CONTENTCONTENT
Introduction1
Company Profile2
Business
Software
3
4
Organization5
Man Power
Certificate
6
7
Major Experience8
INSTRODUCTIONINSTRODUCTION
Welcome to Cando Co., Ltd.
Established in 2001 as plant engineering company consisting of many good experienced engineers, Cando Co., Ltd has been successfully conducting medium sized projects both domestic and abroad.
With "People and Technology", the critical factors in engineering business, as our core values, we are setting out to establish long-term training programs aimed at nurturing professionals with extensive experience.
Cando Co., Ltd will do its best to serve our customers the best quality and services considering one more thinking about project execution.
W i d b i li bl b i iWe are committed to becoming your reliable business partner, catering to your needs with best quality, economy and safety.
Thank you.
Hyo-Man Im, President & CEO, Cando Co., Ltd.
COMPANY PROFILECOMPANY PROFILE
□ N CANDO CO LTD□ Name : CANDO CO., LTD.
□ Established Date : Feb. 07. 2001
□ Business : Engineering, Trade
□ Capital : 200,000,000 KRW
□ Employee : 106 persons
□ Representative Director : Hyo Man Imp y
□ Adress : 5th Fl., GEC, 26, Sangil-Ro 6-Gil, Kangdong-Gu, Seoul, Korea
Tel : 82-02-2023-6900
FAX : 82-02-2023-6999
http : www.cando4u.co.kr
E mail : webmaster@cando4u co krE-mail : [email protected]
BUSINESSBUSINESS
FIELD OF SERVICE PLANT
Project Feasibility Study
Project Management
Petrochemical Plant
Refinery Plant
PLANT
Project Management
FEED Work
Engineering
Refinery Plant
Gas Processing Plant
Chemical, Fertilizer Plantg g
- Basic Design
- Detail Design
,
Fiber, Plastic Plant
Food, Paper Plant
- Procurement Service
- 3D Modeling ( Smart Plant, PDS,PDMS)
Field Engineering
Power Plant
Incineration Facility
Other Industrial Plant- Field Engineering
Equipment Supply
Other Industrial Plant
BUSINESS
PROCESS DESIGN MECHANICAL DESIGN
BUSINESS
Process Study
Evaluation of Process Alternative
Process Simulation
Preparation of Engineering Specification
Mechanical Data sheet Process Simulation
Process Flow Diagram(PFD)
Piping & Instrument Diagram(P & ID)
Engineering Drawing
Mechanical Calculation & Design Utility Flow Diagram(UFD)
Hydraulic Calculation
P E i t D t Sh t
Mechanical Calculation & Design
Strength Calculation & Fabrication Drawing
f Process Equipment Data Sheet
Process Instrument Data
Cause & Effect Diagram
Preparation of Requisition
Evaluation of Vendor’s QuotationCause & Effect Diagram
PSV Load Calculation
Flare system Design
Check & Approval of Vendor Prints
▣ Heat Exchanger Thermal Rating
Operating Manual (HTRI)
BUSINESS
PIPING DESIGN Preparation of Engineering Specification
ELECTRICAL DESIGN
BUSINESS
Preparation of Engineering Specification
Plant Layout & Plot Plan
Preparation of Engineering Specification
Electrical Single Line Diagram
Equipment Data Sheet and Specification Plant Layout & Plot Plan
3D Modeling (PDS/PDMS/SP3D)
Piping Arrangement Drawing
Design for Power, Grounding, Lighting , Fire Alarm and Communication System Preparation of Bill of Material & Requisition
E l ti f V d ’ Q t ti Piping Stress Analysis
Piping lsometric Drawing
Evaluation of Vendor’s Quotation
Check & Review of Vendor Prints
3D Modeling (PDS/PDMS/SP3D)
Line Schedule
Piping Specialty Data Sheet Preparation of Bill of Material &
Study & Calculation
- Transformer/UPS/Battery Charger/Generator Capacity
- Tray / Cable sizingPreparation of Bill of Material & Requisition
Evaluation of Vendor’s Quotation
y g
- Ground Resistance
- Intensity of Illumination
Load Flow Voltage Drop Short Circuit Check & Review of Vendor Prints - Load Flow ,Voltage Drop, Short Circuit
Current & Harmonic by E-TAP
BUSINESS
INSTRUMENT DESIGN CIVIL / ARCHITECTURE DESIGN
BUSINESS
Preparation of Engineering Specification
Instrument Data sheet
Instrument Index/Schedule
Preparation of Engineering Specification
Soil Analysis
Structural Analysis Instrument Index/Schedule
Design of Control System(DCS/ESD),
Control valves and Field instrument
Structural Analysis
Structure/Building design
Pile and Foundation Design
Layout of Cable way, Wiring, Tubing/Piping
Interlock Logic Diagram
g
Shop Drawing Check
Preparation of Bill of Quantity
Loop Diagram / Hook-up Dwg.
