+ All Categories
Home > Documents > THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 |...

THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 |...

Date post: 04-Aug-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
50
THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey
Transcript
Page 1: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

THE COMPANYGizil Enerji Sanayi ve Ticaret Ltd. Şti.

April, 2016 | Istanbul/ Turkey

Page 2: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ABOUT USDetail About Our Company

PORTFOLIOOur Portfolio Offerings

PRODUCTSOur Products in Detail

SECTORSOur Focus Sectors

REFERENCESOur Selected Works

CONTACTKeep in Touch

ContentWhat’s Inside

1

2

3

4

5

6

Gizil Enerji

Page 3: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

About UsDetail About Our Company

ʻʻOur experience gives us confidence

We combine both core technical know-how and global administrative know-

how arising from big and i mportant projects in refinery, energy and industry

sectors.

1

Gizil Enerji

Page 4: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Who we areThe Core of Our Know-How

Diesel Hydro

Treating

Reformer Project

(Tüpraş)• 2003-2007

• 360 million$

budget

Truck Loading

Station and

OxygenateTanks

and Transfer

Sys.Project

(Tüpraş)• 2007-2009

• 20 million$

budget

Gasoline

Specifications

Improvement

Project (Tüpraş)• 2007-2009

• 80 million$ budget

Resid Upgrading

Project (RUP)

(Tüpraş)• 2009-2013

• App. 3 billion $

budget

• The biggest

project in Turkey

at one time

• Portfolio and Partner Management (2007-2009)

• Marketing and Communications (2007-2009)

• Continous Improvement (2009-2010)

• Strategy and Business Development (2010-2014)

INDUSTRIAL ENGINNERING AND MECHANICAL ENGINEERING DISCIPLINES

CORE TECHNICAL

KNOW-HOW

GLOBAL ADMINISTRATIVE

KNOW-HOW

+

Management Consultancy@Siemens (2007-2014)

MSc. MECHANICAL ENGINEERING AND ELECTRICAL ENGINEERING DISCIPLINES Gizil Enerji

Page 5: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

What we want to doOur Goal: Sustainable Partnership

MissionWe provide innovative and cost effective products/ services

for the projects demanding technological and specializ ed

know-how in our focus sectors like refineries,

petrochemical plants and power plants.

VisionBe the most

preferred solution partner

in our operation fields till 2020

Core ValuesEthicsGo forward without

abandoning the principles of

business ethics and honest

work. We abide by the laws

and ethics and work with our

customers depending on the

principle of 'win-win' to make

our success sustainable.

EntrepreneurshipEntrepreneurship as a

way of doing business

and make prospective

research to uncover new

opportunities. Our goal is

to create new

opportunities by leading

the sector.

EnthusiasmThe source of our success is

desire and enthusiasm. We

always strive for our

customers and for our

society with the principle of

that success is just the

beginning of each new move.

InnovationThe key for adding value to

our customers and our

community. We closely

follow up innovations in our

industry and we create

added value through

continuous improvement

efforts.

What is our ambition?

What do we do to achieve

our ambition?

How do we act?

Gizil Enerji

Page 6: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

PortfolioOur P ortfolio Offerings

ʻʻProducts and Services in Global Standards

We have a wide range of product portfolio via our business partnerships

worldwide. In addition to this, all relevant approaches (e.g. Engineering,

P r oject Management ) we use are originated from recogni zed global

methodologies.

