+ All Categories
Home > Documents > The Best Solution for the Best Plant · 2018-08-14 · 3D Modeling (PDS/PDMS/SP3D) Piping...

The Best Solution for the Best Plant · 2018-08-14 · 3D Modeling (PDS/PDMS/SP3D) Piping...

Date post: 10-Mar-2020
Category:
Upload: others
View: 59 times
Download: 1 times
Share this document with a friend
19
The Best Solution for the Best Plant Introduction to CANDO CANDO CO., LTD.
Transcript

The Best Solution for the Best Plant

Introduction to CANDO

CANDO CO., LTD.

CONTENTCONTENT

Introduction1

Company Profile2

Business

Software

3

4

Organization5

Man Power

Certificate

6

7

Major Experience8

INSTRODUCTIONINSTRODUCTION

Welcome to Cando Co., Ltd.

Established in 2001 as plant engineering company consisting of many good experienced engineers, Cando Co., Ltd has been successfully conducting medium sized projects both domestic and abroad.

With "People and Technology", the critical factors in engineering business, as our core values, we are setting out to establish long-term training programs aimed at nurturing professionals with extensive experience.

Cando Co., Ltd will do its best to serve our customers the best quality and services considering one more thinking about project execution.

W i d b i li bl b i iWe are committed to becoming your reliable business partner, catering to your needs with best quality, economy and safety.

Thank you.

Hyo-Man Im, President & CEO, Cando Co., Ltd.

COMPANY PROFILECOMPANY PROFILE

□ N CANDO CO LTD□ Name : CANDO CO., LTD.

□ Established Date : Feb. 07. 2001

□ Business : Engineering, Trade

□ Capital : 200,000,000 KRW

□ Employee : 106 persons

□ Representative Director : Hyo Man Imp y

□ Adress : 5th Fl., GEC, 26, Sangil-Ro 6-Gil, Kangdong-Gu, Seoul, Korea

Tel : 82-02-2023-6900

FAX : 82-02-2023-6999

http : www.cando4u.co.kr

E mail : webmaster@cando4u co krE-mail : [email protected]

BUSINESSBUSINESS

FIELD OF SERVICE PLANT

Project Feasibility Study

Project Management

Petrochemical Plant

Refinery Plant

PLANT

Project Management

FEED Work

Engineering

Refinery Plant

Gas Processing Plant

Chemical, Fertilizer Plantg g

- Basic Design

- Detail Design

,

Fiber, Plastic Plant

Food, Paper Plant

- Procurement Service

- 3D Modeling ( Smart Plant, PDS,PDMS)

Field Engineering

Power Plant

Incineration Facility

Other Industrial Plant- Field Engineering

Equipment Supply

Other Industrial Plant

BUSINESS

PROCESS DESIGN MECHANICAL DESIGN

BUSINESS

Process Study

Evaluation of Process Alternative

Process Simulation

Preparation of Engineering Specification

Mechanical Data sheet Process Simulation

Process Flow Diagram(PFD)

Piping & Instrument Diagram(P & ID)

Engineering Drawing

Mechanical Calculation & Design Utility Flow Diagram(UFD)

Hydraulic Calculation

P E i t D t Sh t

Mechanical Calculation & Design

Strength Calculation & Fabrication Drawing

f Process Equipment Data Sheet

Process Instrument Data

Cause & Effect Diagram

Preparation of Requisition

Evaluation of Vendor’s QuotationCause & Effect Diagram

PSV Load Calculation

Flare system Design

Check & Approval of Vendor Prints

▣ Heat Exchanger Thermal Rating

Operating Manual (HTRI)

BUSINESS

PIPING DESIGN Preparation of Engineering Specification

ELECTRICAL DESIGN

BUSINESS

Preparation of Engineering Specification

Plant Layout & Plot Plan

Preparation of Engineering Specification

Electrical Single Line Diagram

Equipment Data Sheet and Specification Plant Layout & Plot Plan

3D Modeling (PDS/PDMS/SP3D)

