ISO/TS 16949-2002 ISO 14001
The Electroplating Sector: Compliance Assistance, Enforcement, and Pollution
Prevention
ISO/TS 16949-2002 ISO 14001
Elizabethtown, KY USA
COMPANY COMPANY OVERVIEWOVERVIEW
ISO/TS 16949-2002 ISO 14001
Location: Elizabethtown, Kentucky Ownership: 100% Akebono Brake Corporation Incorporated: July 18, 1986 SOP: May 1988 (GM, HONDA)
Land Size: 55 Acres Building Size: 348,000 SQ FT
Associates: 1,157 Total [ January 2007)
Work Schedule: 3 Shift/5 Day, Weekend Crews (3d/12 hr)
OUTLINE
““
ISO/TS 16949-2002 ISO 14001
AKEBONO BRAKE CORPORATION North American Facilities
• AKEBONO BRAKE – ELIZABETHTOWN PLANT, KY (1988)
• AKEBONO BRAKE – GLASGOW PLANT, KY (1994)
• AKEBONO ENGINEERING CENTER, MI (1998)
• AKEBONO BRAKE – SPRINGFIELD PLANT, KY (2001)
AKEBONO ENGINEERING
CENTER
AKEBONO BRAKE – ELIZABETHTOWN
PLANT
AKEBONO BRAKE –
SPRINGFIELD PLANT
AKEBONO BRAKE –
GLASGOW PLANT
ISO/TS 16949-2002 ISO 14001
DAILY PRODUCTION VOLUMES(BASED ON 2006 AVG.)
FRONT & REAR CAST IRON FRONT & REAR CAST IRON CALIPERS
27,500/27,500/DAYDAY
REAR INTEGRAL REAR INTEGRAL CCALIPERS
2,500/2,500/DAYDAY
REAR ALUMINUM REAR ALUMINUM CCALIPERS
3,500/3,500/DAYDAY
REAR DRUM REAR DRUM BRAKESBRAKES
11,000/11,000/DAYDAY
PAD PAD ASSEMBLIESASSEMBLIES
55,000/55,000/DAYDAY
ISO/TS 16949-2002 ISO 14001
PRODUCTSFRONT & REAR CAST IRON FRONT & REAR CAST IRON
CALIPERSCALIPERS
(SINGLE & DUAL PISTON)(SINGLE & DUAL PISTON)
REAR INTEGRAL & ALUMINUM REAR INTEGRAL & ALUMINUM CALIPERSCALIPERS
(SINGLE & DUAL PISTON)(SINGLE & DUAL PISTON)
REAR DRUM BRAKES REAR DRUM BRAKES
(DUO-SERVO & PARKING)(DUO-SERVO & PARKING)
FRONT & REAR PAD FRONT & REAR PAD ASSEMBLIES ASSEMBLIES
NAO - (NON-ASBESTOS NAO - (NON-ASBESTOS ORGANIC)ORGANIC)
ISO/TS 16949-2002 ISO 14001
CUSTOMER BASE - DOMESTICS
Solstice (Ft Caliper)
Malibu (Ft/Rr Caliper/Pad)
G6 (Ft/Rr Caliper/Pad)
Cobalt(Ft Caliper/Pad)
Saturn Ion(Ft Caliper/Pad)
Opel GT (Ft Caliper)
Saturn Sky (Ft Caliper)
Chevy Impala (Rr Caliper/Pad)
HRR (Ft Caliper/Pad)Grand Prix (Rr Caliper/Pad)
Cadillac DTS (Rr Caliper)
Rendezvous (Rr Caliper/Pad)
Monte Carlo (Rr Caliper/Pad)
Saturn Red Line (Fr Caliper/Pad)
Pontiac Pursuit (Fr Caliper/Pad)
Lacrosse (Rr Caliper/Pad)
LeSabre (Rr Caliper)
ISO/TS 16949-2002 ISO 14001
CUSTOMER BASE - DOMESTICS
Buick Terraza (Rr Caliper)
Chevy Trailblazer (Rr Pad)Chevy Uplander (Rr Caliper)
Saturn Relay (Rr Caliper)
Pontiac Montanna (Rr Caliper)
Envoy (Rr Pad)
Chevy Tahoe (Rr Caliper/Pad)
Suburban (Rr Caliper/Pad)
Chevy Express (Rr Caliper/Pad)
Chevy Savanna (Rr Caliper/ Pad)
Ford Econoline (PKB)
ISO/TS 16949-2002 ISO 14001
CUSTOMER BASE - TRANSPLANTSToyota/Toyota/
NUMMINUMMIHONDAHONDA MITSUBISHIMITSUBISHI
Civic (Ft Calipers/Pads)
Accord (Ft Calipers/Pads)
Acura TL (Ft Pads)
MDX (Rr Caliper/Pads & PKB)
Pilot (100%)
Ridgeline (Ft Caliper/Pads, Rr Pads & PKB)
Element (Ft Calipers/Pads)
Corolla (100%)
Avalon (Rr Caliper)
Solara (Rr Caliper)
Matrix (Ft Caliper, Drum Brake)
Vibe (Ft Caliper, Drum Brake)
Eclipse / Spyder (100%)
Galant (100%)
Endeavor (PKB)
Tundra (Rr Caliper)
ISO/TS 16949-2002 ISO 14001
