The Concept of Design & Build, EPC and the Design, Build & Operate Dr. Götz-Sebastian Hök, PHD Adjudicator – Arbitrator FIDIC Legal Advisor, Friendly Reviewer FIDIC Updates
Transcript
Page 1: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The Concept of Design & Build, EPC and the

Design, Build & Operate

Dr. Götz-Sebastian Hök, PHD Adjudicator – Arbitrator FIDIC Legal Advisor, Friendly Reviewer FIDIC Updates

Page 2: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

EPC Strategy

EPCT STRATEGY

Establish Targets Assess Risk Call for Tenders Select Bidder Award Contract

Critical aspects Critical Aspects Why EPC? Establish suitable ITBs Critical aspects Critical Aspects Critical aspects

Targets No major unforeseeable risk Targets Capacities Supervision Capacities

Purpose Innovative design desirable Purpose Skills Design Review Capacities

Time Time Design Approach Contract Administration Capacities

Budget Budget etc. Programming

Quality Quality Risk Management

Example Power Plant

Assess Assess Assess Manage

1000 MEGAWATT Soil If Major unforeseeable Risk Achieveable? Capacities see above

Coal Fired Weather Yellow Book/ENAA Achieveable? Skills

Industrial end users Existing Facility Innovative design is desirable Achieveable? Design Approach

Etc. Environment Own supervision and management capacities available Achieveable? Etc.

Etc. Etc. Etc.

Manage the Contract Pro-

actively

Decide on the

Procurement Strategy

Assess and Negotiate the

Design

Identify all

aspects and

factors

which are

likely to

impact price

and time

Project Management

Capacities limited

Suitable Supervision and

Contract administration

capacities available

The Concepts

Page 3: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Common Element

The Concepts

Page 4: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Distinct Elements D

est

inct

Ele

men

ts:

Design & Build Contractor assumes more duties & risks

EPC Contractor shall hand

over an operational plant

Design, Build & Operate

Contractor assumes a third responsiblility

Close to EPC plus operation

The Concepts

Page 5: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Thesis

• Cornerstones

– Design [Capacities]

– Management [Capacities]

– Construction [Capacities]

– Operation [Capacities] (if required)

The Concepts

One

Single

Contractor

on Site

Page 6: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Design as a holistic approach

6

The Concepts

Page 9: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Risk Management

SYSTEMATIC RISK MANAGEMENT

Procurement

Procedure

Contract

Period

Procurement

Strategy

Select

appropriate

and suitable

D&B

Contractor

Determine

suitable

Procurement

Route and

Risk

Follow up

Risk

Comply with

precontrac-

tual Duties

Manage Risk

and Settle

Claims

Identify and

Assess Risk

The Concepts

Page 10: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Currently the following standard forms which are suitable for

international EPC and turnkey contracts are available:

1. New Engineering Contracts, 3rd edition (NEC3), Option C - Target

contract with activity schedule (lump sum based target cost)

2. FIDIC Yellow and Silver Book, 1999 edition

3. FIDIC Orange Book, 1995

4. ENAA Contract Model Form for Plant

5. FIDIC Design, Build & Operate (DBO) form of Contract, 2008

Further standard forms of contract have been published:

1. ORGALIME Turnkey Contract for Industrial Works, 2003

2. European International Contractors (EIC) Turnkey Contract

The Concepts

Page 12: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

NEC3

Pre

con

trac

t P

has

e

limited precontractual duties as per S-C 60.2

Co

ntr

act

Dat

e

Star

tin

g D

ate

Acc

ess

Dat

e

No Works on Site until the first access date

Co

mp

leti

on

Cer

tifi

cate

PM decides the date of actual completion and certifies Completion within one week of Completion - The defects period starts.

Def

ects

Dat

e (

as p

er C

D)

expiry of delay for notifying defects

Def

ects

Cer

tifi

cate

The Concepts

Page 13: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The ECC / NEC is a procedurally based

contract kit consisting of core clauses, six pricing

options and further secondary options,

one of which must or may (as the case may

be) be chosen for each contract. The

kit comprises:

The Concepts

Page 14: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

NEC3 • NEC3 has been published in 2005 and was updated in 2013. The key Options in the Construction Contract (ECC) April 2013

edition are: • • The Main Options: •

– Option A - Priced contract with activity schedules – Option B - Priced contract with bills of quantities – Option C - Target contract with activity schedules – Option D - Target contract with bills of quantities – Option E - Cost reimbursable contract. – Option F - Management contract.