Preparation of Bill of Material &
Requisition Sheet
Planning for Site Preparation
Equipment Foundation Design
Sewerage Drainage DesignRequisition Sheet
Evaluation of Vendor’s Quotation
Check & Review of Vendor Prints
Sewerage, Drainage Design
Road & Paving Design
Pit/Pond Design
3D Modeling (PDS/PDMS/SP3D)
g
3D Modeling (PDS/PDMS/SP3D)
BUSINESS
Governmental Approval
BUSINESS
High Presssure Gas Manufacturing(SMS)
Industrial Safety (PSM)
Hazardous Material Fire Fighting Hazardous Material, Fire Fighting
Energy Management
Environment
Building, Structure
Chemicals Management
SOFTWARESOFTWARE
Process Simulation
- ASPEN Plus
Strength Calculation for Pressure Vessels
Heat Exchangers, Towers and ReactorsASPEN Plus
Process Hydraulic Calculation
- Hydromaster
Heat Exchangers, Towers and Reactors
- PV Elite
- Compress
Thermal Rating of Heat Exchangers
- HTRI
Pi i St A l i
Strength Calculation for API 650 Tanks :
- iTank (Cando’s In-House Program)
St t l A l i Piping Stress Analysis
- CAESAR II
Electrical Power System Analysis
Structural Analysis
- MIDAS
Computer Aided Design & Drafting :Electrical Power System Analysis
- E-TAP
Computer Aided Design & Drafting :
- PDMS(3D)
- AutoCAD
- Solid Works
ORGANIZATIONORGANIZATION
PRESIDENT
ENGINEERING GROUPSales & Admin.
EM
Project Group
Process Stationary Electrical Civil IT
Rotating/ Package
Piping Instrument Architecture
MAN POWERMAN POWER
Discipline No. of Person
Sales/Project 5Sales/Project 5
Process 8
Mechanical 16Mechanical 16
Electrical 10
Instrument 8Instrument 8
Civil/Architecture 10
Piping 49Piping 49
Total 106
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣Engineering(E) + Detail Design(D)
No. Plant Owner Client Plant/Project Scope Period
1 Lotte Chemical Titan (M) SDN. Lotte E&C Co., Ltd. No. 3 PP Plant, Malaysia D 2016. 10 ∼ 2017. 10
2 PETRONAS Samsung Engineering Co., Ltd. RAPID PKG 6A LLDPE ProjectJohor, Malaysia D 2017. 01 ∼ 2017. 07
3 Lotte Chemical Louisiana LLC Samsung Engineering Co., Ltd. MEG-1 ProjectLouisiana, USA D 2016. 11 ∼ 2017. 06
Lotte Engineering & IP Project4 Lotte Chemical Corp. Lotte Engineering. & Construction Co., Ltd
IP ProjectYeosu, Korea E + D 2014. 12 ~ 2016. 03
5 Hammer Mishrif DGS, Iraq Samsung Engineering Co., Ltd Zubair Oil Field Development Project, Iraq E + D 2014. 06 ~ 2016. 05
6 DongKwang Chemical DongKwang Chemical CO2 Plant 증설공사 E + D 2014 04 2015 126 g gMFG Co., Ltd
g gMFG Co., Ltd
2 증설공사Onsan, Korea E + D 2014. 04 ~ 2015. 12
7 Saudi Arabian Mining Co., Ltd
Hanwha Engineering. &Construction Co., Ltd
Phosphate PlantSaudi Arabia E 2014. 02 ~ 2015. 05
8 Compression Altarmira S.A.d C V Samsung Engineering Co., Ltd Natural Gas Compression Station
Altarmira Mexico E + D 2013. 01 ~ 2014. 04de C.V. g g g , Altarmira, Mexico
9 Uz-Kor Gas Chemical Co., Ltd Samsung Engineering Co., Ltd UGCC PP ProjectUzbekistan E + D 2012. 08 ~ 2013. 12
10 Cheil Industries Co., Ltd. Samsung Engineering Co., Ltd No. 2 DPC/PC PlantYeosu, Korea E +D 2010. 12 ~ 2012.06Yeosu, Korea
11 Honam Petrochemical Corp. Samsung Engineering Co., Ltd NCC Expansion ProjectYeosu, Korea E + D 2011. 01 ~ 2012. 05
<1 / 6>
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣Engineering(E) + Detail Design(D)
No. Plant Owner Client Plant/Project Scope Period
12 Honam Petrochemical Corp Lotte Engineering. & P2(4PP)-Project /P2(INFRA)-Project E + D 2010 10 ~ 2012 0312 Honam Petrochemical Corp. Construction Co., Ltd Yeosu, Korea E + D 2010. 10 2012. 03
