The Approach and Current Situation of The Geothermal Development in Beppu City 20 Nov, 2017 Beppu City Office, Oita Pref.
Transcript
Page 1: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

The Approach and Current Situation of The Geothermal Development in Beppu City

20 Nov, 2017

Beppu City Office, Oita Pref.

Page 2: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

1 The Volcanic Front of the Japanese Archipelago

:Quaternary Volcanos

:The Volcanic Front

Source:JAEA

Kyushu Region

The Volcanic Distribution Mapof the Japanese Archipelago

4-5cm/year

8-9cm/year

Page 3: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

2 About Beppu City

Ave. Temperature in City・・・Approx. 16℃

Ave. Rainfall in City・・・Approx.1800mm

Beppu City

RegionWorkers(Companies)

Ratio of the tertiary Industry

Beppu City 89.9%

Oita Pref. 75.1%

Ave. in Japan 73.5%

Population Aging Rate:31.3%(2015)

Source:METI, etc..

Area:125.34km2

Population:118,673

(61,993 Households)

As of Aug, 2017

Populations and Households

1975-2015

Populations

Households

Page 4: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

【source:Yusa(2008)】

3 Features of Beppu Hot Spring Villages ①

Source:Japan SPA Association 2012

Operating wellheads in Beppu City

Years

Wellheads

Wellheads

Pumped Up Wellheads

Artesian Wellheads

3230034081

3690444486

83058

0 20000 40000 60000 80000 100000

Total yields(ℓ/min)

Beppu HS Vil. Yufuin Okuhida HS Vil.

Ito Kusatsu

452522

649879

2217

0 500 1000 1500 2000 2500

The number of wellheads

Beppu HS Vil. Yufuin Ito Atami HS Vil. Ibusuki

Page 5: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

Beppu Onsen temperature distribution map in 100m below seal evel. (℃)

●:Former Yield Spot →:Hot water movement direction―:Isotherm in 100m below sea levelN :Buried Fault(estimated)

Source:Yusa(2003)

*Formation of Beppu hot spring:50K years*History of Beppu Onsen:Back to 8 Century*Source of Onsen is rain water.*Subsurface rain water turn over every 50 years.* The resources of the onsen is hot water type of the chloride spring places under the Tsurumi volcanic group. (Temp.: 250~300℃、Cl:1400~1600ppm)

3 Features of Beppu Hot Spring(Onsen) Villages ②

Page 6: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

■The place of the hot spring origin in Japan!

-In 1919, drilling for the geothermal(113℃) utilization succeeded in Beppu City.

-In 1925, First geothermal generation(1.3kW) started in Japan.

■Local people opposed to the geothermal development in the past!

-In 1981, the opposition movement by Beppu local people let Idemitsu withdrew the application which had applied drilling plans for the geothermal power plant to Oita Pref..

4 Beppu City relations to the Geothermal Development

Source: Oita News in1981

Page 7: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

5 The approach to The New Energy(Geothermal Energy)

• Feb: Completed the “Beppu City Hot Spring Energy Project Possibility Investigation Study Project”.

2017

• Mar: Enacted the “Ordinance for coexistence with the community of Beppu city hot spring power generation”.

2016

• Jan: The price cuts for water supply to the geothermal plants.

• Mar: Established the “BeppuCity Local New Energy Vision”.

2015

• Feb: Completed the FS for the “Beppu City Local New Energy Vision”.

• Sep: Enacted the “Act Regarding Preliminary Procedures of Local New Energy Installation of Beppu City”.

2014

Page 8: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

地熱発

電, 631,307

温度差利用, 2,452,025

太陽光発電・

熱利用, 447,683

風力発電, 304,641

バイオマス発電・熱

利用,21,640

利用可能量(GJ/年)

Type of Energy

Available amount

Heat Conversion(GJ/year)

Geothermal binary power 631,307

Hot spring (66,257)

Geothermal heat utilization

Hot Spring 922,861

Heat pump 1,529,164

Solar power 447,683

Solar heat (488,011)

Wind power 304,641Hydropower(Small and Mid.) -

BiomassPower 21,640

Heat Utilization (76,727)Total(except Hot spring power, Solar heat, Biomass heat utilization)

3,857,295

<Characteristic in Beppu City for the new energy>

▶Geothermal related: 80%

▶Solar : 12%

Wind : 8%

6 The FS for “the Beppu City Local New Energy Vision”(2014)

Geothermal binary power, etc.

Geothermal heat utilization, etc.

Solar power, etc.

Wind powerBiomass

Available amount(GJ/year)

Page 9: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

Setting “Geothermal power water supply” as purpose of water

supply (Corporate with the Waterworks Bureau of Beppu City)

・Utilizing the tap water to the geothermal binary power: As cooling water

・Lead to the benefit of waterworks.

・The above mentioned benefits applies to the price of water in the area:

Return to the local.