• • The Secondary Options: •

– X1 – Price adjustment for inflation. – X2 – Changes in law. – X3 – Multiple currencies (used only with options A & B) – X4 – Parent company guarantee. – X5 – Sectional completion. – X6 – Bonus for early completion. – X7 – Delay damages. – X12 – Partnering – X13 – Performance bond. – X14 – Advanced payment to the Contractor. – X15 – Limitation of the Contractor’s design liability to reasonable skill and care. – X16 – Retention. – X17 – Low performance damages. – X18 – Limitation of liability. – X20 – Key Performance Indicators (not used with option X12).

The Concepts

Page 15: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

FIDIC P

reco

ntra

ct P

has

e

Extensive precontractual Contractor´s duties to acquaint himself with working and environmental conditions

Co

ntra

ct D

ate

Co

mm

ence

men

t D

ate

followed by design and build period

Taki

ng-

Ove

r C

ert

ific

ate

followed by Tests after Completion and the Defects Notifcation Period

Per

form

ance

Cer

tifi

cate

followed by return of Performance Security and Final Payment

The Concepts

Page 16: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

FIDIC PROJECT DEVELOPMENT UNDER FIDIC

DECISION DECISION START START START START PLANT Fully

Proceed Proceed Issue of tender Issue of ContractContract installed. operational

with with with dossier tender awards awards Start

feasibility project P&DB dossier P&DB CONS commissioning

study strategy design EPCT CONS EPCT

Basic Consideration Project inception APPOINTMENT OF CONSULTING ENGINEER

and project strategy and identification (AND OTHER SPECIALIST ADVISERS )

Initial studies FEASIBILITY

REPORT

Feasibility studies,

including budgets PROJECT Plant & Design-Build: P&DB

STRATEGY MANUAL EPC/Turnkey: EPCT

Project strategy The Period after contract award

including financing are not covered by this guide

CONTRACTOR SELECTION

Programming Project and contracts

programmes

CONTRACTOR TYPE SELECTED

Employer's design and /or Conceptual design

Requirements ALL PERMISSIONS Notes:

Detailed design OBTAINED FOR 1 Activities shown are sequentially indicative only and are not shown to any timescale.

(by Employer for CONS) PROJET TO PROCEED 2 Somme activities may start before approval/authorisation/permission has been obtained. Under certain administrations

this may not be possible, and the overall programme would be correspondingly lenghtened.

Selection of contractor Prequalification of 3 In addition to the three major contract types of CONS, P&DB and EPTC shown on the chart, the other contract forms for

tenderers Minor Works, Dredging and Reclamation Works, and Design, Build and Operate Projects may be used, as appropriate to

the circumstances.

Prepare tender 4 The design for the works may be carried out "in-house" by the employer, or undertaken by a consulting engineer retained

dossier under an agreement with the employer or the contractor, as appropriate to the form of contract.

Tender Period

Tender evaluation

CONTRACT AWARD

Contractor executes and Contractor design

complete the works (for P&DB & EPCT)

CONTRACT AWARD

Manufacture, construction

and installation

Testing and

commissioning

CONTRACT COMPLETE

Project in use Operation and

maintenance

PROJECT PROGRAMMING

Proceed

DECISION

estimate &

The Concepts

Page 17: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

ENAA

Period

Milestone /

Activity

Proper

Examination

Data (S-Cl. 9.2 )

Visual

inspection of

the Site (S-Cl.

9.2)

Contract

Date

Commence-

ment (S-Cl. 8.1)

Testing (S-Cl.

23.1)

Completion

(operationally

and structurally)

Provision of

Staff by

Employer (S-Cl.

24.2)

Provision of

Raw Materials,

Lubricants, etc.

by Employer

Pre-

commissioning

(S-Cl. 24.3)

Completion

Certificate (S-

Cl. 24.5)

Commissioning

(S-Cl. 25.1.1)

Provision of

Personnel and

Raw Materials,

Lubricants etc.

by Employer (S-

Cl. 25.1.2)

Guarantee

Tests (S- 25.2)

Operational

Acceptance

Certificate (S-

Cl. 25.3.2)

Reparation,

Replacement,

Making Good (S-

Cl. 27.2)

Pre-Contract Design and Build Testing Commissioning Defect Liability Period

(including design, manufacture including

associated purchases and/or subcontracting,

installation and completion of the Facilities) (S-Cl.