Mix & Blend
DA82
DA81
DA80
ED
P
BP70
BP71
BP72
BP73Pist
on
Mac
hini
ng
SL62
SL61
SL60
SL
63 /
64
AD
66
/ 67
US50 US52
US51 US53 Pho
spha
tor
E-
Nic
kel P
latt
er
Pist
on
Fini
shin
g
Pist
on
Mac
hini
ng
DM
3D
M2
DA3
DA2
Dis
c
Mai
nten
ance
/ Sto
re
DM
1
DA1G
ener
al
Sto
re
DM
8
DM
9
DM
10
DM
11
DM
12
DM
13Pl
atte
rDA13
DA12
DA11
DA10
DA9
DA8
Piston sub-assembly
DM
4D
M5
DM
7D
M6 DA4
DA5
DA7
DA6
Shipping & Receiving Docks
MP1
FB2
FB1
FB3
CO
3C
O2
HP
4
HP
5H
P6
HP
7
ST1
CO
1
HP3
HP2
HP1
ST2
CO
5
CO
4
HP
8
HP
9
Orbit-form
Kai
zen
Are
a
Quality Assurance
Disc Office
Front OfficeCAFETERIA
1
Fric
tion
Off
ice
Drum Office
Friction QC Office
Die Maintenance
DA14
Shim/Bond
HP
10
CO
5
Paint
Paint
Gri
nder
/Sco
rche
rG
rind
er/S
corc
her
MD
C
DM
14
DM
15
DM
16
DM
17
DA
15
SER
VIC
E
PDA
CA
FET
ER
EIA
/APS
Disc Brake Drum Brake/Piston Friction
PLANT LAYOUTAluminum
ISO/TS 16949-2002 ISO 14001
WATER CONSERVATION
Conductivity Flow Control of Rinse Water Volume
Counter Current Rinse Tanks on Metal Finishing Lines
Flow Restriction Devices on Individual Rinse Tanks
ISO/TS 16949-2002 ISO 14001
Conductivity Flow Control of Process Rinse Water
ISO/TS 16949-2002 ISO 14001
Conductivity Meter
ISO/TS 16949-2002 ISO 14001
Calibration of Conductivity Meter
ISO/TS 16949-2002 ISO 14001
First Stage Rinse Tank
ISO/TS 16949-2002 ISO 14001
Final Stage Rinse Tank
ISO/TS 16949-2002 ISO 14001
Two Stage Conductivity Controlled Rinse Tanks
ISO/TS 16949-2002 ISO 14001
CONDUCTIVITY FLOW CONTROL OF RINSE WATER VOLUME
Flow Control Based on Conductivity of First Stage Rinse Tank of Counter Current
Application
Conductivity Set Point Determined by Analysis of Rinse Water and its Effect on Painting Quality
Rinse Water Reduced in Painting Operation From 7,000 gpd to 2,500 gpd
ISO/TS 16949-2002 ISO 14001
Two Stage Counter Flow Rinse
ISO/TS 16949-2002 ISO 14001
KPPC ENERGY EFFICIENCY ASSESSMENT REPORT
• Major Energy Consuming Equipment: >10 h.p.• Energy Bill Analysis• Energy Management Opportunities• Financing Options
ISO/TS 16949-2002 ISO 14001
ENERGY MANAGEMENT OPPORTUNITIES
• Installation of infrared ovens• Recover waste heat from air compressors• Tie HVAC units into Trane Tracer Summit• Repair compressed air leaks• Install power factor correction banks• Replace 250W high pressure sodium fixtures• Install occupancy controls on facility lighting• Replace compressed air agitators in plating
tanks
ISO/TS 16949-2002 ISO 14001
CURRENT ENERGY MANAGEMENT PRACTICES
• Use outside air for compressor intake
• Purchase premium efficiency motors
• Reduce steam pressure from 100psi – 80 psi
• Use infrared ovens
• Use timers on conveyor motors
• Reduction in compressed air pressure
ISO/TS 16949-2002 ISO 14001
INCREASE THE CAPACITOR BANK ON ELECTRICAL SERVICE ENTRANCE
BEFORE-
Description: Electric Service Entrance
Problem: Power Factor below 90% resulting in penalty charge on electric bill
ISO/TS 16949-2002 ISO 14001
INCREASE THE CAPACITOR BANK ON ELECTRICAL SERVICE ENTRANCE
AFTER:
Description:
Electrical service entrance with additional 300 KVAR capacitor bank