Purpose of water supply

Basic charge Excessive charge

Amount Charge Excessed Amount Charge/t

Normal ~8t 997yen

8t~20t 156yen

20t~100t 194yen

100t~ 244yen

Vessel 488yen/t

Geothermal 152円yen/t

7 New supports for the geothermal development(2015)

Page 10: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

Basic Objective 1: Installation of new energy attuned with the environment⇒ The approaches focused on harmonizing with the environment.

Basic Objective 2: Contribution to the tourism industry⇒ Revitalizing onsen / tourism industry.

Basic Objective 3: Installation of local reduction type new energy⇒ Revitalizing community by returning the merits.

Basic Objective 4: Secure energy in times of disaster⇒ Striving for a community with strong resistance against disasters.

■ Policy for the geothermal power

-Promote only exist wellheads and projects with no effects to the surroundingenvironment not aggressive promoting for large size geothermal (binary) powerplants necessary for new wells.

-Promote mainly for the small size geothermal binary power plants with utilizingexisting wellheads.

8 The “Beppu City Local New Energy Vision”(2015)

Basic Guidelines Regarding the Installation of New Energy

Page 11: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

Target Numbers Measures Answer ratio

Citizens 2,000Choose random from over 20 years old living in Beppu city

30.4%

Companies 200Choose from different industrial type based on ration of the number of offices.

46.7%

Onsen and hotelowners

20 Onsen and hotel owners who have wellheads. 55.0%

1 Research purpose

Grasping the concern in the new energy, intension, opinion to the City’s approaches and etc.

through the survey.

【⇒ Study resource for the New Energy Vision(2015)】

2 Survey period

8th ~ 29th Aug, 2014

3 Target

9 Citizens' awareness survey on the new energy

Page 12: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

10 The result of citizens' awareness survey on thenew energy ①

9.1

27.3

54.5

63.6

72.7

37.6

20.4

59.1

51.6

46.2

28.4

29.6

58.1

57.2

57.9

0 10 20 30 40 50 60 70 80

設置を抑制する地域を設ける

設置工事中や稼働中に職員に立ち入り検査をさせ

新エネルギーの設備設置に関する条件を設ける

設備設置事業者に対して、事前に周辺住民等へ

の説明会の開催を要請する

騒音や地下水位の低下などの環境負荷が懸念さ

れる場合には事業者に状況把握及び結果公表…

市民 事業者 温泉旅館

Q1) What approaches city shall be taken in order to solve environmental burden with installing new energy?

Page 13: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

10 The result of citizens‘ awareness survey on thenew energy ②

45.5

45.5

36.4

63.6

31.2

34.4

47.3

48.4

23

39.5

54.7

30

0 10 20 30 40 50 60 70

温泉エネルギー利用に関する市の相談窓口を設

ける

温泉エネルギー設備を実際に体験できる場を設

け、観光スポットとして活用する

市営温泉施設に設備を導入し効果や課題等を情

報発信する

温泉エネルギーに対する補助制度を創設する

市民 事業者 温泉旅館

Q2) What approaches citizens require to the city for the utilizing onsen energy?

Page 14: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

【The reason for enacting】1)The requests increased for development of new energy system from in/outside of the City Office.

2)Arising the geothermal developers with slight awareness to the regulations and laws.3)More importance of mutual understanding between new energy developers and local peoples.

11 Act Regarding Preliminary Procedures of Local New Energy Installation of Beppu City(2014) and Ordinance

【Occur another issues】1)Rushing large size equity entry2)Affect to the environment3)Worsen the local emotion

4)Over utilization of hot water?5)Over yielding of springs?

Act Regarding Preliminary Procedures of Local New Energy Installation

Some limitations for guidance.

【View of City Office】-In regard to the installing the geothermal facilities, it is necessary for utilizing sustainably and orderly with proper guidance and supervision by administration sector in terms of hot spring and living environment protection, promoting local understanding, and local contribution.

Establishing the strict ordinance in order to promote installation of geothermal power orderly.

Page 15: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

12 Ordinance for coexistence with the community ofBeppu city hot spring power generation(2016)

1.PurposeCo-existance with communities and proper

utilization of hot spring resource.

2.DefinitionOver 7500kW is objected.

3.Obligation of the city and developersSpecify owner of the facility.

4.Prior consultationBriefing to the local peoples, etc..

5.Regulations for the environmentHot spring monitoring, etc..

6.OtherNotification of the counter measure to the

accident, etc..

9.Avoidance area Area limitation and set development

conditions etc..

8.Establishing the councilEvaluate the result of survey and

discuss the issue.

10.Individual deliberationOpinion for hot spring drilling

etc..

2017~

■ Essential of the ordinance

7.Recommend improvement, PublicationPublication to internet and notice to relevant agencies.

Page 16: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

13 Procedure based on the Ordinance

Briefing to the locals

Prior consultation

ConstructionReport of

prior consultation

Indicate prior

consultation

Notification of

construction

Completion acceptance of

prior consultation

Monitoring

Report of monitoring and

survey

Complete all procedure based

on regulations

Environment assessment

Notification of

completion

Local confirmation

Completion report of

regulations

Check the completion

Jurisdiction agencies

Page 17: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

14 Prior survey for the environment

■Impact study for environment・ Noise, pollutions, and etc..