9.1)

The Concepts

Page 18: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The ENAA activities and milestones shown in the timeline above are the following:

Period Milestone/Activity Pre-Contract Call for Tenders

Proper Examination Data (S-C 9.2) Visual inspection of the Site (S-C 9.2)

Design and Build Contract Date Commencement (S-C 8.1) Design, Manufacture (including associated purchases and/or subcontracting), Installation and Completion of the Facilities (S-C 9.1) Testing (S-C 23.1) Completion (operationally and structurally)

Testing Provision of Staff by Employer (S-C 24.2) Provision of Raw Materials, Lubricants, etc. by Employer (S-C 23.3 Pre-commissioning (S-C 24.3)

Completion Certificate (S-C. 24.5) Commissioning Commissioning (S-C 25.1.1)

Provision of Personnel and Raw Materials, Lubricants etc. by Employer (S-C 25.1.2) Guarantee Tests (S-C 25.2)

Operational Acceptance Certificate (S-C 25.3.2) Defect Liability Period Reparation, Replacement, Making Good (S-C 27.2)

Period

Milestone /

Activity

Proper

Examination

Data (S-Cl. 9.2 )

Visual

inspection of

the Site (S-Cl.

9.2)

Contract

Date

Commence-

ment (S-Cl. 8.1)

Testing (S-Cl.

23.1)

Completion

(operationally

and structurally)

Provision of

Staff by

Employer (S-Cl.

24.2)

Provision of

Raw Materials,

Lubricants, etc.

by Employer

Pre-

commissioning

(S-Cl. 24.3)

Completion

Certificate (S-

Cl. 24.5)

Commissioning

(S-Cl. 25.1.1)

Provision of

Personnel and

Raw Materials,

Lubricants etc.

by Employer (S-

Cl. 25.1.2)

Guarantee

Tests (S- 25.2)

Operational

Acceptance

Certificate (S-

Cl. 25.3.2)

Reparation,

Replacement,

Making Good (S-

Cl. 27.2)

Pre-Contract Design and Build Testing Commissioning Defect Liability Period

(including design, manufacture including

associated purchases and/or subcontracting,

installation and completion of the Facilities) (S-Cl.

9.1)

The Concepts

Page 19: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

19 19

The Concepts

In practice first comes the feasibility study and then comes the strategy followed by the decision on the procurement route and then the decision on the standard form of contract.

For the purpose of this presentation we start with a short introducton to the standard forms

Page 20: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

© Dr. Hök 20

The Concepts

Page 21: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Yellow Book

Timeline

Build DNP

Submission of Tender

Pre Contract

Base Date

Contract Date

Taking-Over Certificate

28 Days

21

+ 28 Days Security

Commencement Date

Notice Programme Tests

Performance Certificate

Tests

Liability for DD

Tests

The Concepts

Page 22: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger

Employer

Engineer

Contractor

Design / Planning

Build / Construction

Dispute Adjudication Board

22

The Concepts

Page 23: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger

Employer § 2

Employer‘s Requirements § 1.1.1.5, § 5.1

- Functional Description

- Scope of Works

- Performance Description

- Performance Specification

- Quality Predetermination

- Performance Datas

- Outline Design

- Site Supervision

- Contract Management

- Contract Administration

- Instructions / Variations

- Determinations

- Certificates ( Payment / Hand

Over )

- Inspections, Tests

Contractor § 4

Design

Execution

Employer‘s Requirements Engineer

Completion

Remedy any Defects

Engineer § 3

23

The Concepts

Page 24: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

© Dr. Hök 24

The Concepts

Page 25: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger 25

The Concepts

Page 26: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

© Dr. Hök 26

The Concepts

Page 27: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Silver Book

Timeline

Build DNP

Submission of Tender

Pre Contract

Base Date

Contract Date

Taking-Over Certificate

28 Days

27

+ 28 Days Security

Commencement Date

Notice Programme Tests

Performance Certificate

Tests

Liability for DD

Tests

Page 28: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger

Employer

Representative

Contractor

Design / Planning

Build / Construction

Dispute Adjudication Board

change liability clause

28

The Concepts

Page 29: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger

Employer § 2

Employer‘s Requirements § 1.1.1.3, § 5.1 (a) to (d)

- Functional Description

- Scope of Works

- Performance Description

- Performance Specification

- Quality Predetermination

- Performance Datas

- Outline Design

- Site Supervision

- Contract Management

- Contract Administration

- Instructions / Variations

- Determinations

- Certificates ( Payment / Hand Over)

