ProjectManager.com © 2013 All Rights Reserved 1
The Best of Project Management Systems
A selection of professional insights from the Blog archive
ProjectManager.com © 2013 All Rights Reserved 2
Since 2008 our project management professionals have been sharing knowledge,
experience and learning with online readers via the Project Manager Blog.
Their collective wisdom provides a wealth of how to, top tips and best practice advice,
for project managers, teams and businesses.
To make their writings more accessible we’ve created a series of “Best of” project
management topics available free to download and share.
Here is a collection of excerpts and insights from blog posts that discuss the pro and
cons of project management software systems.
Enjoy
Jason Westland CEO
ProjectManager.com
Top 10 Must Have Project Software Features ............................................................................................ 3
10 Attributes of the Best Project Management Software .......................................................................... 6
A 30,000 Foot View of a Project Management System ............................................................................ 10
A Project Management System for Staying Engaged ................................................................................ 13
Project Management Technology for Creating Estimate .......................................................................... 17
The Pros and Cons of Software for Project Management ........................................................................ 20
What Online Project Management Software Can’t Do ............................................................................. 23
Why Is Project Software Management So Difficult? ................................................................................. 26
6 Ways to Augment Program Management Software with Feet on the Ground ..................................... 29
Using Project Management Software to Manage your Clients Expectations ........................................... 33
5 Things to do Before Selecting an Online Project Management Program .............................................. 35
Benefits and Drawbacks of using Microsoft Project ................................................................................. 38
Five Reasons Not to Depend on Microsoft Excel for Projects ................................................................... 41
30 Day Free Software Trial ........................................................................................................................ 42
ProjectManager.com © 2013 All Rights Reserved 3
Top 10 Must Have Project Software Features
There is a natural evolution a project manager will go through as they start down the
path of managing projects. Early on in their career (which may not start out as project
management), they find they have an affinity toward organizing tasks and people. They
don’t like to waste time. They look for areas where efficiency and predictability can be
introduced to whatever they are working on. They are not big fans of surprises and put
simple systems and processes in place to prevent these from happening.
Early Project Software – The “To-Do” List
The “To-Do” list is their best friend. This list is by their side all
day long. It is reviewed, refreshed, and reprioritized
constantly. Tasks are crossed off while new ones are added.
Pages are torn out while new lists are started. There is the
exhilarating sense of accomplishment and progress that an
ever-changing “to-do” list brings to a nascent project manager.
But, this fledgling project manager soon outgrows the “To-Do” list. It becomes apparent
that priorities, people, and tasks change too frequently. The sheet of paper is not large
enough to hold all the activity and the changes cause the paper to fill up with a cryptic
scribbled down mess.
Precursor to Project Software – The Spreadsheet
The next stage in this evolutionary process is the utilitarian
spreadsheet. It seems like it was designed with a project manager
in mind. The grids, the boxes, the ability to sort and resort and the
flexibility to add whatever you need seem like the perfect home for
the “To-Do” list. This tool allows a new project manager to keep all
of their activity in one place, put together basic reports, update
status, keep track of issues, and even color code and prioritize
those tasks that are most important.
But the almighty spreadsheet also hits a brick wall and also discovered to be deficient
for a project manager. It is quickly found that one change in one place does not affect all
ProjectManager.com © 2013 All Rights Reserved 4
places where the change should be made. More people need to work on projects
together and the single desktop nature of the spreadsheet limits collaboration. Plus, the
real-time reporting needs that management wants on projects are hard to keep up with
using pivot tables and pre-defined charts and graphs.
What’s next? Enter Project Software.
But, where do you start? There are so many different variations of project software on
the market that it’s confusing to know where to even begin. Rather than get bogged
down in brand or type, focus on functionality first. Ask yourself the question “what does
this project software need to do?” and start putting a list together of what you know to
be true in your organization and circumstance. Consider the following 10 features as a
starting point for your decision-making process:
1. Robust Dashboard
One of the limitations of using a spreadsheet as pseudo-project management software
is the level of effort necessary to provide an overview of one or many projects. Project
software needs to have the flexibility to provide dashboard reports that can be
presented to an executive for a high-level overview of project status to the more
granular view that a project manager or team lead would need.
2. Ability to Track Costs
Every project should be viewed as having its
own Profit and Loss statement. In order for
this to occur, you need the ability to enter
expenses and costs against the project that
will either be billed for or absorbed in the
bottom line. The best project tracking
software will track not only cost but time and
resources too.
3. Reporting that is Agile
People are used to getting information exactly the way they want it. It’s no different
when reporting on projects. The project software you choose needs to give you the
ProjectManager.com © 2013 All Rights Reserved 5
flexibility to create and customize your own reports knowing that one group of
stakeholders wants the information one way and the next wants it another way.
4. Easy to Adjust Plans
A plan is just that…a plan. You will need to be able to easily modify and adjust the plan
depending upon the changing project environment. Project planning software should
make it easy to identify, adjust and document any changes to the project plan.
5. Issue and Risk Management
It is the rare project that will make it from Point A to Point B without some bumps along
the way. That’s to be expected and perfectly acceptable. What is not acceptable is to
allow those bumps to turn into mountains that obstruct progress. The project software
you choose needs to have the ability to identify and monitor risk (potential Issue) and
Issues (realized Risk).
6. Ability to Track Time
This is important for any company to know what their employees are working on, but is
imperative for companies that bill their customers either fixed fee or time and
materials. The project software needs to have the ability for employees to enter their
time so billable hours are captured and future estimates become more accurate.
7. Control Changes
Scope Creep is the nemesis of any project. It’s not a matter of “if” it will happen, but
“when” it will happen. If handled and tracked properly, these changes can be either an
additional source of revenue for your company, or at the very least, keep a project on
track. The project software you choose must have the ability to manage change
effortlessly.
8. Ability to Store Documentation
Documentation is the life blood of any project and e-mailing project documents can only
get you so far. You are never sure if everyone is working off the right version, has
received the latest plan, or has the most recent business requirements. Project software
should allow for the ability to have documents stored not only at a project level, but at a
ProjectManager.com © 2013 All Rights Reserved 6
task level as well. This removes any doubt that everyone is literally working from the
same page.
9. Must be Web-Based
With everything, and everyone, moving to “the cloud”, there are few, if any reasons why
a project software solution would not be web-based. If not web-based, it must at least
be accessible remotely as the nature of projects and teams is rapidly changing from one
centralized location to many decentralized locations. An extension of being web-based
is the knowledge that the application is secure. You must feel confident that confidential
and proprietary information is not something that is readily available for others to see.
Security roles and the ability to turn features on and off for particular users are a must.
10. Encourages Collaboration
With the advent of Blogs, Twitter, IM and other rapid-fire media, it is no longer enough
to just have a web-based application and say that it is collaborative. Verify that the
project software solution you are reviewing allows users to truly collaborate (share
documents, calendars, discussions, comments, etc.) to facilitate any ambiguity being
removed from your projects.
It may seem like a tall order to find project software that has all of the features listed
above, but they do exist. The Top 10 list above should help with your due diligence and
research now that you have moved beyond the “To-Do” List and Spreadsheet as your
project management tools of choice.