2

Gizil Enerji

Page 7: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

PROJ ECT MANAGEMENTBASIC AND DETAILED

ENGINEERINGPRODUCT SUPPLY

ELECTRICALPIPINGMECHANICALCIV IL AND STEEL PROCESS

• Piping and Instrument

Diagrams

• Review of P& ID -

J ointly with Client

• Pump specifications

• Tank specifications

• …

• Preliminary projects of

the eq uipment

• Steel projects

• …

• Technical specifications

• Mechanical datasheets

• Mechanical eq uipment

list

• Metallurgy flow

diagrams

• List of spares

• Material req uisitions

• Tender packages for the

main eq uipment

• …

• Isometrical drawings

• Pipe stress analysis

• Prepare material lists

• Support design and

selection

• …

• Technical specifications

• Electrical load list

• One lines and protection

and metering diagrams

• Area classification

drawings

• Major cable routings

• Eq uipment data sheets

• Eq uipment layouts for

substation

• List and q uantity of bulk

materials

• Lighting projects

• Grounding projects

• Preliminary system model

• …

INSTRUMENTATION

• Instrument datasheets

• Control valve siz ing

• Relief valve siz ing

• I-O list

• Cable list

• Main instrument cable

routing

• …

What we can doEngineering Services in Global Standards

Gizil Enerji

Page 8: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

What we can doEngineering Services in Global Standards

Gizil Enerji

Page 9: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

What we can doEngineering Services in Global Standards

Gizil Enerji

Page 10: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

We can do in this wayA well-structured Project Manegement approach

Dispatching

Project

Management

Infrastructure

Project Definition Project Planning Procurement

Action Planning

for Improvement

Customer

Satisfaction

and Feedback

ClosureCustomer

AcceptenceComissioning

Insta

llatio

n

Project Controlling and Monitoring

Project Controlling and Monitoring

PROJ ECT MANAGEMENTBASIC AND DETAILED

ENGINEERINGPRODUCT SUPPLY

Gizil Enerji

Page 11: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

We can do in this wayLet’s see some ex amples from our projects…

Gizil Enerji

Page 12: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ProductsOur P roducts in Detail

ʻʻWe offer what you need with our partners

We possess a large network of both local and international vendors of

which we are representative or distributor. Our ai m is to provide safe,

reliable and cost effective products which you need.

3

Gizil Enerji

Page 13: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Pipe HangersEx clusive representative of N.C.D. Group in TR

N.C.D.

Group

Registered

supplier of

Technip, Foster

Wheeler, Ansaldo,

Danieli,

Snamprogetti

Manufacture

custom designed

special pipe

supports

More than 50 years

of experience in

power and

petrochemical

plants

References in

Turkey (Yeni

Elektrik Gebze

Power Plant,

Tupras Izmir

Refinery)

ʻʻ Safe and reliable

hangers with the

lowest possible cost

Gizil Enerji

Page 14: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Pipe HangersEx clusive representative of N.C.D. Group in TR

Constant

Hangers

They are used when the large vertical

pipeline displacement doesn' t allow the use

of variable load Spring Hangers (S.H.). In

fact, S.H. would charge the pipeline with

“ additional load” due to high deviation

between operating and erection load, so

causing the possible damaging of the

pipework system. Each C.H. is calibrated to

show a constant load throughout its whole

working range, balancing the weight of the

pipeline

Hydraulic

Shock and

Sway

Suppressors

They are used to prevent damages due to

earthq uake, flow pulsation, pipe rupture or

safety valve blow-off. By the use of the

Hydraulic Shock and Sway Suppressor the

occurring pipe movements are minimiz ed.

Unlike a simple viscous damper, the Shock

and Sway Suppressor will not restrain

normal thermal movement and vibration

resulting in a piston velocity lower than the

locking velocity.

V ariable

Spring

Hangers

They are used where vertical movements of

the piping are not allowed to be restricted by

rigid hangers. The Variable Spring Hanger

consists of a pre-compressed spring coil in

a cylindrical casing, with a load-and travel

indicator. Variable Spring Hangers are

designed to enable an adjustment of the

distance between Variable Spring Hanger

and pipe or eq uipment connection.

Accessories(Pipe Clamp,

Saddle, Turnbuckle,

Clevis, Eye Nut, etc)

They are used as connection between pipe

and hanger and between hanger and

construction. Rigid supports are consisting

of accessories only. The design of the

accessories which are connected directly

with the piping or which are subjected to

temperature influences due to medium

pipe/convection-temperature is based upon

the hot yield strength. Compared with the

medium temperature the design

temperatures can be reduced.

Maintanence and Refurbishment

Installation and After Sales Support

Design and Manufacturing

Gizil Enerji

Page 15: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Pipe HangersEx clusive representative of N.C.D. Group in TR

India

Saudi

Arabia

Belgium

France

Czech Rep.

China

Singapore

Russia

United States of America

Brazil

Italy

Spain

United Arab Emirates

Poland

Turkey

Iran

Switzerland

Pakistan

Algeria

ThailandMalaysia

Indonesia

Tunusia

Nigeria

Greece

K uwait

Egypt

Ira

q

Turkmenistan

ʻʻ500+ references

in refinery and

power plants in

30+ countries

ʻʻYeni Enerji and Tüpraş preffered N.C.D. Group

productsGizil Enerji

Page 16: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

SectorsOur Focus S ectors

ʻʻWe do what we have already known

We are aware of what kinds of trends our customers are dealing with and

what kinds of challenges they are tackling with in their daily lives. So, we

know very well how to support them.