13 Hansol Chemical Co., Ltd. Hansol EME Co., Ltd Hydro-peroxide PlantUlsan, Korea E + D 2011. 04 ~ 2012. 02
14 S-Oil Co., Ltd. Samsung Engineering Co., Ltd Para-Xylene & Off-site PlantOnsan Korea E + D 2009. 05 ~ 2010. 09Onsan, Korea
15 Honam Petrochemical Corp. Lotte Engineering. & Construction Co., Ltd
B Project (BD Plant & Off-site)Yeosu, Korea E + D 2009. 05 ~ 2010. 09
16 KP Chemical Corp. Lotte Engineering. & Construction Co., Ltd
OS Tank Terminal ProjectUlsan, Korea E + D 2008. 03 ~ 2009. 12
17 Lotte Daesan PetrochemicalCo., Ltd. Samsung Engineering Co., Ltd EO/EG Plant
Daesan, Korea E + D 2006. 08 ~ 2007. 08
18 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd NCC/C4/BTX Plant ExpansionDaesan, Korea E + D 2005. 12 ~ 2007. 06
19 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd SM Plant ExpansionDaesan, Korea E + D 2005. 12 ~ 2006. 02
20 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd No. 5 HEMC PlantUlsan, Korea E + D 2005. 02 ~ 2005. 09
DME DEMO Pl t21 Korea Gas Corp. Korea Gas Technology Corp. DME DEMO PlantIncheon, Korea E + D 2005. 02 ~ 2006. 02
22 Korea Gas Corp. Korea Gas Corp. DME Pilot PlantIncheon, Korea E + D 2005. 02 ~ 2005. 08
<2 / 6>
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣Engineering(E) + Detail Design(D)
No. Plant Owner Client Plant/Project Scope Period
23 Korea Gas Corp Korea Gas Corp DME Pilot Plant E + D 2005 02 ~ 2005 0823 Korea Gas Corp. Korea Gas Corp. Incheon, Korea E + D 2005. 02 2005. 08
24 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd Aromatic Plant ExpansionDaesan, Korea E + D 2004. 10 ~ 2005. 03
25 Samsung Petrochemical Co., Ltd. Samsung Engineering Co., Ltd PTA Plant ExpansionDaesan Korea D 2003. 12 ~ 2004. 06Daesan, Korea
26 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd Electrolysis/MC Plant Ulsan, Korea E + D 2003. 01 ~ 2003. 07
27 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd No 4 HEMC PlantUlsan, Korea E + D 2002. 09 ~ 2003. 06
28 Honam Petrochemical Corp. Samsung Engineering Co., Ltd No.3 Air Separation PlantYeosu, Korea D 2002. 07 ~ 2002.12
29 Korea Electrical Power Institute Samsung Engineering Co., Ltd 100kW MC Fuel Cell PlantBoryung, Korea E + D 2002. 01 ~ 2002. 09
30 Hanwha Petrochemical Co., Ltd. Samsung Engineering Co., Ltd Ethylene Dichloride No.3 PlantYeosu, Korea D 2001. 05 ~ 2002. 09
31 Korea Petroleum Corp. Samsung Engineering Co., LtdDonghae Gas-1 Gas Treatment PlantOnsan, Korea
E + D 2001. 06 ~ 2002. 08,
32 Air Liquid Korea Samsung Engineering Co., Ltd No. 2 HYCO Gas PlantYeosu, Korea D 2001. 06 ~ 2002. 08
<3 / 6>
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣ Engineering + Detail Design
No. Plant Owner Client Plant/Project Scope Period
1 Kumho Petrochemical Co., Ltd POSCO E&C MDI Plant Piping 2015. 12 ~ 2017. 04
2 Uzbekistan GTL LLC. Hyundai Engineering Co., Ltd Gas To Liquid Plant Mech. 2014. 03 ~ 2016. 04
3 State Oil CompanyAzerbaijen SOCAR Urea SOCAR Ammonia/Urea Project Piping) 2014. 06 ~ 2016. 05
4 Kogas Akkas B.V Daewoo E & C Co., Ltd CPF Akkas Gas Field Project Process 2013. 02 ~ 2014. 02
5 PTT Phenol Company POSCO Engineering Co., Ltd. PTT Phenol Train II Project Piping 2013. 07 ~ 2014. 10
6 Samsung Techwin Co., Ltd Samsung Techwin Co., Ltd Natural Gas Compression Station Process 2013. 06 ~ 2013. 07
7 Samsung Total PetrochemicalCo., Ltd Samsung Engineering Co., Ltd EO Revamp Project Mech. 2011. 05 ~ 2012. 05