10 Attributes of the Best Project Management Software
Whether you’re buying something as small as a camera or as big as a new car the first
step is research. The wealth of information available online allows us to gather facts and
opinions to inform our purchase decision. This could include compiling a list of features
to reading what others have said about the new product. It’s no different if you are in
the market for project management tools. You want this to be the best project
management software that is available so in order to make this decision you’ll need to
do your research. If you look for and include the features listed you will be on the right
track to your purchase for your purchase
ProjectManager.com © 2013 All Rights Reserved 7
1. Security of Project Management Software
The first feature that you’ll want to look for to secure the best project management
software is security. Security is a pretty common feature these days as more and more
people transact their business online. However, you will want to make sure that the
application you choose uses at least 128 bit encryption. This makes it as safe as online
banking and is a good rule of thumb to follow as far as security is concerned. Another
aspect of security has to do with who has access to what features in the application. You
will want to make sure that the software allows different users to have different access
as the best project management software will accommodate different views and
permissions easily. For example:
Administrator: access to everything.
Project teams: access to everything with some exceptions i.e. setting up new
users, assigning permission rights.
Clients: read only view of their particular project.
2. Online Collaboration
The next feature of the best project management software is the ability to collaborate.
E-mail used to be the collaboration tool of choice now the advent of social media and
other technologies has left e-mail in the dust. The project management software you
choose must allow for real-time collaboration. This includes the ability to send instant
messages, share documents, images and videos, and run discussion threads that anyone
who has been assigned the right to do so can provide their input. This type of
collaboration ensures that everyone is on the same page, can reference the history of
the discussion, and keep up to date with the latest direction of the project.
3. Integrates with Microsoft Project
Let’s face it; MS Project is the 800 pound Gorilla when it comes to project management.
Most project managers use MS Project or have used it at some point in the not so
distant past. There are many project plans that are developed and monitored in MS
Project. The software you choose needs to have the ability to integrate with MS Project.
This includes bringing in project schedules that were started in MS Project and exporting
project schedules from the best project management software into MS Project. Why is
this helpful? Your project may be one of many that a client is managing. The ability to
ProjectManager.com © 2013 All Rights Reserved 8
import your project schedule into their version of MS Project and link it to other projects
will be a big timesaver for them and help keep activity on track.
4. Project Reporting
Much of project management has to do with reporting out on the status of a project.
This includes progress reports, resource reports, variance reports, and a host of other
reports that help keep the project running smooth. The best project management
software should include the ability to quickly create, customize, define, and refine your
reports at the click of a button. You have much better things to do than sitting at your
computer and struggling with getting the right information out of the project
management system you have chosen. Your software should make this as easy as
possible so you can get on with the real business of project management.
5. Project Expense Tracking
Keeping your project within a specified budget is critical if you want to be a successful
project manager. The best project management software should help you monitor and
control expenses. Make sure that the software will allow you to categorize and enter
any type of expense. This could be a one-off expense that happens every now and then
to the ability to enter recurring expenses such as paying contractors to help work on the
project. This is another area where you should quickly be able to run reports to manage
the amount of expenditures that are being applied against your project.
6. Risk and Issue Management
This is another big feature of the best project management software. Managing risks
and issues is arguably one of the more important jobs of a project manager. Risks are
constantly trying to attack your project to prevent it from being complete. Issues are
risks that have been realized and have been able to get a foothold into your project and
slow it down. The software needs to have the ability to capture, categorize, and report
out on risks so that they can be discussed on a weekly basis. Then, when (unfortunately)
a risk has become an issue, you need to be able to assign an owner to it and track the
progress of resolution. These features will help you maintain focus on the right things in
order to keep your project moving forward.
ProjectManager.com © 2013 All Rights Reserved 9
7. Project Member Timesheets
The largest expenditure on most projects are the people that have been assigned to
work on them. You will want to capture and report out on the time spent. This is more
challenging than it sounds because human resources are typically reluctant to
continually account for their time. The best project management software will make this
task easy to enter and easy to keep up with time. This will help the adoption rate of time
reporting within your company that much higher.
8. Project Planning
You spend days and weeks talking to people about what it will take to get the job done
when you start out on a new project. The best project management software will allow
you to capture these tasks in one place along with indentation for related groups of
activities, different types of dependencies, and the ability to change things as
circumstances dictate. Another important feature you should look for is the ability to
baseline your projects. This will allow you to capture your project schedule at that
moment in time and compare how the changes to the plan have affected (positively or
negatively) the original project schedule.
9. User Friendly Dashboard
There are a lot of moving parts when it comes to managing a project. The best project
management software will capture these relevant moving parts in one place and make
sure that you can quickly and easily monitor what is happening with your project. You
should ensure that the project management software you choose will allow you to
customize your dashboard for your purposes. For example, one project may be highly
sensitive to the amount of time that is being spent on it, so you will want to move that
dashboard element to the top. Another project you are managing may be highly
sensitive to the amount of expenditures, so you will want to move that dashboard
element to the top. This allows you highlight what is most important to those who are
interested in the success of the project.
ProjectManager.com © 2013 All Rights Reserved 10
10. Project Management Templates and Documentation File
Storage
Finally, you will want to make sure the application you choose is online and comes with
plenty of file storage. There can be hundreds of documents and versions of these
documents that are necessary to manage a project. You need to have plenty of room to
store these documents and more importantly back them up. The last thing you want to
do is go back and have to recreate a complicated document that was corrupted or lost
somehow.
The above list of 10 attributes of the best project management software is a starting
point for your buying decision. Be sure to talk to other users who already have
purchased the software as well. This will provide you with the necessary information
you need to make the best decision possible.
A 30,000 Foot View of a Project Management System
What do you think of when you hear people talking about a project
management system? Most people will think about a piece of
software or web application that allows a project manager to run a
project. The purpose of such project management information
systems would be to assign tasks to resources, manage their activity,
and other critical project management activities until the project is closed out.
That’s a correct understanding. However, we’re going to back WAY UP in this article
when it comes to talking about a project management system. We’re going to look at
the macro-level of project management systems approach and how all of the
documents, meetings, conversations, activity, deliverables, tangible products and
services work together in the project management eco-system.
There are three things that must be
present in order for a system to work.
These are the Inputs, the Process, and the
Outputs.
ProjectManager.com © 2013 All Rights Reserved 11
Characteristics of INPUTS in a Project Management System
There are a countless number of items that could be considered Inputs in a project
management system. The following examples are two types of Input and what must
hold true for each of them:
1. Documents
There are any number of documents that are associated
with a project through its lifecycle. These include business
requirement documents, scope documents, quality
assurance documentation, and the like. In order for these
inputs to be truly useful, they must be thoroughly vetted,
have the input, backing, and support of everyone on the project that needs to provide
input into such documents.
This will require some effort and snooping around from you as the project manager. This
is the area that falls into the category of “you don’t know what you don’t know”, and it’s
hard to tell if everything that is important to know about the project and what needs to
be accomplished has been captured.
One way of at least getting a sense for this is if you begin hearing a repetitive theme or
the same answers time and again to your questions from different people. This means
you’ve done a pretty good job of pulling out as much information as possible before you
move forward.
2. Meetings
Meetings, or more precisely, the decisions from meetings, can also serve as inputs into a
project. The trick with the decisions from meetings is that they can sometimes get
swept under the carpet or never see the light of day. Your job as a Project Manager at
this point is to muddle through all the non-value-add dialogue of these meetings, then
get to the core of what really matters and what must be done. This is important to serve
as Input into the project deliverables, as it will shape the final outcome. These meetings
were held for a reason, and if that reason is not realized by the end of the project it can
only mean rework, lost productivity, and pain.
ProjectManager.com © 2013 All Rights Reserved 12
Characteristics of PROCESS in a Project Management System
Once these Inputs have been gathered, verified, and sent along their way in a project
management system, they will next be acted upon. If the Inputs are Nouns (documents,
meetings, decisions, etc.) then the Process would be Verbs. This is where actions such as
Create, Review, Build, Develop, and the other action-oriented words take place.