Piping Arrangement Drawing

Design for Power, Grounding, Lighting , Fire Alarm and Communication System Preparation of Bill of Material & Requisition

E l ti f V d ’ Q t ti Piping Stress Analysis

Piping lsometric Drawing

Evaluation of Vendor’s Quotation

Check & Review of Vendor Prints

3D Modeling (PDS/PDMS/SP3D)

Line Schedule

Piping Specialty Data Sheet Preparation of Bill of Material &

Study & Calculation

- Transformer/UPS/Battery Charger/Generator Capacity

- Tray / Cable sizingPreparation of Bill of Material & Requisition

Evaluation of Vendor’s Quotation

y g

- Ground Resistance

- Intensity of Illumination

Load Flow Voltage Drop Short Circuit Check & Review of Vendor Prints - Load Flow ,Voltage Drop, Short Circuit

Current & Harmonic by E-TAP

BUSINESS

INSTRUMENT DESIGN CIVIL / ARCHITECTURE DESIGN

BUSINESS

Preparation of Engineering Specification

Instrument Data sheet

Instrument Index/Schedule

Preparation of Engineering Specification

Soil Analysis

Structural Analysis Instrument Index/Schedule

Design of Control System(DCS/ESD),

Control valves and Field instrument

Structural Analysis

Structure/Building design

Pile and Foundation Design

Layout of Cable way, Wiring, Tubing/Piping

Interlock Logic Diagram

g

Shop Drawing Check

Preparation of Bill of Quantity

Loop Diagram / Hook-up Dwg.

Preparation of Bill of Material &

Requisition Sheet

Planning for Site Preparation

Equipment Foundation Design

Sewerage Drainage DesignRequisition Sheet

Evaluation of Vendor’s Quotation

Check & Review of Vendor Prints

Sewerage, Drainage Design

Road & Paving Design

Pit/Pond Design

3D Modeling (PDS/PDMS/SP3D)

g

3D Modeling (PDS/PDMS/SP3D)

BUSINESS

Governmental Approval

BUSINESS

High Presssure Gas Manufacturing(SMS)

Industrial Safety (PSM)

Hazardous Material Fire Fighting Hazardous Material, Fire Fighting

Energy Management

Environment

Building, Structure

Chemicals Management

SOFTWARESOFTWARE

Process Simulation

- ASPEN Plus

Strength Calculation for Pressure Vessels

Heat Exchangers, Towers and ReactorsASPEN Plus

Process Hydraulic Calculation

- Hydromaster

Heat Exchangers, Towers and Reactors

- PV Elite

- Compress

Thermal Rating of Heat Exchangers

- HTRI

Pi i St A l i

Strength Calculation for API 650 Tanks :

- iTank (Cando’s In-House Program)

St t l A l i Piping Stress Analysis

- CAESAR II

Electrical Power System Analysis

Structural Analysis

- MIDAS

Computer Aided Design & Drafting :Electrical Power System Analysis

- E-TAP

Computer Aided Design & Drafting :

- PDMS(3D)

- AutoCAD

- Solid Works

ORGANIZATIONORGANIZATION

PRESIDENT

ENGINEERING GROUPSales & Admin.

EM

Project Group

Process Stationary Electrical Civil IT

Rotating/ Package

Piping Instrument Architecture

MAN POWERMAN POWER

Discipline No. of Person

Sales/Project 5Sales/Project 5

Process 8

Mechanical 16Mechanical 16

Electrical 10

Instrument 8Instrument 8

Civil/Architecture 10

Piping 49Piping 49

Total 106

CERTIFICATECERTIFICATE

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣Engineering(E) + Detail Design(D)

No. Plant Owner Client Plant/Project Scope Period

1 Lotte Chemical Titan (M) SDN. Lotte E&C Co., Ltd. No. 3 PP Plant, Malaysia D 2016. 10 ∼ 2017. 10

2 PETRONAS Samsung Engineering Co., Ltd. RAPID PKG 6A LLDPE ProjectJohor, Malaysia D 2017. 01 ∼ 2017. 07

3 Lotte Chemical Louisiana LLC Samsung Engineering Co., Ltd. MEG-1 ProjectLouisiana, USA D 2016. 11 ∼ 2017. 06

Lotte Engineering & IP Project4 Lotte Chemical Corp. Lotte Engineering. & Construction Co., Ltd

