3/19/21 1 © Saifur Rahman 2021 Professor Saifur Rahman Director, Virginia Tech Advanced Research Inst., USA President, IEEE Power & Energy Society, 2018 & 2019 Candidate, IEEE President-elect The Electric Power System in Bangladesh Addressing the Planning, Operation and Training Issues Root BD Invited Talk 20 March 2021 1 © Saifur Rahman 2021 www.saifurrahman.org 2 2
Transcript
Page 1: The Electric Power System in Bangladesh Addressing the ...

3/19/21

1

© Saifur Rahman 2021

Professor Saifur RahmanDirector, Virginia Tech Advanced Research Inst., USAPresident, IEEE Power & Energy Society, 2018 & 2019Candidate, IEEE President-elect

TheElectricPowerSysteminBangladeshAddressingthePlanning,Operationand

TrainingIssues

RootBDInvitedTalk20March2021

1

© Saifur Rahman 2021

www.saifurrahman.org

2

2

Page 2: The Electric Power System in Bangladesh Addressing the ...

3/19/21

2

© Saifur Rahman 2021

RecentKeynoteSpeechesandInvitedTalks

3

3

© Saifur Rahman 2021

BangladeshPowerSectorChallengesandOpportunities

• AbundantGenerationCapacity• Gassupplyintermittency• Lackofadequatetransmissionfacility• Distributionnetworkisunreliable• Highdiurnalandseasonalloadvariations• Trainedmanpowertorun30GW+system

4

4

Page 3: The Electric Power System in Bangladesh Addressing the ...

3/19/21

3

© Saifur Rahman 2021

OpportunitiesforLoadFactorImprovementsandFuelSavings

5

5

© Saifur Rahman 2021

6

Max Temp 24 deg C

Source: PGCB

03 Feb 2020 Monday

8,963MW

6

Page 4: The Electric Power System in Bangladesh Addressing the ...

3/19/21

4

© Saifur Rahman 2021

7

Max Temp 34.8 deg C

Source: PGCB

04 Aug 2019 Sunday

12,655 MW

7

© Saifur Rahman 2021

FuelMixinElectricityGeneration(high)

Source:BangladeshPSMP8

8

Page 5: The Electric Power System in Bangladesh Addressing the ...

3/19/21

5

© Saifur Rahman 2021

FuelMixinElectricityGeneration(low)

Source:BangladeshPSMP9

9

© Saifur Rahman 2021

%FuelMixinGeneration(high)

Source:BangladeshPSMP10

10

Page 6: The Electric Power System in Bangladesh Addressing the ...

3/19/21

6

© Saifur Rahman 2021

%FuelMixinGeneration(low)

Source:BangladeshPSMP11

11

© Saifur Rahman 2021

Source:BangladeshPSMP12

12

Page 7: The Electric Power System in Bangladesh Addressing the ...

3/19/21

7

© Saifur Rahman 2021

OverDependanceonFossilFuelGlobalWarmingIssues

Year Hydro/Solar/Wind (%) Thermal (%)

2001 25.56 73.472016 33.80 63.772018 37.00 60.002030 52.00 42.00

China Fuel Mix

Source:Dr.Md.Shawkat Akbar,MDNPCBL

13

13

© Saifur Rahman 2021

14

Source:Dr.Md.Shawkat Akbar,MDNPCBL

14

Page 8: The Electric Power System in Bangladesh Addressing the ...

3/19/21

8

© Saifur Rahman 2021

15Source:Dr.Md.Shawkat Akbar,MDNPCBL

15

© Saifur Rahman 2021

Source:Dr.Md.Shawkat Akbar,MDNPCBL16

16

Page 9: The Electric Power System in Bangladesh Addressing the ...

3/19/21

9

AI : Big Data : Cloud :: Energy :: IoT : Automation : Connected Manufacturing

© Saifur Rahman 2021

Comparing100MWGasTurbinevsBESS

Source:Q.ZamanSource:Dr.Md.Shawkat Akbar,MDNPCBL

17

17

© Saifur Rahman 2021

Source:Dr.Md.Shawkat Akbar,MDNPCBL

2019

18

18

Page 10: The Electric Power System in Bangladesh Addressing the ...

3/19/21

10

© Saifur Rahman 2021

NuclearReactorVesselandSteamGenerator

19

19

© Saifur Rahman 2021

20

20

Page 11: The Electric Power System in Bangladesh Addressing the ...

3/19/21

11

© Saifur Rahman 2021

FinishedPlant2024/2025:Artist’sRendering

21

21

© Saifur Rahman 2021

Coal-firedPowerPlant:Challenges

Rampal Coal-fired 660 x 2 =1320 MW

Payra Coal-fired 660 x 2 = 1320 MW

Matarbari Coal-fired 600 x 2 = 1200 MW

Maheshkhali Coal-powered Generation Hub

By 2030 33-40% of power generation will come from Coal

22

22

Page 12: The Electric Power System in Bangladesh Addressing the ...

3/19/21

12

© Saifur Rahman 2021

23

23

© Saifur Rahman 2021

The Rampal Power Station is a proposed 1320 megawatt coal-fired power station at Rampal Upazila of Bagerhat District in Khulna, Bangladesh.[1]The proposed project, on an area of over 1834 acres of land, is situated 14 kilometresnorth of the world's largest mangrove forestSundarbans which is a UNESCO world heritage site.

24

24

Page 13: The Electric Power System in Bangladesh Addressing the ...

3/19/21

13

© Saifur Rahman 2021

ReliabilityandPowerQualityImprovements

25

25

© Saifur Rahman 2021

Shorttermchallenges

• Over-dependenceoncoal-firedgeneration• Abundant(partlyunused)generation• Stabilizegassupply• Buildmoretransmissionanddistributionfacilities• Trainedmanpowerchallenges• Over-dependanceonconsultants

26

26

Page 14: The Electric Power System in Bangladesh Addressing the ...

3/19/21

14

© Saifur Rahman 2021

ModernizationoftheBDPowerGrid

• Bangladeshpowergenerationmix&loadshape• Opportunitiesforloadfactorimprovement• Garmentsectordemanddynamics• BatteryEnergyStorageSystemasbackup• Reliabilityandpowerqualityimprovement• AroadmapforhardeningtheBDpowergrid

27

27

© Saifur Rahman 2021

WhatDoesBangladeshNeed?

GridModernization

28

28

Page 15: The Electric Power System in Bangladesh Addressing the ...

3/19/21

15

© Saifur Rahman 2021

AHardenedPowerGrid

• PaysattentiontoGeneration,TransmissionandDistribution

• MaintainsVoltage,Frequency,PowerQuality• MinimizesOutageandRecoversQuickly• OptimizestheCostofSystemOperation• AllowsSeamlessRenewablesIntegration• AllowsSmoothInterconnectionwithNeihgbours

29

29

© Saifur Rahman 2021

ThankYou