What is the project manager’s responsibility
when it comes to this section of the project
management system? This is typically the black-
box, “pay no attention to the man behind the
curtain” part of the project. It’s sometimes hard
to understand what happens in this area as it is
filled with subject matter experts and those
with enough technical prowess to rival
Archimedes. But, a project manager must know
at a high level what processing is taking place on
the Inputs that have been provided.
It is the responsibility of the project manager to make sure everyone is dealing in reality,
providing realistic dates and cost estimates, and to not get bamboozled by those who
may have decades of experience in one particular area. The only way this can be
accomplished is to gain the trust and respect of these experts. How do you do that?
Make their lives easier. Clear obstacles, help them focus, make sure you have accurate
INPUTS into their PROCESS and end products don’t come back for more work. Respect
their time, push back when necessary, and always work in a spirit of partnership rather
than an “us versus them” mentality.
Characteristics of OUTPUT in a Project Management System
And finally, there is the finished product. After each department or group has acted
upon the Inputs and provided value via their Process…this is the result. The finished
product can be something that is delivered to another department to put their unique
signature on (for example, a version of a software package going from the Development
team to the Quality Assurance team) or can be the finished product that is delivered to
the customer (for example, a building that has been completed).
ProjectManager.com © 2013 All Rights Reserved 13
Regardless of the final product, it is your role to make sure the original requirements of
the project have been met and that scope has not ballooned out of control.
This is the epitome of the 30,000 foot view of a project management system. At its core
it consists of somebody putting something into the machine to be worked upon, value
being added to that input and a final, useful deliverable coming out on the back end as
output. Input – Process – Output. If you view your projects that way at a macro-level
you’ll be able to move mountains.
A Project Management System for
Staying Engaged
The following are some questions you could ask yourself
about how engaged you are as a project manager.
Do I Engage During Conference Calls?
A big part of a project manager’s job is to attend,
moderate, and facilitate meetings about the projects they
are managing. It gives them the information they need to
update their project management systems.
These meetings can become remote and may sometimes flip over into auto-pilot. It
could be easy to “check out” of these meetings even while you are attending in
person. You may be thinking about your next meeting or an upcoming presentation that
needs to be finished.
This ability to disengage is increased exponentially over the phone on a conference call.
You can dial into the call, put your speaker on mute, and not even have to say a word!
Sure, it may lead to awkward moments of silence when you have to say “I’m sorry, but
could you repeat that?” It’s not that you couldn’t hear the question; it’s just that you
DIDN’T hear the question… because you were doing something else.
This is pandemic .Unfortunately, we’ve all experienced how disengaged people
sometimes are on the call when they forget to put their phone back on mute. You can
hear them answering the door, talking on another call, complaining to a bill collector
about their electric bill being late, and a host of other very uncomfortable situations.
ProjectManager.com © 2013 All Rights Reserved 14
Bottom line? Engage with the people on the call if you are on the invite. Ask questions.
Answer questions. Act as if you are sitting across the room from the people that are on
the call. They’ll appreciate the respect and you’ll get that much more from the
conversation.
Do I Acknowledge Receiving Important E-Mails?
Another thing that was driving me crazy about working with this particular company was
that days would pass before they let me know they received what I had sent them.
Actually, the only way they acknowledged it was after I sent them a follow-up email
asking “did you receive my earlier email?” They would then respond back that they
received it and ask me when they could expect to hear back from me again. Part of your
project management system for staying engaged should be to acknowledge important
emails. The emphasis is on ‘important’. You don’t have to get caught in a cycle of
incessant “Thank You’s”, but rather, acknowledge the fact that a major deliverable was
provided that was on the critical path. Include the next steps and any other information
that is relevant for where the project currently stands.
Do I Attack this Project Like a Bulldog?
Bulldogs are notorious for sinking their teeth into something and not letting go. Do you
do the same with your projects? Do you sink your teeth into your projects and shake
them around until they are complete? The only thing we’re talking about killing here is
any apathy that may have crept up into a project by any of the stakeholders, team
members, clients, or even yourself. It’s your job as a PM to implement a project
management system that will drive your project to closure.
Stay involved and visible between meetings.
Never accept the status quo that something needs
to be done a certain way because it has always
been done that way. Look for areas where you can
improve the process and project management
system that is currently in place. Your actions will
speak volumes as to how engaged you are and
inspire others to do the same.
ProjectManager.com © 2013 All Rights Reserved 15
Lessons Learned in Web Based Project Management Software
There are a number of reasons why the same
mistakes are made over and over again. They
primarily have to do with how people think about
work and realizing most people are wired to think a
certain way. People, employees, and resources are
focused on the here and now.
They have an insurmountable To-Do list that they
have to focus on TODAY for deliverables and results
that are due either later today or tomorrow. To convince people to set aside a number
of hours out of their already over-booked schedule is many times met with “are you
kidding me” or the web based project management meeting is dismissed or cancelled at
the last minute because of another emergency that just came up.
Another reason why people put off capturing and implementing lessons learned is
because there is no immediate gratification in working on something that may be
implemented 2 or 3 months from now. People like seeing the results of their work in
real-time, not something to be realized at some point in the future.
Also, people get stuck in and love the same routine they
have established each day. They are comfortable with this
routine and it brings a sense of predictability into their
lives. Once they get into the office, most people want to
bring this consistent and predictable routine with them.
They’ve grown accustomed to checking the web based
project management software you have set up for what
their day looks like. Implementing lessons learned requires a change to this comfort
zone and causes people to stretch a bit and possibly disrupt their precious routine.
It’s Your Responsibility as Project Manager to Get Them Out of the
Rut
ProjectManager.com © 2013 All Rights Reserved 16
At the end of every project, get the key stakeholders in the
room and ask everyone what went right, what went wrong,
and what could have been done better, faster, or smarter. You
may want to bring some key metrics sourced from your
project management tools such as estimated hours compared
to actual, financial budget information, client comments, etc.,
but the biggest thing is just get the conversation started. Ideas
will begin to flow and feed off each other. Once they do, you
need to:
Capture – Record what is being said on a whiteboard for all to see. Write down just
enough to be able to transfer this information over to a spreadsheet for tracking
purposes. Talk about each of the items on the board, the pain that it caused, why it
happened, who it impacted and what can be done to prevent this from happening in
the future. Note: This is not a blame-storming or finger pointing session. The
effectiveness of this meeting disappears, the second people start attacking each
other. It is your job as the project manager and moderator of this meeting to make
sure this does not happen.
Categorize – Once everything has been captured on the board, start transferring
these to a spreadsheet and categorizing them by what type of ‘lesson learned’ has
been captured. Is this something that is related to People on the project, the Process
of making something better, or the Technology used to implement the project? This
will provide a sense of who the best person will be to use to implement the lessons
learned on the project. These lessons learned will ultimately start appearing in your
web based project management software.
Prioritize – Next, identify those lessons learned that would be considered “low-
hanging fruit”. These are the ones that will make a big impact as it relates to either
saving time or money AND would be relatively easy to implement. For example,
throughout the process of capturing problem areas it was identified that one group
never knows when they can begin working on their phase of the project. This has
caused a delay of days and sometimes weeks. The solution is for the manager of the
first department to send an email to the manager of the second department letting
them know it’s ready to move forward. No cost to implement, but a huge time saver.
Assign – Assign ownership of implementing the lesson learned. If you have a PMO,
assign it to one of the project managers on your team to implement. Assign them the
ProjectManager.com © 2013 All Rights Reserved 17
ones they would be best suited for whether it be People, Process, or Technology. If
you don’t have a PMO, assign it to the person who will benefit the most from
implementing the lesson learned. They are then responsible for following through on
working out the operational details of the lesson learned.
