+ All Categories
Home > Documents > The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and...

The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and...

Date post: 17-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
32
The art of detail Providing comprehensive construction services and operational support to clients nationwide.
Transcript
Page 1: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

The art of detail

Providing comprehensive construction services and operational support to clients nationwide.

Page 2: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

The art of detail

Lynx Construction Management

thrives on building superior projects

for its clients. We take it farther than

simply delivering on time and on budget.

We build communities that flourish,

structures that become legacies, and

buildings that become icons.

Page 3: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Mission & Culture

Mission:Lynx Construction Management thrives on building superior projects for its clients. We take it farther than simply delivering on time and on budget. We build communities that flourish, structures that become legacies, and buildings that become icons.

Strategy:We build superior projects through the art of detail. We view the mastery of details as an equal balance of art (creatively implementing solutions to client needs) and science (delivering on time and within allocated resources).

Core Values: The execution of this strategy calls for a relentless focus on excellence - and on the details that create it. You can expect the following values to form part of your every interaction with Lynx Construction Management:

Safety - Maintaining a safe workplace for our clients and employees by implementing best practices and safety awareness in all that we do.

Integrity - Inspiring trust by taking responsibility, acting ethically and encouraging honest and open discussion.

Employees - Attracting and developing the best talent for our business, stretching our people and developing a “can do” attitude.

Client - Improving our clients’ business performance, creating long-term, win-win relationships and focusing on execution excellence.

Excellence - Striving to achieve excellence in all areas of our business – technical, operational, and administrative.

Innovation - Creating new or better ways to provide our service in all areas of our business through technology and development and training of our personnel.

Agility - Embracing change, and adapting rapidly to maintain the knowledge, skills and tools that best serve our clients.

Stewardship - Building a heritage for future generations, acting with an owner’s mentality.

Environment - Protecting the environment through implementation of sustainable and best practices.

The Art of Detail The construction industry is often evaluated in terms of hard numbers. Lynx Construction Management has established

our foundation by consistently delivering our clients’ projects on time and on (or under) budget - and we have exceeded

their expectations by delivering more. Lynx Construction Management believes our success - and what makes us different - lies in the details.

Details are at the heart of Lynx Construction Management’s mission and approach to business because they

define the results we create for our client projects - and fuel the growth of our portfolio. Allow us to explain:

philosophy, culture, organizational structure and infrastructure.

The art of detail

Page 4: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

ExpertisePre-ConstructionLynx Construction Management partners directly with clients

to deliver a project that meets or exceeds their objectives.

Beginning at the pre-construction stage, Lynx will define

and manage all aspects of the project, including estimation,

budgeting, project planning, scheduling and execution.

Benefits of key services provided by Lynx during pre-

construction include:

Collaboration: Lynx will collaborate and fully integrate with

a design team on decisions that impact the final product;

this ensures decisions with key implications further down the

development timeline can be informed earlier.

Cost-Efficiency: Cost-analysis and cost-control practices

employed during design stage, including value engineering and

analysis.

Seamless Project Management: Lynx Pre-Construction services

account for the full range of services for a seamless client

experience from design through construction, including:

• Constructability reviews• Land acquisition• Negotiating project construction services* Permitting• Scheduling• Site condition and logistics

Page 5: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

General ContractingLynx Construction Management is one of the leading

general contracting firms in South Florida, with an

extensive project portfolio exceeding $6 Billion USD, and

consisting of a balance of local institutions and national

clients. Lynx develops partnerships directly with client

teams with the end objective of delivering safe, state-of-

the-art, cost-efficient projects on-schedule and within

budget – and exceeding client expectations.

Key general contracting services and specialties – and

associated advantages – include:

Diverse Construction Expertise: Lynx has deep expertise

in providing contracting services for a variety of

construction projects.

Original Construction: New construction to deliver on

client vision, specializing in large projects for commercial,

residential, and industrial structures and properties.

Renovations and Remodels: Aesthetic and architectural

updates and modifications to revamp existing structures, as

well as maintenance work to optimize existing properties.