- Inspections, Tests

Contractor § 4

Design

Execution

Employer‘s Requirements Employer´s Representative

Completion

Remedy any Defects

Representative § 3

Tender and any other docs

Recommendation or

Requirement

29

The Concepts

Page 30: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

© Dr. Hök 30

EPC Projects under FIDIC

Page 31: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger 31

EPC Projects under FIDIC

Page 32: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger 32

The Concepts

Page 33: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

DBO Timeline DBO TIMELINE

Design-Build Period Operation service Period

The DBO Contract Aggregate of Design-Build and Operation Periods

Commence

ment Date 8.1

Commissioning

Certificate 11.7

Contract

Completion Certificate 8.6

The Concepts

Page 34: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Employer

Representative

Contractor

Design / Planning

Build / Construction Dispute Adjudication Board

change liability clause

34

The Concepts

Operation / Maintenance

Page 35: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Gold Book

Timeline

Design & Build

Operation

Submission of Tender

Pre Contract

Base Date

Contract Date

Commissioning Certificate

Contract Completion Certificate

28 Days

The Concepts

Notice Pro-

gramme Tests

Commencement Date

Mainte-nance

Replace-ments

Hand-back

Retention Period

> 5 years

> 5 years

Page 36: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger

Employer § 2

Employer‘s Requirements § 1.1.1.3, § 5.1 (a) to (d)

- Functional Description

- Scope of Works

- Performance Description

- Performance Specification

- Quality Predetermination

- Performance Datas

- Operation Requirements

- Outline Design

- Site Supervision

- Contract Management

- Contract Administration

- Instructions / Variations

- Determinations

- Certificates ( Payment / Hand Over)

- Inspections, Tests

Contractor § 4

Design

Execution

Employer‘s Requirements Employer´s Representative

Completion

Remedy any Defects

Representative § 3

Tender and any other docs

Recommendation or

Requirement

36

The Concepts

Page 37: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger 37

The Concepts

Page 38: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

DBO stands for New FIDIC Features For the purposes of the Operation Service Period FIDIC has established some new features:

Operation Management Requirements: This document is subject to a definition in Sub-Clause 1.1.55 and means the set of procedures and requirements, provided by the Employer, included in the Employer’s Requirements for the proper implementation of the Contract. This document is supposed to be prepared by the Employer in forms part of the tender pack.

Operation and Maintenance Plan: This document is subject to a definition in Sub-Clause 1.1.56 and means the plan for operating and maintaining the facility, submitted by the Contractor, and agreed and included in the Contract. It forms part of the Contractor´s Proposal and shall therefore be prepared by the Contractor at tender stage.

Operation and Maintenance Manuals: These documents shall be prepared by the Contractor in accordance with the Employer´s Requirements. The documents shall be submitted to the Employer’s Representative prior to the commencement of the Commissioning Period as provided for in Sub-Clause 5.6. Thus the development of this document forms part of the Contractor´s services under the Contract.

The Concepts

Page 39: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

DBO stands for New FIDIC Features The Asset Replacement Fund: This document is subject to a definition in Sub-Clause 1.1.2 and means the fund provided for under Sub-Clause 14.18. It forms part of the Accepted Contract Amount which means that the Contractor shall calculate the needs for replacements at tender stage which requires a sound design approach.

The Asset Replacement Schedule is subject to a definition ins Sub-Clause 1.1.3 and means the schedule referred to in Sub-Clause 14.5 prepared by the Contractor covering the identification and timing of asset replacements. Since this document presupposes a full design it cannot become established prior Contract.

Operation Service Operating Licence: This document is subject to a definition in Sub-Clause 1.1.54 and means the licence referred to in Sub-Clause 1.7. It is intended to grant the legal authorization enabling the Contractor to operate and maintain the Works.

Handback Requirements: The “handback requirements” are referred to in Sub-Clause 8.7 and form part of the Employer’s Requirements. They include residual life requirements and may define the condition in which the Works shall be handed over at the end of the Operation Service Period. It is worth to note that the FIDIC Gold Book assumes that the Works shall not be operated after the expiry of the Operation Service Period. The “handback requirements” may extend the planned use of the Works which will obviously increase the Contract Price.

The Concepts

Page 40: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Guide

published 2000

Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger 40

The Concepts

Page 42: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

42

The Concepts

Page 43: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

43 43

The Concepts

Page 44: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

44

The Concepts

Page 45: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Development of Employer´s Requirements

Dr. Götz-Sebastian Hök, PHD Adjudicator – Arbitrator FIDIC Legal Advisor, Friendly Reviewer FIDIC Updates

Page 46: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Aims

• Employer´s Requirements (FIDIC) or Works Information (NEC) shall determine

– the scope of the services (design and build – and operation as an option) with the objective

• of allowing innovative design and design competition

• of assuring a fully operational plant during the Operation Service Period (optional)

The Employer´s Requirements

Page 47: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The Legal Dimension

• Al-Ġarar الغرر→

• Transactions, where the details in respect of supplies / goods / services are unknown, risky or uncertain, there is a risk that such a trade is similar to gambling.