Introduce – At the next PMO meeting or weekly project status meeting, have
whoever is responsible for implementing the lesson learned into the organization
present how this will be done to the team. Make sure everyone understands the new
process, the benefits and agrees to follow the new procedure.
Repeat – Once these have been implemented, report back on how much time,
money, and/or aggravation has been saved due to making these changes. People
need to know that breaking out of their comfort zone was worth it, made their lives
easier and was better for the company. Then, work down the list from this project
and future projects to implement as many lessons learned as possible.
In just a couple of months you will find there is a well-oiled machine in place that has
been built from the ground up.
Project Management Technology for Creating Estimate
It’s important to spend the necessary time during the due diligence and up-front work
needed for a project to save lots of time down the road. Nowhere is this more
important than when it comes to estimating a project. This is important for a number of
reasons:
Maintains Your Bottom Line: If your company does work for clients on a fixed fee
basis then it will be important for your estimates to be accurate in order to maintain
your profitability.“Fixed Fee” Budgets and their close relatives, “Not To Exceed”
Budgets are when you scope out the size of
the project and then commit to a certain fee
or highest amount for the work to be
complete. Regardless of the project
management technology you use, it’s up to
you to keep the time that is spent on these
projects within these agreed amounts. What
if you can’t? Then typically your company will
have to absorb the additional time and
ProjectManager.com © 2013 All Rights Reserved 18
expense that is incurred on behalf of the project.
Few Clients Have Open Checkbooks: It’s important to use project management
technology for the sake of the clients’ budget as well. In the past, you could find a
client that was willing to pay on a Time and Materials basis for a project without a clear
end in sight. Those days have changed. Clients no longer have an open checkbook
that you can bill time against. They expect an accurate estimate of the amount of
money they can expect to pay on this project before they decide to move forward.
Time is of the Essence: It’s also important to use project management technology to
create accurate estimates, even if funds between companies are not involved. Let’s
say it’s a project that is being done within your organization. There’s no real money
that swaps hands, so the budget is not so much of a concern. However, there are
very real costs to the resources that will be consumed for such a project. Also, people
make their plans around certain dates and commitments around each project. It’s
important to be as accurate as possible when it comes providing these timelines and
project delivery dates.
Three Types of Estimates
Estimates are obviously important when it comes to project management. But, all
estimates are not created equal. There are basically three major types of estimates. The
following is a brief description of each along with its associated pros and cons:
1. The Ballpark Estimate: As the name suggests, the ballpark estimate allows for a
substantial amount of wiggle room, perhaps up to 80%-90% off the original estimate.
Why would anyone ever use a ballpark estimate based upon the blatant inaccuracy of
using this type of estimate? Because it’s
fast, it’s lightning fast. But, what good is a
ballpark estimate if it is so inaccurate? It
may be just enough to give the person an
idea that they are in the wrong ballpark. It’s
not the fanciest project management
technology to use, but it will at least let
someone know if something is in the
$100,000 ballpark or the $10,000,000 one.
2. Order of Magnitude Estimate: The second type of estimate is the order of magnitude
estimate. This is where you look at a new project in the context of projects that have
ProjectManager.com © 2013 All Rights Reserved 19
already been complete and then say “this one is going to be half as large or 3 times as
big.” You would then factor in any areas of complexity, such as using a new technology
or integration with an existing system. This is a useful estimating tool to use. While not
as fast as the ballpark estimate, it will allow you to get more of an accurate estimate in a
short amount of time…perhaps within a couple of hours. Again, this will not be a rock-
solid estimate, but it will at least let someone know if they are in the infield or the
outfield, based upon the results.
3. Detailed Estimate: The detailed estimate, as its name would suggest is just
that…detailed. This is where project management technology really can come into play.
A detailed estimate is created from a WBS and started from the ground up. You look at
every piece of work that has to be done, assign an amount of time to it based upon
conversations with Subject Matter Experts… and then add it all up. This will give you the
most accurate estimate possible using project management technology, but, it will also
take the longest time possible out of the three types of estimates.
You want to be sure to factor in other time to the detailed estimate including project
management work and administrative tasks. Client responsiveness is also something
that should be taken into account if you are looking to associate a date with the amount
of time that was generated from the bottom up exercise.
Project Management Technology for Creating Estimates
There are a number of project management technology tools you can use for creating
estimates.
WBS Generator: Many packages come with the ability to create a Work Breakdown
Structure generator. This will help you get an idea of the scope of the project along
with how long you feel each task will take to complete.
Timesheets: Another project management technology tool you can use to create
accurate estimates is to compare timesheets from the past. Pull these timesheets
and spend some time analyzing the numbers to see how long a similar project took
to complete.
Review Past Projects: It is good form to archive past projects along with their
associated notes and lessons learned. Take the time to pull these old projects out
and see what went right, what went wrong, and how close their final number ended
ProjectManager.com © 2013 All Rights Reserved 20
up being to the estimate. Use this as a basis for putting your accurate estimates
together.
Measure twice, cut once. No truer words have been spoken when it comes to house
building. Plus, you can use this principle in estimating your projects to ensure your
projects are complete in scope and on budget.
The Pros and Cons of Software for Project Management
The following are two types of software for project management you could consider
using along with the pros and cons of each.
Stand-Alone Software USED FOR Project Management
As the name indicates this is software that was not
explicitly designed for the purpose of project
management but can be used for project management.
It consists of independent software that with a bit of
effort on your part can be customized to support your
project management activity.
What are examples of this type of software? Word processors, spreadsheets,
presentation software, databases, time and information management systems, and
accounting packages can all be used for the purpose of managing projects. While not
expressly designed for the purpose of being used for project management they do have
a place when it comes to getting to “know your data” as you figure out what is
important to you and your team and what’s not as important.
The upside of using stand-alone software is:
Most people know how to use the software - Stand-alone software has been around
for some time now and people are already familiar with how to use these packages.
This reduces the need for training costs to bring everyone up to speed on how to use
new software for project management. Plus, people will be in a position to more
likely adopt the software since they are already familiar with how to use its features
and functionality. The software already exists on people’s computers – An extension
ProjectManager.com © 2013 All Rights Reserved 21
of the first bullet above is that this software is most likely on their machines. This
means that it can be used immediately with no additional cost.
The Software is Focused on Its Area of Expertise – Each software package that falls
in this category is designed to do an amazingly good job for the reason it was
designed. This means it has a LOT of functionality in that area, is easy and flexible to
use and learn, and continues to get better in that one area. For example, an
accounting package is going to spend a lot of time getting better on the accounting
side of things and not spend a lot of time enhancing the basic word processor
functionality that it may offer.
The downside of using stand-alone software is:
It doesn’t offer a holistic approach – The nature of stand-alone software is that
it’s…stand-alone. This means that it could be easy for gaps or misses to occur in your
plan because there’s not an overarching view of the entire project. Each package that
is used as a solution for software for project management solution operates in a silo
that needs a lot of manual attention to keep things in sync.
It doesn’t play well with others – Integration between processes and systems
becomes a challenge when you use different pieces of software and couple them
together for project management purposes. It’s hard enough for these stand-alone
programs to talk amongst themselves in your own company and next to impossible
to have them talk to a client’s processes and systems.
Specialty Software DESIGNED FOR Project Management
The second type of software for project
management solutions are those packages that are
DESIGNED specifically for the purpose of managing
projects. The most common example of this is
Microsoft Project but there are a number of other
online and offline solutions available.
