1 News: CLIC workshop very successful. Next years workshop end February/early March, partly combining with general LC discussion (ahead of open ESU meeting in May 2019) CLEAR and X-boxes doing well see reports CLEAR review late this year, early next year A 3.5 GeV CLIC type linac (klystron driven) being discussed in framework of the Physics Beyond Colliders see report later Work in implementation groups (CEIS, Cost & Power, Main Linac Hardware, Parameters, Novel Acc.) moving ahead well you will see some flavours of it today PiP writing we will see today where we are Physics and Detector work progressing well, external review this week (https:// indico.cern.ch/event/707225/overview) MTP budgeting 2018-19 not changed, first discussion of 2020+, see following slides
Transcript
Page 1: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

1

News:CLIC workshop very successful.

• Next years workshop end February/early March,

partly combining with general LC discussion (ahead

of open ESU meeting in May 2019)

CLEAR and X-boxes doing well – see reports

• CLEAR review late this year, early next year

A 3.5 GeV CLIC type linac (klystron driven) being

discussed in framework of the Physics Beyond Colliders

– see report later

Work in implementation groups (CEIS, Cost & Power,

Main Linac Hardware, Parameters, Novel Acc.) moving

ahead well – you will see some flavours of it today

PiP writing – we will see today where we are

Physics and Detector work progressing well, external

review this week

(https://indico.cern.ch/event/707225/overview)

MTP budgeting 2018-19 not changed, first discussion

of 2020+, see following slides

Page 2: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

2

Page 3: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

18 April 2018

Key goals (c/p/indu/risk)

3

Modules (drive-beam,

klystron type)

Final modules, from revised

designs to industrial modules

Optimized structure

and RF components

Finalize industrial structures:

increase manufacturability,

brazed, halves, conditioning.

Use/maintain/operate existing

test-stands for testing

Klystrons and

Modulators

Efficiency and costs

improvements, significant

gains possible for efficiency,

industrial cost-models and

optimization

Magnets

Permanent magnets, longit.

variable magnets, industrial

production and cost-

optimisation

Civil engineering,

infrastructure

Detailed site layout and

CE/infrastructure designs

49 km

29 km

11km

Budget planning

Page 4: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

System tests

4

• Light sources, FACET/FELs for emittance conservation, Final Focus studies (ATF2), Drive-beam Front End facility at CERN

• Two examples:

SOLEIL

MAXIII

PETRAIII

AustralianLS

ESRF

DIAMOND

ASTRID

SLS

SPRING8

ELETTRA

ATF

BESSYII

ALS

ALBA

APSANKA

SPEARIII

PEPII

LEP

CESRTA

NLC

ILC

MAXIV

NSLSII

CLICDR

PEPX

PETRAIII(3GeV)

ESRFII

SIRIUS

SPring-8II

APSII

τUSR DIAMONDII

ALS-U

BAPS-U

SOLEILII

SLSII

FCC-ee(H)FCC-ee(Z)

0.1

1.0

10.0

100.0

1000.0

10000.0

0.001 0.01 0.1 1 10 100

Vetr

calemian

ce[pm]

Horizontalemi ance[nm]

Gun SHB

1-2-3PB Buncher Acc. Structures

500 MHzModulator-klystrons, 1 GHz, 15 MW

~ 140 keV ~ 12 MeV

Diagnostics

18 April 2018 Budget planning

Page 5: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

Cost and Power

5

CERNenergyconsumption2012:1.35TWh

18 April 2018 Budget planning

A cost of ~6 BCHF and power ~200 MW are “reasonable” values

Focus TDR work on modules, RF and CE for costs; for power RF and magnets

Page 6: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

Above: EU Design Study for X-Band FELs

2018-2020: http://compact-light.web.cern.ch

Beyond being a collaboration for CLIC, many

groups have their own X-band facilities and

components (see overview on the left)

X-band technology

CERN XBox-1teststand 50MW Operational,connectiontoCLEARplanned

Xbox-2teststand 50MW Operational

XBox-3 teststand 4x6MW Operational

Trieste LinearizerforFermi 50MW Operational

PSI LinearizerforSwissFEL 50MW Operational

DeflectorforSwissFEL 50MW Designandprocurement

DESY DeflectorforFLASHforward 6MW Designandprocurement

DeflectorforFLASH2 6MW Designandprocurement

DeflectorforSinbad tbd Planning

Tsinghua DeflectorforComptonsource 50MW Commissioning

LinearizerforComptonsource 6MW Planning

SINAP LinearizerforsoftX-rayFEL 6MW Operational

DeflectorsforsoftX-rayFEL 3x50MW Procurement

Australia Teststand 2x6MW Proposalsubmission

Eindhoven CompactComptonsource,100MeV 6MW Designandprocurement

Valencia S-band teststand 2x10MW Installationandcommissioning

KEK NEXTEFteststand 2x50MW Operational

SLAC Designofhigh-efficiencyX-bandklystron 60MW Inprogress

Daresbury Linearizer 6MW Designandprocurement

Deflector tbd Planning

Accelerator tbd Planning

Frascati XFEL,plasma accelerator,1GeV 4(8)x50MW CDR

Teststand 50MW Designandprocurement

Groningen 1.4GEVXFELAccelerator,1.4GeV tbd NLroadmap,CDR

18 April 2018 Budget planning 6

In the CLIC preparation phase:

Take advantage of the widespread use of electron linacs, and rapidly increasing use

of X-band increase collaboration

Page 7: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

An e-beam facility at CERN

Page 8: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

ILC prep. phase project:

CERN coordination of European effort

R&D contracts

MoU annexes or similar (with MS and NMS collaborators)

Techn.Transfer agreements, EU projects.

Preparation Phase 2019-22: Organization and resources

A European ILC project in the preparation phase 2019-22: • Resources needed estimated to ~25 MCHF/year (material) and 60 FTE/year (personnel),

ramping up from 2019 • Move towards more engineering personnel • The organisational model above is used for existing studies at CERN, e.g. CLIC/HE-LHC/FCC

Page 9: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

Choices and common activities

18 April 2018 Budget planning 9

CLIC prep.phase / year

• 21 MCHF (w/collaboration)

• 130 FTE (w/collaboration)

ILC prep.phase /year

• 25 MCHF (Euro-collaboration)

• 60 FTE (Euro-collaboration)

3.5 GeV machine

• 6.5 MCHF (CERN)

• 55 FTE (w/collaboration)

Page 10: The CLIC programme 2020-2025(6)€¦ · CLIC workshop very successful. ... Final modules, from revised designs to industrial modules Optimized structure ... Gun SHB 1-2-3 PB Buncher

For the time being• Look at common areas in all scenarios – consider key topics or facilities 2019-2023

• Cover all existing existing agreements with (INFN, UK, etc) that go into 2020, it also covers CompactLight obligations, ARIES transnational access, LCC:

• By 2019-2020 we need to know where to go next to select between the circles on previous slide to for more solid and concrete planning

• No changes needed for 2018-19

• *in case of ILC ramp down after 2021 (move Xbox facilities partly outside) – other ILC activ. will come in

Material/year

(kCHF)

Personnel/year Total/year

(kCHF)

LC design team 500 5 1700

System tests ATF, DR, etc 300 (above or below) 300

CLEAR 700 5 1900

High Eff Klystrons/modulator and test-

areas

900 3 1600

LCC and admin/finance support 400 2.5 900

Xbox operation and test-structures* 2500 3 3200

Gun (AWAKE, CLEAR, Compact Light) 200 1.5 600

Total 5500 20 10200

18 April 2018 Budget planning 10