Parking Garage
Case Study - 1
The exterior Facades are composed of a blend of white and grey architectural precast panels in combination with aluminium screening.
Toronto Pearson International Airport Parking Garage
Case Study - 1
Precast panel with form liner in production.
Toronto Pearson International Airport Parking Garage
Case Study - 1
Toronto Pearson International Airport Parking Garage
Case Study - 1
Toronto Pearson International Airport Parking Garage
Case Study - 1
10
Halifax International Airport Parking Garage
Case Study - 2
11
Custom form
liner design
allowed for
punched
openings in a
structural
shearwall.
Halifax International Airport Parking Garage
Case Study - 2
12
The form liner
and exposed
aggregate
provides for an
interesting
architectural
treatment.
Halifax International Airport Parking Garage
Case Study - 2
“Clean” form
liners provided
for a smooth
perimeter
finish to the
garage picture
window.
Halifax International Airport Parking Garage
Case Study - 2
14
Custom form
liner in
production.
Halifax International Airport Parking Garage
Case Study - 2
Construction
of the shear
walls with
punched
openings.
Halifax International Airport Parking Garage
Case Study - 2
Halifax International Airport Parking Garage
Case Study - 2
17
GO Aurora Parking Garage
Case Study - 3
Precast panel with form liner in production.
GO Aurora Parking Garage
Case Study - 3
19
GO Aurora Parking Garage
Case Study - 3
20
GO Aurora Parking Garage
Case Study - 3
890 Parking Spaces5 Levels10 Months From Project Start to Opening