Date post: | 18-Jan-2016 |
Category: |
Documents |
Upload: | ilene-carson |
View: | 218 times |
Download: | 0 times |
THE DRAFT CAMPO 2040 REGIONAL TRANSPORTATION
PLANMobile Meeting Presentation
AGENDA
CAMPO REGION
• Six counties encompassing 5,302 square miles
• 1.7 million people
• 12,420 lane miles of roadway
• 41.8 million miles traveled by vehicles every day
• 31.2 million transit boarding each year
MPO PURPOSE
• Produce a 20-year fiscally constrained transportation plan every 5 years
• Produce a 4-year Transportation Improvement Program
• Provide a centralized place for continuing, cooperative, and comprehensive transportation planning
2040 PLAN PURPOSE
• Identify Strategic Transportation Investments
• Develop Multi-modal Transportation System
• Meet the Needs of a Growing Region• Allocate Scarce Funding
2040 DEMOGRAPHICS
2040 FUNDING FORECAST IN BILLIONS
SCENARIOS CONSIDERED
PREFERRED SCENARIO
• $4.25 billion investment to improve IH 35 and surrounding roads
• Includes grouped projects and 100% locally funded projects
PREFERRED SCENARIO
• $605 M investment in transit, local roads, bicycle, and pedestrian paths
THERE IS NO SILVER BULLET
Adding capacity is just one of the strategies we are pursuing
Source: 2013 Mobility Report, Austin Chamber of Commerce
TRANSPORTATION SYSTEM MANAGEMENT
• Intelligent Transportation System• Tolling• Incident Management• Access Management (limiting number,
placement of driveways) • Grade Separation • Intersection & Traffic Flow Improvements • Land Use Planning
TRAVEL DEMAND MANAGEMENT STRATEGIES
• Public Transportation• Ridesharing
Programs/Incentives• Projects & Programs that
Encourage Bicycle and Pedestrian Travel
• Telework• Flextime
NEXT STEPS
2015 PRIORITIES
• Find Funding for Regional Priorities
• Expand Operations & Management
• Strengthen Our Regional Partnership
• Examine & Prioritize Our Regional Arterial Network
QUESTIONS/COMMENTS?