The upside of using specialty software is:
It does play well with others – Project management software is designed to certainly
work together within the program itself and is typically easier to connect to other
ProjectManager.com © 2013 All Rights Reserved 22
project management software solutions. For example, if you change a date,
deliverable, resource, or other element in one place in a specialty software package,
that change will cascade through the all the plans, reports and other necessary
locations where that information needs to be updated. Additionally, there are
“hooks” that can integrate into other specialty software solutions that your clients
may use, and at the very least the ability to export and import critical information
about your project.
There are a number of pre-defined templates – Software for project management
that is expressly designed that purpose will come with a number of pre-defined
templates for your use. These templates can range from project schedules to reports
that are put in place as a starting point for you to use to get a jump start on your
projects. There is no need to reinvent the wheel as 80% of project management
reports are the same (status, resources, workload, expenses, etc.) and usually
require just a bit of refinement to make them work for you.
The downside of using specialty software is:
It will require some training – These types of applications are not readily available
on people’s computers nor are they typically familiar with their use. This will require
some attention on your part as a project manager to make sure they know how to
use the system properly, have their questions answered, and lean toward adoption.
There will be some cost involved – While there are specialty software for project
management solutions that say they are ‘free’, these are usually based upon limited
functionality, users, or features. If you are looking to implement an enterprise wide
solution for project management software then you will need to make sure you have
a budget in place in order to make this happen.
A word of advice if you are just starting out on your pursuit of finding the software for
project management…get to know your data first. You can start down the stand-alone
path and get a sense of what you like and what you don’t need. This invaluable
information can then feed into the selection process for your specialty project
management software.
ProjectManager.com © 2013 All Rights Reserved 23
What Online Project Management Software Can’t Do
Project managers often get caught up in looking
for a silver bullet. We experience problems,
delays, and frustrations with our projects. We
wish there was just one thing that we could do
differently, buy, or change in our process that
would solve all of our problems.
Symptoms of Silver Bullet Thinking
There are multiple manifestations of this type of thinking. Below are a few of the more
common ones:
We Just Need to Hire the Right Person: A common symptom of looking for a silver
bullet is attaching the solution to all of our problems on just one person. For
example, we may be having problems with our team. There may be a lack of
motivation or perhaps some technical skills are missing. We have been cleared to
find a new team member to fill the gap. We have interviewed this person a number
of times and just LOVE what they are going to bring to the team. Either consciously
or subconsciously, we pin all our hopes on this person to help fix morale, raise the
level of skill of those around us, and basically solve what ails us and our project team.
We Just Need to Implement the Right Software: Another common symptom of
looking for a silver bullet is resting all of our hopes on a piece of software to solve
our problems. There may be communication issues, process breakdowns, version
control problems, or a host of other inefficiencies that are negatively impacting our
projects. We may reason that if we implement the right online project management
software it will take care of all of the aforementioned problems. We may believe that
once we flick the switch on our new online project management software that
everything else will fall into place.
We Just Need to Change the Process: A third symptom that someone is looking for a
silver bullet to solve their problems is changing the process to do the trick. For
example, a project manager may reason that if they are involved in the sales cycle
earlier, there may be fewer commitments made by the salespeople that can’t be
honored by the company. This one change may or may not have the holistic impact
that the project manager is looking to facilitate.
ProjectManager.com © 2013 All Rights Reserved 24
The danger in putting all of our hopes in one solution is that it prevents us from looking
at other options. For example, we may have settled on the perfect online project
management software to use.
We may believe this is what is going to solve ALL of our project management problems
exclusively. It causes us to stop looking at other areas that will help as well, such as
hiring a new team member or changing the process.
Why We Look for the Silver Bullet to Solve our Problems
There are a number of reasons why we may slip into the trap of limiting ourselves to
one solution to solve our problems. For example:
We May Be Desperate: We may find that the
problems facing us are so overwhelming that we feel
backed into a corner. We feel as if we have tried
everything else and this one silver bullet solution is all
that is left to do.
We’ve Read Great Things about the Solution: We
subscribe to different trade journals and magazines as
project managers in addition to the blogs we read
online. There may have been an outstanding review
of an online project management software solution
that sounded exactly like it addresses the problems
you are experiencing. This caused you to reason that
the online web project management software will solve your problems.
We’ve Heard Others Talk about the Solution: You may have found yourself listening
to someone at a networking event tell how they solved a problem similar to yours.
The solution they tried solved all of their problems, so you become wildly optimistic
that the same solution will solve your problems as well.
There are a few things to keep in mind about the above scenarios. First, you never want
to make a decision based on desperation. Second, people have a tendency to inflate
what their solution did for them and their company.
It could have solved some of their problems, but as often as is the case, a solution does
not solve all problems as they would lead you to believe.
ProjectManager.com © 2013 All Rights Reserved 25
What Online Project Management Software Can’t Do
Keep the following points in mind if you are leaning toward online project management
software to solve your problems. Believe me, we are huge advocates of implementing
online project management software in as many organizations as possible. But, we are
also realistic that there are certain things online project management software can’t do.
Online project management software can’t:
Build and Nurture Relationships: Project managers erroneously assume that online
project management software will enable them to connect with everyone via email,
updates, reminders, and reports as soon as it is up and running. The art of building
and nurturing relationships should never be left to a virtual planning tool. Building
and nurturing relationships with your team occurs best face-to-face. Interpersonal
relationship building is actually what will solve most of your problems.
Understand the Nuances of a Project in Your Company’s Environment: There are so
many moving parts to a project that it is hard for online project management
software to keep up with all of those dynamics without the judgment and discretion
of a project manager to fill in those blanks. For example, one project may be
wrapping up while another project is queued up. The online project management
software will start serving up those tasks as instructed. But, it won’t know that one of
the VPs has come in with a quick, one-off project that needs to be squeezed in
between those two projects. Online project management software needs to be
manually updated accordingly.
It Can’t Ensure What is Entered is Accurate: Online project management software
can’t make sure what is manually entered is accurate. The principle of garbage in,
garbage out still holds true for today’s technology tools. For example, it won’t be
able to tell you whether the amount of time allotted for testing is the right amount
of time needed. Only you and your expert project manager opinion will be able to
verify that what is being entered is correct. What an online project management
software program will do is allow you to check reality. You’ll be able to use features
such as Gantt charts and other reporting modules to ensure that your plan makes
sense.
Online project management software allows everyone to stay in sync, serves as a
repository of source documents, offers dynamic dashboards and does so much more.
ProjectManager.com © 2013 All Rights Reserved 26
Why Is Project Software Management So Difficult?
“Is this the first time we’ve ever done something like this?” asked the Project Manager
to the developer. “What do you mean?” asked the developer. “I know that we’ve done
this type of software project many times before, but it always feels like it’s the first time
ever. The same questions always seem to remain unanswered, the same disconnects
occur, and we always run into the same problems. You would have expected by now
that we would have had this all figured out” languished the project manager.
Have you felt this way at times? Have you wondered why project software management
is so difficult? Here’s the encouraging and discouraging news all at the same time. It’s
not just your company and your resources that are having this conversation. It’s
everywhere!
You can leave your position as a project software management professional in one
organization and start in another company and you’ll pick up the same conversation
right where you left off!
Why is Project Software Management so Difficult?
It may be a total misperception, but it just doesn’t feel like there is that much confusion
in other industries where project management is applied. The following are some of the
unique aspects of IT projects that we all face, along with some suggestions on how you
can simplify things a bit.