8 Samsung Total Petrochemical Samsung Engineering Co Ltd No2 Aromatic Complex Project Mech 2011 04 ~ 2013 128 Co., Ltd Samsung Engineering Co., Ltd No2 Aromatic Complex Project Mech. 2011. 04 2013. 12
9 Abu Dhabi Gas Development Company Limited., Samsung Engineering Co., Ltd UTOS for Gas Plant Process 2010. 06 ~ 2012. 06
10 Saudi Jubil Export Refinery Samsung Engineering Co., Ltd JER#3 Project Mech 2010. 04 ~ 2011. 04
11 Ibn Rushd & Sabic Samsung Engineering Co., Ltd Ibn Rushd-II PTA DBN Project Instrument 2010. 02 ~ 2010. 09
<4 / 6>
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣ Engineering + Detail Design
No. Plant Owner Client Plant/Project Scope Period
12 SONATRACH Samsung Engineering Co., Ltd Skikda Refinery Project Mech. 2009. 07 ~ 2011. 03
13 AnHoa Paper Joint Stock Co. Hansol EME Co., Ltd. High Quality Paper Mill Plant Piping 2010. 07 ~ 2012. 10
14 Petrovietnam fertilizer and Chemical Corp. Samsung Engineering Co., Ltd CO2 Recovery Project Mech. 2009. 01 ~ 2011. 03
15 Ulsan Metropolitan City Hansol EME Co., Ltd. Sewage Sludge Incineration Plant Ulsan, Korea Piping) 2009. 02 ~ 2009. 12
16 Petrovietnam fertilizer and Chemical Corp. Samsung Engineering Co., Ltd CO2 Revovery Project
Vietnam Mech. 2009. 01 ~ 2011. 03
Saudi Kayan Petrochem Amine Plant Mech17 Saudi Kayan Petrochem. Complex Samsung Engineering Co., Ltd Amine Plant
Kayan, SaudiarabiaMech. 2008. 02 ~ 2008. 10
18 Norske Skoglndustrier ASA Hansol EME Co., Ltd. Paper Mill PlantPorano, Brazil Piping 2007. 09 ~ 2008. 04
19 Saudi Arabian Mining Co Ltd Samsung Engineering Co Ltd Ma’aden Ammonia Plant Process 2007 08 ~ 2008 0919 Saudi Arabian Mining Co., Ltd Samsung Engineering Co., Ltd Saudi Arabia Process 2007. 08 ~ 2008. 09
20 Lotte Daesan Petrochemical Co., Ltd Samsung Engineering Co., Ltd PP Plant
Daesan, Korea Mech. ,Piping 2006. 10 ~ 2007. 10
21 Hebei Pan Asia Paper Co., Ltd. Hansol EME Waste Incineration & Steam Boiler System/Hebei China
Piping Design(D) 2007. 07 ~ 2008. 04Boiler System/Hebei, China Design(D)
22 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd PP PlantDaesan, Korea Mech. ,Piping 2006. 02 ~ 2006. 12
<5 / 6>
MAJOR EXPERIENCEMAJOR EXPERIENCE
▣ Engineering + Detail Design
No. Plant Owner Client Plant/Project Scope Period
23 LG Daesan Petrochemical LG Daesan Petrochemical Co., BR/SBR Revamping Project Process 2005 11 ~ 2006 0223 Co., Ltd Ltd Daesan, Korea Process 2005. 11 2006. 02
24 Topan Photomask Korea Samsung Engineering Co., Ltd ICE2 ProjectIncheon, Korea
ProcessMech. 2005. 08 ~ 2005. 11
25 Samsung Petrochemical Co., Ltd. Samsung Engineering Co., Ltd PTA Plant ExpansionDaesan Korea Mech. ,Piping 2003. 12 ~ 2004. 06Daesan, Korea
26 Lotte Samkang Co., Ltd. Samsung Engineering Co., Ltd Oil Refinery PlantCheonan , Korea Mech. ,Piping 2003. 07 ~ 2004. 06
27 Samsung Atopina Co., Ltd. Samsung Engineering Co., Ltd C9 TA ProjectDaesan, Korea
Mech. ,Piping) 2003. 06 ~ 2004. 06
28 CAPRO Corporation Samsung Engineering Co., Ltd Caprolactam Expansion PlantUlsan, Korea
Mech. ,Piping 2002. 09 ~ 2003. 09
29 Phu My Fertilizer Co., Ltd. Samsung Engineering Co., Ltd Urea Off-Site PlantVietnam Process 2002. 09 ~ 2003. 02
30 Samsung General Chemical Co. Samsung Engineering Co., Ltd Aromatic/NCC RevampingDaesan, Korea
Mech. ,Piping 2002. 01 ~ 2002. 05
31 Samsung Fine ChemicalCo., Ltd. Samsung Engineering Co., Ltd BTP Plant
Ulsan, KoreaMech. ,Piping 2001. 02 ~ 2001. 09
<6 / 6>