The cost challenge on the NCS The Young Energy Conference 2014, Stavanger - 20.11.2014 Grethe Moen, CEO, Petoro AS
Transcript
Page 1: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

The cost challenge on the NCS

The Young Energy Conference 2014, Stavanger - 20.11.2014Grethe Moen, CEO, Petoro AS

Page 2: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Statoil is established

Statoil too big, SDFI takes over half of the assets

Statoil lists on thestock exchange,

Petoro is established

Petoro managesthe SDFI

Statoil Hydro merger, a milestone

1972 1985 1985-2001 2001 2007

2

History of SDFI and PetoroA short lesson in 1 minute

The cost challenge on the NCS

Page 3: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Share in 34 producing fields

ExplorationNew fielddevelopments

Oil and gas infrastructure

Net Cash FlowOPEXCAPEX Revenue

SDFI – large values at stake for the state

NOK 33 bn NOK 40 bn NOK 197 Bn NOK 125 Bn

Turn

ing

Pet(ro

leum

) into

Oro

The cost challenge on the NCS

International oil companies|

Others

20 bn boe remaining reserves

Share in 179 licenses per31.12.13

Page 4: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

A new oil crisis?

The cost challenge on the NCS4

OpportunityDanger

Page 5: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

From volume to value, the need for higher efficiency emphasized

• Stronger prioritization of capital – directed by need to improve profitability

• Cutting activity reduces value creation opportunities

• Need for increased efficiency in the value chain

• An opportunity!

The cost challenge on the NCS5

?

Page 6: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Doubling CAPEX is not deliveringproduction growth

6

Source: Petoro

ACTUAL FORECAST

Su

m b

ud

get

per

field

Mil

l N

OK

(n

om

inal)

Pro

du

cti

on

(kb

oed

)

Production oil, NGL, cond Production gas Field developments Production drillingConcept studies OPEX

The cost challenge on the NCS

Page 7: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Dramatic increase in well costs

• Well costs on fixed installations doubled since 2009

• Well costs on floating units doubled since 2006, levelling off?

• Cost prognosis does not reflect history

7 The cost challenge on the NCS

Page 8: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Better before - Drilling tasks takes twice as long

Perc

ent

incre

ase in t

ime fro

m 1

992-9

5 t

o 2

008-1

3

8

Source: Petoro

Analysis:

Same fields – same wells

1992-95 versus 2008- 13

Drilling from surface to top reservoir

Selected, representative routine operations

The cost challenge on the NCS

Page 9: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

The cost challenge on the NCS9

Radical approach is required to meet the reserve ambitions on mature fields: 6 fields – 10 fixed installations

Page 10: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Radical approach is required to meet the reserve ambitions on mature fields: 6 fields – 10 fixed installations

The cost challenge on the NCS10

Page 11: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Future fields are dominated by smaller reserves – well costs critical for profitability

The cost challenge on the NCS11

Discoveries (per February 2014) in addition to:Johan Sverdrup (315 million Sm³ o.e) + Johan Castberg (86 million Sm³)

Source: OD/ Strategikonferansen 2014, Petoro

49 %

21 %

16 %

9 %5 %

Cost split, subsea development

Boring og kompl.

Havbunnssystem

Rørledning og marineoperasjoner

Topside mod

Prosjektledelse

Approx. 3 mill Sm3 oil: smallest profitable development w/ four well template

Example: Field X (oil, one template w/ 4 wells)

Source: Petoro

Drilling and completion

Pipeline and marine operations

Subsea systems

Project management

Topside modifications

Oil Gas

Reco

vera

ble

reserv

es, m

illi

on

Sm

³ o

.e

Page 12: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Only long term focus and radical initiatives will deliver radical improvement – «several more stones to turn»…

New areas/ presently less focus:

• Contract incentives to drive efficiency

• One team – operator and supplier equal partners

• New technology to drive efficiency

• Faster technology deployment

12

Technology

OrganizationWork

processes

The cost challenge on the NCS

Page 13: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Seize the opportunity and involve yourself

• Deliver quality, every time - will build trust

• Be proactive – not reactive

• Dare to challenge the established thinking and to make mistakes

• You and your new ideas are an important part of the solution

The cost challenge on the NCS13

Opportunity

Danger

Page 14: The cost challenge on the NCS - petoro.no cost challenge on the NCS.pdf · radical improvement –«several more stones to turn»… New areas/ presently less focus: • Contract

Change through co-operation –a long history on NCS

• HSE

• Business driven technology development and fast implementation

• Industry appointed committees and initiatives – NORSOK

• Government appointed committees and initiatives -white papers

• Field specific change processes on the NCS

14 The cost challenge on the NCS