© 1999 - 2011 Fieldbus Foundation ©1994-2010 Fieldbus Foundation End User Seminar 2010 The Business Value Proposition of FOUNDATION Technology
Transcript
Page 1: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

The Business Value Proposition of

FOUNDATION Technology

Page 2: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

• FOUNDATION Technology should be a consultative sale

• Operational and maintenance benefits, that’s where the key value proposition lies

• Benefits can be achieved in the engineering and installation phase

• For sales people, fieldbus projects are high value and require a greater than average service content, which can be very good for your business

• Attention must be given to the overall lifecycle of the project, you have to follow through.

Page 3: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

What’s In It for The Sales Person?

• Again, higher value project versus 4-20 mA.

• More service required in the form of training, etc. particularly if you are a first timer

• Good potential for MAC project

• Will usually accompany a control system migration or upgrade project

• User must be willing to make the investment in fieldbus devices (at least for migration projects)

• When users go fieldbus, it is often part of a corporate wide initiative that involves multiple plants and locations

Page 4: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

What’s In It for The User?

• Reduced engineering costs

• Reduced operational costs

• Reduced maintenance costs

• Reduced energy costs

• Better utilization of fewer personnel

• Better control

Page 5: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Why Fieldbus Projects Fail

• Picking the wrong engineering partner

• Lack of early planning in the FEED stage

• Lack of training

• Lack of a Plant Asset Management Strategy

• Lack of work processes necessary to make fieldbus work

Page 6: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

FOUNDATION Technology Controls The World’s

Largest Plants

• Shanghai SECCO Refinery: 900 Thousand Tons of Ethylene per Year, Using Control in the Field

• CSPC Nanhai Refinery: Refining & Petrochemical Complex with 16,000 FF Devices

• Reliance Jamnagar Refinery: The Largest Refinery in the World: ≥ 22,000 Devices

• NAM Groningen Gas Field: Largest Gas Producer in Netherlands

• Drax: Largest Coal Fired Power Plant in the UK

Page 7: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

• Reliance Life Sciences India: Fast Track OEM Construction with FOUNDATION Technology

• Molson Coors: Using FF for Energy Optimization

• Duke Power: Using FF in a Nuclear Application

• Novo Nordisk: FF for Multiple Applications in Life Sciences

Page 8: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

FOUNDATION Fieldbus Provides Advantages

with Process OEM Equipment

FFOUNDATIONOUNDATION Fieldbus Fieldbus

Instrumentation on a Skid Instrumentation on a Skid

Mounted FermenterMounted FermenterSource: PharmaManufacturing.comSource: PharmaManufacturing.com

• Faster Integration of Skids

• Faster Commissioning

• Easier Validation

• Reduced Cost to Both End User and OEM

Page 9: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

We Test & Register Everything from Cable to

Host

Page 10: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Registered Devices & Hosts

Page 11: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Registered Devices

600

400

200

Jan ’98

Jan ’00

Jan ’02

Jan ’04

Jan ’06

Jan ’08

Jan ’10

Registrations

NewNew

Renewed

Page 12: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

The Importance of Early Involvement in the

FEED Phase

• The Success of Your Operations & Maintenance Strategy

Depends on the FEED Phase

• Fieldbus and its impact should be considered in this phase,

where it can create a more powerful return on investment

Page 13: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Fieldbus for New Projects and Modernization

• According to ARC, the installed base of process automation systems reaching the end of their useful life is $65 billion. Most of these are 20 years old or older.

• FOUNDATION Fieldbus is being chosen by more major end users as they begin to modernize their installed base.

• Users want to avoid a functional replacement.

Nobody Wants to Replace this with Nobody Wants to Replace this with

““More of the SameMore of the Same””

Page 14: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Modernizing with FOUNDATION fieldbus is

Happening Today from Refineries to Nuclear Plants

Page 15: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

How FOUNDATION Fieldbus can Help Reduce

Energy Costs

• An Ideal Solution for Predictive

Maintenance on Key Energy

Related Assets Like Heat

Exchangers, Burner

Management Systems

• Clean Heat Exchangers Before

they Choke Beyond Limit

• Tighter Control of Fan/Damper

Actuators

• Unparalleled Efficiency

Monitoring

• Monitor & Define Optimal Zone

of Operation for Equipment

Energy Consumption (Trillion Btu)

Petroleum

Chemicals

PaperPrimaryMetals

Food Processing

Nonmetallic Minerals

Tobacco/Beverages

Furniture

Leather Machinery and Computers

Wood

Transportation

Fabricated Metals

Textiles/Apparel

Plastics/Rubber

Electrical

Printing

Miscellaneous1

10

100

1000

10 100 1000 10000Energy Intensity

(Thousand Btu/$ GDP) Energy-Intensive

Industries

Industrial Energy Intensity vs. Energy Consumption

Mining

Source: US Department of Energy

Page 16: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Reduce Unplanned Shutdowns

• Unplanned Shutdown Accounts for 5 Percent of Production in the Process Industries

• One Unplanned Shutdown can Wipe Out your Entire Plant Profit for the Year

• Field Diagnostics Provide Advance Knowledge of Impending Problems

• FOUNDATION technology enables truly distributed and deterministic controls which are designed to function regardless of host issues

Page 17: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Customer Experience: CIF Reduces Unplanned

Shutdown

FOUNDATION™ FieldbusCIF with inherent backup capability

prevented 2 incorrect plant

shutdowns, which would have resulted from communication

interruptions.

Page 18: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

An Example of Installation Cost Reductions

Source: Tecnimont 2009

Page 19: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

An Example of Commissioning Cost Reductions

Source: Tecnimont 2009

Page 20: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Fieldbus Can Adapt to Remote Operations

Page 21: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Reduced Maintenance Costs

0%

5%

10%

15%

20%

25%

30%

35%

Routine

check

No

Problem

Calibration

shift

Zero Off Plugged

lines

Failed

35%

28%

20%

6% 6%

4%

Source: Shell Global Solutions

63% of maintenance labor

results in no action!!

Page 22: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Foundation Certified Training & End User

Resources

• Eight Certified Centers Around the World with More on the Way

• Numerous and free user resources: forums.fieldbus.org, AGA-181

• FieldMate Segment Design Tool

Page 23: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Fieldbus Forums

http://forums.fieldbus.org/

Page 24: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Fieldbus Forums

LinkedIn

Page 25: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

Blog: Foundationfieldbus.blogspot.com

Page 26: The Business Value Proposition of FOUNDATION Technology · 2013-03-13 · key value proposition lies • Benefits can be achieved in the engineering and installation phase • For

© 1999 - 2011 Fieldbus Foundation©1994-2010 Fieldbus Foundation

End User Seminar 2010

YouTube• Short videos designed for training, education, best practices, etc.

• First video shot at end user seminar in Carson, California.

• High Definition video


Recommended