Historic Preservation: Restoration and preservation of

historic structures and properties, understanding the

guidelines that govern a historic property.

Long-Term Outlook: Provide system evaluation and

consultation for long-term use of facilities and buildings.

Seamless Infrastructure: General contracting services

include expertise in infrastructural maintenance and

improvements, as a complement to construction and

architectural services.

Sustainability: Green Building (LEED-certified).

The art of detail

Page 6: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

ExpertiseConstruction ManagementLynx Construction Management’s philosophy is to master the Art

of Detail for clients’ business by creating a culture of excellence

– one that relentlessly focuses on the details throughout every

aspect of our client projects. In execution, this means that Lynx

establishes a true partnership with each of our clients, providing

open communication and transparency through each milestone

and decision point within the construction process.

Advantages associated with Lynx’s Construction Management

services include:

Cost-Efficiency: Through capital program planning, purchasing

power, leveraged options for guaranteed maximum contracts

and contract negotiations on our clients’ behalf, we leverage

the scale and depth of our construction relationships to ensure

optimal client costs and return on investment.

Time-Efficiency: By offering fast-tracked and phased

construction project opportunities, our experience allows us to

optimize and streamline the time from inception to construction

completion – while prioritizing quality assurance.

Transparency through Experience: By offering seamless access

to construction operations and associated documentation,

creation of construction and contract documents, materials

verification and accepting accountability for establishing and

managing “lead time”, we ensure that key milestones and high-

impact decisions are a fully transparent, collaborative process

between Lynx Construction Management and our client teams.

Page 7: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Design-BuildLynx Construction Management’s Design-Build expertise presents

clients with a turn-key construction solution targeting superior

results. Lynx has cultivated a team of multi-disciplinary experts

with the objective of offering a single-resource to manage each

construction project from concept to completion, through a single

team and contract.

Advantages of Lynx Construction Management’s turnkey approach

include:

Cost-Efficiency: Construction costs are driven by subcontractors

and suppliers. As a solution to ensure optimal costs for client

projects, Lynx Construction Management leverages extensive

subcontractor and expert relationships to integrate at the inception

of each design-building project to ensure cost-saving opportunities

and inform key decisions prior to implementation.

Single Source of Accountability: A collaborative team of

consultants, architects, builders, subcontractors, suppliers, and

client/owner – managed through a single project manager -

allows Lynx Construction Management to ensure optimal

communication as client goals are consistently exceeded.

Time-Efficiency: Lynx Construction Management’s fully integrated

team is charged with optimizing – and reducing – the time to

convert each project from inception to completion. This is

accomplished by focusing on quality assessments that reduce

the need for rework and redesigns, by overlapping design and

construction phases, and by streamlining buy-out and bidding times.

The art of detail

Page 8: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

SustainabilityGreen BuildingLynx Construction Management believes that efficient

construction processes and sustainable, “green” building

are mutually beneficial practices – and not mutually

exclusive. Lynx subscribes to the philosophy that green

building is a practice of creating structures and utilizing

processes that are environmentally responsible and

resource-efficient throughout a building’s life-cycle. We

recognize the impact that construction activities can have

on the natural ecosystem and on building occupants, and

are therefore committed to employing sustainable practices

that minimize environmental impact, improve energy

efficiency, reduce water demand, and which promote

recycling and improved indoor air quality.

Lynx believes green construction

and building practices can also

help connect people to our natural

surroundings, through more energy-

efficient structures. We are proud to

employ sustainable, “green” building

practices on behalf of our clients, and

encourage awareness across our partnerships.

Renewable EnergyLynx Construction Management employs multiple practices

to invest in and encourage utilization of renewable energy

on behalf of our clients. We believe renewable energy

offers a positive return on investment by reducing our

collective dependence on foreign oil, relying on a less

price-volatile resource than fuel, and ultimately eliminating

pollutants that may otherwise place human health at risk.