IT Does Not Operate In a Vacuum: There are very few, if
any, projects that IT works on that are self-contained and
not intertwined with other groups, departments, processes,
and organizations. A major function of IT is to support the
business activity of an organization. Because of this fact,
there are myriads of people involved who are affected by
any changes that are made during the project software
management process. For example, a company needed to
make a change in order for a certain number and code to be
assigned to a product faster. This would then allow the
other departments to do what they needed to do with that particular item. This
‘change’ came directly from the IT department without consulting with the end users
ProjectManager.com © 2013 All Rights Reserved 27
first. We all know where this story ends up. There was less than stellar acceptance,
and even some outright opposition to the project software management process.
What’s the solution? Make sure you have the buy-in and acceptance of the business
users that will be impacted by the change that is being considered. Additionally,
you’ll need to check the mindset of your company and how they view the
relationship between the business people and the technology people. Is the feeling
that technology is in place to support business, or, is the feeling that the business is
in place to support technology? You’ll have a harder time gaining buy-in and
acceptance if the latter is the case.
There is a Never Ending Supply of IT Projects: Another reason why project software
management is so difficult is that there is a never ending supply of IT projects. A
project may have just been completed and the end users really like what they
received. Now their imaginations start going crazy. They start thinking about all the
other things that could be done to make their jobs and lives easier. They start putting
together a wish list of ideas that ultimately turn into the next project for the IT
department. Part of the problem with projects software management is that ideas
are endless and free, while the resources necessary to get things done are finite and
expensive. What’s the solution? You need to develop an objective and criteria based
process for choosing which projects receive attention. The next time a project
request is made you can run it through the gauntlet. Examples of questions
include…Does it support the company’s strategy? Are there resources available to
work on this project? Will it require highly expensive and in-demand resources? Will
it benefit more than one group of people? How much training is involved? This
questioning process will help filter out those requests that are projects for projects
sake. There has to be a line drawn in the sand somewhere, and you as the project
software management professional are as good a line as any.
IT Resources are Stretched Razor Thin: A third
reason why project software management is so
difficult is because the people that are working on
these projects are stretched way too thin. The
never ending supply of IT projects ensures that
these people have not only their share of work to
do, but the work of at least two others as well!
This is especially true in recent years where
cutbacks hit companies hard. The people that could work on the projects were no
ProjectManager.com © 2013 All Rights Reserved 28
longer there, but the projects were. This introduces complexity into the process for a
number of reasons:
Attention is Divided: It’s hard to focus on the task at hand when you know you have
looming deadlines and commitments just outside your door, trying to break it in. You
may be talking to a team member about what needs to be done on this particular
project. They are shaking their head and saying ‘uh-huh’, but you know they are not
listening. They are more concerned with the commotion outside of their office that is
just about to burst through their door in the form of missed commitments,
deliverables that were wrong and angry stakeholders. The situation then snowballs
because the details you are trying to cover with them will be missed and soon you
will be outside this door trying to break it down.
Quality Suffers: This type of stress on a person can only have a negative impact on
the quality of their projects. This adds complexity to project software management
because now you have to backtrack and make up for lost time because of work
needing to be redone
Dates are Missed: Divided attention and sub-par quality finally culminate as missed
dates. This increases everyone’s frustration levels; attention becomes more divided;
quality suffers more; and even more dates are missed. It’s a vicious circle.
How can you break this cycle? Run interference for your resources. Stop interrupting
them at a whim. Allow them solid, uninterrupted blocks of time where they can get
work done. You may want to consider setting up ‘office hours’ depending upon how
mission-critical this particular resource is to the project. This is where the only time
people can drop by and chat with this resource is during a specified time. This causes
people to work around this valuable resource’s schedule and not the other way
around.
Technology Gets Old…Quickly: Finally, another
reason why software project management is so
difficult is because technology changes so quickly.
Everyone has just come up to speed on the latest
technology and it’s already out the door. Internet
years are like dog years. Every year that you work in
a high-paced internet driven technologically savvy
environment is like seven years to everyone else.
Things change so rapidly it’s hard to keep up. What to do? Make a concerted effort
and have a real plan in place for your resources to keep up with the technology. Have
ProjectManager.com © 2013 All Rights Reserved 29
one person keep their eye on what’s coming up. Have another person go to the
courses and then come back and share that with the rest of the team. It’s not
impossible to keep up with the changes. You just need to pick a direction and stay on
top of what is happening in that particular area.
6 Ways to Augment Program Management Software with
Feet on the Ground
Program management software is great. It allows you to roll up your portfolio of
projects into one central location and categorize them by type, such as organization,
customer, etc. Scorecards can be used to determine how well projects are performing in
each portfolio, and then that information can be used by executives to prioritize and/or
cut projects.
The challenge with program management software, however, is that it doesn’t run on
auto-pilot. It’s not something that you can set up and forget. It requires diligence by the
program and project managers to update with information that ensures their projects
are running as expected. That is why there is no replacement for having feet on the
ground and people on the frontlines of project or program detail.
We don’t like to paint program management with a military brush, but sometimes it
does feel like we are fighting a war. For example:
You Fight For Resources: You
know which resources you
want to include on your
projects and incorporate into
your program management
software. The only problem is
that everyone else wants to
use the same resources on
their projects. It takes a certain
amount of lobbying, finagling,
and deal-making to get these
resources on your projects.
ProjectManager.com © 2013 All Rights Reserved 30
You Fight for Budget: There may be a certain project that is just what your program
needs to realize its fullest potential. The problem is that you don’t have the
necessary funds in this year’s budget. You need to convince management that your
project is worth the investment. This undoubtedly means that the budget will be
coming from somewhere else in the organization.
You Fight for Approvals: Once all the pieces of your program are complete, getting
approval from clients or even internal gatekeepers may be like pulling teeth. There
always seems to be ‘just one more thing’ that they want to look at or tweak before
they put their final stamp of approval on the project or program.
What can help you get through these tough situations? To borrow military terms, you
need a ground assault. Program management software may be the air cover you need,
but to really get something done you need to have feet on the ground. To increase your
project’s chance of success try these…
1. Go Get the Information You Need
The last thing you should do as a program manager is sit back and wait for information
to come to you. There is no excuse for, “I didn’t know that was happening” or “I didn’t
know that was the direction that was chosen.”
Some managers believe that they can sit back and wait for everyone to come to them
with the information they need, but this may or may not happen depending upon how
busy everyone is or the culture of the company.
Gathering information requires a skilled and experienced program manager. They need
to have managed enough projects and programs to know when something is missing or
isn’t right. When they are alerted to an issue, they will start questioning those closest to
the problem or issue.
It’s not done in the style of an interrogation, but as a way of ‘connecting the dots.’
Resources are less likely to come forward with information if something has gone
wrong. They may reason that they can fix a problem before it becomes too big of a deal.
That may be the case, but if not, it puts the entire project and a big part of the program
at risk. The skilled program manager makes it their responsibility to go get this type of
information.
2. Share Information Profusely and Proactively
ProjectManager.com © 2013 All Rights Reserved 31
It’s the program manager’s responsibility to go get the information they need, but it’s
also their responsibility to make sure everyone else has the information they need.
Nobody on the team should be wondering what the next step is, what the goals of the
program are, and what needs to be done in order to meet those goals.
The program manager whose feet are on the ground will use every means of
communication at his disposal. This includes one-on-one meetings, group meetings,
emails, presentations, reports, drive-by updates (quick chats walking down the hallway),
phone calls, IMs, and any other appropriate method to keep everyone informed.
3. Keep the Right
People Involved in the
Program
Outside of knowing how to use
program management
software, a program manager
must also be skilled at keeping
the right people involved in the
program.
Notice I emphasized the word “keeping?” What usually happens is that a program starts
off with all of the right people involved; executive sponsor, functional managers, client,
and the relevant team members are all actively involved and gung-ho about getting the
project off the ground.
