Date post: | 26-Aug-2018 |
Category: |
Documents |
Upload: | hoangquynh |
View: | 213 times |
Download: | 0 times |
Case Study ChecklistInitial Certification and Renewal
Please support our commitment to sustainability and do not print this document unless it is absolutely necessary to do so.
1. OverviewPurpose This checklist is used to determine if a candidate’s Case Study satisfies the
requirements described in GPM’s Case Study Guidelines.
Candidate Assessor
2. Project Characteristics Yes No N/Aa. Project completed within the past 5 years?b. Worked required number of hours? (GPM-b)
c. Served as manager or director? (GPM-s, GPM-m)
d. Satisfies management complexity requirements? (GPM-s, GPM-m)
3. Content Requirements Yes No N/Aa. Company profile present?e. Client profile present?f. Expected benefits described?g. Actual benefits described?h. Expected results (product-of-the-project) described?i. Planned and actual costs and resources described?j. Planned and actual milestones described?k. Product and project management success criteria
described?l. Challenges addressed described?m. Lesson learned described?n. P5 Impact Analysis included?
www.greenprojectmanagement.org 1 version 1.0
www.greenprojectmanagement.org 2 version 1.0
4. Technical Requirements Yes No N/Aa. Single PDF file submitted?b. Professional in appearance?c. Within word range?d. P5 Impact Analysis within page range?e. Appendices within page range?f. Attestation present?
5. Recommendation: Do Not ApproveCandidates will be given an opportunity to address any identified deficiencies and to resubmit their Case Study.
I find that the Case Study of the candidate named above is unacceptable for the following reason(s):Insufficient number of work hours (GPM-b)Role of manager or director not substantiated (GPM-s, GPM-m)Insufficient management complexity (GPM-s, GPM-m)Missing content (specify) Technically deficient (describe) I attest that, in making my recommendation, I carefully reviewed the candidate's application and all supporting materials provided to me by GPM. I declare that typing my name below represents my electronic signature. Date
6. Recommendation: ApproveI find that the candidate named above has satisfied the requirements for renewal of their GPM certification as:
Green Project Manager — Basic (GPM-b)Green Project Manager — Specialist
(GPM-s)Green Project Manager — Master (GPM-
m)I attest that, in making my recommendation, I carefully reviewed the candidate's application and all supporting materials provided to me by GPM. I declare that typing my name below represents my electronic signature. Date
www.greenprojectmanagement.org 3 version 1.0