Lynx Construction Management’s Energy and Sustainability

Management services include:

• Energy Audits• Energy Cost Analysis• Energy Conservation Retrofit• Energy Use Planning and Management• Solar Energy Systems• LEED Project Management

Page 9: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Building a more accessible South FloridaCommunity involvement is an integral detail comprising

Lynx Construction Management’s daily business. It is

reflected in the firm’s vision for its project portfolio, which

presents the opportunity (and self-perceived duty) to

help bridge South Florida’s past with its future. The

firm’s work includes projects that require preservation

and restoration of structures with deep roots and history

in the community, new construction projects that create

opportunity for South Florida’s present and future,

and public-level projects that facilitate multiple South

Florida municipalities to provide additional services to its

residents. Community involvement and service is a priority

that Lynx aims to deliver directly through the details of its

day-to-day business.

Beyond client work, community service is both a passion

and duty honored by the firm and its employees. We

have experienced first-hand that South Florida can be

a community of two extremes: wealth and poverty, and

recognize that a significant portion of the population is

unable to access or afford the opportunities resulting

from economic development. We are passionate about

narrowing that gap through a variety of philanthropic roles

focused on three key causes:

1. Positive Childhood Development2. Social Justice3. Education

Community Involvement

The art of detail

SOUTHERN FLORIDA CHAPTER

Page 10: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Office Building Projects

OverviewLynx conducted renovation and construction of key aesthetic

and architectural elements to complete the national

enterprise’s expansion across 22,000 square feet occupied

across an entire floor. Alterations conducted by Lynx included

detailed aesthetic finishes and accessories, installation of fire

sprinklers, plumbing, HVAC, and electrical and low voltage

specifications necessary for data, phone and audio visual

equipment for the national corporation’s Miami-based office.

AIG DirectSize: 22,000 square feet

Services: General Contracting

Project Location: Brickell, Miami, FL

Owner: Gilbane, Inc.

Architect: Gensler

OverviewLynx completed aesthetic enhancements and renovation of

a high-visibility health insurance corporate office building,

including selective interior demolition for increased space

utilization as well as other cosmetic updates, including interior

painting of ceilings and doors, replacement of existing floor

tile, demolition and rebuilding of showers, and installation of

new tile and other upgrades to plumbing infrastructure.

AssurantServices: Construction Management

Project Location: Miami, FL

Owner: American Bankers Life Assurance

Company of Florida

Page 11: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewCompleted several office build-outs and miscellaneous interior

and exterior building renovations.

Yukon BuildingSize: 90,000 square feet

Services: Construction Management

Project Location: Miami Beach, FL

Owner: Yantra 119 LLC.

The art of detail

OverviewLynx Construction Management’s design-build team

conducted a complete renovation of 45 Almeria, which

originally was one of the oldest U.S. Post offices in Dade

County. The complete restoration and build out resulted in a

state of the art office for The Lynx Companies.

Class A Office BuildingSize: 5,300 square feet

Services: Design-Build

Project Location: Coral Gables, FL

Owner: The Lynx Companies

Architect: Mateu ArchitectureHISTORICAL

RESTORATION

Page 12: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Commercial & Industrial Projects

OverviewComplete renovation and build out of existing restaurant,

including trellis work, the installation of new kitchen

equipment, countertops, floor and wall tile, lighting, and

a complete redesign of the mechanical, fire, and electrical

systems.

Pipalato RestaurantServices: Construction Management

Project Location: Pembroke Pines, FL

OverviewExpansion and enhancement of the Baker showroom - complete

interior demolition of second floor suites - comprising 14,875

square feet at the 750,000 square foot DCOTA facility. Expansion

created 19 new galleries, work rooms, storage areas and other

facilities utilized by designers and clients. Enhancements included

contemporary polished-finish floors, wood base boards, designer

cabinetry, acoustical and drywall ceilings, new doors, frames and

hardware. Additionally, HVAC, plumbing, fire sprinklers and the

electrical system were upgraded.