IP ProjectYeosu, Korea E + D 2014. 12 ~ 2016. 03

5 Hammer Mishrif DGS, Iraq Samsung Engineering Co., Ltd Zubair Oil Field Development Project, Iraq E + D 2014. 06 ~ 2016. 05

6 DongKwang Chemical DongKwang Chemical CO2 Plant 증설공사 E + D 2014 04 2015 126 g gMFG Co., Ltd

g gMFG Co., Ltd

2 증설공사Onsan, Korea E + D 2014. 04 ~ 2015. 12

7 Saudi Arabian Mining Co., Ltd

Hanwha Engineering. &Construction Co., Ltd

Phosphate PlantSaudi Arabia E 2014. 02 ~ 2015. 05

8 Compression Altarmira S.A.d C V Samsung Engineering Co., Ltd Natural Gas Compression Station

Altarmira Mexico E + D 2013. 01 ~ 2014. 04de C.V. g g g , Altarmira, Mexico

9 Uz-Kor Gas Chemical Co., Ltd Samsung Engineering Co., Ltd UGCC PP ProjectUzbekistan E + D 2012. 08 ~ 2013. 12

10 Cheil Industries Co., Ltd. Samsung Engineering Co., Ltd No. 2 DPC/PC PlantYeosu, Korea E +D 2010. 12 ~ 2012.06Yeosu, Korea

11 Honam Petrochemical Corp. Samsung Engineering Co., Ltd NCC Expansion ProjectYeosu, Korea E + D 2011. 01 ~ 2012. 05

<1 / 6>

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣Engineering(E) + Detail Design(D)

No. Plant Owner Client Plant/Project Scope Period

12 Honam Petrochemical Corp Lotte Engineering. & P2(4PP)-Project /P2(INFRA)-Project E + D 2010 10 ~ 2012 0312 Honam Petrochemical Corp. Construction Co., Ltd Yeosu, Korea E + D 2010. 10 2012. 03

13 Hansol Chemical Co., Ltd. Hansol EME Co., Ltd Hydro-peroxide PlantUlsan, Korea E + D 2011. 04 ~ 2012. 02

14 S-Oil Co., Ltd. Samsung Engineering Co., Ltd Para-Xylene & Off-site PlantOnsan Korea E + D 2009. 05 ~ 2010. 09Onsan, Korea

15 Honam Petrochemical Corp. Lotte Engineering. & Construction Co., Ltd

B Project (BD Plant & Off-site)Yeosu, Korea E + D 2009. 05 ~ 2010. 09

16 KP Chemical Corp. Lotte Engineering. & Construction Co., Ltd

OS Tank Terminal ProjectUlsan, Korea E + D 2008. 03 ~ 2009. 12

17 Lotte Daesan PetrochemicalCo., Ltd. Samsung Engineering Co., Ltd EO/EG Plant

Daesan, Korea E + D 2006. 08 ~ 2007. 08

18 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd NCC/C4/BTX Plant ExpansionDaesan, Korea E + D 2005. 12 ~ 2007. 06

19 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd SM Plant ExpansionDaesan, Korea E + D 2005. 12 ~ 2006. 02

20 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd No. 5 HEMC PlantUlsan, Korea E + D 2005. 02 ~ 2005. 09

DME DEMO Pl t21 Korea Gas Corp. Korea Gas Technology Corp. DME DEMO PlantIncheon, Korea E + D 2005. 02 ~ 2006. 02

22 Korea Gas Corp. Korea Gas Corp. DME Pilot PlantIncheon, Korea E + D 2005. 02 ~ 2005. 08

<2 / 6>

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣Engineering(E) + Detail Design(D)