4

Gizil Enerji

Page 17: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Petro-

chemical

IndustryEPCRefinery Power

PlantsOil & Gas

Energy products and solutions –in 6 DivisionsEngineering, Products and Solutions in various sectors

Whom we focus onCustomer centricity in dedicated markets

Gizil Enerji

Page 18: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesOur S elected Works

ʻʻActions speak louder than voice

Our philosophy is what you do is more important than what you say. S o,

let’s talk to our customers.

5

Gizil Enerji

Page 19: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

RefineriesOur S elected Works

Gizil Enerji

Page 20: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTank Construction Project in Karbala Refinery

Challenge

Solution

• Project Planning

• Contract Management

• Project Controlling

• Site Management Activities

• Q A/ Q C Activities

• HSE Activities

• Project Procurement Activities

• Project Reporting

• Technical Drawings

• All Engineering Activities

• Other All Relevant Works

• The ai m of the project is to provide all engineering, procurement and

construction management (EPCM) services for Construction of 42

Storage Tank Project Karbala Refinery, Iraq .

Short project information:

Customer: Arca Metal

Location: Karbala, Iraq

Start: J uly, 2015

Finish: Ongoing

Gizil Enerji

Page 21: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTupras Iz mir Demin Water Tanks and Transfer Lines

Challenge

Solution

• Basic and Detailed Engineering

• Prepare data sheets

• Develop material req uisition forms

• Procurement of all electrical and instrumentation eq uipment

• Installation supervision

• Test and commissioning

• All relevant technical drawings

• Other all relevant works

• The aim of the project is engineering, material supply and test/

commissioning activities of electrical and automation scope of the

project.

Short project information:

Customer: Ada Endüstri

Location: Iz mir, Turkey

Start: October, 2015

Finish: Ongoing

Gizil Enerji

Page 22: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTupras Petrocoke Storage Conveyor Line Project

Challenge

Solution

• Procurement of all electrical and instrumentation eq uipment

• Design and assembly of ex proof electrical panel

• Prepare data sheets

• Material req uisition forms

• Cable routings and projects

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is making of the petrocoke storage conveyor line

which will transport petrocoke as the output of Resid Upgrading Project

(RUP).

Short project information:

Customer: Intra Danismanlik

Location: Kocaeli, Turkey

Start: August, 2014

Finish: May, 2015

Gizil Enerji

Page 23: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTupras Petrocoke Storage Dast Control System

Challenge

Solution

• Procurement of all electrical and instrumentation eq uipment

• Design and assembly of ex proof electrical panels

• Prepare data sheets

• Material req uisition forms

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is designing and assembly of ex proof electrical

panels in dast control system of petrocoke storage in Resid Upgrading

Project (RUP).

Short project information:

Customer: Enveks

Location: Ankara, Turkey

Start: J uly, 2014

Finish: March, 2015

Gizil Enerji

Page 24: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTupras Iz mir Refinery Resid Upgrading Storage Tanks

Challenge

Solution

• Generate electrical one-line diagram

• Preparation of electrical grounding project

• Prepare data sheets of MCC panels

• Calculations of cable sections

• Develop cable list

• Lighting projects

• Instrument data sheets

• Instrument list

• Logic diagrams

• Procurement supervision

• The aim of the project is making of the storage tanks which will feed fuel

oil to the Resid Upgrading Project (RUP).

Short project information:

Customer: Dema Makine

Location: Iz mir, Turkey

Start: 2014

Finish: 2014

Gizil Enerji

Page 25: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTupras Iz mir RUP Charge Tanks

Challenge

Solution

• Relevant special pipe hangers are manufactured and delivered to the

customer site on time. One of the competitive advantages is best price

philosophy. This is the first order intake of NCD Group products in

Tupras Refinery as a result of being a part of listed vendor list.