・ Water intake, drainage, etc..

・ Fumaroles pollutions, hot spring and resources.・ Counter measures to natural disasters.

Procedure based on the laws and regulations

Submit papers to relevant agencies.

Briefing to the local people about scenic landscape measures.

■Safety investigation for pressured tankfor hot water and separator

・ Confirm warrant・ Local confirmation

■Hot spring monitoring survey・ Drilling new well.・ Existing wellheads within 150m.

Page 18: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

15 Reasons of expansion of hot spring power generationin Beppu

Environment condition

*High temp. hot spring

in shallow area.

*A number of private own wells.

*Large number of untouched hot spring.

*Located out of national park.

* Accumulated knowledge for utilizing hot springs.

Trend in the society

*Focus on renewable energy(Baseload power, CO2 emission)

*Large income by FIT(Feed in Tariff)

*Shift from solar power

*Shift to utilizing idle land

Policy changes

*Deregulations of relevant regulations

*Expanding subsidized projects(METI, MOE)

*Power liberalization

Page 19: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

16 Changing in the equipment accreditation

Source: Asahi News 2016.07.23

7861491

4321

5741

6

17

36

47

0

5

10

15

20

25

30

35

40

45

50

0

1000

2000

3000

4000

5000

6000

7000

2014.3 2015.3 2016.3 2017.3

件KWThe equipment accreditation in

Beppu

Equipment capacity Approved equipment

Beppu city

Page 20: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

▲Tsurumi dake 1,375m

▲Garan dake1,045m

Asamigawafault

Hotta fault

Kannawa fault

17 Installed situation of hot spring power generationetc. As of March, 2017

:Under operation(15) :Planned(46)

Page 21: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

大分合同新聞記事(2015.9.16)抜粋

18 Assertion of the effect to the living environment

●Issue caused by the geothermal development.・Lack of procedure based on the laws andregulations.

・Lack of briefing to local people・Lack of well maintenance

(Fumaroles pollutions, Noise, Drainage, etc.)・Lack of ownership sense

Local opposition

Page 22: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

Definitions Contents Measures

Activefumaroles

boiling spring

Situation of heat source

Depth and Caliber

Temperature Main wellheads

Calorific value Calculate from steam table

pH Main wellheads

Chloride Ion Main wellheads(Cl-)

1) Survey target

2)Survey contents

Survey 103 active fumaroles boiling spring where is over 200m from sea level and close to two heat source(Garan-dake, Tsurumi-dake) in Beppu city.

3)Survey Result Publication the survey result through City office HP

19 Beppu City Hot Spring Energy Project PossibilityInvestigation Study Project(2017)

Page 23: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

20 Beppu hot spring power generation, such as measuresCouncil (2017)

Council members Affiliation

会長 由佐 悠紀 京都大学名誉教授

副会長 渡邊 秀一別府商工会議所専務理事

竹村 恵二京都大学大学院地球熱学研究施設教授

阿部 博光別府大学国際経営学部教授

李 燕APU大学院アジア太平洋研究科教授

徳田 宣子 徳田法律事務所

西田 陽一別府市旅館ホテル組合連合会会長

石原 正統大分県産業科学技術センター参事監兼次長

Beppu City Local New Energy Vision

Promotion Committee for Beppu City Local New Energy Vision

Act Regarding Preliminary Procedures of Local New Energy Installation of BeppuCity

Beppu hot spring power generation, such as measures Council

Ordinance for coexistence with the community of Beppu city hot spring power generation

03,2015

05,2016~

04,2017~

10, 2013~

09, 2014~

Page 24: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

21 Result of the survey by Beppu hot spring powergeneration, such as measures Council

◇Decreased calorific valuein 62%, 28 over 45, of hot spring sources.

◇Decline chloride ion concentration of hot spring sources might be caused by weaken of heat and material supply or stronger ground water supply during the process of heat supply.

Stabilization of hot spring

resource

Decay of hot spring resource

◇Comparison of the survey data (30 years ago)(Temperature and drilling depth)

Drilling Depth

Temperature

Page 25: The Approach and Current Situation of The Geothermal ...geothermal.jogmec.go.jp/report/file/session_180312_14.pdfTemp.: 250 ~300 、Cl:1400~1600ppm) 3Features of BeppuHot Spring(Onsen)

22 Schedule of the geothermal energy

2014FY 2015FY 2016FY 2017FY 2018FY 2019FY 2020FY

Planning

Promotion

Regulationdesignig

BeppuCity Local

New Energy Vision

Revising Environmental

Basic Plan

Revising Global

warming measures

execution plan

Global warming measures execution plan【Contain New Energy Vison】・Introduction Plan for the NewEnergy Plan

・Approach to promote the NewEnergy Plan

New energy introduction project①Hot spring pow generation

introduction project→Introduction Feasibility Map

New energy introduction project②Hot spring heat utilization

introduction project→Install to city owned hot spring

facilities

FS for hot spring power generation

Ordinance for coexistence with the community of Beppu city hot spring power generation

Revising Ordinance for coexistence with the community of Beppu city hot spring power generation