No. Plant Owner Client Plant/Project Scope Period

23 Korea Gas Corp Korea Gas Corp DME Pilot Plant E + D 2005 02 ~ 2005 0823 Korea Gas Corp. Korea Gas Corp. Incheon, Korea E + D 2005. 02 2005. 08

24 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd Aromatic Plant ExpansionDaesan, Korea E + D 2004. 10 ~ 2005. 03

25 Samsung Petrochemical Co., Ltd. Samsung Engineering Co., Ltd PTA Plant ExpansionDaesan Korea D 2003. 12 ~ 2004. 06Daesan, Korea

26 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd Electrolysis/MC Plant Ulsan, Korea E + D 2003. 01 ~ 2003. 07

27 Samsung Fine Chemical Co., Ltd. Samsung Engineering Co., Ltd No 4 HEMC PlantUlsan, Korea E + D 2002. 09 ~ 2003. 06

28 Honam Petrochemical Corp. Samsung Engineering Co., Ltd No.3 Air Separation PlantYeosu, Korea D 2002. 07 ~ 2002.12

29 Korea Electrical Power Institute Samsung Engineering Co., Ltd 100kW MC Fuel Cell PlantBoryung, Korea E + D 2002. 01 ~ 2002. 09

30 Hanwha Petrochemical Co., Ltd. Samsung Engineering Co., Ltd Ethylene Dichloride No.3 PlantYeosu, Korea D 2001. 05 ~ 2002. 09

31 Korea Petroleum Corp. Samsung Engineering Co., LtdDonghae Gas-1 Gas Treatment PlantOnsan, Korea

E + D 2001. 06 ~ 2002. 08,

32 Air Liquid Korea Samsung Engineering Co., Ltd No. 2 HYCO Gas PlantYeosu, Korea D 2001. 06 ~ 2002. 08

<3 / 6>

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣ Engineering + Detail Design

No. Plant Owner Client Plant/Project Scope Period

1 Kumho Petrochemical Co., Ltd POSCO E&C MDI Plant Piping 2015. 12 ~ 2017. 04

2 Uzbekistan GTL LLC. Hyundai Engineering Co., Ltd Gas To Liquid Plant Mech. 2014. 03 ~ 2016. 04

3 State Oil CompanyAzerbaijen SOCAR Urea SOCAR Ammonia/Urea Project Piping) 2014. 06 ~ 2016. 05

4 Kogas Akkas B.V Daewoo E & C Co., Ltd CPF Akkas Gas Field Project Process 2013. 02 ~ 2014. 02

5 PTT Phenol Company POSCO Engineering Co., Ltd. PTT Phenol Train II Project Piping 2013. 07 ~ 2014. 10

6 Samsung Techwin Co., Ltd Samsung Techwin Co., Ltd Natural Gas Compression Station Process 2013. 06 ~ 2013. 07

7 Samsung Total PetrochemicalCo., Ltd Samsung Engineering Co., Ltd EO Revamp Project Mech. 2011. 05 ~ 2012. 05

8 Samsung Total Petrochemical Samsung Engineering Co Ltd No2 Aromatic Complex Project Mech 2011 04 ~ 2013 128 Co., Ltd Samsung Engineering Co., Ltd No2 Aromatic Complex Project Mech. 2011. 04 2013. 12

9 Abu Dhabi Gas Development Company Limited., Samsung Engineering Co., Ltd UTOS for Gas Plant Process 2010. 06 ~ 2012. 06

10 Saudi Jubil Export Refinery Samsung Engineering Co., Ltd JER#3 Project Mech 2010. 04 ~ 2011. 04

11 Ibn Rushd & Sabic Samsung Engineering Co., Ltd Ibn Rushd-II PTA DBN Project Instrument 2010. 02 ~ 2010. 09

<4 / 6>

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣ Engineering + Detail Design