• Special pipe support delivery for RUP Charge Tanks in Tupras Iz mir

Refinery

Short project information:

Customer: Tüpraş

Location: İz mir

Start: December, 2014

Finish: February, 2015

Gizil Enerji

Page 26: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTurkmenbashi Refinery LPG Treatment Project

Challenge

Solution

• Develop project pilot plan

• Prepare civil and steel projects

• Pressure vessels and heat ex changers calculations

• Isometrical drawings

• Stress analysis

• Generate electrical and instrumentation projects

• Develop material req uisition forms

• Coordinate procurement activities

• Commissioning supervision

• Other all relevant works

• The aim of the Project is treatment of LPG gas which is output of coker

unit from H2S. Basic engineering is owned by Ax ens as LPG Treatment

Basic Engineering package.

Short project information:

Customer: Lotus Enerji

Location: Turkmenbashi, Turkmenistan

Start: 2014

Finish: Ongoing

Gizil Enerji

Page 27: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesTurkmenbashi Refinery TDSP Project

Challenge

Solution

• Controlling and approval of the documents prepared by Foster Wheeler

• All engineering activities out of Foster Wheeler scope

• Procurement activities

• Supplier relationship management

• The aim of the projects is to add a new DCU (Delayed Coker Unit), SDA

(Solvent Deasphalting Unit) and aux iliary services to the ex isting plant.

Short project information:

Customer: Lotus Enerji

Location: Turkmenbashi, Turkmenistan

Start: 2013

Finish: Ongoing

Gizil Enerji

Page 28: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Tank FarmsOur S elected Works

Gizil Enerji

Page 29: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesAkım Tek Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Akım Tek Ankara

Güvercinlik Plant in the contex t of SEVESO II compliance works

Short project information:

Customer: Armada Danış manlık

Location: Ankara, Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 30: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesLikit Kimya Ex proof Tanks Turnkey Project

Challenge

Solution

• Inspection of as-is stituation

• Definition and classification of haz ordous z one areas

• Engineering calculations and selection of suitable products

• Prepare data sheets

• Material req uisition forms

• Develop cable list

• Lighting projects

• Installation on site

• Commissioning and startup activities

• The aim of the project is transforming of the tank dykes in Likit Kimya

Tekirdağ plant into ex proof with the suitable mechanical, electrical and

automation products.

Short project information:

Customer: Likit Kimya

Location: Tekirdağ , Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 31: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesLikit Kimya Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Likit Kimya

Tekirdağ plant in the contex t of SEVESO II compliance works

Short project information:

Customer: Likit Kimya

Location: Tekirdağ , Turkey

Start: February, 2015

Finish: Ongoing

Gizil Enerji

Page 32: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesAkç a Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Akç a Gaz ’s

plants in the contex t of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Kocaeli-Deniz li, Turkey

Start: J anuary, 2016

Finish: Ongoing

Gizil Enerji

Page 33: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesMir Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Mir Gaz Kırıkkale

plant in the contex t of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Kırıkkale, Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 34: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Referencesİpragaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• P&ID and PFDs of 19 different sites studied in 3 months

• Steam and water lines addition to the LPG, propane, hydraulic and fire

fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc

• The aim of the project is drawing of P&IDs and PFDs of İpragaz ’s 19

plants in the contex t of SEVESO II compliance works

Short project information:

Customer: Türk Loydu

Location: İstanbul, Turkey

Start: April, 2015

Finish: J uly, 2015

Gizil Enerji

Page 35: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesHabaş Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• P&ID and PFDs of 6 different sites studied in 2 months

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Habas’s 6 plants

in the contex t of SEVESO II compliance works

Short project information:

Customer: Habaş

Location: İstanbul, Turkey

Start: August, 2015

Finish: October, 2015

Gizil Enerji

Page 36: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesEr Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of ErGaz ’s 8 plants

in the contex t of SEVESO II compliance works

Short project information:

Customer: Ergaz

Location: Istanbul, Turkey

Start: December, 2015

Finish: Ongoing

Gizil Enerji

Page 37: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesAnt Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Ant Gaz ’s plant

in the contex t of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Antalya, Turkey

Start: December, 2015

Finish: J anuary, 2015

Gizil Enerji

Page 38: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesAnadolu Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• P&ID and PFDs of 4 different sites studied in 1 month

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Anadolugaz ’s 4

plants in the contex t of SEVESO II compliance works

Short project information:

Customer: Anadolu Gaz

Location: Ankara, Turkey

Start: J une, 2015

Finish: August, 2015

Gizil Enerji

Page 39: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

IndustryOur S elected Works

Gizil Enerji

Page 40: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesMKE Barutsan Seveso II P&ID and PFD Works

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All relevant lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Barutsan’s several units’ in

the contex t of SEVESO II compliance works

Short project information:

Customer: Armada Danış manlık

Location: Ankara, Turkey

Start: March, 2016

Finish: Ongoing

Gizil Enerji

Page 41: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesLafarge Conveyor Automation Project

Challenge

Solution

• Procurement of all electrical and instrumentation eq uipment

• Prepare data sheets

• Material req uisition forms

• Cable routings and projects

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is automation of cement conveyor line constructed

by Intra Danismanlik

Short project information:

Customer: Intra Danismanlik

Location: France

Start: August, 2015

Finish: Ongoing

Gizil Enerji

Page 42: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesKümaş Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1: 2015 and BS EN ISO

10628-2: 2012 global standards buy using Autocad Plant 3d software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZ OP and SIL studies showed

additionally to mechanical eq uipment and piping

• Numbering standardiz ation developed and implemented for all relevant

eq uipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Kümaş

Manyez it Sanayi plant in the contex t of SEVESO II compliance works

Short project information:

Customer: TMGD A.Ş.

Location: Kütahya, Turkey

Start: March, 2016

Finish: Ongoing

Gizil Enerji

Page 43: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesAksa Akrilik Piping and Instrumentation Diagrams

Challenge

Solution

• All P&IDs are created according to BS EN ISO 10628-1: 2015 and BS EN

ISO 10628-2: 2012 global standards buy using Autocad Plant 3d software.

• The aim of the project is revision of some P&IDs in the contex t of

SEVESO II compliance works

Short project information:

Customer: Proje Diz ayn

Location: Yalova, Turkey

Start: 2015

Finish: Finished

Gizil Enerji

Page 44: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesClariant Piping and Instrumentation Diagrams

Challenge

Solution

• All P&IDs are created according to BS EN ISO 10628-1: 2015 and BS EN

ISO 10628-2: 2012 global standards buy using Autocad Plant 3d software.

• The aim of the project is revision of some P&IDs in the contex t of

SEVESO II compliance works

Short project information:

Customer: Aveskon

Location: Kocaeli, Turkey

Start: 2015

Finish: Finished

Gizil Enerji

Page 45: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

Power PlantsOur S elected Works

Gizil Enerji

Page 46: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesGSD AS CCPP in Georgia

Challenge

Solution

• Relevant pipe hangers are manufactured and delivered in very short time

schedule which is only 4 week days.

• The customer is asking for the relevant pipe hangers in very short

delivery time which is critical to the rest of the process

Short project information:

Customer: GSD A.Ş.

Location: Georgia

Start: April, 2015

Finish: May, 2015

Gizil Enerji

Page 47: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ReferencesActions speak louder than voice

ʻʻOur philosophy is what you do is more important than

what you say. So, let’s talk to our customers.

Gizil Enerji

Page 48: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ContactKeep in Touch

ʻʻWe remain at your disposal

Do not hesitate to contact us whenever you need…

6

Gizil Enerji

Page 49: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

ContactWe remain at your disposal

Address: Esentepe Mah. Milangaz Cad. No:77 A2 Blok

D: 217 34860 Dumankaya Viz yon Plaz a, Kartal-İstanbul

Phone: +90 (216) 5 11 5 9 43

E-mail: info@giz ilenerji.com.tr

www.gizilenerji.com.tr

Direct Contact:

Esma Gulten Can

E-mail: esmagulten@giz ilenerji.com.tr

ʻʻIf you have any support, please feel free to

contact us:

Gizil Enerji

Page 50: THE COMPANY - Gizil Enerji · THE COMPANY Gizil Enerji Sanayi ve Ticaret Ltd. Şti. April, 2016 | Istanbul/ Turkey

facebook.com/pages/Giz

il-Enerji-Sanayi-ve-

Ticaret-Ltd

https: //twitter.com/giz ile

nerji

https: //plus.google.com/

116727411885 693877723/a

bout

https: //tr.linkedin.com/c

ompany/giz il-enerji-

sanayi-ve-ticaret-ltd-ti

www.gizilenerji.com.tr GO

Follow Us!We are on the line!

Gizil Enerji


Recommended