Savings: Energy charges reduced $ 9,580.00 annually
ISO/TS 16949-2002 ISO 14001
IMPROVE EFFICIENCY OF PROCESS STEAM BOILERS
BEFORE:
DESCRIPTION:
Boiler #1 fire tubes during annual inspection
PROBLEM: Wasted heat results in higher gas stack gas temperatures and heat loss
ISO/TS 16949-2002 ISO 14001
IMPROVE EFFICIENCY OF PROCESS STEAM BOILERS
AFTER:DESCRIPTION:
Installation of “ fuel saver” turbulators reduce lost heat
COST SAVINGS: An annual energy savings of $ 9,940 was realized in reduced energy usage.
ISO/TS 16949-2002 ISO 14001
• Brake pads exiting the powder paint spray booth make their way by conveyor toward the infrared cure oven
ISO/TS 16949-2002 ISO 14001
EUROPEAN UNIONSUBSTANCES OF CONCERN
• In August of 2002, ABE began the conversion from hexavalent to trivalent chromium solutions on the first of ten zinc plating processes.
• Since 2002, seven zinc plating system have been converted to trivalent chromium with the remaining systems planned for completion by July 2007.
ISO/TS 16949-2002 ISO 14001
• The interior of a zinc plating system where trivalent chromium is applied to a disc brake
ISO/TS 16949-2002 ISO 14001
PROCESS MODIFICATIONS
• In 2003 , ABE installed its first powder paint system to begin the phase out of the solvent based painting process for pressure plates.
• Powder paint Line 2 was installed in April 2005 to complete the removal of four solvent based
painting systems
ISO/TS 16949-2002 ISO 14001
ENVIRONMENTAL BENEFITS
• A reduction of 6 tons / year of VOC and HAP emissions were realized with this
process change
• 15 tons / year reduction in hazardous waste generated from the liquid paint process
from 2003 thru 2006
ISO/TS 16949-2002 ISO 14001
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Po
un
ds
VO
C
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Years
Akebono - Elizabethtown VOC Emissions
Backing Plate Paint ( drum brake)
E015 / E016 P/P Adhesive
E014 Pressure Plate Primer
Hamatite Adhesive ( brake lining)
Methyl Ethyl Ketone thinner
Sundine 685W Primer
Pressure Plate Painting
TCE Batch Vapor Cleaning
Pow der Paint Line 1 Installation
Pow der Paint Line 2 Installation
Honda Approval for Pow der Paint
Surface Treatment 1 Conversion to Pow der Adhesive
Surface Treatment 2 conversion to Pow der Adhesive
ISO/TS 16949-2002 ISO 14001
ELECTROLESS NICKEL PLATINGBATH TREATMENT
Reduce Nickel Concentration by 90% in Spent Plating Baths Prior to Discharge into Onsite Pretreatment
Plant
Plate Out the Spent Bath on Metal Shavings Generated from the Manufacturing of Pistons used in the Disc
Brake Applications
Nickel Coated Metal Shavings Sent to Recycling Facility
ISO/TS 16949-2002 ISO 14001
ISO/TS 16949-2002 ISO 14001
ISO/TS 16949-2002 ISO 14001
ISO/TS 16949-2002 ISO 14001
Akebono – Elizabethtown
Plant received the inaugural
Kentucky Excel award in
May 2006 at the Master
Level
Akebono- Glasgow Plant
Received the the Kentucky
Excel award in April 2007 at
The master level.
Akebono- Springfield Plant
Received the Kentucky Excel
Award in April 2007 at the
Leadership level.