No. Plant Owner Client Plant/Project Scope Period

12 SONATRACH Samsung Engineering Co., Ltd Skikda Refinery Project Mech. 2009. 07 ~ 2011. 03

13 AnHoa Paper Joint Stock Co. Hansol EME Co., Ltd. High Quality Paper Mill Plant Piping 2010. 07 ~ 2012. 10

14 Petrovietnam fertilizer and Chemical Corp. Samsung Engineering Co., Ltd CO2 Recovery Project Mech. 2009. 01 ~ 2011. 03

15 Ulsan Metropolitan City Hansol EME Co., Ltd. Sewage Sludge Incineration Plant Ulsan, Korea Piping) 2009. 02 ~ 2009. 12

16 Petrovietnam fertilizer and Chemical Corp. Samsung Engineering Co., Ltd CO2 Revovery Project

Vietnam Mech. 2009. 01 ~ 2011. 03

Saudi Kayan Petrochem Amine Plant Mech17 Saudi Kayan Petrochem. Complex Samsung Engineering Co., Ltd Amine Plant

Kayan, SaudiarabiaMech. 2008. 02 ~ 2008. 10

18 Norske Skoglndustrier ASA Hansol EME Co., Ltd. Paper Mill PlantPorano, Brazil Piping 2007. 09 ~ 2008. 04

19 Saudi Arabian Mining Co Ltd Samsung Engineering Co Ltd Ma’aden Ammonia Plant Process 2007 08 ~ 2008 0919 Saudi Arabian Mining Co., Ltd Samsung Engineering Co., Ltd Saudi Arabia Process 2007. 08 ~ 2008. 09

20 Lotte Daesan Petrochemical Co., Ltd Samsung Engineering Co., Ltd PP Plant

Daesan, Korea Mech. ,Piping 2006. 10 ~ 2007. 10

21 Hebei Pan Asia Paper Co., Ltd. Hansol EME Waste Incineration & Steam Boiler System/Hebei China

Piping Design(D) 2007. 07 ~ 2008. 04Boiler System/Hebei, China Design(D)

22 Samsung Total Co., Ltd. Samsung Engineering Co., Ltd PP PlantDaesan, Korea Mech. ,Piping 2006. 02 ~ 2006. 12

<5 / 6>

MAJOR EXPERIENCEMAJOR EXPERIENCE

▣ Engineering + Detail Design

No. Plant Owner Client Plant/Project Scope Period

23 LG Daesan Petrochemical LG Daesan Petrochemical Co., BR/SBR Revamping Project Process 2005 11 ~ 2006 0223 Co., Ltd Ltd Daesan, Korea Process 2005. 11 2006. 02

24 Topan Photomask Korea Samsung Engineering Co., Ltd ICE2 ProjectIncheon, Korea

ProcessMech. 2005. 08 ~ 2005. 11

25 Samsung Petrochemical Co., Ltd. Samsung Engineering Co., Ltd PTA Plant ExpansionDaesan Korea Mech. ,Piping 2003. 12 ~ 2004. 06Daesan, Korea

26 Lotte Samkang Co., Ltd. Samsung Engineering Co., Ltd Oil Refinery PlantCheonan , Korea Mech. ,Piping 2003. 07 ~ 2004. 06

27 Samsung Atopina Co., Ltd. Samsung Engineering Co., Ltd C9 TA ProjectDaesan, Korea

Mech. ,Piping) 2003. 06 ~ 2004. 06

28 CAPRO Corporation Samsung Engineering Co., Ltd Caprolactam Expansion PlantUlsan, Korea

Mech. ,Piping 2002. 09 ~ 2003. 09

29 Phu My Fertilizer Co., Ltd. Samsung Engineering Co., Ltd Urea Off-Site PlantVietnam Process 2002. 09 ~ 2003. 02

30 Samsung General Chemical Co. Samsung Engineering Co., Ltd Aromatic/NCC RevampingDaesan, Korea

Mech. ,Piping 2002. 01 ~ 2002. 05

31 Samsung Fine ChemicalCo., Ltd. Samsung Engineering Co., Ltd BTP Plant

Ulsan, KoreaMech. ,Piping 2001. 02 ~ 2001. 09

<6 / 6>


Recommended