DCOTA Baker ShowroomSize: 14,875 square feet

Services: Pre-Construction and Construction Management

Project Location: Dania Beach, FL

Owner: DCOTA, Baker

Page 13: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewInterior renovations include offices, exam rooms, lobby/

reception area, restrooms, circulation corridor and other

high-traffic areas. Exterior renovations include new roof with

single-ply membrane, windows, new curtain walls and select

storefront entrances with impact-rated assemblies and new

CMU infill construction.

Borinquen Medical CenterSize: 5 floors

Services: General Contracting

Project Location: Miami, FL

Owner: Borinquen Medical Centers of Miami-Dade

Architect: M.C. Harry & Associates

The art of detail

Commercial & Industrial Projects Healthcare Projects

OverviewNew construction of a 5,000 square foot modern art gallery

at the prestigious Miami high rise condominium and hotel.

Biscayne Marquis GallerySize: 5,000 square feet

Services: General Contracting

Project Location: Miami, FL

Owner: Africa Israel USA

Architect: Charles H. Benson and Associates

Page 14: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Hotel Projects

OverviewOriginally designed by Miami Beach architect and art deco

visionary Henry Hohause, The Park Central Hotel is a historic

property built in 1937 in the Miami Beach Architectural

District. The scope of Lynx’s work included the hotel’s historic

preservation, expansion and renovation across over 100 guest

room units, and other high-traffic areas and guest amenities.

Lynx also performed the renovation of The Park Central Lobby

& Mezzanine, including the restrooms, relocation of the lobby

bar, removal of the current soffit and a complete replacement

and upgrade of the Air Conditioning and HVAC units.

Park Central HotelSize: 6 Floors

Services: Pre-Construction and Construction Management

Project Location: Miami Beach, FL

Owner: Park Central Partners, LLC

Architect: Borges & AssociatesHISTORICAL

RESTORATION

OverviewNew Construction of Park Central Hotel Suites at 620 Ocean

Drive. Lynx expanded the property by constructing 12 new

rooms across 4 floors, a new roof pool deck and restaurant to

enhance hotel visitors’ experience.

Park Central SuitesSize: 4 Floors

Services: Pre-Construction and Construction Management

Project Location: Miami Beach, FL

Owner: Park Central Partners, LLC

Architect: Borges & Associates

Page 15: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

The art of detail

OverviewThe Heathcote Terraces and Pool Deck at 626 Ocean Drive,

renovated with new terraces, planters, ramps, a refreshed pool

deck, gym and meeting room for guests. Additionally, 8 guest

rooms were renovated including reconfiguration of bathroom

layouts.

Heathcote ApartmentsSize: 3 Floors

Services: Pre-Construction and Construction Management

Project Location: Miami Beach, FL

Owner: Park Central Partners, LLC

Architect: Borges & AssociatesHISTORICAL

RESTORATION

OverviewImperial Guest Rooms at 650 Ocean Drive renovations,

including the replacement of plumbing fixtures, newly finished

floors and repainting of walls and doors for a refreshed

aesthetic that still honors the original design. Restrooms were

altered to be American Disabilities Act (ADA)-compliant,

while finishes and doors were replaced.

Imperial HotelSize: 3 Floors

Services: Pre-Construction and Construction Management

Project Location: Miami Beach, FL

Owner: Park Central Partners, LLC

Architect: Borges & AssociatesHISTORICAL

RESTORATION

Page 16: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewLynx conducted several aesthetic enhancements for the

residential condominium, including replacement of existing

concrete sidewalk with a new paver sidewalk. Lynx also

conduced landscaping, installed new irrigation systems and

lighting elements, and removed or replaced signage and

bus shelter elements to enhance the property’s external

aesthetics. Finally, Lynx installed an 8-foot concrete screen

wall with masonry columns and lime stone facing.

Arlen House StreetscapeServices: General Contracting

Project Location: Sunny Isles Beach, FL

Owner: City of Sunny Isles Beach

Architect: Bermello Ajamil & Partners, Inc.