A little time passes and the shiny new toy that everyone liked playing with starts to lose
interest. People have moved on to a new shiny object, and support for the current
program begins to wane. It’s up to you to wrangle them back in and keep them engaged
and interested. Otherwise, you’ll be unable to maintain the level of support necessary to
complete the program.
4. Set the Right Example Yourself
You need to lead by example if you expect people to act a certain way. If your teams see
you taking shortcuts, they will think it’s okay to take shortcuts. If they see you disregard
ProjectManager.com © 2013 All Rights Reserved 32
the plan developed from the program management software, they’ll think it’s okay to
disregard the plan. Part of managing a large program is that people know what you
would do if confronted with a certain situation or choice. Provide them with an
impeccable example to follow.
5. Put Everything Important In Writing
Something else that helps you
keep your feet on the ground as a
program manager is to put every
important decision in writing.
This is not for the purpose of
covering your tracks, but rather
to chronicle the decisions that
were made along the way.
The end of the project or
program many times looks very
different than when it started
out. Instead of sitting in an office somewhere, get out there on the front line and seek to
understand changes and carefully document them. This will prevent long, drawn-out
conversations of why the project went a certain way when memories begin to fade.
6. Challenge Assumptions
You as well as your team should challenge assumptions. Just because something has
been done a certain way for a long period of time doesn’t mean it always has to be done
that way. There may be a much better alternative to get something done. It requires
some frontline jostling and questioning to implement a new and better way, but it’s
worth the effort once the savings in time and/or money is realized.
These six activities are outside of the realm of program management software. The
software is a critical part of managing your programs; however, it requires a very real
and frontline presence of a program manager. This speaks volumes to the resources you
are managing and helps ensure a more successful program.
ProjectManager.com © 2013 All Rights Reserved 33
Using Project Management Software to Manage your Clients
Expectations
1. Keep a Log of ALL Successes
The first thing you need to do in utilizing your web
project management software is to keep a log of ALL
successes. Notice we stressed ALL successes?
Regardless of how big or how small these successes are
you will want to capture them and store them in a safe
place for later use.
What constitutes a success? Anything that has been done on behalf of a client that
helped move their project or company forward. This could be the completion of a new
software application, business process improvement initiative, or something that was
done that helped increase sales, lower costs, or a little of both.
What is the best way to capture these successes? Some project managers feel as if they
will be able to remember all that was done on the client’s behalf if they sit down and
write things out 2-3 months after the fact. That doesn’t work. You’ll sit down and stare
at a blank piece of paper for 30 minutes before you scribble out a meager 1 or 2
accomplishments.
The best thing to do is set up a file in your web based project management software
where you can write yourself a quick note as to what was just accomplished. Or, you can
send yourself an email with a code in the subject line like WIN: [project success] that
automatically gets filed in a folder for later review.
2. Discover as Many ROI Numbers as
Possible
Throughout your conversations with the client, try and
uncover as many ROI numbers as possible that are a direct
result of the projects that have been implemented.
ProjectManager.com © 2013 All Rights Reserved 34
For example, was there an increase in sales as a result of the project that was
implemented? How much faster was a particular task or activity able to be
accomplished as a result of your project? What types of savings were realized from your
project coming to completion at your client’s site?
You may have to dig for these numbers a bit. Sometimes the client doesn’t even think
about projects this way. They just know it was something that needed to get done.
However, you should always wear your business hat and look for the value that was
derived from the implementation of your projects.
Record these findings in your web project management software or send yourself an
email similar to the success emails from above.
3. Create a Sequence of Success Timeline
Now that you’ve collected all the successes (no matter
how small) and discovered as many ROI numbers as
possible, start putting them into a timeline.
For example, map out 6 months of activity that started in
January and ended in June. Put a note on the timeline (in January) of the project that
was completed. Next to it, include the business result in the form of an ROI. Do this for
success after success and spread it across the entire 6 months on the timeline.
NOTE: There doesn’t have to be and ROI for everything.
Perhaps one of the successes was that the two teams were able to meet together for 2
days and hash out a great many details for the next project. This is an important activity
to record, as it feeds into the success and result of what followed. There’s not a direct
ROI from this event, but the fruition of the ROI was realized as a result of a subsequent
project.
If you’ve recorded these successes and ROIs in your web project management software
program you can pull this list together quickly and easily.
ProjectManager.com © 2013 All Rights Reserved 35
4. Take a Walk Through the Forest
The final thing you need to do then is request a meeting with your client and walk
through the forest with them. What does that mean? This is your opportunity to walk
away from the minutiae and day-to-day grind of the ongoing projects (aka “the trees”)
and take a look at the big picture (aka “the forest”). This is an excellent opportunity to
reflect on all those things that have been accomplished over the past 3 – 6 months.
NOTE: Longer than 3-6 months is not recommended as some of the “trees” may have
died during that time and the forest may not look quite as lush.
You need to make sure the right people are walking through the forest with you. You
want to ensure the people you work with on a daily basis are present. But, you also
want to invite their bosses and go up the corporate ladder to the highest possible
executive that it makes sense to have in attendance. They’ll be able to get a good feeling
for the direction, momentum, and successes that have occurred over the recent time
period that is being covered.
This preemptive type of meeting does a couple of things…
Whenever someone internally brings up the question “what have you done for me
lately?” their peers from the same company can be the ones that give them the answer
on your behalf.
It also affords the opportunity to review and revise any current projects that are
underway, to ensure they still make sense to pursue. Finally, the goodwill that this type
of proactive meeting creates is priceless.
5 Things to do Before Selecting
an Online Project Management
Program
Before you make a final decision about
purchasing an online project management
program tick off the following five boxes…
ProjectManager.com © 2013 All Rights Reserved 36
1. Know Your Stuff
The first thing you need to know is something about project management in general. It
will be hard to make a good decision if this is your first day on the job as a project
manager. You need to have some experience to understand the ins and outs of project
management. What are the challenges that surface on a regular basis that an online
project management program will help you conquer?
You need to have a clear idea in your head of what you are looking to accomplish and
how this will fit within your organization. Don’t fret if you are new to project
management you can expedite the learning process by reading and networking with
other project managers that have ‘been there, done that’. The insight you gain from
other professionals will prove to be invaluable in your decision making process.
2. Know Your Organization
Take a poll around your company and see what other departments are using as an
online project management program. It’s no surprise that many companies are silo-ed in
their approach to project management. One group may have realized they need to have
a small group of project managers and another group may have realized a similar thing.
You end up with two departments, two online project management programs both
doing different things. You may find that there is a program that one group is already
using that fits your needs.
3. Find Out What Others Think
One of the things that is great about the Amazon App when you are shopping in a store,
are all the online reviews. It’s hard to know how a product will perform when all the
packages look so professional and enticing. It can be a different story when you read the
products online reviews. What at first seemed to be exactly what you were looking for
may rate only 2 / 5 stars. Thus informed you can look into your other options.
Be aware when you are shopping for an online project management program as
everyone’s websites will tout how revolutionary their product is for project
management, so verify these claims with actual users of the online project management
program. Start by asking your colleagues about their experience with online software
programs. What do they like? What don’t they like? What can and can’t they do? Then
ProjectManager.com © 2013 All Rights Reserved 37
expand your research online and see what the larger user group is saying about the
products as well.
4. Start Small
I have a friend who goes “all in” when he starts a new hobby. He goes out and buys
anything and everything available to immerse himself in this new distraction.
A couple of weeks go by and all of that stuff
ends up in a closet next to the last distraction.
I always recommend to him to start out small
and see if he likes something before he spends
all that money and the same advice applies to
purchasing an online project management
program.
Start small and see if you like the application.