The Employer´s Requirements

Page 48: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The Legal Dimension (FIDIC Approach)

• 1.1.1.5 “Employer's Requirements” means the document entitled employer's requirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works

The Employer´s Requirements

Page 49: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The Legal Dimension (NEC Approach)

• Sub-Clause 20.1 NEC3 reads: The Contractor designs the parts of the works which the Works Information states he is to design.

• Option X 15 proposes a limitation to skill and care only.

The Employer´s Requirements

Page 50: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The Employer´s Requirements

Page 51: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

51

The Employer´s Requirements

Page 52: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

52

The Employer´s Requirements

Page 53: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

53

The Employer´s Requirements

Page 54: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

54

The Employer´s Requirements

Page 55: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

55

The Employer´s Requirements

Page 56: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

• A design brief or performance specification for Works designed by Contractor should typically include the following minimum specifications: – purpose of the Works – size or space limitations – applicable design standards and codes of practice – materials and workmanship specifications (as the case may

be) with reference to applicable standards – loading and capacity requirements (as the case may be) – operational performance and output requirements – residual life requirements – interface requirements (cooperation)

• See NEC3 Guidance Notes, 2013, at page 22; FIDIC Procurement Procedures Guide, 2011, at page 130.

The Employer´s Requirements

Page 57: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

The FIDIC Procurement Procedures Guide lists a more comprehensive set of typical “employer´s requirements” as

follows: Definition of the location of the Site Definition and purpose of the Works Scope, design and other technical criteria Applicable technical standards, codes and regulations Quality and performance criteria Permissions to be obtained by the employer Customs requirements Proposed or required time programmes Phased possession of foundations, structures, plant or means of access Other Contractors on the Site Setting-Out points, lines and levels of reference Involvement of third parties Environmental constraints Access constraints: road, rail, air, and sea Electricity, water, gas and other services available on the Site

Employer´s equipment and free-issue materials Contractor´s documents required, and whether required for information, review and/or approval, and number of copies Criteria for design personnel Facilities for the employer, the engineer and his representative, as well as for the contractor´s personnel Samples Testing during manufacture and/or installation and construction Tests on Completion Damages for failure to pass Tests on Completion Operational training for the employer´s personnel As-built drawings and other records of the works Operation and Maintenance Manuals Tests after Completion Damages for failure to pass tests after completion Provisional Sums

The Employer´s Requirements

Page 58: The Concept of Design & Build, EPC and the Design, Build ... · The Concept of Design & Build, EPC and the Design, Build & Operate ... Adjudicator – Arbitrator FIDIC Legal Advisor,

Special FIDIC Requirements

Clause Description

1.1.1.5 Specification of purpose, scope, and/or design and/or other technical criteria, for the Works

1.1.6.3 Apparatus, machinery and vehicles (if any) made available by the Employer for the use of the Contractor in the execution of the Works

1.8 Number of copies of Contractor's Documents 1.13 Permissions being obtained by the Employer 2.1 Phased possession of foundations, structures,

plant or means of access 4.1 Intended purposes for which the Works are

required 4.6 Other contractors (and others) on the Site

(Cooperation Requirements) 4.7 Setting-out points, lines and levels of

reference (express reference to ER missing) 4.14 Third parties 4.18 Environmental constraints 4.19 Electricity, water, gas and other services

available on the Site 4.20 Employer's Equipment and free-issue

material 5.1 Criteria for design personnel

Clause Description

5.2 Contractor's Documents required, and whether for approval

5.4 Technical standards and building regulations 5.5 Operational training for the Employer's

Personnel

5.6 As-built drawings and other records of the Works

5.7 Operation and maintenance manuals 6.1 Particular arrangements for the engagement

of all staff and labour

6.6 Facilities for Personnel 7.2 Samples 7.4 Testing during manufacture and/or

construction

7.8 Royalties 8.3 Programming requirements 9.1 Tests on Completion 9.4 Damages for failure to pass Tests on

Completion (express reference to ER missing)

12.1 Tests after Completion (express reference to ER missing)

12.4 Damages for failure to pass Tests after Completion (express reference to ER missing)

The Employer´s Requirements


Recommended