OverviewTown of Surfside awarded Lynx Construction Management the

site development and new construction of a streetscape and

park at 95th street and Collins Ave. Work included drainage,

paving, art installation, as well as adjacent park and beach

rehabilitation.

Town of Surfside StreetscapeServices: Contruction Management

Project Location: Surfside, FL

Owner: Town of Surfside

Public Sector Projects

Page 17: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewLynx conducted renovations and modifications to improve

resources and facilities available at two existing administrative

office buildings owned by the Florida Department of

Transportation (FDOT).

FDOT Maintenance FacilityServices: General Contracting

Project Location: West Palm Beach, FL

Owner: Florida Department of Transportation

Architect: Bentley Architects & Engineers, Inc.

The art of detail

OverviewRenovation and preservation of a historic (and currently

functional) transit station which was originally constructed

in 1926. Key interior elements of the renovation included

the lobby, ticketing facilities, baggage storage area and

administrative offices.

FDOT Historic Train StationServices: General Contracting

Project Location: Fort Lauderdale, FL

Owner: Florida Department of Transporation

HISTORICALRESTORATION

Page 18: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Public Sector Projects

OverviewEnhanced recreational facilities were made available through

conversion of an open field into 98th Street Park. Amenities

consist of a splash pad water fountain, a public rest room,

two play structures with shaded overheads a picnic pavilion,

drinking fountains, paver walkways, new park furniture, dog

park, and new landscaping.

Town of Bay Harbor Islands 98th Street ParkServices: General Contracting

Project Location: Bay Harbor Islands, FL

Owner: Town of Bay Harbor Islands

Architect: Synalovski, Romanik & Saye

OverviewGovernment Center work included renovation of the building

envelope, repairs of its fountain, cast-in-place concrete and

precast concrete panel repairs, and aesthetic enhancements

that included painting, sealing, tile, and metals replacement.

City of Sunny Isles Beach Government CenterSize: Multiple projects

Services: Pre-Construction and Construction Management

Project Location: Sunny Isles Beach, FL

Owner: City of Sunny Isles Beach

Page 19: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewLynx completed construction of an aesthetically detailed wall

under the William Lehman Causeway, creating a park alongside

an existing parking garage. Aesthetic detailing aimed to

provide a visual disruption for pedestrian traffic in an otherwise

underserved area.

Lehman Causeway Park WallServices: General Contracting

Location: Sunny Isles Beach, FL

Owner: City of Sunny Isles Beach

Architect: R.J. Behar & Company, Inc.

OverviewExtensive renovation of an existing tile warehouse and

distribution center resulting in a new, state-of-the-art 74,000

square foot shelter facility, representing the first no-kill animal

shelter opened by Miami-Dade County administration.

Miami-Dade Animal Service ShelterSize: 74,000 square feet

Services: General Contracting

Project Location: Doral, FL

Owner: Miami-Dade County

Architect: LIVS Associates

The art of detail

Page 20: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Churches & School Projects

OverviewLynx preserved the cathedral’s original architectural elements

by applying a protective, waterproof layer over the existing

main dome. The dome’s original waterproofing failed, making

it necessary for Lynx to remove the existing delaminating

membrane encapsulation prior to new application, resulting in

a preserved, protected dome.

St. George Orthodox CathedralServices: Design-Build

Project Location: Coral Gables, FL

OverviewNew construction and build out of 28,000 square foot media

center and music suite, including a recording studio, computer

gallery, and practice rooms.

Royal Palm Elementary Media Center & Music SuiteSize: 28,000 square feet

Services: Construction Management

Project Location: Miami, FL

Owner: Miami-Dade County Public Schools

Page 21: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewNew construction of a 64,000 square foot Middle Learning

Center including, science rooms, economic rooms, dining

facilities, medical training facility and computer testing rooms.

Horace Mann Middle SchoolSize: 64,000 square feet

Services: Construction Management

Project Location: Miami, FL

Owner: Miami-Dade County Public Schools

OverviewCompleted build out of 21,000 square foot of office space,

including remodeling of two existing group bathrooms,

installing of money exchange windows and a ground safe

for security.