Most companies will offer a trial period where
you can test drive a small project with a handful of people and closely monitor and
follow how the project moves through its lifecycle. Does it do what you expect? Did it
save time? Is it easy to understand and train others?
Begin working with a handful of the features and functions and run through the entire
process. Dig into the dependencies of the system. For example, if you change one
thing…does it cascade to all other areas of the application? Do the reports reflect the
changes that have been made? Really run the online project management program
through its paces before you make a decision to buy.
5. Get Further Training
This step actually occurs after you’ve made the decision to buy based upon all your
research above. You will want to obtain further training depending upon the complexity
of the application. Some online project management programs are easy to use and
require minimal effort to learn. Yet, they are powerful in what they offer as a set of
features. This is the ideal scenario. Other programs are much more complicated and
require a greater learning curve in order to maximize their potential. Determine what
you need to accomplish with the program and then find training that is commensurate
to your needs.
ProjectManager.com © 2013 All Rights Reserved 38
Buying an online project management program is really just like anything else. You need
to know your stuff, understand your needs, do your research, and then make a decision
to buy. Once you’ve been through this process you’ll have a much better user
experience and reap the full benefits from the package you have selected.
Benefits and Drawbacks of using Microsoft Project
Microsoft Project has been around for around two decades now (can you believe that?)
and arguably has a pretty large slice of the project management software market share.
Thousands upon thousands of project managers have used this powerful tool to quickly
get a handle on their projects and keep everyone on the same page.
Just like every other software company, Microsoft is
constantly looking for ways to improve this software based
upon user feedback. It has made great strides in recent
years in making MS project easier and more intuitive to use
as well as reduce the learning curve that new users would
experience when they fired it up for the first time on their
machines.
What are some of the benefits and drawbacks of using
Microsoft Project? Rather than focus on a particular
version, this article will concentrate on the big picture of
using MS Project and can help you determine if this is
popular project management software package is right for
you.
The Benefits of Using Microsoft Project
The following are some benefits for you to consider when it comes to using Microsoft
Project:
Familiar Look and Feel – If you have used other Microsoft products over the years
you will feel right at home when you open your first Project file. The look and feel is
very similar to the other suite of Microsoft products. This is great when it comes to
not having to spend a lot of time learning a new interface, operating system, or new
ProjectManager.com © 2013 All Rights Reserved 39
way of doing things. There’s a lot to be said for having a familiar look and feel if
you’ve ever flipped back and forth between operating systems or even application
families. While you may not be in the exact “house” as Excel, Word, or PowerPoint
when you open your first project file, you are at least in the same “town” and can
know enough to get around. If you’ve used another project management solution
besides Microsoft Project you can almost relate the experience to being in an
entirely different town or even State in the way they have things set up.
Integrates Well with Other Microsoft Products – One thing Microsoft has done very
well in recent years is integrating their individual applications with each other.
Rather than feeling as if you are just working with Word, Excel, or other Microsoft
application you now feel as if you are working within a Microsoft application that
allows you to do word processing, spreadsheet analysis, email, and yes, even project
management. The ability to send information from one application to the next, open
one application from within another application,
and toggle back and forth between them all has
created a positive user experience and one that
translates well when using Microsoft Project.
Powerful and Flexible User Interface – You can
get as complicated or keep things as simple as
you would like using Microsoft Project. If you
have a simple project with a half-dozen resources
that you need to get off the ground quickly you can make that happen with this
application. Jump into a new Project file, create some resources and high level
activities and get things moving. On the other hand, if you have a project that spans
multiple departments and has a lot of moving parts you can still use Microsoft
Project to help manage such a project.
The Drawbacks of Using Microsoft Project
There are also some drawbacks to consider when it comes to using Microsoft Project:
Does Require Some Training to Fully Utilize – As mentioned above, you can get up
and running relatively quickly for simple projects when it comes to using Microsoft
Project. However, you will find that to truly utilize all the functionality that exists will
require some time spent on training. This training could range from user groups,
books, online sessions, or paid for classes that will help you dig into the details and
ProjectManager.com © 2013 All Rights Reserved 40
full power of the system. It will also alert you to some “gotchas” that could occur
within your project plan since everything is do inter-connected. For example,
changing dependencies in one section of your plan could have downstream impacts
that you are not aware of having occurred. This could send people down the wrong
track without you even beware of the change.
Cost Needs to be Considered – There are a number of less expensive solutions to
Microsoft Project on the market today that may be able to do what you need based
upon your requirements and circumstances. The best thing to do is assemble a list of
what you are looking for in a project management solution and see what options
exist in the marketplace. You may find that Project does exactly what you need it to
do at the cost that fits your budget. Or, you may find that you need something a bit
less robust than Microsoft Project that you will fit your needs.
Some Things to Keep in Mind Regardless of Whether or Not You
Microsoft Project
Microsoft Project is a tool. It’s just a tool like a hammer, saw, or screwdriver. It’s not the
tool that makes the project or job successful, but rather it’s the people that use the tool.
It’s the training and experience these people have when it comes to using the tool.
Someone who knows how to properly use a tool will get considerably different and
better results than somebody who does not properly know how to use the tool.
It’s the same with Microsoft Project, or any project management tool for that matter. If
someone isn’t experienced when it comes to using this powerful tool the results could
be less than satisfactory. You need to make sure the right people and processes are in
place to properly utilize this tool.
If you do feel MS Project is the right tool for you and need to convince management
that they need to purchase this for their company you will need to show them the
efficiency gain this tool will produce within your company. For example, you can show
them how it will:
Save Time – Having a master project plan in one place and as one authoritative
source will save time for the company. This reduces the back and forth of questions
and misunderstandings that can quickly arise without the benefit of a project
management tool in place.
ProjectManager.com © 2013 All Rights Reserved 41
Eliminate Overlapping Work – There is nothing more frustrating than having two
people work on exactly the same deliverable. Or, worse yet, have one person NOT
work on a deliverable because they thought it was being handled by somebody else.
Increase Visibility –Another selling point to management is how a solution like
Microsoft Project will increase project visibility. The reporting features, ability to
compare the baseline project plan against actual, and make adjustments accordingly
are invaluable to a busy executive who just needs a quick reality check as to where
things stand.
One final thing you need to do if this is going to be a no-brainer for management is to
convert the above savings into dollars. Show them how if you invest “this” much in the
project management solution, you will then be able to realize “that” much in your
return on investment. It’s good to see how Microsoft has made constant improvements
on this powerful application. We look forward to seeing what’s coming up in the near
future.
Five Reasons Not to Depend on Microsoft Excel for Projects
Learn the top 5 reasons why you should not depend on Excel or Word to manage your
projects, watch http://www.projectmanager.com/why-not-to-depend-on-microsoft-
excel-for-projects.php
ProjectManager.com © 2013 All Rights Reserved 42
30 Day Free Software Trial
There are two key differences between ProjectManager.com and its competitors.
The first is that we give you all of the features you need to plan, track and report on
projects efficiently. The second key difference is that our competitors charge a high
upfront price as well as annual maintenance fees for new releases.
Here at ProjectManager.com we offer you all of the features you need to manage
projects, at a small monthly price of just $25 per user. That simple! When you sign up to
ProjectManager.com, you also get for free:
Unlimited Projects
3 Gigs of Document Storage
Client Login
Free Upgrade to New Releases
Take Action, Sign-Up for a 30 Day Free Trial Today!
Take a Free Trial
Create your own Projects
Sign up to boost your project success
Any questions? Email [email protected] and
one of our friendly support staff will be happy to help. We
also recommend a visit our resource library if you would
like access to further:-
project management tips
video tutorials
project management templates