Miami Dade College Wolfson Bursar’s OfficeSize: 21,000 square feet

Services: Construction Management

Project Location: Miami, FL

Owner: Miami-Dade College Wolfson Campus

The art of detail

Page 22: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewNew construction of 1750 square foot physical education

center and 6400 square foot classroom laboratory.

Henry S. West Labratory School& Physical Education ShelterSize: 8,150 square feet

Services: Construction Management

Project Location: Miami, FL

Owner: Miami-Dade County Public Schools

OverviewNew construction and build out of an 18,000 square foot, two

story media center and computer gallery.

Thomas Jefferson Middle School Media CenterSize: 18,000 square feet

Services: Construction Management

Project Location: Miami, FL

Owner: Miami-Dade County Public Schools

Churches & School Projects

Page 23: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewLynx Construction Management completed a 9,700 square

foot remodel of a luxury home in Miami including Interior and

exterior work, roofing, concrete, new air conditioning, flooring,

electrical, and plumbing.

Miami Luxury HomeSize: 9,700 square foot remodel

Services: General Contracting

Project Location: Miami, FL

OverviewLynx Construction Management completed a substantial

remodeling of a 10,000 square foot luxury home in Pinecrest,

FL. The scope of the work included remodeling of the

interior and exterior of the home as well as remodeling of the

existing pool and landscape.

Pinecrest Luxury Home RenovationSize: 10,000 square foot

Services: Construction Management

Project Location: Pinecrest, FL

Luxury Home Projects

Page 24: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Multi-family Projects

OverviewLynx Construction Management completed a substantial

rehabilitation for the community of Chimney top in

Antioch Tennessee. Fire destroyed a 20 unit complex in

the community and Lynx Construction Management was

commissioned to take on the complex job of demolition and

reconstruction of the deemed unsafe structure.

Chimney Top ApartmentsSize: 20 units

Services: Contruction Management

Project Location: Antioch, Tennessee

OverviewLynx Construction Management completed a substantial

rehabilitation for the community of Leisure Villas apartments

in Homestead, Fl. Renovation of 30 apartments and

additional enhancements were made available to the

community including a new clubhouse and children’s

playground.

Leisure Villas ApartmentsSize: 32,000 square feet

Services: General Contracting

Project Location: Homestead, FL

The art of detail

Page 25: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewComplete renovation of 458 unit multi-family community in

Hoover, Alabama. Work included renovation and construction

of key aesthetic and architectural elements in each unit as

well as community recreational enhancements.

Riverchase LandingSize: 458 units

Services: Contruction Management

Project Location: Hoover, Alabama

OverviewLynx Construction Managements completed a substantial

rehabilitation for the community of Southpoint Crossings

in Florida City. Lynx completed site work as well as

rehabilitation of the community’s existing clubhouse and pool.

Southpoint CrossingsSize: 124 units

Services: Construction Management

Project Location: Florida City, FL

The art of detail

Page 26: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

OverviewConducted an extensive rehabilitation for the 1080-unit

community including interior, exterior, site work as well as

recreational facilities.

The Grand at GalleriaSize: 1080 units

Services: General Contracting

Project Location: Hoover, Alabama

OverviewExtensive renovation of a 736 unit multi-family apartment

complex in Huntsville, Alabama. The scope of the project

included extensive site work, construction and remodeling of

existing apartments, refurbishing pools and recreational facilities.

The Reserve Research ParkSize: 736 units

Services: Construction Management

Project Location: Huntsville, Alabama

Multi-family Projects

Page 27: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Awards & AccoladesLynx Construction Management has been recognized in its

industry and the community of South Florida as being one of

the top companies in the state. In 2015, South Florida Business

Journal honored Lynx Construction Management with four

prestigious awards, prompting Florida Governor Rick Scott to

send his letters of praise and congratulations.

Top General Contractor

You are to be commended for building a company that is recognizable within your community. Floridians like you are helping make our state the best place in the world to raise a family, have a great career, and enjoy a life full of opportunity.

— Rick ScottGovernor of Florida

The art of detail

LYNX IS#86

LYNX IS#21

LYNX IS#2

LYNX IS#2

Page 28: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Awards & Accolades

During the course of the three CDR Building Rehabs for theFlorida Turnpike project, Lynx Construction Management’s team has shown professionalism, honesty, and integrity throughout the construction process. They have followed the construction plans and technical specifications while maintaining the difficult construction schedule. Furthermore, the working relationship between the superintendent, PM, and myself (CEI inspector) was one of coordination, communication, and understanding of the projects documents. It was a pleasure working with the Lynx Team throughout this projectand I will look forward to working with them again. Thank you, Jerry Hale, Senior Building InspectorFlorida Department of Transportation

“”

Page 29: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Client Testimonials

Lynx Construction

Management was able to

provide solutions to difficult

problems at competitive

prices. Their management

and supervision team has

been a pleasure to work

with as we have found them

to be honest and they have

endeavored to be team

players.

— Cinzia Zanella Yukon, Miami Beach

Lynx performed several

important projects for

us including remodeling,

residential remodeling and

providing expert consulting

to help us achieve beneficial

resolution of a difficult

dispute. Lynx’s staff is

a team of honest, clean

workers who understand

how to work in an occupied

space with minimal

disruption. They provide

excellent quality and stick

with the Owner until the job

is done.

— Thomas J. HerzfeldThomas J. Herzfeld Advisors, Inc.

As we near completion

of a long series of projects,

I wanted to let you know

what a pleasure it has

been working with Lynx

Construction Management.

I am very pleased to have

found a Construction

Company I know I can count

on for our Municipal and

Public Works projects.

— Bill EvansSurfside Public Works

Director

We are pleased to offer

a recommendation for Lynx

Construction Management.

As the General Contractor of

Leisure Villas, Lynx delivered

excellence throughout the

build-out process. Work

was performed within

the estimated time frame

as promised. They put a

considerable amount of time

into the little details, a first-

rate job.

— Aimee MchaleNHT/Enterprise Preservation Corporation

“ “ “

””” ”

The art of detail

Page 30: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

Lynx Construction

Management has overcome

demanding site conditions

on the projects they have

done for the Town of

Surfside and met all critical

deadlines. Based on my

experience working with

Lynx, I know we can rely on

them to give us an honest

day’s work in exchange

for an honest day’s pay,

which is often missing in

today’s general construction

environment.

— Fernando J. RodriguezPublic Works Director, Town Of Surfside

You can expect

form Lynx a streamlined

process built upon open

communication and

thorough market/industry

knowledge that dramatically

simplifies the construction

process. They are a

partner to be relied upon

from the start of a project,

in the concept/budget

development phase, through

punch out, and close out of

the project.

— Maria E. Rodriguez-PortoMiami-Dade Public Housing And Community Development

Lynx Construction

Management has been a

contractor for Surfside

projects during my tenure

as Town Manager. Their

work has been fairly priced

and of high quality. Many

citizens speak highly of the

renovations that have been

completed.

— Roger M. CarltonSurfside Town Manager

Lynx Construction

Management performed a

difficult project in one of

our properties in Tupelo,

Mississippi. The work was

done without inconvenience

to our tenants. It was

completed in a timely

manner and the quality was

superior.

— Nick Lambiase Jr., Apogee Association Services

Client Testimonials

Page 31: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

CONTACT USLynx Construction Management45 Almeria AvenueCoral Gables, FL 33134

Main Office:305.523.3656Fax: 888.499.1748Email: [email protected]

Website:www.LynxConstructionManagement.com

Page 32: The art of detail€¦ · Company of Florida. Overview Completed several office build-outs and miscellaneous interior and exterior building renovations. Yukon Building Size: 90,000

The art of detail


Recommended